Seattle Department of Transportation SEATTLE BICYCLE MASTER PLAN 2019-2024 Proposed Implementation Plan MARCH 28, 2019 DRAFT DRAFT

Upload: vonga

Post on 01-Apr-2019

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Seattle Department of Transportation SEATTLE BICYCLE ... · 1 day ago · PBL NE 70th St PBL 0.20 2019 External agency coordination and weather. ... 28 Northgate to Maple Leaf Light

Seattle Department of Transportation

SEATTLE BICYCLE MASTER PLAN2019-2024 Proposed Implementation Plan

MARCH 28, 2019 DRAFT

DRAFT

Page 2: Seattle Department of Transportation SEATTLE BICYCLE ... · 1 day ago · PBL NE 70th St PBL 0.20 2019 External agency coordination and weather. ... 28 Northgate to Maple Leaf Light

DRAFT

Page 3: Seattle Department of Transportation SEATTLE BICYCLE ... · 1 day ago · PBL NE 70th St PBL 0.20 2019 External agency coordination and weather. ... 28 Northgate to Maple Leaf Light

Move Seattle Levy Resources to Help Implement the Bicycle Master Plan Over the past three years, the City of Seattle has built 27 miles of new bike facilities. Mayor Durkan and SDOT Director Zimbabwe are committed to continuing to build a connected bike network as Seattle grows. We know many people are talking about how we implement Seattle's 2014 Bicycle Master Plan (BMP) recommendations. Today we submitted to City Council a Draft BMP Implementation Plan and proposed project list. Let’s talk about what this means. Last fall, Mayor Durkan directed us to complete a comprehensive update of the Levy to Move Seattle based on more realistic budget assumptions than we used in 2015. The way we came up with the draft six-year plan is by working with the Seattle Bicycle Advisory Board, and considering the updated Levy to Move Seattle commitments. We also continue to use the prioritization framework identified in the 2014 Bicycle Master Plan to make the best investments to maximize safety, connectivity, equity, ridership and livability. We’ll take public comments about this draft plan until April 30 and then submit a revised version to City Council. Once the plan is done, there are still many steps that need to be taken before a project is built because things can change over time. For example, we may need to revise the plan if something unforeseen comes up during engineering, if there are coordination challenges with other public and private projects, or as we learn about other issues through community engagement. One way we can advance transparency is to identify potential risks or issues that may change over time, and by engaging in an open public process. Our goal is to be upfront about what we’ll need to consider before each project is built.

Page 4: Seattle Department of Transportation SEATTLE BICYCLE ... · 1 day ago · PBL NE 70th St PBL 0.20 2019 External agency coordination and weather. ... 28 Northgate to Maple Leaf Light

CONTENTS

Chapters

1. Introduction 4 2. Safety 6

3. Bicycle Master Plan Progress 7

4. Prioritization 11

5. 2019-2024 Proposed Projects 12

6. Coordination Projects Update 18

7. Project Delivery: Taking Projects from 1% Design to 100% Construction 20

8. Funding and Costs 22

Appendices

Appendix 1: Performance Measures 25

Appendix 2: Strategies and Actions 26

Appendix 3: Proposed Project Lists 32DRAFT

Page 5: Seattle Department of Transportation SEATTLE BICYCLE ... · 1 day ago · PBL NE 70th St PBL 0.20 2019 External agency coordination and weather. ... 28 Northgate to Maple Leaf Light

4 | SEATTLE DEPARTMENT OF TRANSPORTATION

1. INTRODUCTION

BACKGROUNDThe Seattle Bicycle Master Plan’s (BMP) vision is that riding a bicycle is a comfortable and integral part of daily life in Seattle for people of all ages and abilities. The BMP identifies projects and programs to be implemented from 2014 to 2033 to achieve the vision and meet the plan’s goals for safety, ridership, equity, connectivity, and livability.

Implementing the BMP also supports other city plans and priorities, including the Housing Affordability and Livability Agenda (HALA), Age-Friendly Seattle, Vision Zero, and Seattle 2035.

The BMP outlines an infrastructure plan for a connected network that includes approximately 100 miles of protected bicycle lanes1 and nearly 250 miles of neighborhood greenways2. The BMP also identifies activities designed to support and encourage riding such as facility maintenance, bicycle parking, and educational events.

This 2019-2024 BMP Implementation Plan identifies projects and programs that, combined with existing facilities, will make significant progress towards implementing the BMP in the next six years.

Starting in 2016, BMP implementation is funded primarily by the Levy to Move Seattle, which was approved by voters in 2015.

PURPOSEThis implementation plan describes the work that the Seattle Department of Transportation (SDOT) and our partners will undertake to implement the BMP over the next six years. We update the implementation plan each year to:

• Provide a list of specific infrastructure projects SDOT is planning to build each year;

• Serve as an accountability and reporting tool; and

• Guide future budget requests.

REPORTING REQUIREMENTS Consistent with Council Resolution 31515, this implementation plan is updated annually by March 31 of each year. Adjustments are made to the project lists and maps to reflect changes to project schedules, changes to project types, and to add or remove projects.

Also, consistent with Council Resolution 31515, SDOT submits a progress report to the City Council as part of the annual implementation plan update. The progress report summarizes progress made during the prior year, and is reviewed and endorsed by the Seattle Bicycle Advisory Board (SBAB). SDOT also provides updates to the City Council and SBAB every 6 months on the status of projects, programs, and actions in the implementation plan.

1Protected bicycle lanes: facilities physically separated from motor vehicle traffic and distinct from the sidewalk; they may be one-way or two-way, and may be at street level or raised several inches above.

2Neighborhood greenways: residential streets with low motorized traffic volumes and speeds that are designated and designed to give bicycle and pedestrian safe and pleasant travel priority.

DRAFT

Page 6: Seattle Department of Transportation SEATTLE BICYCLE ... · 1 day ago · PBL NE 70th St PBL 0.20 2019 External agency coordination and weather. ... 28 Northgate to Maple Leaf Light

SEATTLE BICYCLE MASTER PLAN 2019-2024 PROPOSED IMPLEMENTATION PLAN | 5

In 2018 Council passed Resolution 31826, a resolution relating to the Seattle Center City Bike network (CCBN). This resolution proposed an implementation schedule for the CCBN and requested quarterly status updates to the Chair of the Sustainability and Transportation Committee through 2019.

