Page 1: Sectoral Agenda _URBAN POOR (1)

www.napc.gov.ph @NAPC_ph

Status of Sectoral Agenda and Major Accomplishments

for 2012 to 2014

9 May 2014

SRC Discussion with the NAPC Secretary

Page 2: Sectoral Agenda _URBAN POOR (1)

www.napc.gov.ph @NAPC_ph

Urban Poor

Page 3: Sectoral Agenda _URBAN POOR (1)

NUPSC TOP 3 Agenda www.napc.gov.ph @NAPC_ph

Urban Poor Priority Policy & Reform Agenda

Agenda 1

Agenda 2

PRESIDENTIAL PROCLAMATION OF GOVERNMENT LANDS

Agenda 3

EVICTION AND DEMOLITION

JMC ON P50B FUND (FOR RESETTLEMENT OF ISFs LIVING IN DANGER AREAS IN NCR)

Page 4: Sectoral Agenda _URBAN POOR (1)

www.napc.gov.ph @NAPC_ph

Accomplishments

2011 -2013 NTWG crafted /signed the Joint Memorandum Circular (JMC)

July 12, 2013 NAPC Sectoral Representatives and Cabinet Secretaries Meeting agreed on a CSW on the ISF Fund agenda

Background

Dec 2010 President Noy directed the creation of NTWG for ISFs

Apr 2011 President Noy allocated ISF P10B Fund per year or P50B over 5 years (2011-2015)

ISSUANCE OF JOINT MEMORANDUM CIRCULAR ON P50B FUNDAgenda 1

Page 5: Sectoral Agenda _URBAN POOR (1)

www.napc.gov.ph @NAPC_ph

Status/Challenge

• JMC awaits the signature of HUDCC Chair VP Binay

• Signed JMC should finalize the government policy on the resettlement of ISFs living in danger areas and waterways

• 37 People’s Plans are undergoing validation or being scheduled for consideration by boards of SHFC, NHA, DSWD; and LGUs

• PMO is finalizing the Implementing and Operations Guidelines and the People’s Plan Pro-Forma based on the standard form of each implementing agency

Next Steps

Social Preparation fund should establish and assist the production of people’s proposals/plans in the six (6) major waterways and two (2) esteros in NCR

Facilitate the fast-tracking of implementation of the 37 ISF People’s Proposals/Plans

Agenda 1

Implementing agencies to fast-track the establishment of Local Project Management Team (LPMT) in each of the six (6) major water ways and two (2) esteros

ISSUANCE OF JOINT MEMORANDUM CIRCULAR ON P50B FUND

Page 6: Sectoral Agenda _URBAN POOR (1)

www.napc.gov.ph @NAPC_ph

Accomplishments2012 Inter-agency meetings agreed to study the Presidential Proclamation as

major asset reform program of the PNoy administration

2013 NUPSC identified 13 select priority sites (Pre and Post Proclamation)

2013 PCUP allocated P500,000 as support fund for the CSW in the 13 sites

Background

NUPSC decided to pilot CSW priority sites as basis in crafting the policy reform

The learnings in the 13 sites should provide the basis for amending the implementation guidelines and procedures of the Pre and Post Proclamations.

PRESIDENTIAL PROCLAMATION OF GOVERNMENT LANDSAgenda 2

2014 PCUP convened a 3-day Joint National Strategizing Workshop on 14-16 March 2014 (fund outside of the P500k support for year 2014).

Page 7: Sectoral Agenda _URBAN POOR (1)

www.napc.gov.ph @NAPC_ph

Challenges

The CSW in the 13 sites should provide the basis for amending the implementation guidelines and procedures for both the pre and post proclamations.

Crucial need to review the guidelines for policy reform and for identification of bottlenecks for the effective operationalization of the Presidential proclamation as an asset reform program of government.

Next Steps

Facilitate the establishment of NTWG for Presidential Proclamation

PRESIDENTIAL PROCLAMATION OF GOVERNMENT LANDS

Facilitate the convening and CSW for the establishment of pre and post Proclamation Committees in the 13 priority sites

Agenda 2

Facilitation of PCUP to assist the NUPSC and the actual beneficiaries to meet the President on the establishments of the proclamation committees (pre and post)

Page 8: Sectoral Agenda _URBAN POOR (1)

www.napc.gov.ph @NAPC_ph

AccomplishmentsSept 25, 2012 Inter-Agency Discussion/Agreements to study options to end E &D;July 12, 2013 Cabinet Secretaries' meeting agreed for DILG and PCUP to lead an

interagency TWG to study to convene the Judicial, Executive and Legislative Consultative Council (JELACC)

PCUP explored the utilization of Pre Demolition Conference to ensure consultation of ISFs

DILG agreed to study and facilitate the inclusion of the Certificate of Compliance (COC) requirements in the Seal of Good Housekeeping

2013: DILG allocated support fund to NUPSC to a maximum of P500,000 per year

Background

The NUPSC discussed the agenda on violations and effective implementation of law on “forced eviction and demolition” invoking

Section 28 of RA 7279 (UDHA), RA 7160 (Local Government Code), EO 152 & 708, DILG MCs (2008-143; 2009-05; 2010-134) and the CHR Advisory on Adequate Housing and Humane Eviction

Eviction and DemolitionAgenda 3

Page 9: Sectoral Agenda _URBAN POOR (1)

Challenges

Need to study and craft the appropriate policy reform for LGU compliance to the requirements of RA 7279, particularly section 28 on relocation, and of EO 152 and EO 708 prior to issuance of Certificate of Compliance (COC)

Need to review the necessary amendment to RA 7279 that will ensure the effective Resettlement Action Plan (RAP) and peoples representation in the Local Housing Board (LHBs) before issuance of COC

EVICTION AND DEMOLITIONAgenda 3

Page 10: Sectoral Agenda _URBAN POOR (1)

www.napc.gov.ph @NAPC_ph

Next Steps

Review of proposed bills on LHB and UDHA amendments and related laws and issuances

EVICTION AND DEMOLITION

DILG and PCUP to facilitate the convening of Justice Sector Coordinating Council (JSCC)

Agenda 3

Craft MOA among concerned agencies including DILG and PNP on Pre Demolition Conference (PDC) under the lead of PCUP

Study/facilitate the creation of policy mechanism to ensure genuine PO representation in LHBs and ensuring RAP of LHBs as requirements before any demolition

Page 11: Sectoral Agenda _URBAN POOR (1)

#NAPCenbanc www.napc.gov.ph @NAPC_ph

Thank you!