second bercen plenary meeting ohrid, september 15-16 2003 agenda item 11
DESCRIPTION
Second BERCEN Plenary Meeting Ohrid, September 15-16 2003 Agenda item 11. Key achievements in environmental enforcement and compliance, and discussion on the selected issue/problem BOSNIA AND HERZEGOVINA MLADEN RUDEŽ Federal Ministry of Physical Planning and Environment Federation of B&H. - PowerPoint PPT PresentationTRANSCRIPT
1
Second BERCEN Plenary Meeting Ohrid, September 15-16 2003 Agenda item 11
Key achievements in environmental enforcement and compliance, and
discussion on the selected issue/problem
BOSNIA AND HERZEGOVINA
MLADEN RUDEŽ
Federal Ministry of Physical Planning and Environment
Federation of B&H
2
Key achievements
1) In Bosnia and Herzegovina (in both of Entities) came in force the new set environmental laws:
a) Law on Environmental Protection;
b) Law on Water Protection;
c) Law on Waste Management;
d) Law on Nature Protection;
e) Law on Air Protection;
f) Law on Ecological Fund
3
Key achievements (continue)2) World Bank – IDA Grant/ The both of entity governments and parliaments B&H has adopted:
• National Environmental Action Plan/ NEAP B&H, and• Implementation of NEAP with “NEAP 100 Projects”
3) EU/ EC CARDS Program:
• Support for Capacity Building for Environmental
Management (support to setting up Secondary Legislation in the
frame new adopted set of Environmental Laws)
• Development of a National Environmental Monitoring
• Support for improved Waste Managment
4
Key achievements (continue)
4. LIFE 3th countries project:• “Setting up an Operational Unit under the
Environmental Steering Committee/ESC B&H”,
5. Pakt Stability - REReP• REReP 1.7: BERCEN
a) Finished: Trainings - “Train trainers”, study tours, procurement of equipment and cars for environmental inspections in MoE of Federation B&H and RSb) Setting up: Environmental Inspection in MoE of Federation B&H and RS
• REReP 1.8: “Development of National Environmental Information System in B&H” – www.fmpuio.gov.ba (Synergy with LIFE project)
5
Key achievements (continue)
• REReP 1.14:”Institutional strengthening of MoE RS and Federation of B&H” - under ITF
a) I Phase - Support to the work of Environmental Steering Committee (ESC) for B&H
b) II Phase - “Preparation of Draft Framework Environmental Law and Feasibility Study as Precondition for the EPA in B&H”
6. PRSP – Development Strategy of B&H (2003 to 2007) Part – Anex VII, Sectors Priority: Environment
• Underway: public disscusion - Second proposal of Strategy
• Expected of B&H parliament adoption to the end of this year
6
Introduction of Selected Issue/Problem
1. Main problem in environmental enforcement and regulatory compliance in B&H:
• Lack of institutions and regulatory for implementation: EPA, Environmental Inspectorate and secondary legislation of Environmental Laws
2. World Bank Project:• It‘s finished in May 2003: Action plan of Inspectorate (in
Federation of B&H andRS) including State Inspektorate - Document for reforms:
• Goals of Action Plan: a) New organisation structure of Inspectorates (included Environmental Inspection) as Indipendent Autorised Bodies b) Drawing up draft of new Law on Inspectorates and its implementation; c) Training
7
In-country Training Programme
1. BERCEN B&H Workshop• Scope: Minimum criteria of environmental Inspection in B&H • Objectives:
a) Introduction in the BERCEN Program; b) New Environmental Laws in B&Hc) Criterias of Environmental Protection Inspectiond) Main elements of IPPC Procedure
• Timing and location: November 2003, Sarajevo/Banja Luka
• Trainers:Participants of BERCEN training program: “Train trainers”,
and • Participants: Representatives of Mynistries on the State, Entity, Cantons/Regions, Municipalities responsibilities for environmental inspection, bigger polluters (approx. 25 persons)