DRAFT

Page 7: Seattle Department of Transportation SEATTLE BICYCLE ... · 1 day ago · PBL NE 70th St PBL 0.20 2019 External agency coordination and weather. ... 28 Northgate to Maple Leaf Light

6 | SEATTLE DEPARTMENT OF TRANSPORTATION

2. SAFETY

A central focus of the BMP is to design and implement bicycle facilities that are safe and comfortable for riders of all ages and abilities. Since the BMP was adopted in 2014, we have launched our Vision Zero initiative, which addresses safety for all travelers, and completed the Bicycle and Pedestrian Safety Analysis. These complement the BMP’s focus on safety, and are described below.

VISION ZEROIn 2015, the City of Seattle launched Vision Zero, our plan to end traffic deaths and serious injuries on city streets by 2030 through data-driven engineering, education, and enforcement. Staff who implement the BMP are now part of SDOT’s Vision Zero team, which enhances collaboration and leverages our commitment to safety.

The bike facilities included in this plan provide innovative engineering and smarter street designs that support Vision Zero and the bicycle safety programs help implement the education components of the BMP and Vision Zero. To address the enforcement component, the Seattle Police Department (SPD) will continue to conduct education and enforcement efforts targeting high crash corridors and intersections, and the most frequent contributing factors to bicycle crashes = impairment, speeding, distraction, and failure to yield. We will work with SPD to educate people in advance of these patrols, so everyone will expect appropriate enforcement and develop a better understanding of the rules of the road.

BICYCLE AND PEDESTRIAN SAFETY ANALYSIS In 2016, we completed the Bicycle and Pedestrian Safety Analysis (BPSA) , which studied eight years of citywide data to identify which roadway design and user behavior characteristics most correlated with collisions involving people walking or biking. Based on the data analysis, we developed a safety prioritization model to identify opportunities for spot and corridor improvement projects. The results of this research help inform where the BMP can prioritize bicycle infrastructure as a function of bicycle safety and where spot projects can improve existing bicycle facilities. In 2018, we launched Phase II of the BPSA to better understand the contributing circumstances of crashes involving people walking and biking. This research will continue to inform our work going forward and move us towards our Vision Zero goal. We expect that this second phase of research will be completed in 2019.

DRAFT

Page 8: Seattle Department of Transportation SEATTLE BICYCLE ... · 1 day ago · PBL NE 70th St PBL 0.20 2019 External agency coordination and weather. ... 28 Northgate to Maple Leaf Light

SEATTLE BICYCLE MASTER PLAN 2019-2024 PROPOSED IMPLEMENTATION PLAN | 7

3. BICYCLE MASTER PLAN PROGRESS

The projects in the tables below represent those projects funded by the levy to move Seattle that were completed in 2016, 2017 and 2018 and collectively added more than 25 miles to the network. They range

PROJECTS COMPLETED IN 2016

Project Name On Street From Street To StreetFacility

TypeFacilityMileage

2nd Ave PBL Demonstration

2nd Ave Ext S Yesler Way S Washington St PBL 0.07

Delridge Way SW PBL Delridge Way SW SW Myrtle St SW Holden St PBL 0.38N 34th St PBL N 34th St Fremont Ave N Phinney Ave N PBL 0.23Roosevelt Way NE Paving and Safety Improvements

Roosevelt Way NE NE 65th St University Bridge

PBL 1.37

University Bridge PBL University Bridge Roosevelt Way NE

Fuhrman Ave E PBL 0.35

Westlake Ave N PBL1 Westlake Ave N W Raye St Valley St PBL 1.23Meridian Ave N Paving and Safety Improvements

Meridian Ave N N 103rd St N 112th St BL 0.44

Renton Ave S BL Renton Ave S 51st Ave S City Limits BL 1.34SW Admiral Way BL SW Admiral Way California Ave

SW63rd Ave SW BL 1.39

39th Ave NE NGW Extension

39th Ave NE/NE 85th St/38th Ave NE/NE 89th St

NE 80th St 32nd Ave NE NGW 0.8

E Columbia St NGW E Columbia St 12th Ave 29th Ave NGW 1.02Wallingford NGW Upgrade (Added improvements to existing)

N 43rd St/Burke Ave N/N 44th St/ NE 44th St

Stone Way N Latona Ave NE NGW N/A

39th Ave NE NGW Upgrade (Added improvements to existing)

39th Ave NE Burke-Gilman Trail

NE 80th St NGW N/A

Total Miles Delivered in 2016: 8.621This project did not use levy funding.

PBL = Protected Bike LaneBL = Bike LaneNGW = Neighborhood Greenway

from short extensions like the Banner Way Upgrade, to transformative projects like the 2nd Ave Protected Bike Lane that dramatically increased regional network connectivity.

DRAFT

Page 9: Seattle Department of Transportation SEATTLE BICYCLE ... · 1 day ago · PBL NE 70th St PBL 0.20 2019 External agency coordination and weather. ... 28 Northgate to Maple Leaf Light

8 | SEATTLE DEPARTMENT OF TRANSPORTATION

PROJECT COMPLETED IN 2017

Project Name On Street From Street To StreetFacility

TypeFacilityMileage

520 Bridge Trail (WSDOT)1

SR-520 Bridge Montlake Blvd E

City Limits Trail 2.18

Washington Park Arboretum Loop Trail (Seattle Parks Dept.)1

New Facility Graham Visitor Center

E Madison St Trail 1.20

N 92nd St PBL N 92nd St Wallingford Ave N

1st Ave NE PBL 0.38

Interbay Trail Connections

20th Ave W/Gilman Ave W

Elliot Bay Trail 20th Ave W PBL 1.92

One Center City - 9th Ave N PBL (Phase 1)

