Lincoln Jr/Sr High School Safe Room Addition Project Number - 18165
©Schultz Squared Architects LLC
ADDENDUM NUMBER 300 9111 - 1 of 3
SECTION 00 9111
ADDENDUM NUMBER 3
PARTICULARS
1.01 DATE: JULY 11, 2019
1.02 PROJECT: LINCOLN JR/SR HIGH SCHOOL SAFE ROOM ADDITION
1.03 ARCHITECT'S PROJECT NUMBER: 18165
1.04 OWNER: USD 298 LINCOLN PUBLIC SCHOOLS
1.05 ARCHITECT: SCHULTZ SQUARED ARCHITECTS LLC
TO: PROSPECTIVE BIDDERS:
2.01 THIS ADDENDUM FORMS A PART OF THE CONTRACT DOCUMENTS AND MODIFIES THE
ORIGINALPROCUREMENT DOCUMENTS DATED JUNE 17, 2019, WITH AMENDMENTS AND
ADDITIONS NOTED BELOW.
2.02 ACKNOWLEDGE RECEIPT OF THIS ADDENDUM IN THE SPACE PROVIDED IN THE BID
FORM. FAILURE TO DO SO MAY DISQUALIFY THE BIDDER.
2.03 THIS ADDENDUM CONSISTS OF 12 PAGES:
CHANGES TO PRIOR ADDENDA:
3.01 CHANGES TO ADDENDUM NUMBER 1 - ISSUED JUNE 28, 2019
A. ADDENDA ITEM 4.01
1. SPECIFICATION SECTION 10 4400 - FIRE PROTECTION SPECIALTIES
a. ARTICLE 1.02 REFERENCE STANDARDS
1) ADD THE FOLLOWING: AMERICANS WITH DISABILITIES ACT (ADA) 2010
2) FIRE EXTINGUISHERS CABINET DOOR SHALL BE PROVIDE WITH HANDLEMEETING THE REQUIREMENTS OF ADA.
b. ARTICLE 2.02 FIRE EXTINGUISHERS
1) PARAGRAPH B.2 - REVISE AS FOLLOWS: SIZE: 9 POUND MINIMUM
c. ARTICLE 2.03 FIRE EXTINGUISHER CABINETS
1) PARAGRAPH B.2 - REVISE AS FOLLOWS: TRIM: FLAT ROLLED EDGE,WITH 2-1/2" WIDE FACE.
CHANGES TO THE PROJECT MANUAL - INTRODUCTORY REQUIREMENTS, PROCUREMENT
REQUIREMENTS AND CONTRACTING REQUIREMENTS:
4.01 SECTION 00 2113 - INSTRUCTIONS TO BIDDERS
A. ARTICLE 5.01 EVIDENCE OF QUALIFICATIONS
1. THE FOLLOWING GENERAL CONTRACTORS ATTENDED THE PREBIDCONFERENCE AND PROVIDED ADEQUATE EVIDENCE OF QUALIFICATIONS PRIORTO 5:00 PM, JULY 9, 2019 THEREFORE ARE ELIGIBLE TO SUBMIT A BID:
a. CHENEY CONSTRUCTION
b. COMMERCIAL BUILDERS INC.
c. COMPTON CONSTRUCTION SERVICES
d. HARBIN CONSTRUCTION
e. PAUL-WERTENBERGER CONSTRUCTION
f. PONTON CONSTRUCTION
g. PRAIRIE LANDWORKS
h. RDH ELECTRIC & CONSTRUCTION INC.
i. TRINIUM INC.
j. WIENS & COMPANY
Lincoln Jr/Sr High School Safe Room Addition Project Number - 18165
©Schultz Squared Architects LLC
ADDENDUM NUMBER 300 9111 - 2 of 3
4.02 SECTION 00 4100 - BID FORM
A. REPLACE BID FORM IN ITS ENTIRETY WITH ATTACHED FORM.
B. BID FORM HAS BEEN REVISED TO ADDRESS THE ADDITION OF SECTION 01 2100 -ALLOWANCES NOTED BELOW.
4.03 SECTION 04 4323 - ALTERNATES FORM
A. ARTICLE 2.02 - ALTERNATE #1
1. CONTRACTOR'S OPTION - IN LIEU OF ASPHALT PAVING, CONTRACTOR MAYINSTALL 5" CONCRETE PAVING WITH 8" MINIMUM THICKENED EDGES, SINGLELAYER 6X6, W2.9XW2.9 WWF. PROVIDE A MINIMUM OF THREE (3) DOWELEDEXPANSION JOINTS, AND A MINIMUM OF SIX (6) SAWN CONTROL JOINTS.
B. ARTICLE 2.03 - ALTERNATE #2
1. CONTRACTOR'S OPTION-CURRENTLY, THE OWNER HAS A TEMPORARY WOODFRAMED STORAGE BUILDING LOCATED DIRECTLY OVER THE PLANNEDLOCATION OF THE SEWER. CONTRACTOR MAY TEMPORARILY MOVE THEBUILDING WITH THE OWNER REMOVING CONTENTS TO ALLOW INSTALLATIONOF LINE AS SHOWN. CONTRACTOR WILL BE REQUIRED TO REPLACE STORAGEBUILDING TO ITS ORIGINAL LOCATION ONCE SEWER LINE IS PLACED; ORCONTRACTOR CAN REROUTE THE LINE AROUND THE TEMPORARY BUILDING. IFREROUTED, CONTRACTOR SHALL INSTALL CLEANOUTS AT ALL CHANGES INDIRECTION OF THE NEW SEWER LINE.
C. REPLACE ALTERNATES FORM IN ITS ENTIRETY WITH ATTACHED FORM.
4.04 SECTION 01 2100 - ALLOWANCES
A. ADD SECTION 01 2100 - ALLOWANCES TO THE PROJECT MANUAL.
B. REFERENCE ATTACHED SPECIFICATION SECTION.
4.05 SECTION 01 3000 - ADMINISTRATIVE REQUIREMENTS
A. OWNER WILL PROVIDE CONTRACTOR WITH EIGHT (8) HARD COPIES OF THECONSTRUCTION DOCUMENTS FOR THEIR USE DURING CONSTRUCTION.
CHANGES TO THE PROJECT MANUAL - SPECIFICATIONS:
5.01 SECTION 07 2100 - THERMAL INSULATION
A. SUBSTITUTION
1. EXPANDED POLYSTYRENE (EPS) RIGID INSULATION MAY BE UTILIZED FORBELOW FLOOR SLAB APPLICATIONS ONLY.
a. EPS SHALL MEET ALL THE MINIMUM CHARASTICS OF SPECIFICATION
b. INCREASE THICKNESS AS REQUIRED TO MEET EQUIVALENT TOTAL R-VALUESPECIFIED.
CHANGES TO DRAWINGS:
6.01 DRAWINGS A7.1 - ARCHITECTURAL
A. FINISH SCHEDULE
1. SUSPENDED ACOUSTICAL TILE CEILINGS IN ROOMS 100 AND 101 SHALL BE
1-HOUR FIRE RATED.
