Section 1 Introduction
1. Introduction
Section 1 | Introduction
1-1 Public Environmental Review/Draft Environmental Impact Statement
1 Introduction
1.1 Overview of documentThis Public Environmental Review/Draft Environmental Impact Statement (PER/Draft EIS) assesses the environmental impacts associated with BHP Billiton Iron Ore’s proposed Outer Harbour Development Port Hedland. The proposed project will be located adjacent to BHP Billiton Iron Ore’s current operations (Figure 1.1) at Port Hedland and includes the construction of stockyards within the vicinity of the decommissioned Hot Briquetted Iron (HBI) Plant at Boodarie and a jetty/wharf structure offshore from Finucane Island (Figure 1.2).
1.1.1 Proposal Title The proposed Outer Harbour Development Port Hedland will be referred to in this document as either the “Outer Harbour Development” or “the project”.
1.1.2 Proponent The proponent for the Outer Harbour Development is BHP Billiton Iron Ore, located at:
BHP Billiton Iron Ore 225 St Georges Terrace PERTH WA 6000
The key contact for the environmental approvals component is:
Mr Gavin Price Head of Environment BHP Billiton Iron Ore
Ph: (08) 6224 4024 Email: [email protected]
Further information on the proponent can be sourced from the Company’s website (www.bhpbilliton.com).
1.1.3 Project ObjectivesThe primary objective of the Outer Harbour Development is to expand the export capacity of BHP Billiton Port Hedland iron ore port operations to support current and future operational and capacity requirements and meet expected increase in global demand.
Increasing BHP Billiton’s export capacity at the Port will:maximise the efficiency of existing export ▸operations;enhance health, safety and amenity ▸associated with existing operations; andpromote sustainability of the region as an ▸export hub.
Finu
cane
Isla
ndBH
P B
illito
n Iro
n O
re
Uta
h P
oint
PHP
A
Ande
rson
Poi
ntFM
G
FMG
Nel
son
Poi
ntBH
P B
illito
n Iro
n O
re(U
nder
Con
stru
ctio
n)
PHP
A
Dam
pier
Sal
t
POR
T H
EDLA
ND
Wed
gefie
ld
Sout
h H
edla
nd
GreatNorth
ernHighway
Dec
omm
issi
oned
HB
I Pla
ntBH
P B
illito
n Iro
n O
re
FMG
Rai
lway
Gol
dsw
orth
yR
ailw
ay
Exis
ting
Ship
ping
Cha
nnel
Har
riet P
oint
BHP
Bill
iton
Iron
Ore
SW C
reek
Dev
elop
men
t
6580
0066
0000
6620
0066
4000
6660
0066
8000
6700
0067
2000
7744000774600077480007750000775200077540007756000
003\
g002
_WV
0502
4_R
ev0
Lege
nd Prin
cipa
l Roa
d
Exis
ting
Rai
lway
Exis
ting
Ship
ping
Cha
nnel
Sour
ce:
Cha
nnel
: 112
-SK
-005
00 (0
1/11
/200
8)O
rthor
ectif
ied
Aer
ial P
hoto
grap
h: 1
5/06
/200
7 (B
HP
BIO
)To
pogr
aphy
: GE
OD
ATA
Top
o 25
0K V
3
© C
omm
onw
ealth
of A
ustra
lia (G
A), 2
006
! (
! (N
EWM
AN
POR
TH
EDLA
ND Port Hedland Newman Railro
ad
GreatNorthern Higway
Figu
re 1
.1 P
ort H
edla
nd E
xist
ing
and
Pro
pose
d O
pera
tions
Dat
um: G
DA
94M
ap G
rid: M
GA
94 Z
one
50
01
2
kilo
met
res
°Sc
ale
=1:
75,0
00at
A4
Final
desig
n dr
awing
file
s wi
ll be
for
ward
ed t
o the
rele
vant
Gove
rnme
nt au
thoriti
es o
n fina
lisati
on a
nd co
mplet
ion.
This
figur
e is
an in
dicati
ve re
pres
entat
ion o
f the
cur
rent
desig
nof
the O
uter
Har
bour
Dev
elopm
ent.
Chan
ges
may
be
nece
ssar
y as
the
en
ginee
ring
desig
npr
ogre
sses
to e
nsur
e it
is eff
icien
t, pr
actic
al an
d wi
thin
land
distur
banc
e req
uirem
ents
at the
time o
f con
struc
tion.
Link Channel
Car Dumpers
Tug Access Channel
Western Spur Railway
Crossover Channel
Berth Pocketsand Swing Basins
Goldsworthy Rail Loop
Departure Channel
Stockyards
Infrastructure Corridor
Jetty
FINUCANEISLAND
SOUTH HEDLAND
WEDGEFIELD
PORT HEDLAND
Existing Shipping Channel
Wharf
640000 645000 650000 655000 660000 665000 670000 675000 680000 685000
7735
000
7735
000
7740
000
7740
000
7745
000
7745
000
7750
000
7750
000
7755
000
7755
000
7760
000
7760
000
7765
000
7765
000
7770
000
7770
000
7775
000
7775
000
7780
000
7780
000
7785
000
7785
000
7790
000
7790
000
LegendProposed Car Dumper
Proposed Jetty
Proposed Wharf
Proposed Goldsworthy Rail Loop
Proposed Western Spur Railway
Existing Railway
Proposed Tug Access ChannelState/CommonwealthJurisdiction BoundaryProposed Infrastructure Corridor
Proposed Stockyards
Proposed Departure Channel
Proposed Berth Pockets and Swing Basins
Proposed Link Channel
Proposed Crossover Channel
Existing Shipping Channel
0 2 4
kilometres
°Source:Australian Maritime Boundaries (AMB) andTopography: GEODATA Topo 250K V3�© Commonwealth of Australia (GA), 2006Channel: 112-SK-00500 (FAST JV 01/11/2008)Channel: Navy Hydrographer, AUS00740Imagery: Landsat Mosaic (2005)
003\g003_WV05024_Rev0
!(
!(
!(
Indian Ocean
PERTH
NEWMAN
PORT HEDLAND
Figure 1.2 Proposed Outer Harbour Development General Arrangement
Transfer Station
Datum: GDA94Map Grid: MGA94 Zone 50
1:250,000Scale = at A4
Final design drawing files will be forwarded to the relevantGovernment authorities on finalisation and completion.
This figure is an indicative representation of the current design ofthe Outer Harbour Development.Changes may be necessary as the engineering designprogresses to ensure it is efficient, practical and within landdisturbance requirements at the time of construction.
Section 1 | Introduction
1-4Public Environmental Review/Draft Environmental Impact Statement
The objectives will be achieved whilst:protecting the conservation, amenity and ▸social values of the Port Hedland area; responsibly managing environmental, health ▸and safety requirements; and implementing sound environmental management ▸throughout all phases of the development.
1.1.4 Background to the ProjectBHP Billiton Iron Ore is in a period of significant growth and has focused on growing the business via a phased approach to meet market demand.
BHP Billiton Iron Ore plans to continue to grow capacity in line with market demand for iron ore. China and other emerging economies are expected to continue to drive global demand for steel, and hence long term demand for iron ore, as steel remains a critical building block for modernisation.
To meet this expected continuation in demand. BHP Billiton Iron Ore is seeking to further expand export capacity through the development of new port facilities and supporting infrastructure as part of the proposed Outer Harbour Development at Port Hedland. The timing and the composition of the stages will ultimately be dependant on the market demand for iron ore, internal and external approvals and construction methodology.