9th Ave N Westlake Ave N

Harrison St PBL 0.35

Roy St PBL Roy St Dexter Ave N 9th Ave N PBL 0.12Dexter Ave N PBL Dexter Ave N Mercer St Roy St PBL 0.06Western Ave PBL Western Ave University Ave Virginia Ave PBL 0.34NE Pacific PBL NE Northlake Way/NE

Pacific St (sidewalk project)

7th Ave NE Eastlake Pl NE PBL 0.09

Pike/Pine PBLs Pike St/Pine St 2nd Ave 8th PBL 0.54Cedar Park Elementary NGW Connection

37th Ave NE/NE 125th St/38th Ave NE

NE 123rd St NE 145th St NGW 1.21

Greenwood Elementary NGW Connection

1st Ave NW N 73rd St N 92nd St NGW 0.98

Banner Way NE Corridor Project

Banner Way NE 5th Ave NE 15th Ave NE BBL 0.57

Spring Street Bike Lane Spring St Bike Lane (Bus Lane Project)

3rd Ave 6th Ave BL 0.18

S Dearborn Project S Dearborn St Rainier Ave S 6th Ave S BBL 0.69Total Miles Delivered in 2017: 10.81

1This project did not use levy funding.

PBL = Protected Bike LaneBL = Bike LaneBBL = Buffered Bike LaneNGW = Neighborhood Greenway

DRAFT

Page 10: Seattle Department of Transportation SEATTLE BICYCLE ... · 1 day ago · PBL NE 70th St PBL 0.20 2019 External agency coordination and weather. ... 28 Northgate to Maple Leaf Light

SEATTLE BICYCLE MASTER PLAN 2019-2024 PROPOSED IMPLEMENTATION PLAN | 9

PROJECT COMPLETED IN 2018

Project Name On Street From Street To StreetFacility

TypeFacility Mileage

2nd Ave PBL 2nd Ave Denny Ave Pike St PBL 0.927th Ave PBL 7th Ave Westlake Ave Pike St PBL 0.39Banner Way Upgrade Banner Way NE 77th St 9th Ave NE PBL 0.57S Dearborn St PBL S Dearborn St Rainier Ave S 6th Ave S PBL 0.46Eagle Staff Middle School NGW Connection

N 92nd St Fremont Ave N Wallingford Ave N NGW 0.65

Highland Park NGW Connection

SW Trenton St/ 11th Ave SW

17th Ave SW 10th Ave SW NGW 0.52

Louisa Boren STEM K-8 NGW Connection

SW Juneau St/ Croft Pl SW

21st Ave SW 26th Ave SW NGW 0.45

Olympic Hills NGW Connection

25th Ave NE/NE 130th S/20th Ave NE

NE 127th NE 135th NGW 0.76

Rainier Valley NGW Phase 1

30th Ave S/ S Ferdinand St/ 46th Ave S

S College St S Henderson St NGW 5.54

Total Miles Delivered in 2018: 10.26

DRAFT

DRAFTSpot improvements are prioritized annually by the frequency and severity of collisions, geographic equity which is assessed through race and social justice initiative metrics, and with guidance from the prioritization in the 2017 Trails Upgrade Plan which builds from the Seattle Pedestrian Master Plan and Bicycle Master Plan. SDOT also considers opportunities to partner and leverage with other projects.

BICYCLE RACKS AND SPOT IMPROVEMENTS COMPLETED IN 2016 – 2018 Levy Deliverable 2016 2017 2018

Bike parking spaces added 622 466 306Urban trail and bikeway spot improvement 10 12 12

Page 11: Seattle Department of Transportation SEATTLE BICYCLE ... · 1 day ago · PBL NE 70th St PBL 0.20 2019 External agency coordination and weather. ... 28 Northgate to Maple Leaf Light

10 | SEATTLE DEPARTMENT OF TRANSPORTATION

We met or exceeded our 2018 goals informed by the Bicycle Master Plan for education and outreach, spot improvements projects, and bike racks installed. See Appendix 1: Performance Measures for more information on our safety, ridership, and connectivity achievements. We

did not meet the Neighborhood Greenway and Protected Bicycle Lane mileage goals set for 2018 for a variety of reasons including weather and contractor delays. The Projects not completed in 2018 that will be completed in 2019 are listed below:

2018 PROJECTS WITH 2019 FINAL DELIVERY1

Facility Type Project Name

Facility Mileage

Estimated Completion Notes

PBL NE 65th St Vision Zero Safety Corridor

0.74 2019 Delay of equipment. Weather.

PBL NE 70th St PBL 0.20 2019 External agency coordination and weather. NGW NE 70th St NGW 0.17 2019 External agency coordination and weather. PBL S Columbian Way

Paving Project1.11 2019 Contracting delays. Missed the weather

window for paving.PBL Swift Ave S/S Myrtle

Paving Project1.75 2019 Contracting delays. Missed the weather

window for paving.PBL Wilson Ave Paving

Project0.81 2019 Contracting delays. Missed the weather

window for paving.NGW North Seattle NGW 2.70 2019 External agency coordination and weather.NGW West Seattle NGW 2.21 2019 External agency coordination Total miles of 2018 Projects with 2019 final delivery: 9.69

1Total number of projects planned for 2019 delivery and their corresponding mileage can be found in the final project delivery list.

In addition to the projects listed above SDOT initiated installation of a protected bike lane on 35th Ave NE in conjunction with a paving project. After considerable community engagement, SDOT has determined not to proceed with the installation of the bike facilities at this time, but to focus corridor improvements on pedestrian safety and additional improvements to the 39th Ave NE greenway. DRAFT

Page 12: Seattle Department of Transportation SEATTLE BICYCLE ... · 1 day ago · PBL NE 70th St PBL 0.20 2019 External agency coordination and weather. ... 28 Northgate to Maple Leaf Light

SEATTLE BICYCLE MASTER PLAN 2019-2024 PROPOSED IMPLEMENTATION PLAN | 11

4. PRIORITIZATION

The 2019- 2024 implementation plan includes a set of proposed infrastructure projects. The project list in this plan was developed using the prioritization process established in the BMP, which includes both a quantitative and a qualitative process.

