Section 2:Hydrology
Generating a runoff hydrograph85 Minutes
Copyright 2004 HydroCAD Software Solutions LLCAll Rights Reserved - Duplication Prohibited
Press Space, PageDown, or Click to advance.Press PageUp to reverse. Esc to exit.
Right-Click for other options.
2-010
IntroductionWhat are we going to discuss?
PWe will start with a review of some fundamentalhydrologic techniques.
PA basic understanding of these calculations willimprove your ability to understand and interpretthe results from any hydrology software.
PPlease see other texts for full details, such as theHydroCAD Owner’s Manual.
2-020
What is the Return Period?A common point of confusion!
PRoughly speaking, the return period is theaverage time between occurrences of a givenevent, such as the 25-year storm.
PTo be more precise, a 25-year storm has a 4%probability of occurring in any given year.
PTherefore, a 25-year storm can occur in twoconsecutive years!
2-030
Intensity-Duration-Frequency Data
A basic way toquantify rainfallobservations.
Typicallycompiled foreach county inthe US.
PAn IDF curve indicates the rainfall intensity thatwill occur for a given duration and return period.
PThe rainfall intensity remains constant for theentire duration.
Rainfall Duration (minutes)0 10 20 30 40 50 60
2
4
8
6
10
12
14
16
18
20
Frequency (years)5025105
2
100
Typical IDFCurves
2-040
The Rational MethodA basic equation for predicting peak runoff
PQ=Peak Runoff [CFS]PC=Runoff CoefficientP i=Rainfall intensityPA=Catchment Area< The intensity is determined from the IDF curve, but
what duration do we use?
Q ' C IA
2-050
Setting the Rainfall Durationfor the Rational Method
A simple equation gets more complicated!
PWe must use the “critical duration”, whichproduces the highest runoff.
PFor a single, homogeneous subcatchment, theduration is typically equal to the time-of-concentration, Tc.
PBut when several subcatchments are combined,the critical duration can be any value between theshortest and longest Tc.
2-060
Other Limitations ofthe Rational Method
PThe Rational Method predicts peak runoff, butnot total runoff volume.
PThe Rational Method predicts a constant flow,rather than generating a complete hydrograph.
PRational Method is poorly suited for volume-sensitive calculations, such as detention ponds.< How do we overcome these limitations ???
2-070
The SCS Rainfall DistributionsAllowing the rainfall intensity to vary over time
PA mass curve indicates the cumulativerainfall depth at any time during the storm.
2-080
Features of RainfallDistributions
PAllows the intensity to vary over time.< Similar to an actual rainfall event
P Includes rainfall volume of entire (24-hour)event.< Can be used for volume-sensitive calculations.
PEach curve includes all events up to 24-hours.< Eliminates need to identify the critical duration!
2-090
More RainfallDistribution Features
PRepresents most of the US with just a few curves.< Curve is scaled for your local 24-hour rainfall depth.
PSynthetic rainfalls provide design standards< Type II peak defined at 12 hours
PCan also create an actual rainfall distribution< Allows modeling of observed events
2-100
The SCS Runoff EquationHow much of the precipitation appears as runoff?
PQ=Precipitation excess (runoff) [inches or mm]PP=Cumulative precipitation [inches or mm]PS=Potential maximum retention [inches]PCN=SCS Curve Number
Q'(P&.2 S )
2
P% .8S(Q=0 if P<.2S )
where S '1000
CN& 10
2-110
Time-of-Concentration:What does it mean?Determining when the runoff occurs
PThe Tc is the time required for a particle of waterto travel from the most hydrologically remotepoint in the watershed to the point of collection.
PThere are many procedures for calculating Tc< TR-55 Sheet Flow< TR-55 Shallow Concentrated Flow< Channel Flow (based on Manning’s velocity)< Upland Method< CN Method (a.k.a. Lag Method)
– We’ll examine the individual procedures in the next section2-120
The SCS DimensionlessUnit Hydrograph
Defines the runoff hydrograph for a single “burst”
2-130
Unit HydrographTime Axis
How long does the runoff lastfrom a single burst?
