Section C: Your funding application Community Group Wisborough Green Parish Council Project Title Pavilion/Kirdford Road Flooding Issues Brief description of proposed works or activity New culvert – Kirdford Road Due to blocked culvert, water is currently flowing down Kirdford Road and accumulating at dangerous junction. Clearing pathways – A272 East of village Vegetation growth had reduced the width of the pavement making it dangerous for pedestrians to use. Pavilion Flooding – repairs to pipe and formation of new chamber Investigations into surface water gullies around the Pavilion confirmed blockages and damaged pipes. This consequently created flooding around the Pavilion, potentially affecting the integrity of the building and causing the foul water system to be overwhelmed – sewage visible. How long has the community been aware of the issue you aim to address? (please tick) 2012/13 1-2 years 3-5 years 5-10 years 10+ years x What are the objectives this work will achieve? Prevent flooding around the Pavilion, reduce the accumulation of water in Kirdford Road and create a safer pavement for pedestrians along the A272 into the village. How does this project fit in with the aims of Operation Watershed? The above work will ensure that surface water is directed into the existing ditches, which were recently cleared. How many Households in the community will benefit? (please tick) 1-5 6-10 11-20 20-50 50+ x When do you expect the work be carried out? Please estimate how long it will take? April 2013 – already completed with authority from WSCC. Total estimated cost of proposed works (Please obtain estimates from all proposed contractors): 4799.00 Total amount you are applying for: 4799.00 Who is going to do the work for you? E P Clark & Co Ltd Billingshurst Road Wisborough Green RH14 0DZ Are your community committed to the long term care and maintenance of its assets? Yes Section D: Community support Name of WSCC County Councillor: Was Chris Duncton, now Janet Duncton. Does your County Councillor support this proposal? YES

Upload: others

Post on 16-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Section C: Your funding application Community …...Within the next 3 months it should only take 3-5 days Total estimated cost of proposed works (Please obtain estimates from all proposed

Section C: Your funding application

Community Group Wisborough Green Parish Council

Project Title Pavilion/Kirdford Road Flooding Issues

Brief description of proposed works or activity

New culvert – Kirdford Road Due to blocked culvert, water is currently flowing

down Kirdford Road and accumulating at dangerous junction.

Clearing pathways – A272 East of village Vegetation growth had reduced the width of the

pavement making it dangerous for pedestrians to use.

Pavilion Flooding – repairs to pipe and formation of

new chamber Investigations into surface water gullies around the

Pavilion confirmed blockages and damaged pipes. This consequently created flooding around the Pavilion, potentially affecting the integrity of the building and causing the foul water system to be overwhelmed – sewage visible.

How long has the community been aware of the issue you aim to address?

(please tick)

2012/13 1-2

years 3-5

years 5-10 years

10+ years

x

What are the objectives this work will achieve?

Prevent flooding around the Pavilion, reduce the accumulation of water in Kirdford Road and

create a safer pavement for pedestrians along the A272 into the village.

How does this project fit in with the aims of

Operation Watershed?

The above work will ensure that surface water

is directed into the existing ditches, which were recently cleared.

How many Households in the community will

benefit? (please tick)

1-5 6-10 11-20 20-50 50+

x

When do you expect the work be carried out? Please estimate how long it will take?

April 2013 – already completed with authority from WSCC.

Total estimated cost of proposed works

(Please obtain estimates from all proposed contractors):

4799.00

Total amount you are applying for: 4799.00

Who is going to do the work for you? E P Clark & Co Ltd Billingshurst Road Wisborough Green RH14 0DZ

Are your community committed to the long term care and maintenance of its assets?

Yes

Section D: Community support

Name of WSCC County Councillor: Was Chris Duncton, now Janet Duncton.

Does your County Councillor support this proposal?