QUANTITATIVE PRIORITIZATIONQuantitatively, all bicycle projects are assigned scores based on five factors, in order of highest weight to lowest:

• Safety• Connectivity• Equity• Ridership• Livability

The sum of these scores is assigned to individual project segments, which are then divided into five different priority tiers of projects. Tier 1 is the highest scoring 20% of the projects, Tier 2 is the next highest 20%, and so on.

QUALITATIVE PRIORITIZATIONThe next step of our prioritization process considers qualitative factors including policy directives, community interest, and geographic balance. In collaboration with the Seattle Bicycle Advisory Board these factors were considered along with the quantitative data to select projects that helped to connect and extend Seattle’s all ages and abilities network.

LEVERAGING OPPORTUNITIESLeveraging the benefits of other SDOT projects was another high priority in this year’s project selection process. SDOT and SBAB prioritized BMP projects if they could be completed at the same time as other projects involving major work on a street, including bus rapid transit, paving, or safety projects.1 The complete streets approach helps to reduce construction impacts and provides benefits to multiple SDOT and partner agency programs. We also look for opportunities to partner with private development to support HALA through BMP investments.

Throughout the next five years, we will also be looking to leverage funding opportunities outside SDOT and the City, including those available through Sound Transit Station Access Improvement funding. SDOT will also leverage opportunities presented by WSDOT’s replacement of the SR 520 bridge in improving bike connections.

1Approximately 25 miles of bike facilities will be delivered by other programs over the next 5 years.

DRAFT

DRAFT

Page 13: Seattle Department of Transportation SEATTLE BICYCLE ... · 1 day ago · PBL NE 70th St PBL 0.20 2019 External agency coordination and weather. ... 28 Northgate to Maple Leaf Light

12 | SEATTLE DEPARTMENT OF TRANSPORTATION

5. 2019-2024 PROPOSED PROJECTS

Appendix 3 describes the selected projects for implementation for 2019 through 2024.

For ease of review and discussion, the project list and maps are organized by geographic sector (north, central, and south), and provide a description including desired year, facility type, and project length. All projects for the six-year implementation plan are included to show the connected network.

There are several projects on the list and map where the exact route, length, and/or facility type of each project are still unknown. In those instances, the location, length, and/or facility type is listed as “TBD” (to be determined). Subsequent

implementation plans will be updated with more specific information as these projects enter the project definition phase.

There are several projects where we have identified potential risks for construction. These risks include project cost, neighborhood support, and corridors that have high demands from other modes.

In addition, three neighborhood greenways will be upgraded in 2019. Because they are existing facilities and won’t add new mileage to the bike network, they are in a table below separate from the overall project list.

2019 NEIGHBORHOOD GREENWAY UPGRADESProject Name Facility

MileageOn Street From Street To Street

Ballard East-WestSignal detection improvement at 8th Ave NW

2.1 NW 58th St Seaview Ave NW 4th Ave NW

Central Area East - WestCrossing Improvement, curb bulbs/ramps at 14th Ave

1.2 E Columbia St Broadway 29th Ave E

Delridge - Highland ParkSpeed Hump Replacement

4.0 17th Ave SW/ 21st Ave SW

Delridge Way SW SW Cambridge StDRAFT

Page 14: Seattle Department of Transportation SEATTLE BICYCLE ... · 1 day ago · PBL NE 70th St PBL 0.20 2019 External agency coordination and weather. ... 28 Northgate to Maple Leaf Light

SEATTLE BICYCLE MASTER PLAN 2019-2024 PROPOSED IMPLEMENTATION PLAN | 13

DRAFT

QUICK WINSWe consistently look for opportunities to quickly enhance safety and comfort, both for permanent and interim facilities. This can include upgrading minor-separation bike lanes, intersection improvements, and pavement repair. Examples of upcoming quick wins are described below:

The High Point Loop neighborhood greenway will build off of the Safe Routes to School crossing at Sylvan Way SW and SW Holly St. This loop will provide an enhanced connection for the High Point neighborhood to the West Seattle Neighborhood Greenway Phase 1, High Point Elementary School and the future crossing of 35th Ave SW at SW Graham St.

Greenway UpgradesThe Neighborhood Greenway Program systematically evaluates greenways after they are installed. The evaluation takes into account vehicle speeds, vehicle volumes, collisions, ridership numbers and community feedback to determine what improvements need to be made. In 2017 and 2018 SDOT upgraded the following greenways based on those evaluations: Delridge-Highland Park, Central Area North-South, Jackson Place, and PhinneyWood. In 2019 there will be upgrades to Delridge-Highland Park, and Central Area East-West.

DRAFT

Page 15: Seattle Department of Transportation SEATTLE BICYCLE ... · 1 day ago · PBL NE 70th St PBL 0.20 2019 External agency coordination and weather. ... 28 Northgate to Maple Leaf Light