< Tp=Time to peak< D=Burst duration < Tc=Time of concentration
PEverything is based on the Tc
Tp' 5D and Tp'23
Tc ˆ D 'Tc
7.5
2-140
UH Time Axis ExampleJust substitute the Tc !
If Tc = 30 minutesD = Tc/7.5 = 4 minutesTp = 5D = 20 minutesTb = 5Tp = 100 minutes
Time (minutes)20 40 60 80 1000
2-150
Unit Hydrograph Flow AxisWhat is the peak runoff from a single burst?
Pqp=Peak discharge [CFS]PC=Units conversion factor (653.33)
PK=UH Shape Factor (0.75 for SCS UH)
P484=SCS UH “Peak Factor”PA=Area [sq-miles]PQ=Precipitation Excess (runoff) [inches]
qp 'C K A Q
Tp
'484 A Q
Tp
'484 A Q
2
3Tc
2-160
UH Flow Axis ExampleDetermine the flow for a single burst,with precipitation excess Q
Time (minutes)20 40 60 80 1000
If Q= 0.2 inchand A = 0.1 sq-mileand Tc = 0.5 hours
qp = 484 A Q / 2/3Tc = 29 cfs
2-170
A Fully Dimensioned UH !The actual runoff hydrographfrom a single burst of rainfall
Time (minutes)20 40 60 80 1000
PNow we have a completehydrograph for one burst.
PBut how do we get thehydrograph for an entire24-hour storm?
2-180
Convolution: The Heartof TR-20
Constructing the entire runoff hydrograph
PThe unit hydrograph (when dimensioned) tells usthe runoff for a single burst of rainfall.
PTo determine the runoff for the entire storm, wemust perform a convolution of the unithydrograph with the precipitation excess.< We must break the storm into a sequence of individual
bursts, and add up the hydrographs from all the bursts.
2-190
Convolution: Step #1Adding up the hydrographs for each burst
Time (hours)
1) Divide storminto bursts “D”
2-200
Convolution: Step #2Adding up the hydrographs for each burst
Time (hours)
1) Divide storminto bursts “D”
2) Generate UHfor each burst
2-210
Convolution: Step #3Adding up the hydrographs for each burst
Time (hours)
1) Divide storminto bursts “D”
2) Generate UHfor each burst
3) Add all UHTotal Hydrograph
2-220
Complete Runoff HydrographWhy does the hydrograph look like this?
1) Zero runoff forseveral hours
2) Runoffpeaks afterrainfall peak
Time (hours)
3) Runoffcontinues afterend of storm
2-230
Performing the ConvolutionA computation-intensive process
P If Tc = 7.5 minutes< Then burst duration D = 1 minute< And 24-hour storm contains 1440 bursts
P If UH consists of 100 coordinates< 1440 x 100 = 144,000 coordinates must be calculated
and summed to generate the runoff hydrograph !!PCalculation is not feasible by hand!
2-240
TR-55 and theTabular Method
Doing runoff calculations by hand
PThe TR-55 Tabular method allows manualcalculation of a runoff hydrograph thatapproximates the TR-20 UH procedure.
PTR-55 tables were produced by TR-20 with:< Curve Number = 75< Runoff = 3 inches< Fixed Tc values from 0.1 hours to 2.0 hours
POther values require approximation and resultswill differ from actual TR-20 results.
2-250
TR-55 WarningsQuoting from the TR-55 manual
PThis method (TR-55) approximates TR-20, amore detailed hydrograph procedure... UseTR-20 if the watershed is very complex or ahigher degree of accuracy is required.
PThe procedure (TR-55) should not be used toperform final design if an error in storage of25 percent cannot be tolerated... Moredetailed hydrograph development and routingwill often pay for itself through reducedconstruction costs.
2-260
HydroCAD: An EasierTRS20 Solution
Plus lots of other calculations and capabilities
P In 1986, HydroCAD was the first PC-basedprogram to use the full UH runoff procedure.