1.1.5 Scope of Public Environmental Review/Environmental Impact Statement
This document describes and assesses the significance of the environmental impacts associated with the construction, operation and decommissioning phases of the Outer Harbour Development and how these impacts will be avoided, minimised and managed should the project proceed. The scope of the Outer Harbour Development project assessed in this PER/Draft EIS includes:
rail spur and loops from the existing BHP ▸Billiton Iron Ore Newman and Goldsworthy mainline rail infrastructure to proposed stockyards at Boodarie;rail loops and stockyards at Boodarie; ▸infrastructure corridor (including conveyors, ▸access roadway and utilities) from the stockyards to the proposed jetty;
jetty, wharf, dredged channel, basins and ▸berthing pockets offshore from Finucane Island to accommodate bulk carriers; andsupporting infrastructure including access ▸roads, upgrades to existing roads and utilities, buildings, temporary construction facilities and communication systems.
1.2 Environmental Management Framework1.2.1 Approval ProcessThis PER/Draft EIS has been prepared to satisfy both Western Australian and Commonwealth environmental legislation.
The Environmental Protection Act 1986 (EP Act) is the principal statute relevant to environmental protection in Western Australia. The Outer Harbour Development was referred to the Environmental Protection Authority (EPA) in accordance with Section 38 of the EP Act. Subsequently on 30 April 2008 the level of assessment for the proposed Outer Harbour Development was set at a Public Environmental Review (PER).
An Environmental Scoping Document (ESD) (BHP Billiton Iron Ore 2008a), describing the potential key environmental factors raised by the proposed Outer Harbour Development and the intended environmental studies to be completed as part of the assessment, was approved by the EPA on 4 November 2008. This PER/Draft EIS has been prepared in accordance with the final approved ESD.
The project description (including dredging volumes) provided in the ESD (BHP Billiton Iron Ore 2008a) has been revised based on advancements in the engineering design, oceanographic data, modelling and detailed bathymetry surveys. The current project description is provided in Section 2. Studies and/or technical appendices to the PER/Draft EIS have not been updated to incorporate minor changes in project description if these changes do not alter the significance of the studies’ outcomes.
In addition to the assessment by the EPA, the project was referred to the Commonwealth Department of the Environment, Water, Heritage and the Arts (DEWHA) under the provisions of the Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act) on 4 April 2008.
Section 1 | Introduction
1-5 Public Environmental Review/Draft Environmental Impact Statement
The Commonwealth regulatory authority previously known as DEWHA has recently changed name and is now known as the Department of Sustainability, Environment, Water, Population and Communities (DSEWPaC). The department is referred to as DSEWPaC throughout this document.
DSEWPaC determined that the proposed activity was a ‘controlled action’ under the EPBC Act due to the potential significant impacts on the following Matters of National Environmental Significance:
listed threatened species or communities ▸(Section 18 and 18A);listed migratory species (Section 20 and 20A); ▸andCommonwealth marine areas (Section 23 ▸and 24A).
DSEWPaC set the level of assessment at an Environmental Impact Statement (EIS) on 16 May 2008 and the EIS guidelines were issued on 24 December 2008.
The Environment Protection (Sea Dumping) Act 1981 (Sea Dumping Act), regulates the loading and dumping of waste at sea. This Act also fulfils Australia’s international obligations under the London Protocol to prevent marine pollution by controlling dumping of wastes and other matter.
Under the Sea Dumping Act, the Commonwealth aims to minimise the threat of pollution by:
prohibiting ocean disposal of waste ▸considered too harmful to be released in the marine environment; andregulating permitted waste disposal to ensure ▸environmental impacts are minimised.
An application to dispose of dredged material at sea was also submitted to the Federal Minister for the Environment and Heritage under the Sea Dumping Act on 4 April 2008. The Minister’s delegate determined that the proposed disposal is likely to
have a significant impact on the environment and sought advice in accordance with Section 160 of the EPBC Act. This requires assessment of the project in accordance with Part 8 of the EPBC Act. The PER/Draft EIS also provides the information required for the DSEWPaC to assess the project for granting of the Sea Dumping Permit. As the project is to be assessed by the Western Australian Government at the PER level of assessment, and the Commonwealth Government at the EIS level of assessment, the EPA and DSEWPaC determined that BHP Billiton Iron Ore should undertake a coordinated assessment (as shown in Figure 1.3). The submission of this joint PER/Draft EIS document is intended to satisfy the requirements of both jurisdictions.
Prior to the construction and operation of these facilities, a works approval and licence amendment will be required under Part V of the EP Act.
1.2.2 Terms of ReferenceThe terms of reference (Table 1.1) outlines the requirements that should be considered in preparing the PER/Draft EIS. Furthermore, the terms of reference provides the framework for the PER/Draft EIS, including information on the purpose and role of the PER/Draft EIS, and the factors considered to be most significant for the project based on the initial risk assessment undertaken at the Scoping Phase. The Scoping Phase determined the studies necessary and the data required to undertake the impact assessment as described in the ESD (Appendix B1). All potentially significant impacts on the environment were to be investigated for the Outer Harbour Development, and requirements for the mitigation of any adverse impacts are detailed in this PER/Draft EIS. The guidelines should, however, not be interpreted as excluding from consideration any matters which were not foreseen or which may arise during ongoing scientific studies or from any changes to the proposal.
Section 1 | Introduction
1-6Public Environmental Review/Draft Environmental Impact Statement
Figure 1.3 – Coordinated Environmental Assessment Process and Indicative Timeframes
1-7Pu
blic
Envi
ronm
enta
l Rev
iew
/Dra
ft En
viro
nmen
tal I
mpa
ct S
tate
men
t
Tabl
e 1.1
– Te
rms o
f Ref
Item
Num
ber
Cons
ider
atio
nRe
quire
men
t Re
leva
nt S
ectio
n of
PE
R/Dr
aft E
IS
Rele
vant
Gu
idel
ines
/ Re
fere
nce
1Bi
odive
rsity
Biol
ogica
l sur
veys
to d
ocum
ent e
xistin
g ba
selin
e co
nditi
ons a
nd to
ass
ess fi
ndin
gs in
loca
l an
d re
gion
al co
ntex
t.Se
ctio
ns 5
and
6Ta
ble
7.2,
Envir
onm
enta
l Sc
opin
g Do
cum
ent
(App
endi
x B1
)2
Sust
aina
bilit
yEs
tabl
ish a
sust
aina
bilit
y fra
mew
ork
for t
he p
roje
ct.
▸Co
nduc
t cle
aner
pro
duct
ion
revi
ews a
nd li
fe cy
cle a
nalys
is. ▸
Sect
ion
1Se
ctio
n 3
3Cu
mul
ative
Impa
cts
Eval
uate
cum
ulat
ive n
oise
and
dus
t em
issio
ns.
▸Ev
alua
te cu
mul
ative
loss
es o
f man
grov
es a
nd o
ther
ben
thic
prim
ary p
rodu
cer h
abita
t. ▸
Sect
ion
11Se
ctio
n 10
4Ge
olog
y, So
ils (i
nclu
ding
Acid
Sul
phat
e So
ils) a
nd
Land
form
sUn
derta
ke g
eote
chni
cal i
nves
tigat
ions
. Un
derta
ke :
prel
imin
ary a
cid su
lpha
te so
ils in
vest
igat
ion;
and
▸de
taile
d ac
id su
lpha
te so
ils in
vest
igat
ion
inco
rpor
ated
in th
e ge
otec
hnica
l ▸in
vest
igat
ions
.Un
derta
ke h
ydro
logy
impa
ct st
udy f
or th
e st
udy a
rea.
▸
Sect
ion
9
5Flo
ra a
nd V
eget
atio
n (e
xclu
ding
inte
rtida
l)Ba
selin
e flo
ra a
nd ve
geta
tion
surv
eys (
inclu
sive
of se
ason
al su
rvey
s).
