semi statoil equipment and material information statoil plant maintenance systems semi stid statoil...
TRANSCRIPT
SEMI Statoil Equipment and Material Information
Standardized methods and tools for equipment and material information
May 2015 2015-05-31Classification: Open
Comments to presentation placed in SEMI
• Statoil internal useThis presentation is used to introduce SEMI and should be run in Powerpointpresentation mode. The SEMI tool presentation is a number of screenshots and pdfcannot show slideshow with these details. For Statoil internal use this link instead: http://team.statoil.com/sites/ts-95261/_layouts/DocIdRedir.aspx?ID=d3d85ad6-0800-4209-8192-8044f75c08da&HintUrl=Presentations%2fSEMI+Oppl%c3%a6ring+May+2015.pptx
• Statoil external useThe pdf is the only available presentation.SEMI can only hold pdf files as source to documentation.
2015-04-242 Classification: Open
The purpose of this presentation
Increase knowledge of the SEMI solution in Statoil and enable implementation of SEMI in your LCI delivery
• SEMI project purpose and outcome
• Clarify requirements
• SEMI live demonstration
2015-05-133 Classification: Open
SEMI project purpose
Part of Statoil Technical Efficiency Programme (STEP) initiative to reduce cost in LCI*)
• Establish efficient and standardized methods and tools for standard equipment documentation
• Enable reuse of standard documentation
• Realize delivery of documentation for standard equipment according new LCI requirement
TR2381, chapter 2.3Documentation for standard equipment
4 Classification: Open 2015-05-13
*) LCI = Life Cycle Information
SEMI project outcome
5 Classification: Open 2015-05-13
• Launched the SEMI portal as a tool to handle standard equipmentwith standard documentation
• Implemented SEMI in LCI Solution in Statoil
• Established documentation in SEMI for selected Frame Agreements
• SEMI used in LCI solution will streamline the flow of all standard equipment documentation
• Enabling potential for reuse of documentation in every project for the same equipment
Training and implementation
• The main training method is a 2 hour presentation to relevant users followed by on-the-job training (self-driven) with SEMI user manual online
• Train the trainers who take over this task when the SEMI project is completed and demobilised
• Typical roles to be trained Discipline/frame agreement responsibleExternal users, relevant contractors and vendors responsible for LCI deliverablesMaterial managementLCI leads and standardization coordinators in greenfield projects
2015-04-246 Classification: Open
LCI Requirements
2015-04-247 Classification: Open
• TR2381, LCI Requirements New version 5 with high focus on standard equipment and standard documentation
• TR3111, LCI Requirements - Data content and transferStandard documentation linked to tag through Tag no/Manufacturer/Model number/Variant/Semi id
Equipment documentation for custom made or adapted equipment, documentation for assemblies. Documentation specific to
individual equipment and installation like calibration and testing documentation.
Documentation specific to the project delivery as SPIR lists, certificates of conformance.
ENS numbered Design documentation and ENS numbered Supplier
documentation that is specific for the plant or project.
Documentation from SEMI and
STID seamlessly integrated in
STIDtips and SAP
TR2381, 2.3 Documentation for standard equipment
Company's requirements
TR2381 Lifecycle Information Requirements
Standard equipment documentation
Contractors Design documentation
as per TR2381 section 3
Equipment documentation as per TR2381 section 4
Contractors LCI deliveries STID
Documentation per plant
SEMI: Repository for globally reusable documentation for
standard material
Contractors, suppliers and frame agreements contribute to standard
document registration in SEMI
SAP
STIDtips
LCI deliveries with the new SEMI solution
8 Classification: Open 2015-05-13
LCI delivery to Statoil
LCI delivery method to Statoil is divided in standard and non-standard documentation:
• Industry standard equipment documentation is delivered in SEMI
• Non-standard documentation is delivered in STID
Classification: Internal 2015-03-24
TR2381LCIRequirements
Chapter 3: Contractors design documentation
SAP Statoil plant maintenance systems
SEMI
STID
Statoil specific numbered design and supplier documentation that is custom-made for the plant or project
Manufacturer’s unmodified documentation containing all relevant information to purchase, preserve, install, operate and maintain the equipment.