PEliminates approximations in the tabular method.PAlso provides:< TR-55 Tc procedures< Hydraulics calculations< True hydrograph routing< Lots more! (As we’ll see throughout the day)
PBut first, let’s examine some basic concepts inmore detail... 2-270
What is a hydrograph?The flow of water over time (Flow vs. Time)
T i m eA hydrograph is ideally a smooth curve...
2-280
But how do we represent thehydrograph curve numerically?
Use a series of pointsspaced equally in time
T i m eThe time increment is called “dt”
2-290
What is the peak flow?HydroCAD uses an interpolated peak, just like TR-20
T i m e
PTrue peak may fallbetween points...
PSo interpolate usingthree highest points
Allows for variations in point timing2-300
What time increment should I use?The time increment (dt) specifies the point spacing
PFor best results, use dt # Tc / 2< This ensures good peak definition
P If Tc $ 0.1 hours (6 minutes), use dt = 0.05 hours< This is the default value for new projects
PA warning will occur if dt is too large< This will occur if Tc < 0.1 hours
PDt can be as small at 0.01 hours< For fastest operation, don’t go smaller than required
2-310
What time span should I use?Long enough to cover all flow of interest!
T i m e (hours)0 3 6 9 12 15 18 21 24
Default time span5-20 hours
Use longer span ifentire volume is
required!
2-320
Rational Method hydrographsA shorter time span andtime increment are required
0 Tc D D+Tc D+2Tc
Default dt =0.01 hours
Default time span = 0-3 hours2-330
Time for a quick stretch!
PPlease have a quick stretch at your deskPWe’ll have a full break after this section
2-340
Rainfall Curves #1Different ways to define the rainfall distribution
Time (hours)
PThe actual rainfalldistribution is acurve
PHow do werepresent this inHydroCAD?
True RainfallMass Curve
2-350
Rainfall Curves #2Different ways to define the rainfall distribution
Time (hours)
Fitted MassCurve
PUses a polynomialfit to each segmentfor a true curve
PUsed for standardSCS rainfalls
PFor details seeStart|Programs|HydroCAD|Rainfall Info
2-360
Rainfall Curves #3Different ways to define the rainfall distribution
Time (hours)
Mass curvepoints
PEasy to definePLine segments may
cause runoff “steps”PSmoothing option
gives better curve
2-370
Rainfall Curves #4Different ways to define the rainfall distribution
Time (hours)
Intensitycurve points PEasy to define
PGives smoothrunoff curve
2-380
Sample Mass Curve FileThis is all you need to create a custom mass curve
timeunits=hoursduration=1
depthunits=inchesstormdepth=2.5
depth= 0 .020 .080 .200 .410 .625depth= .805 .915 .985 .995 1.000
1-hour duration
2.5 inch depth
Mass-curve points
For full details see HydroCAD “Sample B” file2-390
Sample Intensity Curve FileThis is all you need to create a custom curve
timeunits=hoursduration=1
depthunits=inchesstormdepth=2.5
inten= 0 .20 .60 1.2 2.1 2.15Inten= 1.8 1.1 .7 .1 .05
1-hour duration
2.5 inch depth
Intensity-curve points
For full details see HydroCAD “Sample A” file2-400
Changing the Storm DurationHydroCAD can rescale a storm to any duration
Original24-hourstorm
Time (hours)
Rescaled12-hourstorm
PStorm durationcan be changed
<But beware ofchange in peak
PDifferent rainfalldistribution may
be required!
2-410
Tc Effects #1How does the Tc effect the runoff hydrograph?
Time (hours)0 6 12 18 24 30 36 42 48
P If Tc=0, runoff is immediate!< HydroCAD will accept Tc=0
PHydrograph has same timingas rainfall distribution< Peak runoff occurs at same time
as peak rainfall
2-420
Tc Effects #2How does the Tc effect the runoff hydrograph?
Time (hours)0 6 12 18 24 30 36 42 48
PAs the Tc increases:< Unit Hydrograph is extended< Runoff occurs later
2-430
Curve Number EffectsHow does the CN effect the runoff?
PLow CN values decrease the runoff volume< Runoff timing is not directly effected by CN
PHigh CN values increase the runoff volume< If CN=100 all precipitation will appear as runoff:
S '1000
CN&10 ' 0
Q'(P&.2 S )2
P% .8S
Maximum Potential Retention =
SCS Runoff Volume = 'P
NoRetention!