YES

Page 2: Section C: Your funding application Community …...Within the next 3 months it should only take 3-5 days Total estimated cost of proposed works (Please obtain estimates from all proposed
Page 3: Section C: Your funding application Community …...Within the next 3 months it should only take 3-5 days Total estimated cost of proposed works (Please obtain estimates from all proposed
Page 4: Section C: Your funding application Community …...Within the next 3 months it should only take 3-5 days Total estimated cost of proposed works (Please obtain estimates from all proposed
Page 5: Section C: Your funding application Community …...Within the next 3 months it should only take 3-5 days Total estimated cost of proposed works (Please obtain estimates from all proposed

Section C: Your funding application

Community Group Sidlesham Parish Council

Project Title Sidlesham Flood Alleviation Works

Brief description of proposed works or activity

Area SW of Pondtail Cottage:- Clearance of Pond / Flood plain area remove willows etc

Rookery Lane - west of New Barn:- Survey of culvert into Reed Beds

Rookery Lane - East of New barn:- Survey of culvert into Reed Beds

Across fields from church farm lane to Littleton cottage:- Ditch reinstatement 1 mile

Church Farm:- Clearance of pond,

Church Farm Lane:- Culvert jetting/ camera survey, 50m

Church Farm Lane - Old Police house/ Sub-station:- culvert & camera survey

Swan Cottage to Haven :- Link into existing ditch 400m new ditch

Watery Lane:- survey of system

Nb: Cost estimates and details provided.

How long has the community been aware of the issue you aim to address?

(please tick)

2012/13 1-2

years 3-5

years 5-10 years

10+ years

What are the objectives this work will achieve?

Improvements to deal with the on-going impact of flooding through the village.

How does this project fit in with the aims of

Operation Watershed?

An area at high risk of regular flooding works

undertaken is expected to improve the quality of roads damaged by on-going flooding caused

by these damaged culverts. This would provide visible evidence of improvement to customers which would increase confidence in services. The floods have had a significant negative impact on local crops and so the local economy

and production.

How many Households in the community will benefit? (please tick)

1-5 6-10 11-20 20-50 50+

When do you expect the work be carried out? Please estimate how long it will take?

3 – 6 months

Total estimated cost of proposed works (Please obtain estimates from all proposed contractors):

Initial costs £17,600

Page 6: Section C: Your funding application Community …...Within the next 3 months it should only take 3-5 days Total estimated cost of proposed works (Please obtain estimates from all proposed

Section C: Your funding application

Total amount you are applying for: £17,600

Who is going to do the work for you?

Contractor approved by WSCC

Are your community committed to the long term care and maintenance of its assets?

The community is committed to the long term

care – there is a 40 strong flood group which

serves as a sub-group of the Parish Council

Section D: Community support

Name of WSCC County Councillor: Margaret Whitehead

Does your County Councillor support this proposal?

Yes

Page 7: Section C: Your funding application Community …...Within the next 3 months it should only take 3-5 days Total estimated cost of proposed works (Please obtain estimates from all proposed

Section C: Your funding application

Community Group Sidlesham Parish Council

Project Title Sidlesham B2145 Culvert works

Brief description of proposed works or activity

The road gullies and culverts under the B2145 and one under Church Farm Lane are in need of

significant improvements. Request for assessment of works required and costing. (information attached)

B2145 between culvert A & The Haven Survey of culverts & Gullies / camera

B2145 Culvert o/s Pondtail cottage:- Survey of culvert / camera

B2145 culvert o/s Littleton cottage:- Survey of

culvert / camera

B2145 culvert o/s Littleton cottage:- Rebuild sandbag headwall

B2145 culvert N of Littleton cottage:- upgrade of field access culvert

NB: estimate provided

How long has the community been aware of the issue you aim to address?

(please tick)

2012/13 1-2

years 3-5

years 5-10 years

10+ years

What are the objectives this work will achieve?

To stop the regular flooding affecting Sidlesham

at this point. Identification of works required

and improvements made.

How does this project fit in with the aims of Operation Watershed?

An area at high risk of regular flooding works

undertaken is expected to improve the quality

of roads damaged by on-going flooding caused

by these damaged culverts. This would provide

visible evidence of improvement to customers

which would increase confidence in services.

How many Households in the community will benefit? (please tick)

1-5 6-10 11-20 20-50 50+

When do you expect the work be carried out? Please estimate how long it will take?

3 – 6 months

Total estimated cost of proposed works (Please obtain estimates from all proposed contractors):

Initial costs £5,450

Total amount you are applying for: £5,450

Who is going to do the work for you?