▸Co
nduc
t im
pact
ass
essm
ent o
f the
pro
pose
d pr
ojec
t foo
tprin
t on
the
loca
l and
▸re
gion
al si
gnifi
canc
e of
flor
a sp
ecie
s and
reve
geta
tion
com
mun
ities
.
Sect
ion
5Se
ctio
n 9
6Fa
una
Base
line
faun
a su
rvey
and
ass
essm
ent i
nclu
sive
of sh
ort-r
ange
end
emics
and
seas
on.
▸Co
nduc
t an
impa
ct a
sses
smen
t of t
he p
ropo
sed
proj
ect f
ootp
rint o
n th
e lo
cal a
nd
▸re
gion
al si
gnifi
canc
e of
faun
a sp
ecie
s.
Sect
ion
5Se
ctio
n 9
7Su
bter
rane
an Fa
una
Unde
rtake
a su
bter
rane
an fa
una
risk
asse
ssm
ent.
▸Un
derta
ke g
roun
dwat
er/ h
ydro
geol
ogy a
sses
smen
t for
pro
pose
d de
wate
ring.
▸Se
ctio
n 9
8Su
rface
Wat
er Fl
ows
Cond
uct a
hyd
rolo
gica
l ass
essm
ent o
f the
stud
y are
a.Se
ctio
n 9
1-8
Publ
ic En
viro
nmen
tal R
evie
w/D
raft
Envi
ronm
enta
l Im
pact
Sta
tem
ent
Item
Num
ber
Cons
ider
atio
nRe
quire
men
t Re
leva
nt S
ectio
n of
PE
R/Dr
aft E
IS
Rele
vant
Gu
idel
ines
/ Re
fere
nce
9In
terti
dal a
nd S
ubtid
al B
enth
ic Pr
imar
y Pro
duce
r Hab
itats
an
d as
socia
ted
Biot
aBa
selin
e su
rvey
s inc
ludi
ng b
enth
ic ec
olog
y inv
estig
atio
ns, b
asel
ine
wate
r qua
lity a
nd
▸co
ral h
ealth
will
be
cond
ucte
d to
:de
scrib
e an
d ev
alua
te in
terti
dal,
supr
atid
al a
nd su
btid
al h
abita
ts;
▸de
term
ine
the
pres
ence
and
dist
ribut
ion
of b
enth
ic pr
imar
y pro
duce
r hab
itat;
▸co
nduc
t a sa
mpl
ing
and
anal
ysis
pilo
t pro
gram
to ch
arac
teris
e se
dim
ents
; ▸pr
ovid
e ba
selin
e da
ta to
ass
ist d
evel
opm
ent o
f the
futu
re m
onito
ring
prog
ram
; ▸de
term
ine
cum
ulat
ive (h
istor
ic) lo
sses
; and
▸de
term
ine
requ
irem
ent f
or a
ben
thic
prim
ary p
rodu
cer h
abita
t offs
et p
lan.
▸ Cond
uct a
ssoc
iate
d m
odel
ling
and
surv
eys t
o id
entif
y are
as o
f sen
sitiv
ity a
nd
▸in
fluen
ce;
Near
shor
e hy
drod
ynam
ic/ ti
dal fl
ow m
odel
ling
to id
entif
y are
as o
f sen
sitiv
ity a
nd
▸in
fluen
ce; a
ndDr
edgi
ng p
lum
e m
odel
ling
to p
redi
ct th
e im
pact
zone
for b
enth
ic pr
imar
y pro
duce
r ▸ha
bita
t (m
orta
lity,
sub-
leth
al a
nd n
o de
tect
able
chan
ge).
Sect
ion
10Ap
pend
ices
B2,
B3,
B6
B18
and
B19
Appe
ndix
B4
Tabl
e 7.2
, En
viron
men
tal
Scop
ing
Docu
men
t (A
ppen
dix
B1)
10Hy
drod
ynam
ics a
nd C
oast
al P
roce
sses
Colle
ct b
asel
ine
data
to d
eter
min
e ex
istin
g co
asta
l hyd
rody
nam
ic an
d ge
omor
phic
▸pr
oces
ses.
Esta
blish
hyd
rody
nam
ic an
d ge
omor
phic
mod
els f
or th
e st
udy a
rea
and
dete
rmin
e th
e ▸im
pact
of t
he p
ropo
sed
desig
n on
coas
tal p
roce
sses
and
sedi
men
t sta
bilit
y.
Sect
ion
10
11Pr
otec
ted
Mar
ine
Biot
aCo
nduc
t an
offs
hore
mar
ine
envi
ronm
enta
l sur
vey t
o:
▸pr
ovid
e ba
selin
e da
ta to
des
crib
e th
e ex
istin
g m
arin
e en
viro
nmen
t and
pre
senc
e of
▸an
y sig
nific
ant f
eatu
res a
nd m
ap th
e di
strib
utio
n of
mar
ine
habi
tats
;ad
dres
s dat
a lim
itatio
ns o
n lis
ted
spec
ies o
r hab
itats
; ▸pr
ovid
e ba
ckgr
ound
dat
a to
ass
ist d
evel
opm
ent o
f fut
ure
mon
itorin
g pr
ogra
ms;
and
▸de
term
ine
the
pres
ence
and
dist
ribut
ion
of fa
una
habi
tats
and
pot
entia
l for
agin
g ▸gr
ound
s.Dr
edgi
ng p
lum
e di
sper
sion
and
sedi
men
t re-
susp
ensio
n m
odel
ling.
▸Ba
selin
e wa
ter q
ualit
y and
cora
l hea
lth m
onito
ring.
▸M
arin
e tu
rtle
surv
ey a
nd a
sses
smen
t. ▸M
arin
e m
amm
al st
udy t
o in
corp
orat
e po
tent
ial i
mpa
cts f
rom
ligh
ting
and
noise
▸ge
nera
ted
durin
g co
nstru
ctio
n.Un
derta
ke m
arin
e m
amm
al st
udy t
o id
entif
y mig
ratio
n pa
ths,
pote
ntia
l for
stud
y are
a ▸to
be
utili
sed
(for f
orag
ing,
bre
edin
g or
mig
ratio
n) b
y mar
ine
mam
mal
s.
Sect
ion1
0
Tabl
e 1.1
– Te
rms o
f Ref
1-9
Publ
ic En
viro
nmen
tal R
evie
w/D
raft
Envi
ronm
enta
l Im
pact
Sta
tem
ent
Tabl
e 1.1
– Te
rms o
f Ref
Item
Num
ber
Cons
ider
atio
nRe
quire
men
t Re
leva
nt S
ectio
n of
PE
R/Dr
aft E
IS
Rele
vant
Gu
idel
ines
/ Re
fere
nce
12No
n-en
dem
ic M
arin
e Sp
ecie
sUn
derta
ke a
des
ktop
ass
essm
ent o
f im
pact
s ass
ocia
ted
with
intro
duce
d m
arin
e sp
ecie
s and
pa
thog
ens t
hrou
gh in
crea
sed
ship
ping
mov
emen
ts a
nd co
nstru
ctio
n eq
uipm
ent.