6.02 DRAWINGS S1.2 - STRUCTURAL
A. LOAD PLAN NOTES
1. ADD NOTE NUMBER 3 AS SHOWN ON ATTACHED DRAWING.
B. DETAIL 1A/S1.2
1. ADD "PLF" UNIT DESIGNATION AS SHOWN ON ATTACHED DRAWING.
Lincoln Jr/Sr High School Safe Room Addition Project Number - 18165
©Schultz Squared Architects LLC
ADDENDUM NUMBER 300 9111 - 3 of 3
6.03 DRAWINGS S2.1 - STRUCTURAL
A. DETAIL 2/S2.1 FOUNDATION PLAN-ALTERNATE
1. RELOCATE DETAIL MARK 8/S5.1 AS SHOWN ON ATTACHED DRAWING.
6.04 DRAWINGS E3.1 - ELECTRICAL
A. ADD TYPE E LIGHT FIXTURE TO VESTIBULE 102. REFERENCE ATTACHED DRAWINGFOR LOCATION.
APPROVAL OF ADDITIONAL PRODUCTS/SYSTEMS:
7.01 SECTION 07 5400 - THERMOPLASTIC MEMBRANE ROOFING
A. THE FOLLOWING MANUFACTURER IS ACCEPTABLE SUBSTITUTION. SUBSTITUTIONSHALL MEET ALL THE MINIMUM CHARACTERISTICS OF SPECIFICATION
1. MULE-HIDE PRODUCTS CO., INC. TPO SYSTEM
END OF SECTION 00 9111
Lincoln Jr/Sr High School Safe Room Addition Project Number - 18165
©Schultz Squared Architects LLCBID FORM
00 4100 - 1 of 2
SECTION 00 4100
BID FORM
THE PROJECT AND THE PARTIES
1.01 TO:
A. USD 298 Lincoln Public Schools (Owner) 133 East Lincoln Avenue Lincoln, Kansas 67455
1.02 FOR:
A. Project: Lincoln Jr/Sr High School Safe Room Addition
B. Architect's Project Number: 18165 701 East North Street Lincoln, Kansas 67455
1.03 DATE: ______________ (BIDDER TO ENTER DATE)
1.04 SUBMITTED BY: (BIDDER TO ENTER NAME AND ADDRESS)
A. Bidder's Full Name _________________________1. Address _________________________2. City, State, Zip_________________________
1.05 OFFER
A. Having examined the Place of The Work and all matters referred to in the Instructions toBidders and the Bid Documents prepared by Schultz Squared Architects LLC for the abovementioned project, we, the undersigned, hereby offer to enter into a Contract to perform theWork for the Sum of:
B. __________________________________________________________________________________________________________________ dollars($______________________), in lawful money of the United States of America.
C. We have included the required security Bid Bond as required by the Instruction to Bidders.
D. We have included the required performance assurance bonds in the Bid Amount as required bythe Instructions to Bidders.
E. All Cash Allowances described in Section 01 2100 - Allowances are included in the Bid Sum.
1.06 ACCEPTANCE
A. This offer shall be open to acceptance and is irrevocable for forty five days from the bid closingdate.
B. If this bid is accepted by Owner within the time period stated above, we will:1. Execute the Agreement within seven days of receipt of Notice of Award.
C. If this bid is accepted within the time stated, and we fail to commence the Work or we fail toprovide the required Bond(s), the security deposit shall be forfeited as damages to Owner byreason of our failure, limited in amount to the lesser of the face value of the security deposit orthe difference between this bid and the bid upon which a Contract is signed.
D. In the event our bid is not accepted within the time stated above, the required security depositshall be returned to the undersigned, in accordance with the provisions of the Instructions toBidders; unless a mutually satisfactory arrangement is made for its retention and validity for anextended period of time.
1.07 CONTRACT TIME
A. Complete the Work by the 12th day of March, 2020.
B. Owner will suffer financial loss if the Work is not completed within the time specified in aboveplus any extensions granted in accordance with Articles 10 and 11 of AIA DocumentA105-2017. The amount of actual damages the Owner will incur from a delay of completion of
Lincoln Jr/Sr High School Safe Room Addition Project Number - 18165
©Schultz Squared Architects LLCBID FORM
00 4100 - 2 of 2
the Work is not easily and readily determinable. Accordingly, instead of requiring proof,Contractor shall pay to Owner liquidated damages for delay (but not as a penalty) the sum ofTwo Hundred Fifty Dollars ($250.00) per calendar day for each calendar day after the agreedSubstantial Completion Date that the Work is not certified by the Architect as being substantiallycomplete.
1.08 CHANGES TO THE WORK
A. When Architect establishes that the method of valuation for Changes in the Work will be netcost plus a percentage fee in accordance with General Conditions, our percentage fee will be:1. ______ percent overhead and profit on the net cost of our own Work;2. ______ percent on the cost of work done by any Subcontractor.
B. On work deleted from the Contract, our credit to Owner shall be Architect-approved net costplus _________ of the overhead and profit percentage noted above.
1.09 ADDENDA
A. The following Addenda have been received. The modifications to the Bid Documents notedbelow have been considered and all costs are included in the Bid Sum.1. Addendum # _______ Dated ________________.2. Addendum #_______ Dated ________________.3. Addendum # _______ Dated ________________.4. Addendum # _______ Dated ________________.5. Addendum # _______ Dated ________________.
1.10 BID FORM SUPPLEMENTS
A. The following Supplements are attached to this Bid Form and are considered an integral part ofthis Bid Form:1. Document 00 4322 - Unit Prices Form: Include a listing of unit prices specifically
requested by the Contract Documents.2. Document 00 4323 - Alternates Form: Include the cost variations to the Bid Sum
applicable to the Work as described in Section 00 4323.
1.11 BID FORM SIGNATURE(S)
A. The Corporate Seal of
B. ____________________________________________
C. (Bidder - print the full name of your firm)
D. was hereunto affixed in the presence of:
E. ____________________________________________
F. (Authorized signing officer, Title)
G. (Seal)
H. ____________________________________________
I. (Authorized signing officer, Title)
END OF SECTION 00 4100
Lincoln Jr/Sr High School Safe Room Addition Project Number - 18165
©Schultz Squared Architects LLCALTERNATES FORM
00 4323 - 1 of 3
SECTION 00 4323
ALTERNATES FORM
PARTICULARS
1.01 THE FOLLOWING IS THE LIST OF ALTERNATES REFERENCED IN THE BID SUBMITTED BY:
1.02 (BIDDER) _______________________________
1.03 TO (OWNER ): USD 298 LINCOLN PUBLIC SCHOOLS
1.04 FOR: LINCOLN JR/SR HIGH SCHOOL SAFE ROOM ADDITION
1.05 PROJECT NUMBER: 18165
1.06 DATED ________________ (BIDDER TO ENTER DATE) AND WHICH IS AN INTEGRAL PART
OF THE BID FORM.
ALTERNATES LIST
2.01 THE FOLLOWING AMOUNTS SHALL BE ADDED TO OR DEDUCTED FROM THE BID
AMOUNT. REFER TO SECTION 01 2300 - ALTERNATES.
A. FOR EACH ALTERNATE, CONTRACTOR SHALL CLEARLY INDICATE WHETHER OFFER
IS AN ADD OR DEDUCT TO THE BASE BID BY CIRCLING "ADD" OR "DEDUCT"
ADJACENT TO THE CORRESPONDING OFFER.
2.02 ALTERNATE #1:
A. ASPHALT DRIVE-CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS ANDRELATED WORK FOR COMPLETE INSTALLATION OF NEW 5" ASPHALT DRIVE ANDBASE AS SHOWN.
