Section C: Your funding application
Community Group Wisborough Green Parish Council
Project Title Pavilion/Kirdford Road Flooding Issues
Brief description of proposed works or activity
New culvert – Kirdford Road Due to blocked culvert, water is currently flowing
down Kirdford Road and accumulating at dangerous junction.
Clearing pathways – A272 East of village Vegetation growth had reduced the width of the
pavement making it dangerous for pedestrians to use.
Pavilion Flooding – repairs to pipe and formation of
new chamber Investigations into surface water gullies around the
Pavilion confirmed blockages and damaged pipes. This consequently created flooding around the Pavilion, potentially affecting the integrity of the building and causing the foul water system to be overwhelmed – sewage visible.
How long has the community been aware of the issue you aim to address?
(please tick)
2012/13 1-2
years 3-5
years 5-10 years
10+ years
x
What are the objectives this work will achieve?
Prevent flooding around the Pavilion, reduce the accumulation of water in Kirdford Road and
create a safer pavement for pedestrians along the A272 into the village.
How does this project fit in with the aims of
Operation Watershed?
The above work will ensure that surface water
is directed into the existing ditches, which were recently cleared.
How many Households in the community will
benefit? (please tick)
1-5 6-10 11-20 20-50 50+
x
When do you expect the work be carried out? Please estimate how long it will take?
April 2013 – already completed with authority from WSCC.
Total estimated cost of proposed works
(Please obtain estimates from all proposed contractors):
4799.00
Total amount you are applying for: 4799.00
Who is going to do the work for you? E P Clark & Co Ltd Billingshurst Road Wisborough Green RH14 0DZ
Are your community committed to the long term care and maintenance of its assets?
Yes
Section D: Community support
Name of WSCC County Councillor: Was Chris Duncton, now Janet Duncton.
Does your County Councillor support this proposal?
YES
Section C: Your funding application
Community Group Sidlesham Parish Council
Project Title Sidlesham Flood Alleviation Works
Brief description of proposed works or activity
Area SW of Pondtail Cottage:- Clearance of Pond / Flood plain area remove willows etc
Rookery Lane - west of New Barn:- Survey of culvert into Reed Beds
Rookery Lane - East of New barn:- Survey of culvert into Reed Beds
Across fields from church farm lane to Littleton cottage:- Ditch reinstatement 1 mile
Church Farm:- Clearance of pond,
Church Farm Lane:- Culvert jetting/ camera survey, 50m
Church Farm Lane - Old Police house/ Sub-station:- culvert & camera survey
Swan Cottage to Haven :- Link into existing ditch 400m new ditch
Watery Lane:- survey of system
Nb: Cost estimates and details provided.
How long has the community been aware of the issue you aim to address?
(please tick)
2012/13 1-2
years 3-5
years 5-10 years
10+ years
What are the objectives this work will achieve?
Improvements to deal with the on-going impact of flooding through the village.
How does this project fit in with the aims of
Operation Watershed?
An area at high risk of regular flooding works
undertaken is expected to improve the quality of roads damaged by on-going flooding caused
by these damaged culverts. This would provide visible evidence of improvement to customers which would increase confidence in services. The floods have had a significant negative impact on local crops and so the local economy
and production.
How many Households in the community will benefit? (please tick)
1-5 6-10 11-20 20-50 50+
When do you expect the work be carried out? Please estimate how long it will take?
3 – 6 months
Total estimated cost of proposed works (Please obtain estimates from all proposed contractors):
Initial costs £17,600
Section C: Your funding application
Total amount you are applying for: £17,600
Who is going to do the work for you?
Contractor approved by WSCC
Are your community committed to the long term care and maintenance of its assets?
The community is committed to the long term
care – there is a 40 strong flood group which
serves as a sub-group of the Parish Council
Section D: Community support
Name of WSCC County Councillor: Margaret Whitehead
Does your County Councillor support this proposal?