13Ai
r – Pa
rticu
late
Dus
t Em
issio
nsUn
derta
ke a
dus
t mod
ellin
g as
sess
men
t to:
▸de
velo
p an
atm
osph
eric
mod
el;
▸id
entif
y dus
t sou
rces
; ▸pr
edict
like
ly du
st e
miss
ions
; ▸de
scrib
e ex
istin
g em
issio
ns fr
om n
atur
al b
ackg
roun
d so
urce
s and
oth
er P
ort
▸He
dlan
d so
urce
s inc
ludi
ng e
xist
ing
BHP
Billi
ton
Iron
Ore
oper
atio
ns, p
ropo
sed
BHP
Billi
ton
Iron
Ore
oper
atio
ns, P
HPA
oper
atio
ns in
clusiv
e of
Uta
h Po
int a
nd F
MG
oper
atio
ns;
eval
uate
cum
ulat
ive im
pact
s as a
resu
lt of
the
proj
ect;
and
▸de
term
ine
pote
ntia
l im
pact
s and
eva
luat
e th
e re
sults
aga
inst
acc
epte
d gu
idel
ines
, ▸Se
ctio
n 46
targ
ets a
nd st
atut
ory r
equi
rem
ents
. De
posit
iona
l mod
ellin
g to
det
erm
ine
any p
oten
tial i
mpa
cts t
o ar
eas o
f her
itage
▸sig
nific
ance
.Un
derta
ke co
mm
unity
cons
ulta
tion
and
enga
gem
ent.
▸
Sect
ion
11
14Ai
r – G
reen
hous
e Ga
ses
Cond
uct a
gre
enho
use
gas a
sses
smen
t.Gr
eenh
ouse
Gas
As
sess
men
t (SK
M 2
009o
)
15Gr
ound
wate
r and
Sur
face
Wat
er Q
ualit
yId
entif
y pot
entia
l con
tam
inat
ion
sour
ces,
path
ways
and
det
erm
ine
man
agem
ent c
ontro
ls re
quire
d to
pre
vent
cont
amin
atio
n an
d m
anag
e st
orm
wate
r.Se
ctio
n 8
16M
arin
e W
ater
and
Sed
imen
t Qua
lity
Unde
rtake
sam
plin
g an
d an
alys
is of
mar
ine
sedi
men
ts to
iden
tify p
rese
nce
of p
oten
tial
▸co
ntam
inan
ts a
nd d
eter
min
e se
dim
ent p
artic
le si
ze.
Unde
rtake
sedi
men
t plu
me
mod
ellin
g to
det
erm
ine
the
geog
raph
ic ex
tent
of t
he
▸pr
opos
ed p
lum
e.Ch
arac
teris
e ba
selin
e wa
ter q
ualit
y par
amet
ers f
or a
min
imum
of 1
2 m
onth
s, at
▸re
pres
enta
tive
impa
ct a
nd re
fere
nce
sites
in S
tate
and
Com
mon
wea
lth w
ater
s.Un
derta
ke co
ntam
inat
ion
and
acid
sulp
hate
soils
test
ing
of sp
oil m
ater
ial i
dent
ified
▸fo
r disp
osal
to la
nd.
Sect
ion
10Ap
pend
ices
B4,
B6
and
B19
Wat
er Q
ualit
y Mon
itorin
g Re
port
(SKM
200
9f)
17Hy
droc
arbo
ns a
nd H
azar
dous
Mat
eria
lsId
entif
y pot
entia
l con
tam
inat
ion
sour
ces a
nd p
athw
ays.
Sect
ions
9, 1
0 an
d 11
18So
lid a
nd Li
quid
Was
te D
ispos
alCo
nduc
t a w
aste
stud
y to
iden
tify s
ourc
es, q
uant
ities
and
disp
osal
opt
ions
.W
aste
Man
agem
ent S
tudy
(S
KM 2
009s
) Se
ctio
n 8
1-10
Publ
ic En
viro
nmen
tal R
evie
w/D
raft
Envi
ronm
enta
l Im
pact
Sta
tem
ent
Item
Num
ber
Cons
ider
atio
nRe
quire
men
t Re
leva
nt S
ectio
n of
PE
R/Dr
aft E
IS
Rele
vant
Gu
idel
ines
/ Re
fere
nce
19Te
rrest
rial N
oise
and
Vib
ratio
nCo
nduc
t a n
oise
ass
essm
ent t
o:id
entif
y noi
se so
urce
s (in
cludi
ng co
nvey
or d
rives
, tra
ffic,
rail,
pili
ng, e
tc);
▸pr
edict
like
ly no
ise e
miss
ions
; ▸id
entif
y opp
ortu
nitie
s to
min
imise
noi
se e
miss
ions
; ▸ev
alua
te n
oise
em
issio
ns re
sulti
ng fr
om th
e pr
ojec
t in
isola
tion;
and
▸m
odel
noi
se im
pact
s on
sens
itive
rece
ptor
s fro
m th
e pr
opos
al in
isol
atio
n an
d ▸cu
mul
ative
ly w
ith o
ther
sour
ces i
nclu
ding
impa
cts f
rom
ass
ocia
ted
incr
ease
in ra
il an
d tra
ffic n
oise
.
Sect
ion
11
20M
arin
e No
ise, B
last
ing
and
Vibr
atio
nCo
nduc
t noi
se e
miss
ion
mod
ellin
g an
d es
tabl
ish b
asel
ine
noise
dat
a fo
r mar
ine
▸en
viro
nmen
t;Co
nduc
t a m
arin
e no
ise a
nd v
ibra
tion
asse
ssm
ent t
o: ▸
iden
tify m
arin
e fa
una
at ri
sk a
nd e
xten
t of i
mpa
cts;
▸de
term
ine
pote
ntia
l noi
se a
nd v
ibra
tion
impa
cts f
rom
dre
dgin
g, b
last
ing,
pili
ng a
nd
▸sh
ippi
ng; a
ndes
tabl
ish m
anag
emen
t stra
tegi
es to
min
imise
any
sign
ifica
nt im
pact
s. ▸ Esta
blish
tole
ranc
e lim
its o
f sen
sitive
mar
ine
faun
a. ▸
Sect
ion
10
21Lig
htCo
nduc
t a li
ght i
mpa
ct a
sses
smen
t.Ap
pend
ix B
5Se
ctio
ns 9
, 10
and
1122
Fishe
ries
Liaise
with
rele
vant
fish
ing
grou
ps a
nd re
leva
nt st
akeh
olde
rs.
▸Co
nduc
t a fi
sher
ies s
tudy
to in
clude
: ▸
iden
tifica
tion
of re
crea
tiona
l, co
mm
ercia
l fish
erie
s; ▸as
sess
men
t of a
quac
ultu
re o
pera
tions
with
in th
e vi
cinity
of t
he d
evel
opm
ent a
rea;
▸an
did
entifi
catio
n of
key
com
mer
cial s
pecie
s. ▸ Unde
rtake
seas
onal
char
acte
ristic
s and
iden
tifica
tion
of a
ny si
gnifi
cant
issu
es fo
r ▸co
nsid
erat
ion
in p
roje
ct d
esig
n.
Desk
top
Fishe
ries
Stud
y (SK
M 2
009n
)
23In
dige
nous
Her
itage
Cond
uct a
rcha
eolo
gica
l and
eth
nogr
aphi
c sur
veys
ove
r the
stud
y are
a.
▸Re
leva
nt lo
cal A
borig
inal
gro
ups a
nd re
pres
enta
tives
will
be
cons
ulte
d. ▸
Sect
ion
7
Tabl
e 1.1
– Te
rms o
f Ref
1-11
Publ
ic En
viro
nmen
tal R
evie
w/D
raft
Envi
ronm
enta
l Im
pact
Sta
tem
ent
Item
Num
ber
Cons
ider
atio
nRe
quire
men
t Re
leva
nt S
ectio
n of
PE
R/Dr
aft E
IS
Rele
vant
Gu
idel
ines
/ Re
fere
nce
24Eu
rope
an H
erita
geCo
mpl
ete
a de
skto
p re
view
of n
on-in
dige
nous
her
itage
surv
eys i
nclu
ding
mar
itim
e ▸he
ritag
e sit
es.