Contractor approved by WSCC

Page 8: Section C: Your funding application Community …...Within the next 3 months it should only take 3-5 days Total estimated cost of proposed works (Please obtain estimates from all proposed

Section C: Your funding application

Are your community committed to the long term care and maintenance of its assets?

The community is committed to the long term

care – there is a 40 strong flood group which

serves as a sub-group of the Parish Council

Section D: Community support

Name of WSCC County Councillor: Margaret Whitehead

Does your County Councillor support this proposal?

Yes

Page 9: Section C: Your funding application Community …...Within the next 3 months it should only take 3-5 days Total estimated cost of proposed works (Please obtain estimates from all proposed
Page 10: Section C: Your funding application Community …...Within the next 3 months it should only take 3-5 days Total estimated cost of proposed works (Please obtain estimates from all proposed
Page 11: Section C: Your funding application Community …...Within the next 3 months it should only take 3-5 days Total estimated cost of proposed works (Please obtain estimates from all proposed

Section C: Your funding application

Community Group Mannings Heath Residents with WSCC

Project Title Winterpit Close Drainage Renewal

Brief description of proposed works or activity

Dig out damaged land drain and install 225mm

pipe. Reinstate connection to culverts

How long has the community been aware of the issue you aim to address?

(please tick)

2012/13 1-2

years 3-5

years 5-10 years

10+ years

What are the objectives this work will

achieve?

To alleviate flooding of Winterpit Close

How does this project fit in with the aims of Operation Watershed?

Flood alleviation works, protecting residential homes from flood

How many Households in the community will benefit? (please tick)

1-5 6-10 11-20 20-50 50+

When do you expect the work be carried out?

Please estimate how long it will take?

Immediate start

Total estimated cost of proposed works (Please obtain estimates from all proposed contractors):

£2943.60

Total amount you are applying for: £2943.60

Who is going to do the work for you? Landbuild. A WSCC recommended contractor

Are your community committed to the long term care and maintenance of its assets?

As appropriate

Section D: Community support

Name of WSCC County Councillor: Brad Watson OBE

Does your County Councillor support this proposal?

YES

Page 12: Section C: Your funding application Community …...Within the next 3 months it should only take 3-5 days Total estimated cost of proposed works (Please obtain estimates from all proposed

Section C: Your funding application

Community Group Bosham Parish Council

Project Title Fairfield Road Ditch

Brief description of proposed works or activity

Turn a much neglected overgrown ditch into more effective French Drain.

How long has the community been aware of the issue you aim to address?

(please tick)

2012/13 1-2

years 3-5

years 5-10 years

10+ years

x

What are the objectives this work will

achieve?

To improve a neglected ditch and create a more

effective self-maintaining ditch.

How does this project fit in with the aims of Operation Watershed?

Remedial works on existing drainage system to alleviate potential backup of water and reduce future flooding.

How many Households in the community will benefit? (please tick)

1-5 6-10 11-20 20-50 50+

x

When do you expect the work be carried out? Please estimate how long it will take?

Within the next 3 months it should only take 3-5 days

Total estimated cost of proposed works (Please obtain estimates from all proposed

contractors):

Landbuild - £5,588.34

SDI-Unistride - £6,648.44

KJB Contractors - £8,750

(all figures are net values see attached quotes)

Total amount you are applying for: Full cost of works eg: £5,588.34

Who is going to do the work for you? Landbuid (as these are cheapest.)

Are your community committed to the long term care and maintenance of its assets?

Consultation with PCC on behalf of the burial ground and Fairfield Road community suggests that this work is required to help them in the on-going maintenance.

Section D: Community support

Name of WSCC County Councillor: Louise Goldsmith

Does your County Councillor support this proposal?

Yes

Page 13: Section C: Your funding application Community …...Within the next 3 months it should only take 3-5 days Total estimated cost of proposed works (Please obtain estimates from all proposed

Section C: Your funding application

Community Group South Pond Group

Project Title Midhurst South Pond De-silting

Brief description of proposed works or activity

We are working on a major restoration of this historic

pond in the heart of Midhurst. Our key aims are to

improve the biodiversity and amenity value of the

pond. This is being done for the benefit of the whole

community. We are working in partnership with the

National Park Authority and Chichester District

Council/Midhurst Town Council. Major capital works

are required to fulfil this vision but action now will

prevent the need for additional measures in future

years.

