seattle seawall replacement project presentation 042312
TRANSCRIPT
8/2/2019 Seattle Seawall Replacement Project Presentation 042312
http://slidepdf.com/reader/full/seattle-seawall-replacement-project-presentation-042312 1/44
Seattle City Council
Special Committee Briefing
April 23, 2012
8/2/2019 Seattle Seawall Replacement Project Presentation 042312
http://slidepdf.com/reader/full/seattle-seawall-replacement-project-presentation-042312 2/44
Topics Today
• Review of recommended design
• Updated 35% cost estimate
• Next steps
8/2/2019 Seattle Seawall Replacement Project Presentation 042312
http://slidepdf.com/reader/full/seattle-seawall-replacement-project-presentation-042312 3/44
Current Project Schedule
8/2/2019 Seattle Seawall Replacement Project Presentation 042312
http://slidepdf.com/reader/full/seattle-seawall-replacement-project-presentation-042312 4/44
Project Area
Central Waterfront Team
8/2/2019 Seattle Seawall Replacement Project Presentation 042312
http://slidepdf.com/reader/full/seattle-seawall-replacement-project-presentation-042312 5/44
• Reduce the risks of coastalstorm and seismic
damages• Protect public safety,
critical infrastructure, andassociated economicactivities along Seattle’s
central waterfront
• Improve the degradedecosystem functions andprocesses of the Elliott Baynearshore in the vicinity ofthe existing seawall
5
Project Purpose
8/2/2019 Seattle Seawall Replacement Project Presentation 042312
http://slidepdf.com/reader/full/seattle-seawall-replacement-project-presentation-042312 6/44
What’s at Risk?
• Public safety
• Transportation corridor
• Critical utilities
• Residential and commercialstructures
• Public recreation
• Tourism and local attractions
• Seattle’s front porch
8/2/2019 Seattle Seawall Replacement Project Presentation 042312
http://slidepdf.com/reader/full/seattle-seawall-replacement-project-presentation-042312 7/44
Strong Public Support
Address the safety issues
Get construction started
Seize the habitat opportunity
Maintain a responsible budget
Create more physical access towater and gathering spaces
Maintain transportation routesConsider construction impacts
Preserve historical and culturalsignificance
8/2/2019 Seattle Seawall Replacement Project Presentation 042312
http://slidepdf.com/reader/full/seattle-seawall-replacement-project-presentation-042312 8/44
Review of
Recommended Design
8/2/2019 Seattle Seawall Replacement Project Presentation 042312
http://slidepdf.com/reader/full/seattle-seawall-replacement-project-presentation-042312 9/44
Seawall and Waterfront Design CoordinatioJune/July Aug Sept Oct Nov Dec Jan - March
Seawall 35% Design
ocus Area: Habitat
ollaboration on a total habitat andstainability approach
Focus Area: Seawall Alignment RefinementCollaboration on refined alignment that blends Alternative
A and Alternative B, working toward a recommendedalternative
Focus Area: Targeted Design IssuesCollaboration on seawall design issues that are informed by thelong-term Waterfront Seattle vision, such as:• Light penetrating surfaces/other sidewalk elements• Area-specific design elements• Seawall face treatments• Temporary spaces• Riparian plantings
Ongoing Design and Outreach Coordination
8/2/2019 Seattle Seawall Replacement Project Presentation 042312
http://slidepdf.com/reader/full/seattle-seawall-replacement-project-presentation-042312 10/44
Elements of a Seawall Alternative
• Structural solution
• Habitat enhancement measures
• Wall location
• Restored roadway andpedestrian/bicycle facilities
• Flexibility for Waterfront Seattleand project partners
• Potential early wins, both in-waterand uplands
8/2/2019 Seattle Seawall Replacement Project Presentation 042312
http://slidepdf.com/reader/full/seattle-seawall-replacement-project-presentation-042312 11/44
OLYMPIC SCULPTUREPARK?