Iden
tify a
ny h
erita
ge si
tes l
isted
on
the
Regi
ster
of N
atio
nal E
stat
e, th
e St
ate
Herit
age
▸Co
uncil
’s Re
gist
er o
f Site
s and
the
loca
l Mun
icipa
l Inv
ento
ry.Fi
nalis
e an
d im
plem
ent a
Com
mun
ity E
ngag
emen
t and
Con
sulta
tion
Plan
. ▸
Sect
ion
7
25So
cial I
mpa
cts
Cond
uct a
socia
l im
pact
ass
essm
ent o
f the
ove
rall
grow
th st
rate
gy o
f the
pro
ject
.Se
ctio
ns 7
and
11
26Vi
sual
Am
enity
Cond
uct a
visu
al a
men
ity a
sses
smen
t to
dete
rmin
e th
e vis
ual i
mpa
cts o
f the
pro
ject
dur
ing
day a
nd n
ight
tim
e op
erat
ions
.Se
ctio
ns 7
and
11
27Re
crea
tion
Cond
uct a
socia
l im
pact
ass
essm
ent t
o:id
entif
y the
recr
eatio
nal a
reas
with
in th
e pr
oxim
ity to
the
stud
y are
a; a
nd ▸de
term
ine
the
pote
ntia
l im
pact
s. ▸
Sect
ions
4, 7
and
11
28De
com
miss
ioni
ngEs
tabl
ish a
pre
limin
ary C
losu
re a
nd D
ecom
miss
ioni
ng S
trate
gy th
at o
utlin
es th
e ap
proa
ch
of th
e clo
sure
pla
nnin
g pr
oces
s in
acco
rdan
ce w
ith cl
osur
e st
anda
rds
Sect
ion
12
29M
anag
emen
t Pla
ns to
be
inclu
ded
in th
e PE
RAc
id S
ulph
ate
Soils
Man
agem
ent P
lan
▸Ap
pend
ix A
7Ta
ble
9.1,
Envir
onm
enta
l Sc
opin
g Do
cum
ent
(App
endi
x B1
)
Dust
Man
agem
ent P
lan
▸Re
fer t
o Po
rt He
dlan
d Du
st M
anag
emen
t Pr
ogra
m
Noise
Red
uctio
n M
anag
emen
t Pla
n ▸
Refe
r to
Port
Hedl
and
Noise
Red
uctio
n M
anag
emen
t Pro
gram
Mar
ine
Turtl
e M
anag
emen
t Pla
n ▸M
arin
e M
amm
al M
anag
emen
t Pla
n ▸
Turtl
es –
Appe
ndix
A1
Mar
ine
Mam
mal
s –
Appe
ndix
A4
Dred
ging
and
Spo
il Di
spos
al M
anag
emen
t Pla
n ▸
Appe
ndix
A3
Non-
Ende
mic
Mar
ine
Spec
ies M
anag
emen
t Pla
n ▸
Inva
sive
Mar
ine
Spec
ies –
Ap
pend
ix A
5
30Ge
nera
l Inf
orm
atio
nPr
ovid
e ba
ckgr
ound
and
cont
ext.
Sect
ion
1Se
ctio
n 1
EIS
Guid
elin
es
Tabl
e 1.1
– Te
rms o
f Ref
1-12
Publ
ic En
viro
nmen
tal R
evie
w/D
raft
Envi
ronm
enta
l Im
pact
Sta
tem
ent
Item
Num
ber
Cons
ider
atio
nRe
quire
men
t Re
leva
nt S
ectio
n of
PE
R/Dr
aft E
IS
Rele
vant
Gu
idel
ines
/ Re
fere
nce
31De
scrip
tion
of th
e Ac
tion/
Pro
posa
lIn
clude
s des
crip
tion
of:
key c
ompo
nent
s and
cons
truct
ion
in d
etai
l; ▸ho
w th
e w
orks
are
to b
e un
derta
ken;
▸de
sign
para
met
ers r
elat
ed to
rele
vant
impa
cts;
▸pr
ovid
e a
com
preh
ensiv
e de
scrip
tion
of th
e pr
opos
al;
▸pr
ovid
e pl
ans o
f the
pro
posa
l whi
ch a
re si
gnifi
cant
from
an
envi
ronm
enta
l pro
tect
ion
▸pe
rspe
ctive
;de
scrib
e tim
ing
and
stag
ing
of p
roje
ct; a
nd ▸de
tail
owne
rshi
p an
d lia
bilit
y for
oth
er a
spec
ts re
late
d to
the
prop
osal
. ▸
Sect
ion
2Se
ctio
n 2
EIS
Guid
elin
esSe
ctio
n 4.1
PER
Gu
idel
ines
32Fe
asib
le A
ltern
ative
sDi
scus
s fea
sible
alte
rnat
ives t
o th
e ac
tion.
Sect
ion
3Se
ctio
n 3
EIS
Guid
elin
es
33De
scrip
tion
of th
e En
viron
men
tDe
scrib
e en
viro
nmen
t of t
he p
ropo
sal s
ite a
nd su
rroun
ding
are
as th
at m
ay b
e af
fect
ed
▸by
the
actio
n.Se
ctio
ns 5
, 6 a
nd 7
Sect
ion
4 EI
S Gu
idel
ines
Deve
lop
and
unde
rtake
Sam
plin
g &
Anal
ysis
Plan
(SAP
). ▸
Appe
ndix
B6
Deve
lop
and
unde
rtake
add
ition
al o
ffsho
re d
ispos
al si
te se
lect
ions
for d
redg
ed
▸m
ater
ial.
Sect
ion
3 an
d Sp
oil
Grou
nd S
elec
tion
Stud
y (S
KM 2
009h
)
Desc
ribe
Com
mon
wea
lth m
arin
e en
viro
nmen
t with
resp
ect t
o sig
nific
ant r
egio
nal
▸ha
bita
t for
list
ed th
reat
ened
and
mig
rato
ry m
arin
e sp
ecie
s.Se
ctio
ns 6
and
10
Desc
ribe
exist
ing
envir
onm
ent i
n a
loca
l and
regi
onal
cont
ext,
inclu
ding
:ke
y eco
syst
em p
roce
sses
; ▸bi
odive
rsity
; ▸ex
istin
g sit
e co
nditi
on; a
nd ▸en
viro
nmen
tal i
ssue
s tha
t may
be
cons
train
ts o
r fat
al fl
aws t
o th
e pr
opos
al ▸
Sect
ion
4.2
PER
Guid
elin
es
Tabl
e 1.1
– Te
rms o
f Ref
1-13
Publ
ic En
viro
nmen
tal R
evie
w/D
raft
Envi
ronm
enta
l Im
pact
Sta
tem
ent
Item
Num
ber
Cons
ider
atio
nRe
quire
men
t Re
leva
nt S
ectio
n of
PE
R/Dr
aft E
IS
Rele
vant
Gu
idel
ines
/ Re
fere
nce
34Re
leva
nt Im
pact
sDe
scrib
e po
tent
ial r
elev
ant i
mpa
cts o
n th
e ec
olog
y, hy
drol
ogy a
nd g
eom
orph
olog
y rel
ated
to
the
Mat
ters
of N
atio
nal E
nviro
nmen
tal S
igni
fican
ce (N
ES),
inclu
ding
:as
sess
ing
the
natu
re a
nd e
xten
t of l
ikely
shor
t-ter
m, l
ong-
term
and
cons
eque
ntia
l ▸re
leva
nt im
pact
s;po
tent
ial d
irect
, ind
irect
and
cons
eque
ntia
l im
pact
s on
regi
onal
and
Com
mon
wea
lth
▸m
arin
e en
viro
nmen
t;im
pact
s on
othe
r use
rs;
▸po
tent
ial i
mpa
cts o
n im
porta
nt a
men
ities
, nav
igat
ion,
cultu
rally
and
hist
orica
lly
▸sig
nific
ant s
ites,
thre
aten
ed o
r mig
rato
ry sp
ecie
s or s
ensit
ive h
abita
ts;
pote
ntia
l im
pact
on
liste
d m
arin
e sp
ecie
s; ▸po
tent
ial r
isk o
f pes
t spe
cies b
ecom
ing
esta
blish
ed in
Com
mon
wea
lth m
arin
e ar
ea;
▸an
dch
ange
s in
air a
nd w
ater
qua
lity.