14 | SEATTLE DEPARTMENT OF TRANSPORTATION

0

9TH

AVE

N

SW ROXBURY ST

23R

DAV

EE

FAU

NTL

ER

OY

WAY

SW

LEARYW

AYNW

AIRPORTW

AYS

ELLI

SAV

ES

FAIR

VIEW

AVE

N

BROAD ST

NE NORTHGATE WAY

MO

NTL

AK

EB

LVD

NE

BA

LLA

RD

BR

NNORTH

GATE

WAY

SWIFTAVE

S

24TH

AVE

E

1 ST

AVE

S

ML

KING

JRW

AYS

15TH

A VE

NW

N 46TH ST

4TH

A VE

S

ROY STMERCER ST

N 105TH ST

NE 145TH ST

EA

STL

AK

EAV

EE

15TH

AVE

NE

AIRPO

RT WAY S

1ST

AVS

BR

NB

WE

STLAKE

AVE

N

1 5T H

A VE

W

DE

LRID

GE

WAY

SW

2ND

AVE

SW

23R

D A

VE

1ST

AVS

BR

SB

SR

50 9SB

31S

TAV

ES

1ST

AVE

NE

59THAV

SWTU

RN

N 65TH ST

17TH

AVE

NE

NE 70TH ST

NW 100TH ST

S ORCAS ST

32N

DAV

EN

W

3RD

AVE

W

NE 115THST

N 90TH ST

32N

DAV

EW

1 0T H

A VE

W

NW 96TH ST

W BERTONAST

SW HOLDEN ST

BEACON

AVES

BEACO

NAV

ES

N 125TH ST

NE 41ST ST

SW 106TH ST

3RD

AV

E N

W

48TH

AVE

SW

47TH

AVE

NE

LAK

ES

IDE

AVE

S

1 4TH

AVE

S

NE 55TH ST

43R

DAV

EE

CA

LIF O

RN

IAA V

ES

W

N 43RDST

17TH

AVE

S

1 4T H

A VE

NW

E JEFFERSON ST

8TH

AVE

SLA

T ON

AA V

EN

E

NW 80TH ST

34TH

AV

E

NE 75TH ST

19TH

AVE

E

NE 110TH ST

SW GENESEE ST

3RD

A VE

NW

35TH

AVE

SW

SW TRENTON ST

NW 125THST

20TH

AVE

NE

W COMMODORE WAY

6TH

AVE

W

L IN

DE

NAV

EN

8 TH

A VE

NW

62N

DAV

ES

DA Y

TON

AVE

N

N 115TH ST

49TH

AVE

SW

SW 100TH ST

1STAVE

S

16TH

AVE

SW

20T H

AVE

NE

2 8T H

AVE

W2 8

THA V

EN

W

8TH

AVE

S

1 5T H

A VE

NW

6THAVE

S

22N

DAV

EW

THAC

KER

AYPL

NE

4THAVE

N

BROAD ST

S ALASKA ST

ML K

ING

JR W

AY S

ML

KIN

GJR

WAY

S12TH

AVE

SR

OO

SE

VE

LTW

AY N

E

AIRPO

RT

WAY S

NE 125TH ST

WEST

MAR

GIN

AL

WAY SW

FRE

MO

NT

AVE

N

HIG

HLAN

DPA

RKW

AY S

W

BR

OO

KLY

NAV

E N

E

SEWAR

D

PARK

AVE S

12TH

AVE

E

SYLVANWAY SW

SW ROXBURY

ST/OLSON

PL SW

FAU

NTL

ERO

YW

AY S

WBEAC

ON

AVE S

N 130TH ST

MYE

RS

WAY S

5TH

AV

E N

E

6TH

AV

E S

12TH

AVE

NE

EA

ST

MA

RG

INA

LW

AY S

11TH

AVE

NE

EAST

LAKE

AVE

E

EAST

MAR

GIN

ALW

AY S

EA

ST

MA

RG

INA

LW

AY S

E UNION STM

L KI

NG

JR W

AY S

ELLIS

AVE S

EAST

MAR

GIN

AL

WAY S

ALASKAN

WAY

N 40TH ST

PIKEST

4THAVE

EASTGREENLAKE DR N

5TH

AV

E N

E

SW AV

ALON

WAY

NE 65TH ST

EAST

GRE

EN

LAKE

WAY

N

DE

LRID

GE

WAY

SW

2323

5656

25255151

2323

5959

6262

3333

5858

6565

5050

3030

2121

6565

1616 5050

2020

5757

3131

6363

2727

3838

4343

88

1717

2626

4242

2929

2626

6363

3232

4747

4141

3535

3333

2424

3838

1818

2828

434366

77

1010

77

66666767

6161

4040

5454

3737

1111

5252

3737

6464

3434

6060

55

1515

5353

1313

1919

4545

3636

4646

1414

4444

5353

3939

5555

1212

2222

11

22

99

44

33

0 1 20.5Miles

March 27, 2019

DRAFTPlanned Bicycle Master PlanProjects2019 - 2024

BMP Project StatusProjects in ConstructionProjects in DesignProjects in PlanningProjects in Pre-PlanningExisting

N

The specific streets of a future bicycle facility will be decided after a public engagement process for projects in the planning and pre-planning phases.

Page 16: Seattle Department of Transportation SEATTLE BICYCLE ... · 1 day ago · PBL NE 70th St PBL 0.20 2019 External agency coordination and weather. ... 28 Northgate to Maple Leaf Light