B. REFERENCE PLANS AND ALL SPECIFICATION SECTION FOR EXTENT OF WORK ANDADDITIONAL REQUIREMENTS.
C. CONTRACTOR'S OPTION - IN LIEU OF ASPHALT PAVING, CONTRACTOR MAY INSTALL5" CONCRETE PAVING WITH 8" MINIMUM THICKENED EDGES, SINGLE LAYER 6X6,W2.9XW2.9 WWF. PROVIDE A MINIMUM OF THREE (3) DOWELED EXPANSION JOINTS,AND A MINIMUM OF SIX (6) SAWN CONTROL JOINTS.
D. ADD / DEDUCT $ ________________________
2.03 ALTERNATE #2:
A. SANITARY SEWER EXTENSION-CONTRACTOR SHALL PROVIDE ALL LABOR,MATERIALS AND RELATED WORK FOR COMPLETE INSTALLATION OF NEW 4"DIAMETER PVC SANITARY SEWER LINE AS SHOWN. INCLUDE TRENCHING, BACKFILL,REMOVAL AND PATCHING OF EXISTING ASPHALT PAVING, CLEANOUTS, ANDADDITIONAL PIPING AS SHOWN.
B. OMIT BASE BID EXTENSION AND CONNECTION OF SANITARY SEWER TO EXISTINGSEWER LINE IN ROOM X101, REMOVAL AND REPLACEMENT OF EXISTING CONCRETEFLOOR, AND INSTALLATION OF NEW VCT FLOORING IN ROOMS X100 AND X101.
C. CONTRACTOR'S OPTION-CURRENTLY, THE OWNER HAS A TEMPORARY WOODFRAMED STORAGE BUILDING LOCATED DIRECTLY OVER THE PLANNED LOCATION OFTHE SEWER. CONTRACTOR MAY TEMPORARILY MOVE THE BUILDING WITH THEOWNER REMOVING CONTENTS TO ALLOW INSTALLATION OF LINE AS SHOWN. CONTRACTOR WILL BE REQUIRED TO REPLACE STORAGE BUILDING TO ITS ORIGINALLOCATION ONCE SEWER LINE IS PLACED; OR CONTRACTOR CAN REROUTE THE LINEAROUND THE TEMPORARY BUILDING. IF REROUTED, CONTRACTOR SHALL INSTALLCLEANOUTS AT ALL CHANGES IN DIRECTION OF THE NEW SEWER LINE.
D. ADD CARPET TRANSITION STRIP AT DOORS X100 WHERE EXISTING THRESHOLD ISREMOVED.
E. REFERENCE PLANS AND ALL SPECIFICATION SECTION FOR EXTENT OF WORK ANDADDITIONAL REQUIREMENTS.
Lincoln Jr/Sr High School Safe Room Addition Project Number - 18165
©Schultz Squared Architects LLCALTERNATES FORM
00 4323 - 2 of 3
F. ACCEPTANCE/REJECTION OF THIS ALTERNATE WILL BE DETERMINED ONCECONTRACTOR VERIFIES ELEVATION OF EXISTING SEWER WHERE BASE BIDCONNECTION IS TO OCCUR.
G. ADD / DEDUCT $ ________________________
2.04 ALTERNATE #3:
A. PRECAST CONCRETE PANEL FINISH-CONTRACTOR SHALL PROVIDE ALL LABOR,MATERIALS AND RELATED WORK FOR COMPLETE HEAVY SAND BLAST FINISH ONEXTERIOR SIDE ONLY OF ALL PRECAST CONCRETE PANELS TO MATCH EXISTINGBUILDING CONCRETE WALL PANELS.
B. REFERENCE PLANS AND ALL SPECIFICATION SECTION FOR EXTENT OF WORK ANDADDITIONAL REQUIREMENTS.
C. ADD / DEDUCT $ ________________________
2.05 ALTERNATE #4:
A. STOREFRONT WINDOW-CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS ANDRELATED WORK FOR COMPLETE INSTALLATION OF STEPPED STOREFRONT WINDOWTYPE 'B' INCLUDING STEEL FRAME AND FOUNDATIONS.
B. REFERENCE PLANS AND ALL SPECIFICATION SECTION FOR EXTENT OF WORK ANDADDITIONAL REQUIREMENTS.
C. ADD / DEDUCT $ ________________________
2.06 ALTERNATE #5:
A. TAPERED POLYISOCYANURATE ROOF INSULATION-CONTRACTOR SHALL PROVIDEALL LABOR, MATERIALS AND RELATED WORK FOR COMPLETE INSTALLATION OF R-25TAPERED, RIGID POLYISOCYANURATE ROOF INSULATION AND 1/2" FIBERGLASSFACED COVER BOARD ALL ADHERED TO REINFORCED CONCRETE DECK (BASE BID). PROVIDE SIMILAR SLOPE AND CRICKETS AT ROOF EQUIPMENT AS SHOWN. PROVIDEANY PRESSURE TREATED WOOD NAILERS AS REQUIRED BY ROOFING SYSTEMMANUFACTURER.
B. OMIT BASE BID INSULATED LIGHTWEIGHT CONCRETE SYSTEM.
C. REFERENCE PLANS AND ALL SPECIFICATION SECTION FOR EXTENT OF WORK ANDADDITIONAL REQUIREMENTS.
D. ADD / DEDUCT $ ________________________
2.07 ALTERNATE #6:
A. HVAC UNIT IN CORRIDOR 101-CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALSAND RELATED WORK FOR COMPLETE INSTALLATION OF HVAC UNIT, ASSOCIATEDACCU, EXTERIOR CONCRETE EQUIPMENT SLAB, ALL ASSOCIATED ACCESSORIES,ELECTRICAL AND PLUMBING CONNECTIONS.
B. REFERENCE PLANS AND ALL SPECIFICATION SECTION FOR EXTENT OF WORK ANDADDITIONAL REQUIREMENTS.
C. ADD / DEDUCT $ ________________________
Lincoln Jr/Sr High School Safe Room Addition Project Number - 18165
©Schultz Squared Architects LLCALTERNATES FORM
00 4323 - 3 of 3
2.08 ALTERNATE #7:
A. VINYL COMPOSITION TILE-CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALSAND RELATED WORK FOR COMPLETE INSTALLATION OF VCT IN ROOMS 100, 101, AND102 INCLUDING CONCRETE SLAB TESTING FOR WATER EMISSION AS REQUIRED BYFLOORING MANUFACTURER, FLOOR PREP, ADHESIVE, AND TRANSITION STRIPS.
B. REFERENCE PLANS AND ALL SPECIFICATION SECTION FOR EXTENT OF WORK ANDADDITIONAL REQUIREMENTS.
C. ADD / DEDUCT $ ________________________
END OF SECTION 00 4323
Lincoln Jr/Sr High School Safe Room Addition Project Number - 18165
©Schultz Squared Architects LLCALLOWANCES01 2100 - 1 of 1
SECTION 01 2100
ALLOWANCES
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Inspecting and testing allowances.
1.02 RELATED REQUIREMENTS
A. Section 01 2000 - Price and Payment Procedures: Additional payment and modificationprocedures.
1.03 INSPECTING AND TESTING ALLOWANCES
A. Costs Included in Inspecting and Testing Allowances: Cost of engaging an inspecting or testingagency; execution of inspecting and tests; and reporting results.