▸Fo
cus o
n th
e ke
y or m
ore
signi
fican
t env
ironm
enta
l iss
ues a
nd th
e as
socia
ted
fact
ors.
▸Di
scus
s the
ext
ent t
o w
hich
bes
t pra
ctice
will
be
appl
ied
to th
e pr
opos
al.
▸Pr
ovid
e su
mm
ary t
able
for a
ll en
viro
nmen
tal f
acto
rs.
▸
Sect
ions
9, 1
0 an
d 11
Sect
ion
5 EI
S Gu
idel
ines
Sect
ions
9, 1
0 an
d 11
Sect
ion
12Ex
ecut
ive
Sum
mar
y
Sect
ion
4.3
PER
Guid
elin
es
35Pr
opos
ed S
afeg
uard
s and
Miti
gatio
n M
easu
res
Desc
ribe
prop
osed
safe
guar
ds a
nd m
itiga
tion
mea
sure
s. ▸As
sess
exp
ecte
d or
pre
dict
ed e
ffect
ivene
ss o
f miti
gatio
n m
easu
res.
▸Pr
ovid
e co
sts o
f the
miti
gatio
n m
easu
res.
▸Pr
ovid
e Fr
amew
ork
Envi
ronm
enta
l Man
agem
ent P
lan.
▸Na
me
agen
cy/ie
s res
pons
ible
for e
ndor
sing
or a
ppro
ving
eac
h m
itiga
tion
mea
sure
or
▸m
onito
ring
prog
ram
.
Sect
ions
9, 1
0 ,11
an
d 12
and
rele
vant
M
anag
emen
t Pla
ns
Sect
ion
6 EI
S Gu
idel
ines
36Ot
her A
ppro
vals
and
Cond
ition
sDe
tail
any o
ther
requ
irem
ents
for a
ppro
val o
r con
ditio
ns th
at a
pply.
Sect
ion
1Se
ctio
n 7
EIS
Guid
elin
es
37Co
nsul
tatio
nDe
scrib
e pu
blic
parti
cipat
ion
and
cons
ulta
tion
activ
ities
und
erta
ken.
Sect
ion
4Se
ctio
n 8
EIS
Guid
elin
esSe
ctio
n 5
PER
Guid
elin
es
38In
form
atio
n So
urce
sDe
tails
of s
ourc
e, a
ge a
nd re
liabi
lity o
f inf
orm
atio
n re
fere
nced
in th
e EI
S.Se
ctio
n 13
Sect
ion
9 EI
S Gu
idel
ines
Tabl
e 1.1
– Te
rms o
f Ref
1-14
Publ
ic En
viro
nmen
tal R
evie
w/D
raft
Envi
ronm
enta
l Im
pact
Sta
tem
ent
Item
Num
ber
Cons
ider
atio
nRe
quire
men
t Re
leva
nt S
ectio
n of
PE
R/Dr
aft E
IS
Rele
vant
Gu
idel
ines
/ Re
fere
nce
39En
viron
men
tal r
ecor
d of
Per
son(
s) P
ropo
sing
to Ta
ke
the
Actio
nPr
ovid
e de
tails
of a
ny p
roce
edin
gs u
nder
a C
omm
onw
ealth
, Sta
te o
r Ter
ritor
y law
for
▸th
e pr
otec
tion
of th
e en
viro
nmen
t or t
he co
nser
vatio
n an
d su
stai
nabl
e us
e of
nat
ural
re
sour
ces.
Prov
ide
deta
ils o
f the
corp
orat
ion’
s env
ironm
enta
l pol
icy a
nd p
lann
ing
fram
ewor
k. ▸
Sect
ion
12Se
ctio
n 10
EIS
Gu
idel
ines
40Co
nclu
sion
Prov
ide
an o
vera
ll co
nclu
sion
as to
the
envir
onm
enta
l acc
epta
bilit
y of t
he p
ropo
sal.
Indi
cate
the
prop
onen
t’s v
iew
of t
he e
nviro
nmen
tal c
osts
(sub
stan
tial i
nves
tmen
t) an
d ▸be
nefit
s of t
he p
ropo
sal.
Outli
ne th
e ba
sis u
pon
whi
ch th
e pr
opon
ent b
elie
ves t
he E
PA sh
ould
conc
lude
that
the
▸pr
opos
al is
env
ironm
enta
lly a
ccep
tabl
e.
Exec
utiv
e Su
mm
ary
Sect
ions
9.8
and
10.5
Sect
ion
11 E
IS
Guid
elin
esSe
ctio
n 6
PER
Guid
elin
es
41Pr
incip
les
Prov
ide
a ta
ble
show
ing
how
cons
ider
atio
n ha
s bee
n gi
ven
to th
e pr
incip
les o
f en
viron
men
tal p
rote
ctio
n.Se
ctio
n 1
Tabl
e 1.
5Se
ctio
n 4.
4 PE
R Gu
idel
ines
42En
viron
men
tal M
anag
emen
tPr
ovid
e a
brie
f des
crip
tion
of th
e pr
opos
ed e
nviro
nmen
tal m
anag
emen
t sys
tem
Sect
ion
12Se
ctio
n 4.
5 PE
R Gu
idel
ines
Tabl
e 1.1
– Te
rms o
f Ref
Section 1 | Introduction
1-15 Public Environmental Review/Draft Environmental Impact Statement
1.2.3 Key Legislation and PoliciesState and Commonwealth Legislation and Policies
The Outer Harbour Development is required to comply with relevant Western Australian and Commonwealth legislation. Current key legislation applicable to this project includes but is not limited to that outlined in Table 1.2.
Table 1.2 – Key Western Australian and Commonwealth Legislation
Western Australian Legislation
Aboriginal Heritage Act 1972 Explosives and Dangerous Goods Act 1961
Aboriginal Heritage Regulations 1974 Fish Resources Management Act 1994
Agriculture and Related Resources Protection Act 1976 Health Act 1911
Agricultural and Related Resources (Declared Plants and Restricted Animals) Regulations 1982
Heritage of Western Australia Act 1990
Biosecurity and Agriculture Management Act 2007 Iron Ore (Mount Goldsworthy) Agreement Act 1964
Bush Fires Act 1954 Jetties Act 1926
Conservation and Land Management Act 1984 Land Administration Act 1997
Conservation and Land Management Regulations 2002 Litter Act 1979
Contaminated Sites Act 2003 Local Government Act 1995
Contaminated Sites Regulations 2002 Main Roads Act 1930
Country Areas Water Supply Act 2003 Marine and Harbours Act 1981
Dangerous Goods Safety Act 2004 Mining Act 1978
Dangerous Goods (Transport) Act 1998 Native Title (State Provisions) Act 1999
Dangerous Goods Safety (Storage and Handling of Non-explosives) Regulations 2007
Occupational Health and Safety Act 1984
Dangerous Goods Safety (Goods in Ports) Regulations 2007 Planning and Development Act 2005
Electricity Act 1945 Pollution of Waters by Oil and Noxious Substances Act 1987
Environmental Protection Act 1986 Port Authorities Act 1999
Environmental Protection Regulations 1987 Rail Safety Act 2010
Environmental Protection (Clearing of Native Vegetation) Regulations 2004 Rights in Water Irrigation Act 1914
Environmental Protection (Controlled Waste) Regulations 2004 Shipping and Pilotage Act 1987
Environmental Protection (NEPM-NPI) Regulations1998 Soil and Land Conservation Act 1945
Environmental Protection (Noise) Regulations 1997 Soil and Land Conservation Regulations 1992
Environmental Protection (Unauthorised Discharges) Regulations 2004 Wildlife Conservation Act 1950
Commonwealth Legislation
Aboriginal and Torres Strait Islander Heritage Protection Act 1984 Environment Protection (Sea Dumping) Regulations 1983
Australian Ballast Water Management Requirements & Australian Quarantine Regulations 2001
National Environmental Protection Council Act 1994
Australian Heritage Council Act 2003 Historic Shipwrecks Act 1976
Australian Maritime Safety Authority Act 1990 Native Title Act 1993
Energy Efficiency Opportunities Act 2006 Navigation Act 1912
Environment Protection and Biodiversity Conservation Act 1999 National Greenhouse and Energy Reporting Act 2007
Environment Protection and Biodiversity Conservation Regulations 2000 Protection of the Sea (Prevention of Pollution from Ships) Act 1983
Environment Protection (Sea Dumping) Act 1981
Section 1 | Introduction
1-16Public Environmental Review/Draft Environmental Impact Statement
International Conventions
In addition to State and Commonwealth legislation, there are a number of international conventions and bilateral agreements for the protection of fauna and flora. In undertaking the PER/Draft EIS, the agreements and conventions included in Table 1.3 have been considered and applied where appropriate.