SEATTLE BICYCLE MASTER PLAN 2019-2024 PROPOSED IMPLEMENTATION PLAN | 15

NE

PACIF

ICST

AURORAAVEN

8THAVENE

NE

45T

H S

T

SANDPO

INT

WAY

NE

NE

75T

H S

T

AURORAAVEN

NE

125

TH S

T

N 1

45TH

ST

GREENWOODAVEN

N34

THS

T

NE

NO

RTH

GAT

EW

AY

NPACIFICST

1STAVENE

NW

85T

H S

T

15THAVENW

NE

125 T

HS

T

N 4

6TH

ST

N 3

6TH

ST

N 5

0TH

ST

GREENWOODAVEN N 1

05TH

ST

NE

145

TH S

T

HOLMAN

RD N

W

25THAVENE

15THAVENE 15THAVENE

24THAVE NE

LAKECITYWAYNE 25THAVENE

1STAVENE

N 6

5TH

ST

17THAVENE

NE

70T

H S

T

NW

100

TH S

T

NE

115

TH S

T

N 9

0TH

ST

24THAVENW

40THAVENE

NE

85TH

ST

32NDAVEW

NW

96T

H S

T

NE

45T

H S

T

W B

ER

TON

A S

T

N 1

25TH

ST

NE

41S

T S

T

3RD AVE NW

47THAVENE

NE

55T

H S

T

22NDAVENE

N43

RD

ST

14THAVENW

NE

47T

H S

T

NW

65T

H S

T

MERIDIANAVEN

LATONAAVENE

NE

75T

H S

T

55THAVENE

NE

110

TH S

T

3RDAVENW

28THAVEW

30TH AVE W

MERIDIANAVEN

NW

125

TH S

T

20THAVENE

N 1

22N

D S

T

WC

OM

MO

DO

RE

WAY

LOYAL WAY

NW

LINDENAVEN

8THAVENW

DAYTONAVEN

N 1

15TH

ST

NE

125T

HS

T

N 1

28TH

ST

ROOSEVELT WAY NE

20THAVENE

RAVENNAAVENE

28THAVENW

10THAVEW

LINDEN AVE N

MAGNOLIABLVDW

3RDAVEW

15THAVENW

WALLINGFORDAVEN

30THAVENE

22NDAVEW

1ST PL NE

4THAVE N

THACKERAYPL NE

15TH AVE NE

W D

RAV

US

ST

ROOSEVELTWAY NE 12TH

AVE NE

FREMONTAVE N

BROOKLYNAVE NE

NE

125

TH S

T

N 1

30TH

ST

5TH AVE NE

EASTLAKE AVE E

12THAVE NE

11THAVE NE

BUR

KE G

ILM

ANM

ISSI

NG

LIN

K

N 5

0TH

ST

BU

RK

EG

ILM

AN

MIS

SIN

G L

INK

N 4

0TH

ST

EAST

GREE

N

LAKE

DR N

5TH AVE NE

NE

65T

H S

T

EAST GREEN

LAKE W

AY N

2525

6262

33336565

5050

3030

2121

6565

16165050

2020

6363

4343

4242

2929

2828

434366

77

77

5353

1313

1919

4545

4646

5353

3939

1212

99

00.

51

0.25

Mile

sN

Mar

ch 2

7, 2

019

Plan

ned

Bicy

cle

Mas

ter P

lan

Proj

ects

20

19 -

2014

Futu

re L

ight

Rai

l Sta

tion

Exis

ting

Ligh

t Rai

l Sta

tion

BMP

Proj

ect S

tatu

sPr

ojec

ts in

Con

stru

ctio

nPr

ojec

ts in

Des

ign

Proj

ects

in P

lann

ing

Proj

ects

in P

re-P

lann

ing

Exis

ting

The

spec

ific

stre

ets

of a

futu

re b

icyc

le

faci

lity

will

be

deci

ded

afte

r a p

ublic

en

gage

men

t pro

cess

for p

roje

cts

in th

e pl

anni

ng a

nd p

re-p

lann

ing

phas

es.

DRAF

T

Page 17: Seattle Department of Transportation SEATTLE BICYCLE ... · 1 day ago · PBL NE 70th St PBL 0.20 2019 External agency coordination and weather. ... 28 Northgate to Maple Leaf Light

16 | SEATTLE DEPARTMENT OF TRANSPORTATION

0ALA

SKAN WAY

9THAVEN

NE

PACIF

ICST

ELLIOTT AVE W

7TH AVE

6TH AVE

RAINIER AVE S

23RDAVEE

NE

45T

H S

T

15THAVENW

LEARY WAY NW

HOWELL ST

N34

THS

T

NPACIFICST JAM

ES S

T

BALLARD BR

24THAVEE

2ND AVE

WALL ST

N 4

6TH

ST

ALASKAN WAY

N 3

6TH

ST

4THAVES

N 5

0TH

ST

5THAVEN

RO

Y S

T

UNIO

N ST

EASTLAKEAVEE

25THAVENE25THAVENE

15THAVENE

1STAVES

WESTLAKE AVE N

15THAVEW

ALASKANWAYS

23RD AVE 23RDAVES

AURORAAVEN

31STAVES

3RDAVENW

32NDAVENW

17THAVENE

14TH AVE

14THAVENW

W G

ALE

R S

T

LATONAAVENE

7THAVEW

32NDAVEW

10THAVEW

W B

ER

TON

A S

T

NE

41S

T S

T

47THAVENE

LAKESIDEAVES

14THAVES

NE

55T

H S

T

43RDAVEE

22NDAVENE

NE

47T

H S

T

34TH AVE

EA

LOH

AS

T

BELLEVUEAVEE

19TH AVE

30TH AVE W

WC

OM

MO

DO

RE

WAY

40THAVENE

32NDAVEE

M L KING JR WAY

6THAVEW

MADRONA

DR

12THAVES

42NDAVEE

MAGNOLIA BLVD W

17THAVES

20THAVENE

28THAVEW

20THAVES

3RDAVEW

WALLINGFORDAVEN

CALIFORNIAAVESW

22NDAVEW

4THAVE N

E Y

ES

LER

WAY

THACKERAYPL NE

15TH AVE NE

BROAD ST

VALL

EY

ST

W D

RAV

US

ST

S H

OLG

ATE

ST

ML KINGJR WAY S

12THAVE S

MONTLAKEBLVD E

FREMONTAVE N

BROADWAY E

STEWART ST

BROOKLYNAVE NE

12TH AVE E

6TH AVE S

QUEENANNEAVE N

11THAVE NE

EASTLAKE AVE E

EAST MARGINAL WAY S7TH

AVE

YE

SLE

RW

AY

2NDAVE

EXT

E U

NIO

N S

T

ML KINGJR WAY S

BURK

E

GILM

AN M

ISSI

NGLI

NK

ALASKANWAY

N 5

0TH

ST

N 4

0TH

ST

PIKE ST

12THAVE S

BELL ST

FAIR

VIEWAVE N

4TH AVE

EAST GREEN LAKE WAY N

1st Ave N 4848

5959

4949

2121

2020

5757

6363

1717

4242

6363

4747

4141

3535

2424 3838

1818

6767

4040

54543737

1111

5252

3737

6464

6060343455

1515

5353

1313

1919

3636

1212

4444

3939

22

00.

51

0.25

Mile

s

N

DRAF

TPl

anne

d Bi

cycl

e M

aste

r Pla

n Pr

ojec

ts20

19 -

2024

Futu

re L

ight

Rai

l Sta

tion

Exis

ting

Ligh

t Rai

l Sta

tion

Mar

ch 2

7, 2

019

BMP

Proj

ect S

tatu

sPr

ojec

ts in

Con

stru

ctio

nPr

ojec

ts in

Des

ign

Proj

ects

in P

lann

ing

Proj

ects

in P

re-P

lann

ing

Exis

ting

The

spec

ific

stre

ets

of a

futu

re b

icyc

le

faci

lity

will

be

deci

ded

afte

r a p

ublic

en

gage

men

t pro

cess

for p

roje

cts

in th

e pl

anni

ng a

nd p

re-p

lann

ing

phas

es.