Soil Stabilization Methods
Drilled ShaftsJet Grouting
8/2/2019 Seattle Seawall Replacement Project Presentation 042312
http://slidepdf.com/reader/full/seattle-seawall-replacement-project-presentation-042312 12/44
otential Habitatnhancements
Textured seawall
Intertidal corridor
Lighting
Riparian vegetation
Substrateenhancement
Cobble reefs
Potential Habitat Enhancement Measures
8/2/2019 Seattle Seawall Replacement Project Presentation 042312
http://slidepdf.com/reader/full/seattle-seawall-replacement-project-presentation-042312 13/44
Recommended Design Features
• Face of wall: 10-15 feet inland
• Soil stabilization with jet grouting
• Continuous migration corridor and nearshore restoration
• Restored Alaskan Way and pedestrian/bicycle facilities
• Early program wins
8/2/2019 Seattle Seawall Replacement Project Presentation 042312
http://slidepdf.com/reader/full/seattle-seawall-replacement-project-presentation-042312 14/44
Recommended Design
existing seawall
N
8/2/2019 Seattle Seawall Replacement Project Presentation 042312
http://slidepdf.com/reader/full/seattle-seawall-replacement-project-presentation-042312 15/44
alternative seawall
Recommended Design
N
8/2/2019 Seattle Seawall Replacement Project Presentation 042312
http://slidepdf.com/reader/full/seattle-seawall-replacement-project-presentation-042312 16/44
existing seawall
alternative seawall
sidewalk
multi-use path
Recommended Design
N
8/2/2019 Seattle Seawall Replacement Project Presentation 042312
http://slidepdf.com/reader/full/seattle-seawall-replacement-project-presentation-042312 17/44
existing seawall
alternative seawall
sidewalk
multi-use path
habitat corridor enhancement
Recommended Design
N
8/2/2019 Seattle Seawall Replacement Project Presentation 042312
http://slidepdf.com/reader/full/seattle-seawall-replacement-project-presentation-042312 18/44
Existing – Zone 1
8/2/2019 Seattle Seawall Replacement Project Presentation 042312
http://slidepdf.com/reader/full/seattle-seawall-replacement-project-presentation-042312 19/44
Recommended Design – Zone 1
8/2/2019 Seattle Seawall Replacement Project Presentation 042312
http://slidepdf.com/reader/full/seattle-seawall-replacement-project-presentation-042312 20/44
Existing – Zone 1
8/2/2019 Seattle Seawall Replacement Project Presentation 042312
http://slidepdf.com/reader/full/seattle-seawall-replacement-project-presentation-042312 21/44
Recommended Design – Zone 1
15’
8/2/2019 Seattle Seawall Replacement Project Presentation 042312
http://slidepdf.com/reader/full/seattle-seawall-replacement-project-presentation-042312 22/44
Existing – Zone 2
8/2/2019 Seattle Seawall Replacement Project Presentation 042312
http://slidepdf.com/reader/full/seattle-seawall-replacement-project-presentation-042312 23/44
15’
Recommended Design – Zone 2
8/2/2019 Seattle Seawall Replacement Project Presentation 042312
http://slidepdf.com/reader/full/seattle-seawall-replacement-project-presentation-042312 24/44
Existing – Zone 3
8/2/2019 Seattle Seawall Replacement Project Presentation 042312
http://slidepdf.com/reader/full/seattle-seawall-replacement-project-presentation-042312 25/44
Recommended Design – Zone 3
10-15’
8/2/2019 Seattle Seawall Replacement Project Presentation 042312
http://slidepdf.com/reader/full/seattle-seawall-replacement-project-presentation-042312 26/44
Existing – Zone 4
8/2/2019 Seattle Seawall Replacement Project Presentation 042312
http://slidepdf.com/reader/full/seattle-seawall-replacement-project-presentation-042312 27/44
Recommended Design – Zone 4
10’
8/2/2019 Seattle Seawall Replacement Project Presentation 042312
http://slidepdf.com/reader/full/seattle-seawall-replacement-project-presentation-042312 28/44
Existing – Zone 4
8/2/2019 Seattle Seawall Replacement Project Presentation 042312
http://slidepdf.com/reader/full/seattle-seawall-replacement-project-presentation-042312 29/44
Recommended Design – Zone 4
10’ 10’
8/2/2019 Seattle Seawall Replacement Project Presentation 042312
http://slidepdf.com/reader/full/seattle-seawall-replacement-project-presentation-042312 30/44
Construction Contracting Considerations
Conduct risk analysis todetermine preferredapproach
Means and methods for jetgrouting
Responsiveness tostakeholder needs/concerns
Managing change ordersand cost reduction incentiveproposals
Panel (with new designers)to convene in late May
8/2/2019 Seattle Seawall Replacement Project Presentation 042312
http://slidepdf.com/reader/full/seattle-seawall-replacement-project-presentation-042312 31/44
35% Design Cost Estimate
8/2/2019 Seattle Seawall Replacement Project Presentation 042312
http://slidepdf.com/reader/full/seattle-seawall-replacement-project-presentation-042312 32/44
Foundation of the Waterfront Program
8/2/2019 Seattle Seawall Replacement Project Presentation 042312
http://slidepdf.com/reader/full/seattle-seawall-replacement-project-presentation-042312 33/44
Foundation of the Waterfront Program
8/2/2019 Seattle Seawall Replacement Project Presentation 042312
http://slidepdf.com/reader/full/seattle-seawall-replacement-project-presentation-042312 34/44
Foundation of the Waterfront Program
8/2/2019 Seattle Seawall Replacement Project Presentation 042312
http://slidepdf.com/reader/full/seattle-seawall-replacement-project-presentation-042312 35/44
Foundation of the Waterfront Program
8/2/2019 Seattle Seawall Replacement Project Presentation 042312
http://slidepdf.com/reader/full/seattle-seawall-replacement-project-presentation-042312 36/44
What Elements are “Final”?