B. Costs Not Included in the Inspecting and Testing Allowances:1. Costs of incidental labor and facilities required to assist inspecting or testing agency.2. Costs of testing services used by Contractor separate from Contract Document
requirements.3. Costs of retesting upon failure of previous tests as determined by Architect.4. Special Inspection services as defined by contract documents will be provide by the
Owner.
C. Payment Procedures:1. Submit one copy of the inspecting or testing firm's invoice with next application for
payment.2. Pay invoice on approval by Architect.
1.04 ALLOWANCES SCHEDULE
A. Inspecting and Testing Allowance: Include the sum of $6,500.00 for payment of inspecting andtesting services specified in Section 01 4000 - Quality Requirements.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
END OF SECTION 01 2100
NOTE: POSITIVE PRESSURES ARE DIRECTED INWARD ON THE EXTERIOR SURFACE. NEGATIVE PRESSURES ARE DIRECTED OUTWARD ON THE EXTERIOR SURFACE.
BUILDING ELEMENTSPAN
(FT)
WIDTH
(FT)AREA (FT2)
WIND PRESSURE
ZONE 1 (PSF)
WIND PRESSURE
ZONE 2 (PSF)
WIND PRESSURE
ZONE 3 (PSF)
WIND PRESSURE
ZONE 4+2 (PSF)4WW+LW
WIND PRESSURE
ZONE 5+3 (PSF)5WW+5LW
WIND PRESSURE
ZONE 4 (PSF)
WIND PRESSURE
ZONE 5 (PSF)
WALL PANEL 13'-4" VARIES 59.3 EFFECTIVE -- -- -- -- -- -192/180 -212/180
WINDWARD + LEEWARDPARAPET
2.00 VARIES <10 -- -- -- 368 505 -- --
7'-0" DOUBLE TEE 43.00 7.00 616.33 EFFECTIVE -197/102 -224/102 -224/102 -- -- -- --
8'-0" DOUBLE TEE 43.00 8.00 616.33 EFFECTIVE -197/102 -224/102 -224/102 -- -- -- --
8'-0" DOUBLE TEE (SHORT) 29.00 8.00 280.33 EFFECTIVE -197/102 -224/102 -224/102 -- -- -- --
4" TOPPING SLAB 4.00 1.50 6 -211/115 -319/115 -455/115 -- -- -- --
DOUBLE TEE BEARING 21.50 4.00 86 -198/103 -203/103 -239/103 -- -- -- --
EXTREME WIND COMPONENTS AND CLADDING LOADS
1. SHELTER GENERAL INFORMATION
A. TYPE OF SHELTER: COMMUNITY TORNADO SAFE ROOM.
B. SHELTER WIND DESIGN GUIDELINES:
1) ICC/NSSA STANDARD FOR THE DESIGN AND CONSTRUCTION OF STORM SHELTERS - 2014
(ICC 500-2014).
2) SAFE ROOMS FOR TORNADOES AND HURRICANES, GUIDANCE FOR COMMUNITY AND
RESIDENTIAL SAFE ROOMS - 2015 (FEMA P-361, THIRD EDITION)
C. MISSILE CRITERIA:
1) 15-LB SAWN LUMBER 2x4 MISSILE
2) 100 MPH MISSILE SPEED FOR VERTICAL SURFACES
3) 67 MPH MISSILE SPEED FOR HORIZONTAL SURFACES
D. ROOF SYSTEMS HAVE BEEN SELECTED IN ACCORDANCE WITH DEBRIS IMPACT TESTING INACCORDANCE WITH ASTM E 1886 AT TEXAS TECH UNIVERSITY (REFER SUMMARY REPORT DATED
JUNE 2003 PREPARED BY WIND SCIENCE AND ENGINEERING RESEARCH CENTER). REFER
SECTION A1 4" THICK CONCRETE-#4 REBAR REINFORCEMENT 12 INCHES ON CENTER EACH WAY
(TESTED FOR 162 MPH)-67 MPH REQUIRED.
E. WALL SYSTEMS HAVE BEEN SELECTED IN ACCORDANCE WITH DEBRIS IMPACT TESTING IN
ACCORDANCE WITH ASTM E 1886 AT TEXAS TECH UNIVERSITY (REFER REPORT FOR CORESLAB
STRUCTURE DATED APRIL 1, 2016 PREPARED BY WIND SCIENCE AND ENGINEERING RESEARCH
CENTER). REFER SECTION FOR 4" THICK CONCRETE-PRESTRESSED PANELS WITH 250 PSI
INITIAL COMPRESSIVE PRESTRESS FACE-100 MPH REQUIRED.
F. SHELTER DOORS AND LOUVERS SHALL BE RATED FOR A MINIMUM SERVICE DESIGN PRESSURE
OF 246 PSF (ZONE 5) AND HAVE BEEN TESTED TO MEET THE IMPACT CRITERIA LISTED
ABOVE. MANUFACTURER SHALL SUBMIT TESTING REPORTS AND INSTALLATION DETAILS TO
ARCHITECT/ENGINEER FOR APPROVAL.
G. REFERENCE ELEVATION OF 100'-0" EQUALS DATUM FINISHED FLOOR ELEVATION FOR THE
SAFE ROOM.
H. REFER TO CIVIL DRAWINGS FOR FINISHED FLOOR ELEVATION AND BASE FLOOD ELEVATION.
I. REFER TO ARCHITECTURAL DRAWINGS FOR GROSS AREA, USABLE STORM SHELTER FLOOR AREA,
OCCUPANT LOAD, AND WHEELCHAIR OCCUPANT LOAD.
J. REFER TO MECHANICAL DRAWINGS FOR LOCATIONS AND SIZES OF SHELTER VENTILATION.
K. INDIVIDUAL PRECAST WALL PANELS SHALL BE CONNECTED TO TRANSFER SHEAR ACROSS
PANEL JOINTS AND PERFORM AS A SINGLE SHEAR WALL ALONG CONTINUOUS WALL RUNS,
EXCEPT AT 14" PANEL.
L. FURNISH LOOSE CONNECTION HARDWARE AND ANCHORAGE ITEMS TO BE EMBEDDED IN OR
ATTACHED TO OTHER CONSTRUCTION BEFORE STARTING THAT WORK. PROVIDE LOCATIONS,
SETTING DIAGRAMS, TEMPLATES, INSTRUCTIONS, AND DIRECTIONS, AS REQUIRED, FOR
INSTALLATION.
M. PRECAST WALL TO FOUNDATION CONNECTIONS SHALL BE DESIGNED AND DETAILED BY THE
PRECASTER. ALL CONNECTION HARDWARE, PLATES AND/OR BARS EMBEDDED IN FOUNDATIONS
SHALL BE PROVIDED BY THE PRECASTER TO BE FIELD INSTALLED BY THE FOUNDATION
CONTRACTOR.
N. ROOF DIAPHRAGM TO PRECAST WALL CONNECTIONS SHALL BE DETAILED BY THE PRECASTER
FOLLOWING DETAILS IN THE STRUCTURAL DRAWINGS. THE EMBEDMENT INTO THE PRECAST
SHALL BE DESIGNED BY THE PRECASTER FOR THE FORCES GIVEN. ALL CONNECTION
HARDWARE, PLATES AND BARS SHALL BE PROVIDED BY THE PRECASTER TO BE FIELD
INSTALLED BY THE CONCRETE CONTRACTOR BEFORE ROOF DIAPHRAGMS ARE POURED.