Page 18: Seattle Department of Transportation SEATTLE BICYCLE ... · 1 day ago · PBL NE 70th St PBL 0.20 2019 External agency coordination and weather. ... 28 Northgate to Maple Leaf Light

SEATTLE BICYCLE MASTER PLAN 2019-2024 PROPOSED IMPLEMENTATION PLAN | 17

ALASKANWAYS

RAINIER AVE S

SW

RO

XB

UR

Y S

T

23RDAVES

1STAVES

AIRPORT WAY S

WEST MARGINALWAY SW

SWIFT AVE S

1STAVES

M L KING JR WAY S

SW

ADMIRAL WAY

SW

MO

RG

AN

ST

14THAVES

SYLVAN

WAYSW

OLSONPLSW

AIRPORT WAY S

MYERS WAY S

1STAVSBRNB

DELRIDGE WAY SW

EAST MARGINAL W

AYS

M L KING JR WAY S

15THAVES

31STAVES

64THAVES

S C

LOV

ER

DA

LE S

T

6THAVES

SO

RC

AS

ST

WATERS AVE S

49THAVESW

SW

HO

LDE

N S

T

BEACON

AVE

S

BEACON AVE S

SW

106

TH S

T

LAKESIDEAVES

14THAVES

SW

TH

ISTL

E S

T

CALIFORNIAAVESW

8THAVES

S R

OX

BU

RY

ST

55THAVESW

SW

GR

AH

AM

ST

S C

OLL

EG

E S

T

SW

GE

NE

SE

E S

T

35THAVESW

38THAVES

SW

TR

EN

TON

ST

62NDAVES

25THAVESW

49THAVESW

SW

100

TH S

T

1ST AVE S

37THAVESW

16THAVESW

8THAVES

CALIFORNIAAVESW

6TH AVE S

S A

LAS

KA

ST

ML KING JRWAY S

S H

OLG

ATE

ST

SW H

OLD

EN S

T

ML KINGJR WAY S

12THAVE S

AIRPORT WAY S

WEST

MARGINAL

WAY SW

HIGHLAND PARK WAY SW

SEWARD

PARKAVE S

FAUNTLEROYWAY SW

SYLV

ANW

AY S

W

SW R

OXBUR

Y

ST/O

LSON

PL S

W

FAUNTLEROY WAY SW

S J

AC

KS

ON

ST

S S

PO

KA

NE

ST

BEACON

AVE S

MY

ER

SW

AY S

6TH AVE S

EASTMARGINAL

WAY S

EAST MARGINAL WAY S

EASTMARGINAL

WAY S

4THAVE

ML KINGJR WAY S

ELLI

S

AVE

S EAST

MARGINAL

WAY S

SW AVALONWAY

DELRIDGE WAY SW

2323

5656

2323

5151

5959

5858

31312727

3535

88

1717

26262626

3232

4141

3333

3838

1010

6666

6161

5454

1111

60604444

1414

5555

2222

11

22

44

33

00.

51

0.25

Mile

s

DRAF

TPl

anne

d Bi

cycl

e M

aste

r Pla

n Pr

ojec

ts20

19 -

2024

Futu

re L

ight

Rai

l Sta

tion

Exis

ting

Ligh

t Rai

l Sta

tion

Mar

ch 2

7, 2

019

BMP

Proj

ect S

tatu

sPr

ojec

ts in

Con

stru

ctio

nPr

ojec

ts in

Des

ign

Proj

ects

in P

lann

ing

Proj

ects

in P

re-P

lann

ing

Exis

ting

The

spec

ific

stre

ets

of a

futu

re b

icyc

le

faci

lity

will

be

deci

ded

afte

r a p

ublic

en

gage

men

t pro

cess

for p

roje

cts

in th

e pl

anni

ng a

nd p

re-p

lann

ing

phas

es.

N

Page 19: Seattle Department of Transportation SEATTLE BICYCLE ... · 1 day ago · PBL NE 70th St PBL 0.20 2019 External agency coordination and weather. ... 28 Northgate to Maple Leaf Light

18 | SEATTLE DEPARTMENT OF TRANSPORTATION

6. COORDINATION PROJECTS UPDATE

Some of the projects that contribute to building out the all ages and abilities bicycle network involve multiple agencies and have multi-year schedules.

Project DescriptionExpected

Completion Date Bike Components Where to Learn MoreSR-520 Bridge Replacement and HOV Program

Replaces the SR 520 floating bridge across Lake Washington and makes transit and roadway improvements throughout the SR-520 corridor from I-5 in Seattle to I-405 in Bellevue.

Montlake Phase: 2022-2023Portage Bay Phase: 2026-2028Montlake Cut Phase: 2029

• 14-foot wide bicycle and pedestrian path across Lake Washington (opened in 2017) and Portage Bay

• New bicycle/pedestrian crossings over SR 520 and I-5

Email: [email protected]: www.wsdot.wa.gov/Projects/SR520Bridge/

Accessible Mt. Baker

Builds near-term access and safety improvements at the Mt. Baker Link light rail station, and builds long-term multimodal transportation enhancements

2024 • TBD walking and biking connections in the area to be completed by 2024

Website: www.seattle.gov/transportation/projects-and-programs/programs/transportation-planning/accessible-mt-baker

Burke-Gilman Trail Missing Link

Connects two existing portions of the Burke-Gilman Trail in Ballard to complete the regional facility that otherwise runs continuously from Kenmore Park to Golden Gardens.

Phase 1: 2019Phase 2: 2020

1.4-mile multi-use trail on NW 45th St, Shilshole Ave NW, and NW Market St.

Email: [email protected]: www.seattle.gov/transportation/projects-and-programs/programs/bike-program/burke-gilman-trail-missing-link-project

Center City Bike Network

Builds near- and long-term improvements to the transportation system and public realm in Seattle's Center City neighborhoods

2019-2021 Bike facilities on multiple north-south and east-west streets in the Center City. Check project map for updates.