Yes
Section C: Your funding application
Community Group Sidlesham Parish Council
Project Title Sidlesham B2145 Culvert works
Brief description of proposed works or activity
The road gullies and culverts under the B2145 and one under Church Farm Lane are in need of
significant improvements. Request for assessment of works required and costing. (information attached)
B2145 between culvert A & The Haven Survey of culverts & Gullies / camera
B2145 Culvert o/s Pondtail cottage:- Survey of culvert / camera
B2145 culvert o/s Littleton cottage:- Survey of
culvert / camera
B2145 culvert o/s Littleton cottage:- Rebuild sandbag headwall
B2145 culvert N of Littleton cottage:- upgrade of field access culvert
NB: estimate provided
How long has the community been aware of the issue you aim to address?
(please tick)
2012/13 1-2
years 3-5
years 5-10 years
10+ years
What are the objectives this work will achieve?
To stop the regular flooding affecting Sidlesham
at this point. Identification of works required
and improvements made.
How does this project fit in with the aims of Operation Watershed?
An area at high risk of regular flooding works
undertaken is expected to improve the quality
of roads damaged by on-going flooding caused
by these damaged culverts. This would provide
visible evidence of improvement to customers
which would increase confidence in services.
How many Households in the community will benefit? (please tick)
1-5 6-10 11-20 20-50 50+
When do you expect the work be carried out? Please estimate how long it will take?
3 – 6 months
Total estimated cost of proposed works (Please obtain estimates from all proposed contractors):
Initial costs £5,450
Total amount you are applying for: £5,450
Who is going to do the work for you?
Contractor approved by WSCC
Section C: Your funding application
Are your community committed to the long term care and maintenance of its assets?
The community is committed to the long term
care – there is a 40 strong flood group which
serves as a sub-group of the Parish Council
Section D: Community support
Name of WSCC County Councillor: Margaret Whitehead
Does your County Councillor support this proposal?
Yes
Section C: Your funding application
Community Group Mannings Heath Residents with WSCC
Project Title Winterpit Close Drainage Renewal
Brief description of proposed works or activity
Dig out damaged land drain and install 225mm
pipe. Reinstate connection to culverts
How long has the community been aware of the issue you aim to address?
(please tick)
2012/13 1-2
years 3-5
years 5-10 years
10+ years
What are the objectives this work will
achieve?
To alleviate flooding of Winterpit Close
How does this project fit in with the aims of Operation Watershed?
Flood alleviation works, protecting residential homes from flood
How many Households in the community will benefit? (please tick)
1-5 6-10 11-20 20-50 50+
When do you expect the work be carried out?
Please estimate how long it will take?
Immediate start
Total estimated cost of proposed works (Please obtain estimates from all proposed contractors):
£2943.60
Total amount you are applying for: £2943.60
Who is going to do the work for you? Landbuild. A WSCC recommended contractor
Are your community committed to the long term care and maintenance of its assets?
As appropriate
Section D: Community support
Name of WSCC County Councillor: Brad Watson OBE
Does your County Councillor support this proposal?
YES
Section C: Your funding application
Community Group Bosham Parish Council
Project Title Fairfield Road Ditch
Brief description of proposed works or activity
Turn a much neglected overgrown ditch into more effective French Drain.
How long has the community been aware of the issue you aim to address?
(please tick)
2012/13 1-2
years 3-5
years 5-10 years
10+ years
x
What are the objectives this work will
achieve?
To improve a neglected ditch and create a more
effective self-maintaining ditch.
How does this project fit in with the aims of Operation Watershed?
Remedial works on existing drainage system to alleviate potential backup of water and reduce future flooding.
How many Households in the community will benefit? (please tick)
1-5 6-10 11-20 20-50 50+
x
When do you expect the work be carried out? Please estimate how long it will take?
Within the next 3 months it should only take 3-5 days
Total estimated cost of proposed works (Please obtain estimates from all proposed
contractors):
Landbuild - £5,588.34
SDI-Unistride - £6,648.44
KJB Contractors - £8,750
(all figures are net values see attached quotes)
Total amount you are applying for: Full cost of works eg: £5,588.34
Who is going to do the work for you? Landbuid (as these are cheapest.)
Are your community committed to the long term care and maintenance of its assets?
Consultation with PCC on behalf of the burial ground and Fairfield Road community suggests that this work is required to help them in the on-going maintenance.
Section D: Community support
Name of WSCC County Councillor: Louise Goldsmith
Does your County Councillor support this proposal?