Table 1.3 – Bilateral Agreements and International Conventions
Bilateral Agreements
China-Australia Migratory Bird Agreement (CAMBA)
Japan-Australia Migratory Bird Agreement (JAMBA)
Republic of Korea-Australia Migratory Bird Agreement (ROKAMBA)
International Conventions
The Convention on Biological Diversity 1993 (CBD)
The Convention on the Conservation of Migratory Species of Wild Animals 1979 (CMS or Bonn Convention)
The Convention on the International Trade in Endangered Species of Wild Fauna and Flora 1973 (CITES)
The Convention on Wetlands of International Importance 1971 (Ramsar Convention)
The London Convention 1972 (replaced by the 1996 Protocol)
1.2.4 BHP Billiton Sustainable Development FrameworkThe growth opportunity presented by the expansion of the market for iron ore represents a significant challenge to BHP Billiton Iron Ore to capture this growth in partnership with the communities in which it operates, while realising the social benefits and protecting the environment.
The Outer Harbour Development represents the largest engineering project yet undertaken at Port Hedland, and will present BHP Billiton Iron Ore with many opportunities to incorporate sustainability principles into its development approach.
BHP Billiton’s commitment to sustainable development has evolved over a long history of operational experience. The Company recognises the benefits of successful management of environmental and social performance while delivering economic benefits.
As the world’s largest diversified resource company, BHP Billiton’s decisions have the potential to impact the environment and society, both now and into the future. The continuing success and sustainability of the Company is heavily dependent upon securing and maintaining a licence to operate and grow. This requires BHP Billiton to demonstrate on an ongoing basis that the Company can and will protect the value of environmental and social resources in the communities in which it operates, and that the host communities will continue to share in the business success.
The BHP Billiton Group operates under a series of corporate requirements, including a Charter, Sustainable Development Policy, health safety
environment and community standards and a Code of Business Conduct. These corporate requirements promote a mutually beneficial relationship between the Company, the environment and the communities in which it operates, including Indigenous communities. The main principles of the Health and Safety Environment and Community Management Standards are:
an overriding commitment to health, safety, ▸environmental responsibility and sustainable development;the development, implementation and ▸maintenance of management systems that drive sustainable development and continual improvement;consideration of the entire asset’s lifecycle, ▸from planning to design, construction, operation and closure; anda requirement that all employees are ▸accountable for behaving in accordance with the corporate policies and standards.
BHP Billiton Iron Ore develops and assesses each of its development projects against an internal project evaluation process. The process requires identification of economic, environmental and social aspects arising from a project at each stage of development, and requires each aspect to be addressed satisfactorily before the project is permitted to proceed through the ‘tollgate’ to the next stage of development (Figure 1.4). The BHP Billiton Group is continually looking to optimise the performance of its operations.
Section 1 | Introduction
1-17 Public Environmental Review/Draft Environmental Impact Statement
The BHP Billiton Group has developed a proprietary risk management standard which provides a consistent platform across the Company’s operations by which risks are rated and ranked. The phased project development process is integrated with this risk assessment process to ensure that risks associated with proposed projects are identified and that the outcomes of the risk assessment process are considered and addressed in each successive project review. BHP Billiton Iron Ore used the risk standard to assess the risks of the project:
against safety, health, environmental, ▸community and economic performance, including the implications for Matters of National Environmental Significance (NES) protected under Part 3 of the EPBC Act; andto conform with the BHP Billiton Group and ▸BHP Billiton Iron Ore’s policies and standards.
1.2.5 Applicable Guidelines and StandardsIn undertaking the PER/Draft EIS, the guidelines and statements included in Table 1.4 have been considered and applied where appropriate.
1.2.6 Principles of Environmental ProtectionIn 2003, the EP Act was amended to include the following principles of environmental protection (EPA 2004a):
the precautionary principle; ▸the principle of intergenerational equity; ▸the principle of the conservation of biological ▸diversity and ecological integrity;principles relating to improved valuation, ▸pricing and incentive mechanisms; andthe principle of waste minimisation. ▸
The EPBC Act describes the following principles of ecologically sustainable development:
decisionmaking processes should effectively ▸integrate both longterm and shortterm economic, environmental, social and equitable considerations; if there are threats of serious or irreversible ▸environmental damage, lack of full scientific certainty should not be used as a reason for postponing measures to prevent environmental degradation; the principle of intergenerational equity that ▸the present generation should ensure that the health, diversity and productivity of the environment is maintained or enhanced for the benefit of future generations; the conservation of biological diversity and ▸ecological integrity should be a fundamental consideration in decision making; andimproved valuation, pricing and incentive ▸mechanisms should be promoted.
The application of these principles to the Outer Harbour Development is described in Table 1.5.
Concept Phase Study
Selection Phase Study
Definition Phase Study
Execution Phase
Operation Phase
▼
Tollgate
▼
Tollgate
▼
Tollgate
▼
Tollgate
▼
Post Investment
ReviewFigure 1.4 – BHP Billiton Group’s Project Evaluation and Investment Process
Section 1 | Introduction
1-18Public Environmental Review/Draft Environmental Impact Statement
Table 1.4 – Applicable Guidelines and Standards
Guidelines and Standards
EPA Guidance Statements
No. 1: Protection of Tropical Arid Zone Mangroves along the Pilbara Coast
No. 12: Minimising Greenhouse Gases
No. 18: Prevention of Air Quality Impacts from Land Development Sites
No. 20: Sampling of Short-range Endemic Invertebrate Fauna for Environmental Impact Assessment in Western Australia
No. 33: Environmental Guidance for Planning and Development
No. 40: Management of Mosquitoes by Land Developers
No. 41: Assessment of Aboriginal Heritage
No. 51: Terrestrial Flora and Vegetation Surveys for Environmental Impact Assessment in Western Australia
No. 54: Consideration of Subterranean Fauna in Groundwater and Caves
No. 55: Implementing Best Practice in Proposals Submitted to the Environment Impact Assessment Process
No. 56: Terrestrial Fauna Surveys for Environmental Impact Assessment in Western Australia
Draft EPA Guidance Statements
No. 8: Environmental Noise
Environmental Assessment Guideline
No. 1: Defining a Proposal.