There is an active local voluntary group to support

the project and work directly on it. The major

improvement and first stage is a proper dredging of

the pond, which will reduce regular flooding around

the pond.

SDNPA have drawn up a proposal through Salix (copy

attached). We particularly need to fund the dredging

operation as a high priority.

How long has the community been aware of the issue you aim to address?

(please tick)

2012/13 1-2

years 3-5

years 5-10 years

10+ years

X

What are the objectives this work will achieve?

Reduction in flooding

Improved bio-diversity for the pond and feeder

stream

Improved and valued local amenity and historic

feature

How does this project fit in with the aims of Operation Watershed?

We believe it fits directly with the aims of the project relating to flood alleviation.

How many Households in the community will benefit? (please tick)

1-5 6-10 11-20 20-50 50+

X

When do you expect the work be carried out? Please estimate how long it will take?

Autumn of 2013

Total estimated cost of proposed works

(Please obtain estimates from all proposed contractors):

Total work £70,000

Dredging activity c. £25,000

Estimates are based on the Salix proposal

Total amount you are applying for: £25,000

Who is going to do the work for you? Salix

Page 14: Section C: Your funding application Community …...Within the next 3 months it should only take 3-5 days Total estimated cost of proposed works (Please obtain estimates from all proposed

Section C: Your funding application

Are your community committed to the long term care and maintenance of its assets?

Yes,

The South Pond Group was established in 2012

to promote these changes and to help manage the pond and feeder stream for the future so it does not get into the current unsatisfactory state again.

Section D: Community support

Name of WSCC County Councillor: Gordon McAra

Does your County Councillor support this proposal?

Yes

Page 15: Section C: Your funding application Community …...Within the next 3 months it should only take 3-5 days Total estimated cost of proposed works (Please obtain estimates from all proposed

Cgrpmunky Group COMPTON PARISH COUNCIL

IVORE0olup ttJ{+.1 So4t< Au,l+,Brief dgscription of proposed woGE activity n Sor+r nr+rrl"/ t N Tps t+o1s1

Paooo. t. ,\rdtr-D J 1-a B&- (L€t>N€ DOt*-?- r+9 i.r tS gl a.re- o r.rp ftN O

ll4ip ,uA-rf R BAqKS {4 p ?t -I-i+f,qrDDc€ oi. ti{e- flenD s^ti+€R€ trTSCAP'5 VITl A P,ANCCU€R, TILAI A/ It€ Av '7 'Dor+r.r.r CrGtrAS L6Au e-S T.r.r

itr..c6 F}" PcSdp - $e-r*t S vHow long has the community bEEn aware oithe issue you aim to address? zAtzit3,

What are the objectives this work l rill Tnr w*TFRAcaosg Tft€

latt ct S clA tB AkJA\ d

?aoooe t1

How does this project fit in ith the;it1ts ofOperation Watershed?

:

tT A t L z Pec= a,t:.anT Tt{L= lvtqxt e8a-irue- Tr4€ FiASr PCr.r.r7 6 rs Aeltv TtitZ /UiDDe€ eF ?.{6 R(j,lb.

How many HqEmfrotds in the community willbenefit? (ptedse tick)

when doyou expectthmPlease estimate how long it will take? A ec,.^p 0z- *J, ,d*t. a;;t-EZ

$tt-nme-r r.r"4> n-Lh STctal estimated cost of proposeO woE--{Ptease obtain estimates from ail proposed fntt cllv\1;uL6 E .topo-,.{, n q o ,.

,,ubt,-Lt "on [,-,..t.j- i s ..SdTotal amount you are apptying forr

Se-q .u [:.,1 ,, -^ £1080.00Who is going to Co tfre wortEriou?

-sa^L o0-o*e"Are your community cornmitted ao the longterm care and maintenance of its assets?

'

Name of WSCC Cqunty Counciilon SALro tzrl €ftivtt S

Does your County Counciltor.up[ort thE

OAN€i?o.r11

.f.€Lt-

Grll,q

*