O. REFER TO 1/S1.2 FOR REQUIRED PRECAST DIAPHRAGM AND SNOW LOADS.
P. REFER TO 2/S1.2 AND CORRESPONDING TABLE FOR REQUIRED COMPONENT AND CLADDING
DESIGN LOADS.
2. SHELTER DESIGN LOADS
A. DEAD LOAD: SELF WEIGHT OF MATERIALS, UNLESS NOTED OTHERWISE
B. ROOF DEAD LOAD:
1) ELASTIZELL/INSULATION.......................................10 PSF
2) TOPPING SLAB................................................50 PSF
3) CONCRETE OVERAGE.............................................6 PSF
4) 32" DEEP 8'-0" N.W. DOUBLE TEES.............................81 PSF
5) MISC (LIGHTING, DUCTWORK, PIPING, ETC.)......................6 PSF
6) CEILING......................................................2 PSF
7) TOTAL......................................................155 PSF
C. ROOF LIVE LOADS:
1) ROOF LIVE LOAD (SHELTER)..................................140 PSF
D. SHELTER WIND PARAMETERS:
1) GOVERNING CODE:........................................ICC500-2014
2) EXPOSURE CATEGORY:...............................................C
3) INTERNAL PRESSURE COEFFICIENTS, GCPI.......................+/-0.55
4) TOPOGRAPHIC FACTOR, KZT........................................1.0
5) DIRECTIONALITY FACTOR, KD......................................1.0
6) WIND VELOCITY, V:..........................................250 MPH
E. EXTREME WIND PRESSURES-MAIN WIND FORCE RESISTING SYSTEM:
1) -GCPI
A) WINDWARD WALL:.....................................167 PSF IN
B) LEEWARD WALL:.......................................23 PSF IN
C) SIDE WALL:...........................................6 PSF OUT
2) +GCPI
A) WINDWARD WALL:......................................18 PSF IN
B) LEEWARD WALL:......................................132 PSF OUT
C) SIDE WALL:.........................................156 PSF OUT
3) WINDWARD PARAPET:......................................205 PSF IN
4) LEEWARD PARAPET:.......................................137 PSF OUT
5) ROOF 0 TO 13.3' FROM LEADING EDGE:.....................179 PSF OUT
6) ROOF 13.3' TO 26.7' FROM LEADING EDGE:.................132 PSF OUT
7) ROOF BEYOND 26.7' FROM LEADING EDGE:...................109 PSF OUT
8) ROOF:...................................................54 PSF IN
F. SNOW LOADS:
1) GOVERNING CODE:..........................................ASCE 7-10
2) IMPORTANCE FACTOR, Is:........................................1.00
3) GROUND SNOW LOAD, Pg:.......................................25 PSF
4) EXPOSURE FACTOR, Ce:...........................................1.0
5) THERMAL FACTOR, Ct:............................................1.0
6) ROOF SLOPE FACTOR, Cs:.........................................1.0
7) CALCULATED FLAT ROOF SNOW LOAD, Pf:.......................17.5 PSF
8) MINIMUM FLAT ROOF SNOW LOAD, I*Pf:..........................20 PSF
9) DRIFT LOADS:.............................................ASCE 7-10
G. SEISMIC DESIGN CRITERIA:
1) GOVERNING CODE:..........................................ASCE 7-10
2) IMPORTANCE FACTOR, Ie:........................................1.00
3) SOIL SITE CLASSIFICATION:........................................D
4) 0.2 SEC. MAPPED SPECTRAL ACCELERATION, Ss:...................0.090
5) 1.0 SEC. MAPPED SPECTRAL ACCELERATION, S1:...................0.045
6) SITE COEFFICIENT, 0.2 SEC. PERIOD, Fa:.........................1.6
7) SITE COEFFICIENT, 1.0 SEC. PERIOD, Fv:.........................2.4
8) 0.2 SEC. DESIGN SPECTRAL ACCELERATION, Sds:..................0.096
9) 1.0 SEC. DESIGN SPECTRAL ACCELERATION, Sd1:..................0.072
10) SEISMIC DESIGN CATEGORY:.........................................B
11) SEISMIC PARAMETERS:
A)SEISMIC FORCE RESISTING SYSTEM: ORDINARY PRECAST CONCRETE SHEAR WALLS
B) RESPONSE MODIFICATION COEFFICIENT, R:......................3.00
C)SYSTEM OVERSTRENGTH FACTOR, O:.............................2.50
D) DEFLECTION AMPLIFICATION FACTOR, Cd:.......................3.00
E) ANALYSIS PROCEDURE: EQUIVALENT LATERAL FORCE METHOD.
F) SEISMIC RESPONSE COEFFICIENT, Cs:........................0.0320
G)LATERAL BASE SHEAR, V:................................30.2 KIPS
3. QUALITY ASSURANCE PLAN
A. CONTRACTOR RESPONSIBILITY: EACH CONTRACTOR RESPONSIBLE FOR THE CONSTRUCTION,
FABRICATION OR INSTALLATION OF A MAIN WIND FORCE-RESISTING SYSTEM OR ANY
COMPONENT LISTED IN THE QUALITY ASSURANCE PLAN SHALL SUBMIT A WRITTEN STATEMENT
OF RESPONSIBILITY TO THE AHJ, THE ARCHITECT/ENGINEER, AND THE OWNER PRIOR TO
THE COMMENCEMENT OF WORK ON THE SYSTEM OR COMPONENT. CONTRACTOR'S STATEMENT OF
RESPONSIBILITY SHALL BE INCLUDED WITH THE FIRST SUBMITTAL/SHOP DRAWING. THE
CONTRACTOR'S STATEMENT OF RESPONSIBILITY SHALL CONTAIN:
1) ACKNOWLEDGEMENT OF AWARENESS OF THE SPECIAL REQUIREMENTS CONTAINED IN THE
QUALITY ASSURANCE PLAN.
2) ACKNOWLEDGEMENT THAT CONTROL WILL BE EXERCISED TO OBTAIN COMPLIANCE WITH THE
CONSTRUCTION DOCUMENTS.
3) PROCEDURES FOR EXERCISING CONTROL WITHIN THE CONTRACTOR'S ORGANIZATION, THE
METHOD AND FREQUENCY OF REPORTING AND THE DISTRIBUTION OF REPORTS.
4) IDENTIFICATION AND QUALIFICATIONS OF THE PERSON(S) EXERCISING SUCH CONTROL
AND THEIR POSITION(S) IN THE ORGANIZATION.
B. MAIN WINDFORCE-RESISTING SYSTEMS AND WIND-RESISTING COMPONENTS
1) FOUNDATIONS
2) PRECAST BEARING/SHEAR WALLS
3) PRECAST DOUBLE TEES
4) PRECAST CONNECTIONS
5) CAST-IN-PLACE TOPPING SLAB
6) STEEL PROTECTION DEVICES
7) SAFE ROOM DOORS
8) SAFE ROOM LOUVERS
C. REQUIRED SPECIAL INSPECTIONS TYPE AND FREQUENCY ARE IDENTIFIED ON S1.5.
D. CONCRETE TESTS: TESTING OF COMPOSITE SAMPLES OF FRESH CONCRETE OBTAINED
ACCORDING TO ASTM C 172/C 172M SHALL BE PERFORMED AS INDICATED IN THE
SPECIFICATIONS.