Chapter 2.3: Standard documentation
Chapter 4: Equipment documentation
Repository for globally reusable documentation
Plant specificDocumentation
SEMI - Reuse of standard documentation
As it was: Documentation is reviewed, modified and duplicated. Reuse across projects and plants is not possible
Future with SEMI: SEMI will manage modell standard documentation i.e. no plant/project specific modification ofequipment or documentation. Enabeling reuse
10 Classification: Open 2015-05-13
Expectations to organisation
• Realising benefits from SEMI require change in behaviour
• Including use of SEMI for delivery of standard documentationin contracts and PO’s
• Using TR2381 chapter 2 to describe WHAT and partly HOW
• Identify roles and responsibilities regarding use of SEMI for internal and external actors
• Ensure sufficient training based on the SEMI projects “training of the trainers” philosophy
11 Classification: Open 2015-05-13
SEMI - Architecture and data flowSEMI database/web portalRegister models and documentation and retrieve model documentation
SAP / MDM Manufacturer register
ProCoSys
Manufacturer names synchronized from SAP/MDM
Basis for EquipmentTagNoManufacturerModelNoManufacturerPartNo(variant)SEMI-IDRFOC-dateSerialNo
TagNo to SAP creates FL and EquipmentNo
Always
MM-toolLinks SAP MM no
Optional
Exte
rnal
data
sou
rces
deliv
ers
mod
eldo
cum
enta
tion
SAP PMFunctional Location (FL)Equipment and materialC
PST
–C
ontra
ctor
s sy
stem
sim
plem
enta
tion
is c
ontra
ctor
sre
spon
sibi
llity
ManufacturerModelNoSEMI-ID
ManufacturerModelNoSEMI-ID
= TIE transport
12 Classification: Open 2015-05-13
TagNoManufacturerModelNoManufacturerPartNo(variant)SEMI-ID
SEMI - Content and QC responsibility
• Selected frame agreements (FA) product list with documentation is delivered from manufacturer to SEMI and checked and approved by Statoil FA responsible
• Contractor is responsible to establish, check and approve documentation in project,and if not in SEMI for project standard equipment - establish it
• Manufacturers can be granted access to SEMI and deliver their documentation in SEMI for contractor’s approval
• Approved models with documents represented by a SEMI id can be used in delivery on all tag using same equipment in any project
• Contractor is responsible to check model/variants and documentation when reusing approved documents from other projects
13 Classification: Open 2015-05-13
LCI Solution with SEMI - «Show and tell»
• SEMI - Access and login
• SEMI - Search
• SEMI - Creating new models and docs
• ProCoSys - Using SEMI id on tags
• SAP - FL and Equiment
• SEMI - Support
14 Classification: Open 2015-05-13
SEMI - Access
User name(short name for Statoilor email for external)
First name Last name Company RoleMobil phone(Externalusers only)
Duration(External usersonly) 3 - 36 mths
jdo John Doe Statoil Operator
jdo John Doe Statoil Superuser
[email protected] Ola-Andre Normann ACME LTD Edit +4741000000 24 Months
• All users must be defined in SEMI prior to use
• Statoil internal users will by default be given a role «Statoil - operator» to read all
• External users apply and will get access to their company or projects scope
• Mobil phone is essential for external access due to required SMS code for login
• SEMI user requests is sent as an email to [email protected] required information is as follows
15 Classification: Open 2015-05-13
SEMI - Login and scoping your user
• Login requires a personal user and a role
• Statoil internal userswill get read user at first use
• Set scope at first use and when needed in Upload documentation
• Use the menuto maneuver in SEMI functions
16 Classification: Open 2015-05-13
SEMI - Search
17 Classification: Open 2015-05-13
• “Search documentation” is a powerful and easy to use search engine and result can be filtered by attributes
• Select columnheader to sort the result
• Information elementsin list can be adjusted
• Select Model number to explore details including documentation
SEMI live demo - Search and presenting models
• Link to SEMI production data
http://semi.statoil.com/
18 Classification: Open 2015-05-13
SEMI - Create new Manufacturer Model
19 Classification: Open 2015-05-13
• To add a new model use the “Upload documentation” function
• Type in Manufacturer and select in list
• Enter model and press the “Look up model”
• If new it will be presentedas not yet documented
• Press to create
• Add Model description, Category and Typeand press “Continue” to create the new model
• New model is presentedand ready to add documents
SEMI - Create new documents to model
• Add a new document to model by adding document no, title and revison
• Drag and drop the file(s) representing the document
• Add a new doc by “New document” if needed
• Press “Complete”
• Press to edit/approve
• Check and press “Approve”
• Sign your approval
• Modell with documentation is approved and ready to be used in LCI
20 Classification: Open 2015-05-13
SEMI demo in semiqa - Create and Approval
• Link to semiqa and test data
https://semiqa.azurewebsites.net
21 Classification: Open 2015-05-13
SEMI - Support
• SEMI group mail as long as SEMI project exist (fase2 till Aug. 2015)Typical SEMI user requestsis sent as an email to [email protected]
• General support - services@statoilUse the LCI service pagesLCI Help & contacts
• AccessIT and specific SEMIservice page will replace groupmailduring in Q3 2015
22 Classification: Open 2015-05-13
Any questions or comments?