All precipis runoff!
2-440
Rainfall on thesurface of a pondHow do we include thisprecipitation in the model?
P Include pond surface area in an adjacentsubcatchment.< OK for small pond areas
POr, model as separate subcat with:< Tc=0< CN=100< Produces “Runoff” equal to rainfall
2-450
Adding HydrographsWhat happens when multiplehydrographs are combined?
7 Inflow #1
7 Inflow #2
T i m e
7 Combined FlowPPeak flows add
directly only if theyoccur at the same
time!PVolumes mustalways add-up
2-460
Software ExercisesExploring these topics in HydroCAD
PBefore we begin the software demonstration, arethere any other questions about runoffcalculations?
P If you wish, you may perform the followingexercises yourself, or just watch the demo.
2-470
Are You Ready?Before we begin the exercises...
P Is your computer logged-in?< The windows desktop should be visible
PCan you locate the HydroCAD shortcut?< HydroCAD icon should be on the desktop< Otherwise look in Start | Programs | HydroCAD
PDoes anyone need help?
2-480
Subcatchment Setup #1Prepare a subcatchment toreceive our sample data
PGetting ready< Start HydroCAD< Open the “TR-20 Sample Project”
PCreate a subcatchment:< Drag a subcat from the palette
PEdit the subcatchment< Double-click the node -or-< Right-click and select Edit from the menu
2-490
Subcatchment Setup #2Enter some sample data
PEnter a couple of sub-areas & curve numbers:< Click the “Area” tab< Enter an area and a CN value directly
– For example: Area=10 acres, CN=75< Enter a second area and lookup the CN value
– To open the lookup table, double-click the line– Select the desired CN value from the table
PA few notes about data entry tables< Right-click any table for options< Drag first column to change order of rows
2-500
Subcatchment Setup #3Enter some sample data
PEnter some Tc values:< Click the “Tc” tab< Do a direct Tc entry
– Double-click a blank line– Select “Direct Entry”– Enter a TC value of 20 minutes– Click OK to save the TC data
PWe’ll examine the other Tc options later
2-510
Subcatchment Setup #4View the results!
PClick “OK” to save the subcat dataPOpen a report window:< Double-click any described node -or-< Right-click and select “report”
2-520
Subcatchment Setup #5View the results!
PExplore the report tabs:< Hydrograph
– Tabular view– Note maximum values in bold– Click “Shrink” to see more points
< Summary– Use summary to review results and input data– Click any line for help (new 7.1 feature)
2-530
Rainfall Settings #1Global settings for the current project
PReview the calculation settings< Click the “Calculator” icon
– Note: You can leave any report windows open!
PRunoff methods< TR-20 / SCS UH< SBUH< Rational
P (We’ll return to the routing options later)
2-540
Rainfall Settings #2Global settings for the current project
PRainfall data< Rainfall distribution & depth< Antecedent moisture condition< Rainfall duration< Back-to-back storms
PRainfall events< Define events as desired< -or- import events from another project
PFor Rational Method:< Can define Custom IDF curves
2-550
Rainfall Settings #3Global settings for the current project
PTime Span & Time Increment< Adjustable in response to any warning messages< “Fast Hydrograph Plots” generally recommended
– Improves plot speed and appearance– Does not affect accuracy of calculations
PUnit Hydrograph selection< Changing the Peak Factor
2-560
Rainfall Settings #4Global settings for the current project
PAdvanced Parameters< Initial Abstraction ratio< Used with new modeling techniques< (New feature added in version 7.1)
2-570
Rainfall Settings #5Global settings for the current project
PAutomatic pipe & culvert sizing< Lots of options to explore on your own< Remember: Click HELP for more information
PClick “OK” to close the calculation settings< Repots are updated for new settings!
2-580
*** End of Section ***
PBefore we move on, are there any other questionsabout subcatchments?
P If you performed the exercises, you may closeHydroCAD at this time.< You do NOT need to save your changes.
PWe will continue after a SHORT BREAK
2-590