E. STRUCTURAL OBSERVATIONS: IN ADDITION TO THE REQUIREMENTS OF THE SPECIAL
INSPECTOR, THE OWNER SHALL EMPLOY A LICENSED PROFESSIONAL STRUCTURAL ENGINEER
TO INSPECT THE FOLLOWING ELEMENTS OF THE MAIN WIND FORCE RESISTING SYSTEM OF
THE SHELTER TO VERIFY CONFORMANCE WITH THE CONTRACT DOCUMENTS AT SIGNIFICANT
CONSTRUCTION STAGES AND AT THE COMPLETION OF THE STRUCTURAL SYSTEM.
DEFICIENCIES SHALL BE REPORTED IN WRITING TO THE OWNER AND AHJ. AT THE
CONCLUSION OF THE WORK, THE REGISTER DESIGN PROFESSIONAL SHALL SUBMIT TO THE
AHJ A WRITTEN STATEMENT INDICATING SITE VISITS MADE AND IDENTIFYING ANYOUTSTANDING DEFICIENCIES THAT HAVE NOT BEEN RESOLVED.
1) FOUNDATIONS
A)REBAR SIZE, SPACING, LAP LENGTHS, EMBED SIZE AND LOCATIONS
2) WALLS
A)HOLD DOWN CONNECTIONS
B) WALL TO WALL CONNECTIONS
3) ROOF
A)DT TO DT CONNECTIONS
B) DT BEARING CONNECTIONS
C)DT TO WALL CONNECTIONS
D) REBAR SIZE, SPACING, LAP LENGTHS
4) DOORS/SHUTTERS
A)VERIFY INSTALLATION OF EACH DOOR IS PER MANUFACTURER'S TESTED ASSEMBLY.
B) VERIFY ALL DOOR HARDWARE IS FULLY OPERATIONAL.
C)VERIFY DOORS HAVE PROPER LABELS INDICATING REQUIRED PRESSURE AND IMPACT
RATING.
5) LOUVERS
A)VERIFY INSTALLATION OF EACH LOUVER IS PER MANUFACTURER'S TESTED ASSEMBLY.
B) VERIFY LOUVERS HAVE PROPER LABELS INDICATING REQUIRED PRESSURE AND IMPACT
RATING.
6) PROTECTION DEVICES
A)VERIFY INSTALLATION OF EACH STEEL PLATE PROTECTION DEVICE IS PER CONTRACT
DRAWINGS.
B) VERIFY ALL OPENINGS REQUIRING PROTECTION HAVE PROTECTION DEVICE INSTALLED.
MAXIMUM SNOW DRIFT
INTENSITY Pd=14.5 PSF
FOUNDATION LATERAL SHEAR FORCES
EXTREME WIND = 4.26 KIPS
SEISMIC = 1.33 KIPS
IMPACT (LR) = NA
ROOF LATERAL SHEAR FORCES
EXTREME WIND = 4.26 KIPS
SEISMIC = 1.0 KIPS
IMPACT (LR) = NA
DIAPHRAGM CHORD FORCES
EXTREME WIND = 11.82 KIPS
SEISMIC = 2.73 KIPS
IMPACT (LR) = 3.85 KIPS
FOUNDATION LATERAL SHEAR FORCES
EXTREM
E WIND= 20.64 KIPS
SEISMIC
= 4.34 KIPS
IMPACT (LR)
= 4.80 KIPS
ROOF LATERAL SHEAR FORCES
EXTREM
E WIND= 15.6 KIPS
SEISMIC
= 3.60 KIPS
IMPACT (LR)
= 4.80 KIPS
DIAPHRAGM CHORD FORCES
EXTREM
E WIND= 12.24 KIPS
SEISMIC
= 2.68 KIPS
MAXIMUM SNOW DRIFT
INTENSITY Pd=14.5 PSF
FOUNDATION LATERAL SHEAR FORCES
EXTREME WIND = 52.30 KIPS
SEISMIC = 12.34 KIPS
IMPACT (LR) = 1.56 KIPS
ROOF LATERAL SHEAR FORCES
EXTREME WIND = 45.87 KIPS
SEISMIC = 10.00 KIPS
IMPACT (LR) = 1.56 KIPS
DIAPHRAGM CHORD FORCES
EXTREME WIND = 15.61 KIPS
SEISMIC = 3.60 KIPS
IMPACT (LR) = 5.08 KIPS
FOUNDATION LATERAL SHEAR FORCES
EXTREM
E WIND= 56.25 KIPS
SEISMIC
= 13.71 KIPS
IMPACT (LR)
= 16.14 KIPS
ROOF LATERAL SHEAR FORCES
EXTREM
E WIND= 49.6 KIPS
SEISMIC
= 11.41 KIPS
IMPACT (LR)
= 16.14 KIPS
DIAPHRAGM CHORD FORCES
EXTREM
E WIND= 12.24 KIPS
SEISMIC
= 2.68 KIPS
FOUNDATION LATERAL SHEAR FORCES
EXTREME WIND = 73.51 KIPS
SEISMIC = 16.73 KIPS
IMPACT (LR) = 1.46 KIPS
ROOF LATERAL SHEAR FORCES
EXTREME WIND = 67.80 KIPS
SEISMIC = 14.82 KIPS
IMPACT (LR) = 1.46 KIPS
DIAPHRAGM CHORD FORCES
EXTREME WIND = 15.60 KIPS
SEISMIC = 3.60 KIPS
IMPACT (LR) = 5.08 KIPS
NOTES:
1. VERIFY FINAL LOCATION OF ALL ROOF
PENETRATIONS AND HUNG EQUIPMENT.
2. REFER ARCHITECTURAL AND MECHANICAL
DRAWINGS FOR ADDITIONAL HANGING
LOADS NOT SHOWN.
3. FOR WALL PANEL DESIGN AND WALL
PANEL CONNECTIONS, THE PRECASTER
SHALL CONSIDER MAIN FRAME PRESSURES
FOR IN PLANE SHEAR AND AXIAL LOADS
CONCURRENT WITH COMPONENT AND
CLADDING OUT OF PLANE WIND
PRESSURES.