? !
23 Classification: Open 2015-05-13
Presentation title: SEMI, Statoil Equipment and material Information
Presenters name: LCI representative
www.statoil.com
24 Classification: Open 2015-05-13
Backup slides
SEMI info and flow of information in LCI Solution
2015-04-2425 Classification: Open
SEMI - Approved model with documentation
• LCI Solution tourwith SEMI starting with approved model
26 Classification: Open 2015-05-13
TIE transfer from SEMI to ProCoSys
• Automaticallytransfer of Manufacturer andModel with SEMI-ID deliveredto ProCoSys
• CPST will get the same info(Contractor has to implement SEMI infoin their own system)
• SAP will getSEMI-ID as a A01type document
27 Classification: Open 2015-05-13
TIE details
• TIE log viewer will present trafficand details in SEMI context
28 Classification: Open 2015-05-13
ProCoSys will link SEMI ID to TAG
• TR3111, LCI Requirement - Data content and transfer ch. 2.11.21 TAG_MOD_X describes requirement to deliver manufacturer, model, variant and SEMI id to document the standard equipment installed on a tag
29 Classification: Open 2015-05-13
ProCoSys – search for SEMI IDModel is available in ProCoSys library for Manufacturer/Model/Variant (With default variant value in ProCoSys)
30 Classification: Open 2015-05-13
TIE transfer SEMI - SAP
Approved model is exported to SAP as a DOCUMENT object using SEMI id as presented TI document no with a permanent hyperlink back to the model in SEMI
31 Classification: Open 2015-05-13
TIE details on SAP document data
32 Classification: Open 2015-05-13
SAP document holding the SEMI URL
• DMS document no with description from SEMI and the URL to lead the model with assosiated documents in SEMI
33 Classification: Open 2015-05-13
SAP document details
• Since SEMI data is not plant-specific, the plant number is set to a default value for all Models.
• The document can be further used as a SAP DMS document in equipment BOMs, linked to SAP Material etc.
34 Classification: Open 2015-05-13
ProCoSys and SAP Equipment
35 Classification: Open 2015-05-13
TIE Equipment details
• Note that if the Manufacturer/Model has a SEMI-ID, it is included in the export.
36 Classification: Open 2015-05-13
Equipment details
• Even if no SEMI ID exists, Manufacturer, ModelNo, Variant, SerialNo, RFOC date will be transferred to SAP
• Automatic creationof SAP Equipment no for all tag created as FL in SAP
37 Classification: Open 2015-05-13
One tag, many components• The SEMI Converter will create one Equipment message for each
Manufacturer/Model relationship in the tag message
38 Classification: Open 2015-05-13
Functional Location in SAP
39 Classification: Open 2015-05-13
Equipment in SAP• If the Equipment message has a
SEMI-ID, and this SEMI-ID is existing as an A01 Document in SAP, it will be linked to the newly created equipment
• The hyperlink will direct the user to the documentation for the Model in SEMI based on SEMI-ID
40 Classification: Open 2015-05-13
…and back into SEMI again!
The URL in SAP will take you back to the SEMI portal, where we started
41 Classification: Open 2015-05-13