• 100-year design life for structural elements
• In-water habitat restoration features
• Restored Washington Street Boat Landing
• Pocket beach near Washington Street, with potential forseamless expansion
• Historic pier slips
• Railing
• Promenade with light penetrating surfaces
• Full flexibility for ongoing work with project partners, such asthe Seattle Aquarium
8/2/2019 Seattle Seawall Replacement Project Presentation 042312
http://slidepdf.com/reader/full/seattle-seawall-replacement-project-presentation-042312 37/44
Costs in Year of Construction
Alt A Alt B Current
CIP
35%Design
Environmental and Design $35 M $40 M $40 MConstruction
Soil Stabilization $185 M $223 M $178 M
Ecosystem Restoration $8 M $23 M $11 M
Roadway and Access $19 M $23 M $23 M
Contingency $63 M $81 M $48 M
Subtotal $310 M $390 M $330M $300MPublic Utilities Infrastructure
SPU Facilities (full cost) $6 M $7 M $6 M
SCL Facilities (full cost) $19 M $19 M $19 M
Total $335 M $416 M $365M $325M
Central Seawall Costs – 35% Design
8/2/2019 Seattle Seawall Replacement Project Presentation 042312
http://slidepdf.com/reader/full/seattle-seawall-replacement-project-presentation-042312 38/44
10% Design 35% Design
Central seawall project boundaryextends to Virginia Street
Total distance (S. Washington toVirginia): 3,700 lineal feet
Increased from previous length by240 lineal feet
Central seawall project boundarystays at Virginia Street• Total distance (S. Washington to
Virginia): 3,700 lineal feet
Drilled shafts assumed for soilstabilization, due to better historicprice record and less cost risk
Jet grouting for soil stabilization,with availability to use drilled shafts ifneeded
Ecosystem restoration featuresncluded, range of costs largely dueo excavation needs
Ecosystem restoration balancesneeds and functions, less excavationneeded
Utility costs included Utility costs included
30% construction contingency,standard for early design
25% construction contingency,due to design progression
Cost Assumptions – 10% vs. 35% Design
8/2/2019 Seattle Seawall Replacement Project Presentation 042312
http://slidepdf.com/reader/full/seattle-seawall-replacement-project-presentation-042312 39/44
35% Cost Estimate Notes
• Design is under budget
• Cost savings achieved with
refinement of the design,particularly in jet grouting
• Estimated budget for habitatfeatures reduced
– Hybrid of the alternatives
–Less excavation required
• Reduced contingency from30% to 25%
• Costs for utilities assumed tobe same as 10% estimates
8/2/2019 Seattle Seawall Replacement Project Presentation 042312
http://slidepdf.com/reader/full/seattle-seawall-replacement-project-presentation-042312 40/44
Breakdown of 35% Estimate
Design anEnvironme
16%
SoilStabilization
72%
EcosystemRestoration
4% Roadwayand Access
8%
8/2/2019 Seattle Seawall Replacement Project Presentation 042312
http://slidepdf.com/reader/full/seattle-seawall-replacement-project-presentation-042312 41/44
Other Critical Waterfront Infrastructure
• Pier 62/63 and WaterfrontPark badly deteriorated
and in need of rebuilding
• Current conceptual costestimate: $80-100M
8/2/2019 Seattle Seawall Replacement Project Presentation 042312
http://slidepdf.com/reader/full/seattle-seawall-replacement-project-presentation-042312 42/44
Upcoming Topics for Council Discussion
Army Corps and project schedule update
Waterfront Seattle coordination and integration
Introduction of final design team
Jet grouting stabilization technique
Habitat research progress
Construction contracting approach
8/2/2019 Seattle Seawall Replacement Project Presentation 042312
http://slidepdf.com/reader/full/seattle-seawall-replacement-project-presentation-042312 43/44
8/2/2019 Seattle Seawall Replacement Project Presentation 042312
http://slidepdf.com/reader/full/seattle-seawall-replacement-project-presentation-042312 44/44