4. LR = ROOF LIVE LOADS.
MAXIMUM SNOW DRIFT
INTENSITY Pd=79.8 PSF
MAXIMUM SNOW DRIFT
INTENSITY Pd=14.5 PSF
FOUNDATION LATERAL SHEAR FORCES
EXTREM
E WIND= 68.73 KIPS
SEISMIC
= 10.63 KIPS
IMPACT (LR)
= 11.70 KIPS
ROOF LATERAL SHEAR FORCES
EXTREM
E WIND= 40.0 KIPS
SEISMIC
= 9.12 KIPS
IMPACT (LR)
= 11.70 KIPS
DIAPHRAGM CHORD FORCES
EXTREM
E WIND= 9.13 KIPS
SEISMIC
= 2.00 KIPS
MAXIMUM SNOW DRIFT
INTENSITY Pd=14.5 PSF
MAXIMUM SNOW DRIFT
INTENSITY Pd=14.5 PSF
DIAPHRAGM SHEARS
EXTREME WIND LONG. = 102.44 KIPS
EXTREME WIND TRANS. = 97.3 KIPS
SEISMIC = 22.4 KIPS
IMPACT (LR) TRANS = 31.6 KIPS
BALANCED SNOW LOAD
Pb = 20 PSF
FOUNDATION LATERAL SHEAR FORCES
EXTREME WIND = 7.35 KIPS
SEISMIC = 1.94 KIPS
IMPACT (LR) = 0.16 KIPS
ROOF LATERAL SHEAR FORCES
EXTREME WIND = 7.35 KIPS
SEISMIC = 1.61 KIPS
IMPACT (LR) = 0.16 KIPS
DIAPHRAGM CHORD FORCES
EXTREME WIND = 11.82 KIPS
SEISMIC = 2.73 KIPS
IMPACT (LR) = 3.85 KIPS
3'-4" 3'-4"
3'-4"
3'-4"
3'-4"
27'-9"
1AS1.2
______
1
a=4'-
6"
a
a
a
a
a
ROOF
ZONE 1
ROOF
ZONE 2
ROOF
ZONE 3
PARAPET
ZONE 5+3
PARAPET
ZONE 4+3
WALL
ZONE 5
565 PLF (IMPACT LR)
780 PLF (IMPACT LR)
NOTE:
PRECAST MANUF. TO DESIGN
PANELS TO TAKE INDICATED
LOADS APPLIED BETWEEN
ELEVATIONS 111'-7" AND
112'-7" (INCLUSIVE)
1
1
Kirkpatrick Forest Curtis PCStructural Engineering
525 Central Park Drive, Suite 202Oklahoma City, OK 73105Telephone: 405.528.4596Fax: 405.528.4580
KS CA #E-1496, EXP. 12/31/20
engineering
Seal:
Revisions:
Project #:
Date:
Sheet Title:
Drawn By:
Checked By:
© 2
019 S
CH
ULT
Z S
QU
AR
ED
AR
CH
ITE
CT
S, LLC
SCHULTZ
ARCHITECTS, LLC
2
1999 North Amidon, Suite 373
Wichita, Kansas 67203
Phone: 316-425-7745
7/1
1/2
01
9 2
:48
:19 P
M
LIN
CO
LN
JR
/SR
HS
FE
MA
SA
FE
RO
OM
AD
DIT
ION
US
D 2
98
LIN
CO
LN
PU
BL
IC S
CH
OO
LS
70
1 E
AS
T N
OR
TH
ST
RE
ET
LIN
CO
LN
, K
AN
SA
S
18165
6-17-2019
LOADING PLANS
CJC
LEC
S1.2
NO
RT
H
SCALE: 1/8" = 1'-0"S1.2
1 LOAD PLAN
SCALE: NONES1.2
2 COMPONENT AND CLADDING ISOMETRIC
SCALE: 1" = 1'-0"S1.2
1APANEL IMPACT LOADS(SOUTH WALL ONLY)
No. Description Date
1 BID REVISION 07-11-19
1. FOUNDATION AND SLAB SUBGRADE SHALL BE PREPARED ASOUTLINED IN THE STRUCTURAL GENERAL NOTES.
2. REFERENCE ELEVATION OF 100'-0" EQUALS THE EXISTING FIRST FINISHED FLOOR DATUM ELEVATION OF 1399.75 FEET.
3. EXCEPT WHERE SHOWN OTHERWISE, NEW SLABS-ON-GRADE SHALL BE 4" THICK CONCRETE REINFORCED WITH #4 BARS AT 12" ON CENTER EACH WAY OVER A 4" GRANULAR BASE COURSE AS OUTLINED IN THE GENERAL NOTES. REINFORCING BARS SHALL BE PLACED 1 1/2" CLEAR FROM TOP OF SLAB USING CHAIRS OR SLAB BOLSTERS COMPLYING WITH CRSI'S "MANUAL OF STANDARDPRACTICE".
4. SLABS-ON-GRADE SHALL BE WATER CURED FOR A MINIMUM OF 7 DAYS BY PONDING, SPRAYING, SPRINKLING OR BY USE OF SATURATED COVERINGS. THE USE OF CURING COMPOUNDS FOR SLABS-ON-GRADE IS PROHIBITED.
5. SAWED JOINTS (SJ) AND REQUIRED CONSTRUCTION JOINTS (CJ) ARE SHOWN ON THE DRAWINGS. AT THE CONTRACTOR'S OPTION, ADDITIONAL DOWELED CONSTRUCTION JOINTS MAY BE PLACED AT LOCATIONS INDICATED TO BE SAWED.
6. INDICATES (2)#4 BARSx4'-0" TO BE PLACED IN SLAB-ON-GRADEAT ALL RE-ENTRANT SLAB EDGE CORNERS AND
CONSTRUCTION JOINT CORNERS. RE-ENTRANT CORNERS ARE DEFINED AS INTERIOR CORNERS WHERE JOINTS DO NOT OCCUR IN BOTH DIRECTIONS. SIMILAR BARS SHALL BE PLACED AT ANY DISCONTINUOUS ENDS OF SAWED JOINTS OR CONSTRUCTION JOINTS AND AT OPENINGS AND CORNERS OF CMU WALLS.
7. REFER MECHANICAL FOR ADDITIONAL FLOOR DRAIN (F.D.) INFORMATION.
8. REFER SHEET S1.4 FOR COLUMN ANCHOR ROD AND BASE PLATE INFORMATION.
FOUNDATION PLAN NOTES:
5S5.1
______
6S5.1
______
1S5.1
______
2S5.1
______
1S5.1
______
2S5.1
______
3S5.1
______ELEV.= 100'-0"
FINISHED FLOOR
4" CONC. SLAB W/ #4 AT 12" O.C.
EA. WAY OVER VAPOR BARRIER OVER
4" GRANULAR BASE OVER 1'-0" LVC
OVER GENERAL STRUCTURAL FILL
S.J. TYP. U.N.O.
11'-6" 11'-6" 11'-6" 11'-6" 8'-0"
12'-0"
10'-4"
10'-4"
10'-4"
S.J. TYP. U.N.O.
45'-0"
(FIELD VERIFY)
10'-0" 1'-0"
43'-0"
1'-0"
56'-0"
45'-0"
4'-6"
1'-9"
1'-0"
1'-9"
4'-6"
1'-9"
1'-0"
1'-9"
4'-6"
1'-9"
1'-0"
1'-9"
4'-6"
1'-9"
1'-0"
1'-9"
F.D.
1'-0" 7'-0" 8'-0" 8'-0" 8'-0" 8'-0" 7'-0"
1'-0"
8'-0"
7'-6"
10'-0"
10'-0"
10'-0"
7'-6"
1'-0"
7'-0" 8'-0" 8'-0" 8'-0" 8'-0" 7'-0" 8'-0" 1'-0"
5S5.1
______
S.J.
S.J.
4S5.1
______
PANEL SPACING
ELEV.= 96'-2"
T.O. FOOTING
FOOTING
TRANSITION
REFER
7/S5.1
ELEV.= 98'-0"
T.O. FOOTING
PANEL SPACING
7'-6"
7'-6"
10'-0"
10'-0"
10'-0"
PANEL SPACING
DO NOT CONNECT
RETAINING WALL TO
SHELTER WALL OR
FOOTING
PANEL SPACING
FOOTING TRANSITION
REFER 7/S5.1
ELEV.= 96'-2"
T.O. FOOTING
9'-4"
3'-4"
2'-4"
21'-6"
6'-4"
2'-2"1
S5.2
______
2S5.2
______2S5.2
______
O.H.
