SECURING ECC & SECURING ECC & COMPLYING WITH COMPLYING WITH OTHER OTHER ENVIRONMENTAL ENVIRONMENTAL REGULATIONS REGULATIONS The Philippine The Philippine Environmental Environmental Impact Statement Impact Statement (EIS) System (EIS) System Environmental Management Bureau AO 42: AO 42: Rationalizing the implementation of the Rationalizing the implementation of the Philippine EIS System and giving Philippine EIS System and giving authority in addition to the Secretary of authority in addition to the Secretary of the DENR, to the Director and Regional the DENR, to the Director and Regional Director of the EMB to grant or deny the Director of the EMB to grant or deny the issuance of ECCs. issuance of ECCs. Aims to achieve sustainable development Aims to achieve sustainable development Environmental Management Bureau DAO 2003 DAO 2003- 30: 30: PEIS Implementation PEIS Implementation Guidelines & Procedures Guidelines & Procedures Streamline the EIS System & to Streamline the EIS System & to strengthen the processes for its strengthen the processes for its implementation implementation 1

Upload: vulien

Post on 26-Jun-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

SECURING ECC & SECURING ECC & COMPLYING WITH COMPLYING WITH OTHER OTHER ENVIRONMENTAL ENVIRONMENTAL REGULATIONSREGULATIONS

The Philippine The Philippine Environmental Environmental Impact Statement Impact Statement (EIS) System(EIS) System

Environmental Management Bureau

AO 42: AO 42:

Rationalizing the implementation of the Rationalizing the implementation of the Philippine EIS System and giving Philippine EIS System and giving authority in addition to the Secretary of authority in addition to the Secretary of the DENR, to the Director and Regional the DENR, to the Director and Regional Director of the EMB to grant or deny the Director of the EMB to grant or deny the issuance of ECCs.issuance of ECCs.

Aims to achieve sustainable developmentAims to achieve sustainable development

Environmental Management Bureau

DAO 2003DAO 2003--30:30:PEIS Implementation PEIS Implementation

Guidelines & ProceduresGuidelines & Procedures

Streamline the EIS System & to Streamline the EIS System & to strengthen the processes for its strengthen the processes for its implementationimplementation

1

Environmental Management Bureau

EIS System EIS System ProceduresProcedures

Environmental Management Bureau

SCOPINGSCOPINGBASELINE STUDYBASELINE STUDYIMPACT IDENTIFICATIONIMPACT IDENTIFICATIONIMPACT PREDICTIONIMPACT PREDICTIONIMPACT EVALUATIONIMPACT EVALUATIONIMPACT MITIGATION & PREPARATION IMPACT MITIGATION & PREPARATION OF EMPOF EMP

EIA PROCESSEIA PROCESS

Environmental Management Bureau

Project Description Project Description Description of the ProjectDescription of the ProjectLocation and area coveredLocation and area coveredCapitalization and manpower Capitalization and manpower requirementsrequirementsFor processing industries, a listing of the For processing industries, a listing of the raw materials to be used,description of raw materials to be used,description of the process and overall performance or the process and overall performance or manufacturing technologymanufacturing technologyType and volume of products and Type and volume of products and dischargesdischarges

Environmental Management Bureau

Brief project description

Vicinity/location map

List of stakeholders to be invited for the site/formal scoping

PrePre--Scoping Requirements:Scoping Requirements:

2

Environmental Management Bureau

Pre-ScopingScoping Process SelectionOf EIARCMembers

Project Briefing

SiteScoping

SubmitScopingReport

TechnicalScoping

FinalScopingChecklist

DetermineERA/EHIA

RequirementsPost-Scoping

Proponent gives

notice to DENR-EMB

3

Environmental Management Bureau

EIS DOCUMENT EIS DOCUMENT Executive SummaryExecutive SummaryProject DescriptionProject DescriptionMatrix of Scoping and Agreements Matrix of Scoping and Agreements critical issues and concerns as critical issues and concerns as validated by EMBvalidated by EMBBaseline environmental conditionsBaseline environmental conditionsImpact assessment focused on Impact assessment focused on significant environmental impacts significant environmental impacts

Environmental Management Bureau

EIS DOCUMENT EIS DOCUMENT Environmental Risks Assessment Environmental Risks Assessment Environmental Management Plan Environmental Management Plan Proposals for Environmental Monitoring Proposals for Environmental Monitoring and Guarantee Fundand Guarantee FundAccountability Accountability

statements/preparers/proponents statements/preparers/proponents Other documents as may be determined Other documents as may be determined during scopingduring scoping

Environmental Management Bureau

Defines the scope of compliance reporting, institutional and financial mechanisms to ensure that mitigating and monitoring measures will be instituted and implemented by the project proponent.

Environmental Management Environmental Management Plan (EMP)Plan (EMP)

Environmental Management Bureau

Mitigation and enhancement measures

Social development program

(resettlement, relocation, livelihood)

Contingency/Emergency Response Plan

Risk Management Program

Environmental Management Environmental Management Plan (EMP)Plan (EMP)

4

Environmental Management Bureau

Abandonment Plan (when applicable)

Environmental Monitoring Plan

Information-Education and Communications Plan

Environmental Management Environmental Management Plan (EMP)Plan (EMP)

Environmental Management Bureau

Coverage of Monitoring

Frequency of MonitoringStandard Procedures or Methods of Monitoring (e.g. labeling, transport & handling of samples) & laboratory analysis

Environmental Management Environmental Management Plan (EMP)Plan (EMP)

Environmental Management Bureau

Selection of Sampling Stations

Manpower Requirements

Logistics

Environmental Management Environmental Management Plan (EMP)Plan (EMP)

5

EIS Review Process for ECPs

yes

no

EIS Review Process

Submit 1 setOf EIS + Checklist A total of 120

working days if processed at the central office, or 60

working days if processed

at the regional office

ECC Denial

Recommendationby endorsing

authority

SubmitEIARC Report

Review ProcessReport

EIARC Meetings

Field Visits orSite Inspections

Public Hearing(if necessary)

Additional Info.Limited to 2

Requests3 EIARC meeting(60 working daysfor Central Off.,or 40 workingdays for R. O.)