No. 3: Protection of Benthic Primary Producer Habitats In Western Australia’s Marine Environment
No. 4: Towards Outcome-based Conditions Draft
No. 5: Draft Environmental Assessment Guideline for Protecting Marine Turtles from Light Impacts
EPA Position Statements
No. 2: Environmental Protection of Native Vegetation in Western Australia
No. 3: Terrestrial Biological Surveys as an Element of Biodiversity Protection
No. 7: Principles of Environmental Protection
Miscellaneous Publications
Australian and New Zealand Environment Conservation Council & Agricultural and Resource Management Council of Australia and New Zealand (ANZECC/ARMCANZ) Australian and New Zealand Guidelines for Fresh and Marine Water Quality 2000.
Contaminated Sites Management Series: Assessment Levels for Soil, Sediment and Water, Draft for Public Comment
Department of Environment: General Guidance on Managing Acid Sulfate Soils 2006a
Department of Environment: Pilbara Coastal Water Quality Consultation Outcomes: Environmental Values and Environmental Quality Objectives 2006
Department of Water: Stormwater Management Manual for Western Australia 2004-2007
Department of Environment and Conservation: Draft Identification and Investigation of Acid Sulfate Soils (2009a)
Department of State Development: Port Hedland Air Quality and Noise Management Plan, the Port Hedland Dust Management Taskforce Report, March 2010
EPA Application of Risk-based Approach in EIA, Draft for Comment, November 2008
EPA Guide to Preparing a Public Environmental Review/ Environmental Review and Management Program, June 2008
National Environment Protection Goals as defined in the National Environment Protection (Ambient Air Quality) Measure
Section 1 | Introduction
1-19 Public Environmental Review/Draft Environmental Impact Statement
Guidelines and Standards
National Ocean Disposal Guidelines for Dredged Material1 (NODGDM) 2002
North-West Marine Bioregional Plan 2008
Water and Rivers Commission: Environmental Water Provisions Policy for Western Australia 2000: Statewide Policy No. 5
Western Australian Planning Commission: Draft Statement of Planning Policy: Road and Rail Transport Noise
Western Australian Planning Commission Planning Bulletin 64: Acid Sulfate Soils
Western Australian Planning Commission: Visual Landscape Planning in Western Australia: A Manual for Elevation, Assessment, Siting and Design
1The proposed Outer Harbour Development approvals for sea dumping were sought under the National Ocean Disposal Guidelines for Dredge Management (Environment Australia 2002). During this period, the NODGM have been revised and the environmental assessment process is now guided by the National Assessment Guidelines for Dredging (2009).
Table 1.5 – Core Environmental Principles
Principle Consideration Section of PER/EIS
1) EP Act: The precautionary principle Where there are threats of serious
or irreversible damage, lack of full scientific certainty should not be used as a reason for postponing measures to prevent environmental degradation.
In application of this precautionary principle, decisions should be guided by: a) careful evaluation to avoid, where
practicable, serious or irreversible damage to the environment; and
b) assessment of the risk weighted consequences of various options.
The Outer Harbour Development has been subjected to a rigorous options evaluation which assessed the project against potential environmental and social impacts and related criteria.A risk assessment has been completed on the potential key and relevant environmental factors associated with the project.Specialist studies and site investigations have been conducted to increase the knowledge of the Port Hedland terrestrial and marine environments. Numerical models have been used to predict the potential impacts resulting from dredging, and noise and dust emissions.
Section 3Section 12Sections 5 and 6Sections 10 and 11
2) EP Act: The principle of intergenerational equity
The present generation should ensure that the health, diversity and productivity of the environment is maintained and enhanced for the benefit of future generations.
BHP Billiton Iron Ore recognises the importance of sustainable development as detailed in BHP Billiton Iron Ore’s Sustainable Development Policy, and considers that this project can be implemented without adversely impacting on the environment for future generations.Where practicable, Indigenous heritage sites have been avoided. Where an indigenous heritage site cannot be avoided by the proposed works, consent from the Minister for Indigenous Affairs pursuant to Section 18 of the Aboriginal Heritage Act 1972 will be sought. BHP Billiton Iron Ore has implemented a community consultation program and is committed to maintaining open dialogue with the community and addressing issues such as ongoing access to the social services and recreational facilities.
Section 11Section 4
3) EP Act: The principle of conservation of biological diversity and ecological integrity
Conservation of biological diversity and ecological integrity should be a fundamental consideration.
Site specific studies have been undertaken to determine the presence of Declared Rare Flora/Fauna, Priority Flora/Fauna and Threatened or Endangered Communities.Final design has considered the environmental values over the marine and terrestrial study areas and where practicable, measures have been taken to avoid (where possible) and minimise impacts (e.g. location of project footprint to minimise disturbance to mangroves).Dispersion modelling has been conducted to determine the impacts that dredging activities and disposal may have on the benthic primary producers in the area.
Sections 5 and 6Sections 9 and 10Section 10
Section 1 | Introduction
1-20Public Environmental Review/Draft Environmental Impact Statement
Principle Consideration Section of PER/EIS
4) EP Act: The principles relating to improved valuation, pricing and incentive mechanismsa) Environmental factors should be
included in the valuation of assets and services.
b) The polluter pays principles – those who generate pollution and waste should bear the cost of containment, avoidance and abatement.
c) The user of goods and services should pay prices based on the full life cycle costs of providing goods and services, including the use of natural resources and assets and the ultimate disposal of any waste.
d) Environmental goals, having been established, should be pursued in the most cost effective way, by establishing incentive structure, including market mechanisms, which enable those best placed to maximise benefits and/or minimise costs to develop their own solution and responses to environmental problems.
BHP Billiton Iron Ore recognises and accepts the costs of managing the project and its environmental impacts and these costs have been factored into the construction activities and ongoing operation/maintenance of the proposed facilities.When procurement and services are purchased during the execution phase of the Outer Harbour Development, BHP Billiton Iron Ore will make decisions which incorporate valuation, pricing and incentive mechanisms. BHP Billiton Iron Ore will also endeavour to pursue these principles where ever possible during the life of the Outer Harbour Development.Decommissioning estimates will be accrued as part of BHP Billiton Iron Ore’s closure planning processes.
Section 3
5) EP Act: The principle of waste minimisation
All reasonable and practicable measures should be taken to minimise the generation of waste and its discharge into the environment.
BHP Billiton Iron Ore will adopt the following approach to waste management for the Outer Harbour Development , in order of preference:avoid and reduce at source;reuse and recycle; andtreat and/or dispose.
Sections 3 and 11
EPBC Act: Decision making processes should effectively integrate both longterm and shortterm economic, environmental, social and equitable considerations.
The Outer Harbour Development has been subjected to a rigorous options evaluation which assessed the project against potential impacts and environmental, social and economic criteria.
Section 3
EPBC Act: If there are threats of serious or irreversible environmental damage, lack of full scientific certainty should not be used as a reason for postponing measures to prevent environmental degradation.
Refer to discussion regarding the equivalent EP Act precautionary principle above.
Sections 3,5, 6, 10 and 11
EPBC Act: The principle of intergenerational equity--that the present generation should ensure that the health, diversity and productivity of the environment is maintained or enhanced for the benefit of future generations.
Refer to discussion regarding the equivalent EP Act principle of intergenerational equity above.
Sections 4 and 11
EPBC Act: The conservation of biological diversity and ecological integrity should be a fundamental consideration in decision making.
Refer to discussion regarding the equivalent EP Act principle of conservation of biological diversity and ecological integrity above.
Sections 5, 6, 9 and 10
EPBC Act: Improved valuation, pricing and incentive mechanisms should be promoted.
Refer to discussion regarding the equivalent EP Act principles relating to improved valuation, pricing and incentive mechanisms above.
Section 3