3S5.2
______
(2) #4 CHORD
REINF. BARS,
TYP. AT
PERIMETER
1'-0"
48'-0" 8'-0"
1'-0"
1'-0"
_____S2.1
2
IF ALT. IS
ACCEPTED
DO NOT CONNECT FOOTING
OR TURN DOWN SLAB TO
SHELTER FOOTING
DO NOT CONNECT FOOTING
OR TURN DOWN SLAB TO
SHELTER FOOTING
EXISTING BUILDING TO REMAIN
(2)
#4x2'-6"x2'-6"
CORNER BARS,
TYP.4
S5.2
______
3 7/8"
22'-4 3/4"
FIELD VERIFY
10'-0"
8'-6 7/8"3 7/8"
1'-7"
1'-2"
1'-9"
4S5.1
______ 1S5.2
______
2S5.2
______
8'-0" 1'-0"
5S5.1
______
S.J.
S.J.
2S5.2
______
O.H.
EXISTING BUILDING
F1
F1
5S5.2
______
HSS4X4X1/4 /A
HSS4X4X1/4 /A
2'-0"
2'-3"
2'-0"
2'-3"
8S5.1
______
1
A
B
5 1/8"
18'-0"
3'-11 5/8"
FIELD VERIFY
10'-0"
10'-0"
5 1/8"
1'-4 3/8"
1'-2"
1'-8"
2'-6"
C4, TYP. (4
LOCATIONS)
LEGEND:
HSS4x4x
1/4/A
COLUMN SIZE
BASE PLATE TYPE
F1FOOTING TYPE
Kirkpatrick Forest Curtis PCStructural Engineering
525 Central Park Drive, Suite 202Oklahoma City, OK 73105Telephone: 405.528.4596Fax: 405.528.4580
KS CA #E-1496, EXP. 12/31/20
engineering
Seal:
Revisions:
Project #:
Date:
Sheet Title:
Drawn By:
Checked By:
© 2
019 S
CH
ULT
Z S
QU
AR
ED
AR
CH
ITE
CT
S, LLC
SCHULTZ
ARCHITECTS, LLC
2
1999 North Amidon, Suite 373
Wichita, Kansas 67203
Phone: 316-425-7745
7/1
1/2
01
9 2
:48
:20 P
M
LIN
CO
LN
JR
/SR
HS
FE
MA
SA
FE
RO
OM
AD
DIT
ION
US
D 2
98
LIN
CO
LN
PU
BL
IC S
CH
OO
LS
70
1 E
AS
T N
OR
TH
ST
RE
ET
LIN
CO
LN
, K
AN
SA
S
18165
6-17-2019
FOUNDATION
PLAN
CJC
LEC
S2.1
NO
RT
H
SCALE: 1/8" = 1'-0"S2.1
1 FOUNDATION PLAN
NO
RT
H
SCALE: 1/8" = 1'-0"S2.1
2 FOUNDATION PLAN-ALTERNATE
COLUMN FOOTING SCHEDULE ALTERNATE
MARK LENGTH WIDTH THICKNESS Reinforcement
F1 2'-0" 2'-3" 2'-0" (3) #4 EW TOP AND BOT.
No. Description Date
1 BID REVISION 07-11-19
1
STOR103
TLT104
ADA TLT105
WRESTLING106
VESTIBULE102
CORRIDOR101
VESTIBULE100
A
A
A
A
A
A
A
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
XA
XAXA
XA
A
A
A
A
B
B
C
C
XA
E E
E
EE
E E
1 1
E
CE
HA-5
HA-7
HA-9(VIA CONTACTOR)
2
DD
DE
D
D
DD
B
B
B
3
3
E 1
1 1
GENERAL NOTES:1. ALL CIRCUITS INDICATED ON DRAWINGS SHALL BE 20A,
120V CIRCUITS WITH (2)-#12'S AND (1)-#12 G. IN 0.5"CONDUIT U.O.N.
2. LABEL ALL SNAP SWITCH COVERPLATES WITH THEPANEL AND CIRCUIT NUMBER.
3. REFER TO RELATED ARCHITECTURAL DRAWINGS FORRELATED INFORMATION.
4. REFER TO THE SPECIFICATIONS FOR DATA NOT ON THEDRAWINGS.
5. WALL MOUNTING HEIGHTS TO CENTERLINE OF DEVICEUNLESS OTHERWISE NOTED.
6. A GROUND CONDUCTOR SIZED PER N.E.C. ARTICLE 250IS REQUIRED IN ALL POWER, RECEPTACLE, ANDLIGHTING CIRCUITS. GROUND CONDUCTORS ARE NOTSHOWN ON DRAWINGS.
LOWER CASE LETTERS NEXT TO LIGHT FIXTURES INDICATE WHICH SWITCH THEY ARE CONTROLLED BY.
7.
L ICENSED
K A N S AS
#26948PROFESSIONA L EN
GIN
EER
AN HE LDSTAB
GROM
Seal:
Revisions:
Project #:Date:Sheet Title:
Drawn By:
Checked By:
© 2
019
SCH
ULT
Z SQ
UAR
EDAR
CH
ITEC
TS, L
LC
SCHULTZ ARCHITECTS, LLC
2
1999 North Amidon, Suite 373Wichita, Kansas 67203
Phone: 316-425-7745
[email protected]@SCHULTZSQUARED.COM
7/10
/201
9 11
:22:
13 A
M
LIN
CO
L JR
/SR
HS
FEM
A S
AFE
RO
OM
AD
DIT
ION
USD
298
LIN
CO
L PU
BLI
C S
CH
OO
LS70
1 EA
ST N
OR
TH S
TREE
TLI
NC
OLN
, KAN
SAS
1816506-13-19FIRST FLOORPLAN - LIGHTING
MHDR
E3.1
Proj
ect S
tatu
s NORTH
E3.1 PLAN NOTES1 MOUNT TO BOTTOM OF BEAM.2 EXISTING FIXTURE SHALL BE REMOVED BACK TO
ORIGINAL POINT OF ORIGINTION.3 FIXTURE SHALL BE MOUNTED TO THE BOTTOM OF
SUPPORTS.
SCALE: 1/4" = 1'-0"
FIRST FLOOR PLAN - LIGHTINGA
#
ALL BOXES LOCATED IN THE PRECAST WALLS SHALL BE RECESSED. ALL CONDUIT THAN RUNS PERPENDICULAR TO THE DOUBLE TEES SHALL BE WALL MOUNTED AND RUN TIGHT TO THE TEE STEMS. OVERLAP OF EXPOSE CONDUIT SHALL BE KEPT TO A MINIMUM.
PENETRATIONS THROUGH THE STORM SHELTER ENVELOPE LARGER THAN 3-1/2 SQUARE INCHES OR 2-1/2" INCHES FOR SYSTEMS AND UTILITIES INSTALLED FOR ANY PURPOSE, SHALL BE CONSIDERED OPENINGS AND SHALL BE PROTECTED. REFER TO STRUCTURAL PLANS FOR ADDITIONAL INFORMATION.
No. Description Date
1 BIDREVISIONS
2019-07-10