second project orientation 26112011
TRANSCRIPT
-
8/3/2019 Second Project Orientation 26112011
1/16
Project Orientation
2 nd
26 th November 2011, Saturday
BSc IT Sem-6 /BCA Sem-6 / MSc IT Sem-4 / MSc TT Sem-4
-
8/3/2019 Second Project Orientation 26112011
2/16
www.company.com
Contents
Synopsis Project Guide
Attendance Change in Title / Organization Interim Report Interim Report presentation
Internal Marks Overview of final project report contents
Department of Information Technology, ISBAT - Kampala
-
8/3/2019 Second Project Orientation 26112011
3/16
www.company.com
Synopsis
Received Guides allocated
Check notice board Meet your Project Guide every week
Department of Information Technology, ISBAT - Kampala
-
8/3/2019 Second Project Orientation 26112011
4/16
www.company.com
Project Guide
Support ideas , refine the project work Facilitate improving the report content
Department of Information Technology, ISBAT - Kampala
-
8/3/2019 Second Project Orientation 26112011
5/16
www.company.com
Attendance
Regular contact with guide essential Sign attendance min 10 .
Department of Information Technology, ISBAT - Kampala
-
8/3/2019 Second Project Orientation 26112011
6/16
www.company.com
Change in Title / Organization
Written request to the project guide to beforwarded to the project committee forapproval
No changes will be accepted after thesubmission of Interim Report
Certificate from the Company
Department of Information Technology, ISBAT - Kampala
Reminder!
-
8/3/2019 Second Project Orientation 26112011
7/16
www.company.com
Interim Report
Progress of the project work to the guide Hard copy only / 10 marks Submission date : 14 th Jan 2012, Saturday Content : theoretical aspects
Department of Information Technology, ISBAT - Kampala
Font Name Times New Roman
Title 18
Sub Heading 16
Paragraphs 12
Paper Size A4
Line Space 1.5 inches
-
8/3/2019 Second Project Orientation 26112011
8/16
www.company.com
Interim Report Presentation
Interim report presentation torespective project guide & getapproval
It carries 10 marks
-
8/3/2019 Second Project Orientation 26112011
9/16
www.company.com
Presentation time/slides of students
10 Minutes of time is allocated for eachstudent for the presentation.
Make sure that your presentation slide shouldnot exceed more than 7 slides.
Get approval from your project guide beforeyou go for presentation.
Dress Code
21.01.2012, Saturday
-
8/3/2019 Second Project Orientation 26112011
10/16
www.company.com
Presentation time/slides of students
Slides Title
1 Title of the Project
2 Overview of the project (Shortly)
3 Module description
4 Operational Environment
5 Flowchart
6 Data flow diagram (Level 0,1,2)
7 E-R Diagram
PowerPoint Presentation
21.01.2012, Saturday
-
8/3/2019 Second Project Orientation 26112011
11/16
www.company.com
Overview of final Project Report contents BSc IT, BCA, MSC IT
Chapter-1 Introduction
1.1. Overview of the Project
1.1.1. Name1.1.2. Objective1.1.3. Scope
1.1.4. Company Profile
Department of Information Technology, ISBAT - Kampala
-
8/3/2019 Second Project Orientation 26112011
12/16
www.company.com
Overview of final Project Report contents BSc IT, BCA, MSC IT
Chapter-2 System Analysis
2.1. Existing System
2.2. Feasibility study2.3. Software Requirement Specification
2.4. Operational Environment
2.4.1. Software requirement2.4.2. Hardware requirement
Department of Information Technology, ISBAT - Kampala
-
8/3/2019 Second Project Orientation 26112011
13/16
www.company.com
Overview of final Project Report contents BSc IT, BCA, MSC IT
Chapter-3 System Design
3.1. Architecture Design
3.1.1. Module descriptions3.1.2. Flow chart
3.1.3. Data Flow Diagram (3 levels)
3.2. Database Design
3.2.1. E-R Diagram
3.2.2. Table Design with ConstraintsDepartment of Information Technology, ISBAT - Kampala
-
8/3/2019 Second Project Orientation 26112011
14/16
www.company.com
Internal Marks
SynopsisParticipation in
Project Work andAccomplishment
(Attendance:Minimum -10
meeting with Guide)
Interim report &Presentation
Project report(Content andCoverage)
10 Marks 20 Marks 20 Marks 10 Marks
In case of change of project title after approval Penalty $25
Code Credit Internal External Total
BT0061 4 60 140 200
BT0095 8 120 280 400
MT0053 4 60 140 200
ME0023 4 60 140 200
-
8/3/2019 Second Project Orientation 26112011
15/16
www.company.com
BOOK
Reference Book Software Engineering
Title : Software Engineering A Practitioners Approach
Author: ROGER S. PRESSMAN
Publisher: McGraw-Hill International Edition
Department of Information Technology, ISBAT - Kampala
eAvailable!
-
8/3/2019 Second Project Orientation 26112011
16/16
www.company.com
NEXTORIENTAT Thanks
14 th Jan 2012, at 4:30pm