SubstantiveReview

• Clarity• Balance• Accuracy &

Precision• Consistency• Response

Convene EIARC

Completeand clear?

Pay Fee(s) Submit 10 sets+ electronic copy

Procedural Review (3 working days)

6

Environmental Management Bureau

Major amendments if such involves modification as:

• Expansion of land/project area;• Increase in production capacity;• Change in project location;• Major change/s in process flow or

technology to be used

ECC AmendmentECC Amendment

Environmental Management Bureau

ECC AmendmentECC AmendmentMinor amendments if such involves

modification as• Typographical error • Extension of deadlines for submission of

post-ECC requirements• Change in company name/ownership• Decrease in land/project area or

production cap.

Environmental Management Bureau

Necessary data, information, reports or documents that will substantiate or

support the requested revision (i.e. for transfer of ownership – ECC and other environmental laws compliance, justification) Detailed process description (old and new) with material balances; documentation of environmental performance of the old process; corresponding comparison of the old and new process in terms of environmental performance and EMS-based EMP

ECC Amendment RequirementECC Amendment Requirement

Environmental Management Bureau

Submit to: Approving office (Secretary/EMB RD)Reviewed by:Technical Committee (major amendment/s)Case handler (minor amendment/s)

Timeframe:30 days for IEE60 days for EIS/PEIS

Approving authorityECC Approving Office (major amendment/s)ECC Endorsing Office (minor amendment/s)

Procedure for ECC AmendmentProcedure for ECC Amendment

Environmental Management Bureau

THE ENVIRONMENTAL THE ENVIRONMENTAL COMPLIANCE CERTIFICATE COMPLIANCE CERTIFICATE

The ECC is the The ECC is the approval document approval document signifying that the signifying that the project proponent has project proponent has complied with all the complied with all the requirements of the EIA requirements of the EIA ProcessProcess

Environmental

Compliance

Certificate

Environmental Management Bureau

STANDARD CONDITIONS OF AN ECC STANDARD CONDITIONS OF AN ECC • Scope of the operations• Installation of waste treatment facility • Emissions/discharges

within DENR standards• Permits from other agencies• Monitoring measures• EMP• Transfer of ownership• EMF/EGF• Preparation of abandonment plan

7

Environmental Management Bureau

8

Environmental Management Bureau

9

Environmental Management Bureau

Requirements Requirements for Other for Other Environmental Environmental RegulationsRegulations

Environmental Management Bureau

RA 6969RA 6969REGISTRATION AS HAZARDOUS WASTE REGISTRATION AS HAZARDOUS WASTE

GENERATOR & TSD FACILITYGENERATOR & TSD FACILITY

RequirementsRequirementsCompleted registration forms Completed registration forms ECC ECC Permits to Operate Pollution Control FacilitiesPermits to Operate Pollution Control FacilitiesStorage Management Plan for raw materials, Storage Management Plan for raw materials, residues, byresidues, by--products & endproducts & end--productsproductsLongLong--term plan for the term plan for the recycled/processed/endrecycled/processed/end--productproductContingency/emergency planContingency/emergency plan

Environmental Management Bureau

REGISTRATION AS LOCAL TRANSPORTER REGISTRATION AS LOCAL TRANSPORTER OF HAZARDOUS WASTEOF HAZARDOUS WASTE

RequirementsRequirementsOfficial letter of requestOfficial letter of requestInformation on registration/accreditation of , Information on registration/accreditation of , transporter, waste generator and transporter, waste generator and treater/recycling facilitytreater/recycling facilityInformation on the waste generatedInformation on the waste generatedMemorandum of Agreement/Affidavit of Joint Memorandum of Agreement/Affidavit of Joint Understanding between concerned partiesUnderstanding between concerned partiesWaste to be treated is included in Waste to be treated is included in recycler/treaterrecycler/treater’’s ECCs ECC

RA 6969RA 6969

Environmental Management Bureau

10

Environmental Management Bureau

RA 9275RA 9275SECURING DISCHARGE PERMITSECURING DISCHARGE PERMIT

RequirementsRequirements

ECCECCAppointment of PCOAppointment of PCOEngineerEngineer’’s Reports ReportPlans & specificationPlans & specificationVicinity mapsVicinity maps

Environmental Management Bureau

Environmental Management Bureau

RA 8749RA 8749SECURING PERMIT TO OPERATE AIR SECURING PERMIT TO OPERATE AIR POLLUTION CONTROL and SOURCE POLLUTION CONTROL and SOURCE INSTALLATIONINSTALLATION

RequirementsRequirements

ECCECCAppointment of PCOAppointment of PCOEngineerEngineer’’s Reports ReportPlans & specificationPlans & specificationVicinity mapsVicinity maps

Environmental Management Bureau