Yes
Section C: Your funding application
Community Group South Pond Group
Project Title Midhurst South Pond De-silting
Brief description of proposed works or activity
We are working on a major restoration of this historic
pond in the heart of Midhurst. Our key aims are to
improve the biodiversity and amenity value of the
pond. This is being done for the benefit of the whole
community. We are working in partnership with the
National Park Authority and Chichester District
Council/Midhurst Town Council. Major capital works
are required to fulfil this vision but action now will
prevent the need for additional measures in future
years.
There is an active local voluntary group to support
the project and work directly on it. The major
improvement and first stage is a proper dredging of
the pond, which will reduce regular flooding around
the pond.
SDNPA have drawn up a proposal through Salix (copy
attached). We particularly need to fund the dredging
operation as a high priority.
How long has the community been aware of the issue you aim to address?
(please tick)
2012/13 1-2
years 3-5
years 5-10 years
10+ years
X
What are the objectives this work will achieve?
Reduction in flooding
Improved bio-diversity for the pond and feeder
stream
Improved and valued local amenity and historic
feature
How does this project fit in with the aims of Operation Watershed?
We believe it fits directly with the aims of the project relating to flood alleviation.
How many Households in the community will benefit? (please tick)
1-5 6-10 11-20 20-50 50+
X
When do you expect the work be carried out? Please estimate how long it will take?
Autumn of 2013
Total estimated cost of proposed works
(Please obtain estimates from all proposed contractors):
Total work £70,000
Dredging activity c. £25,000
Estimates are based on the Salix proposal
Total amount you are applying for: £25,000
Who is going to do the work for you? Salix
Section C: Your funding application
Are your community committed to the long term care and maintenance of its assets?
Yes,
The South Pond Group was established in 2012
to promote these changes and to help manage the pond and feeder stream for the future so it does not get into the current unsatisfactory state again.
Section D: Community support
Name of WSCC County Councillor: Gordon McAra
Does your County Councillor support this proposal?
Yes
Cgrpmunky Group COMPTON PARISH COUNCIL
IVORE0olup ttJ{+.1 So4t< Au,l+,Brief dgscription of proposed woGE activity n Sor+r nr+rrl"/ t N Tps t+o1s1
Paooo. t. ,\rdtr-D J 1-a B&- (L€t>N€ DOt*-?- r+9 i.r tS gl a.re- o r.rp ftN O
ll4ip ,uA-rf R BAqKS {4 p ?t -I-i+f,qrDDc€ oi. ti{e- flenD s^ti+€R€ trTSCAP'5 VITl A P,ANCCU€R, TILAI A/ It€ Av '7 'Dor+r.r.r CrGtrAS L6Au e-S T.r.r
itr..c6 F}" PcSdp - $e-r*t S vHow long has the community bEEn aware oithe issue you aim to address? zAtzit3,
What are the objectives this work l rill Tnr w*TFRAcaosg Tft€
latt ct S clA tB AkJA\ d
?aoooe t1
How does this project fit in ith the;it1ts ofOperation Watershed?
:
tT A t L z Pec= a,t:.anT Tt{L= lvtqxt e8a-irue- Tr4€ FiASr PCr.r.r7 6 rs Aeltv TtitZ /UiDDe€ eF ?.{6 R(j,lb.
How many HqEmfrotds in the community willbenefit? (ptedse tick)
when doyou expectthmPlease estimate how long it will take? A ec,.^p 0z- *J, ,d*t. a;;t-EZ
$tt-nme-r r.r"4> n-Lh STctal estimated cost of proposeO woE--{Ptease obtain estimates from ail proposed fntt cllv\1;uL6 E .topo-,.{, n q o ,.
,,ubt,-Lt "on [,-,..t.j- i s ..SdTotal amount you are apptying forr
Se-q .u [:.,1 ,, -^ £1080.00Who is going to Co tfre wortEriou?
-sa^L o0-o*e"Are your community cornmitted ao the longterm care and maintenance of its assets?
'
Name of WSCC Cqunty Counciilon SALro tzrl €ftivtt S
Does your County Counciltor.up[ort thE
OAN€i?o.r11
.f.€Lt-
Grll,q
*