Website: www.seattle.gov/transportation/projects-and-programs/programs/bike-program/center-city-bike-network

Waterfront Seattle

Rebuild Seattle’s waterfront following the removal of the Alaskan Way Viaduct

2019-2023 A 2-way protected bike lane from S Yesler St to Pine St

Email: [email protected]: www.waterfrontseattle.org/

For these projects, we provide an annual update through this report, while additional information is available through the individual project websites.

DRAFT

Page 20: Seattle Department of Transportation SEATTLE BICYCLE ... · 1 day ago · PBL NE 70th St PBL 0.20 2019 External agency coordination and weather. ... 28 Northgate to Maple Leaf Light

SEATTLE BICYCLE MASTER PLAN 2019-2024 PROPOSED IMPLEMENTATION PLAN | 19

DRAFTProject Description

Expected Completion Date Bike Components Where to Learn More

Northgate Pedestrian and Bicycle Bridge

Build a new pedestrian and bicycle bridge over I-5 to improve connections within the Northgate community

2020-2021 • A new pedestrian and bicycle bridge over I-5

• A potential shared-use path on the west side of 1st Ave NE between NE 92nd St and NE 103rd St

• A potential shared-use path on the east side of 1st Ave NE between NE 103rd St and NE Northgate Way

Email: [email protected]: www.seattle.gov/transportation/northgatepedbridge.htm

Transit-Plus Multi Modal Corridor Program

Build new Transit-Plus Multi Modal Corridors throughout the City

2021-2024 Improvements to crossings, neighborhood greenways, and bike lanes

Website: www.seattle.gov/transportation/projects-and-programs/programs/transit-program/transit-plus-multimodal-corridor-program

DRAFT

Page 21: Seattle Department of Transportation SEATTLE BICYCLE ... · 1 day ago · PBL NE 70th St PBL 0.20 2019 External agency coordination and weather. ... 28 Northgate to Maple Leaf Light

20 | SEATTLE DEPARTMENT OF TRANSPORTATION

7. PROJECT DELIVERY: TAKING PROJECTS FROM 1% DESIGN TO 100% CONSTRUCTION

We rely on key tools and practices to develop and deliver our projects, including conducting a Complete Streets review, applying the Race and Social Justice Initiative equity toolkit, engaging with community members, and evaluating alternatives. The BMP identifies where bicycle facilities are needed and what facilities are appropriate; our public engagement process focuses on soliciting community input to ensure projects balance community interests. We describe these tools here and combine them along with the guidance in the BMP to direct the Project Delivery Process laid out on the following page.

COMPLETE STREETS POLICYBicycle facilities are an integral aspect of Complete Streets. Established in 2012, the Complete Streets policy guides how we develop projects to provide for all users of the roadway. We use a checklist to help us review the needs of other modes, relationships to land use, and the future vision for streets so that we can reflect those needs in our project development.

RACE AND SOCIAL JUSTICE INITIATIVEThe vision of the Seattle Race and Social Justice Initiative is to eliminate racial inequity in the community. To do this requires ending individual racism, institutional racism, and structural racism. The Racial Equity Toolkit lays out a process and a set of questions to help evaluate and guide project and program development. This toolkit was used as part of creating the BMP and is also used to evaluate individual projects.

PUBLIC ENGAGEMENTDuring the planning, design, and construction phases of all our projects, we conduct inclusive public engagement and strive to balance varying needs presented by public comments that we receive at each step of our outreach processes.

SDOT has developed an iterative public engagement process built on gathering input from community members about their needs and concerns, presenting them with options that meet project goals and objectives, and incorporating their input along with our expertise and collected data in selecting a design for a particular project.

We also reach out to the public when we implement the strategies, actions, and programs shown in Appendix 2, which include installing bicycle parking, conducting education and encouragement programs, and performing bike facility maintenance.

SDOT uses a wide variety of methods to reach community members, including mailers, traditional open houses, drop-in events, online open houses and surveys, and joining regularly scheduled meetings and events of community-based organizations. We will continue working with the Seattle Bicycle Advisory Board and the Department of Neighborhoods to continually strengthen our public engagement strategies and reach more members of the community more effectively throughout the project development and delivery process.

DRAFT

Page 22: Seattle Department of Transportation SEATTLE BICYCLE ... · 1 day ago · PBL NE 70th St PBL 0.20 2019 External agency coordination and weather. ... 28 Northgate to Maple Leaf Light

SEATTLE BICYCLE MASTER PLAN 2019-2024 PROPOSED IMPLEMENTATION PLAN | 21

DRAFT

ALTERNATIVES DEVELOPMENT AND EVALUATIONThe project development and delivery process is outlined in the BMP and summarized in this diagram:

The bicycle network recommended in the BMP was developed based on a robust methodology. However, as projects move through the project development process, our analysis, design, and community engagement may lead to a project being developed in a different way or location than envisioned in the plan. For example, the BMP may recommend a protected bike lane

on a particular street, but through our project development and outreach process, we may determine that an alternate facility, such as a parallel neighborhood greenway, would be preferable. The goal of our engagement process is to make these determinations as early in the project development phase as possible.

DRAFT2

3

4

56

7

9

8

1 Project selected through prioritization process for implementation

Project development and design process:• Data collection and technical analysis• Initial public engagement• Conceptual design alternatives • More public engagement• Evaluate the project through the Race

and Social Justice Initiative toolkit• Preferred design selected• Assess maintenance needs

Further engage public and develop education materials to clearly explain new designs

Pre-implementation marketing

Project implementation

Post-implementation encouragement programming to publicize new facilities

Evaluate projects

Bicycle facility maintenance

Continue evaluation and consideration for upgrades

BIKE ROUTE MAP

BICYCLE PROJECT DELIVERY PROCESS

Pre-planning

Planning

Design

Construction

Operation

Page 23: Seattle Department of Transportation SEATTLE BICYCLE ... · 1 day ago · PBL NE 70th St PBL 0.20 2019 External agency coordination and weather. ... 28 Northgate to Maple Leaf Light

22 | SEATTLE DEPARTMENT OF TRANSPORTATION

8. FUNDING AND COSTS

FUNDING ASSUMPTIONSThe 2019-2024 Implementation Plan leverages the funding provided by the Levy to Move Seattle with other local funds as well as existing and anticipated grant funding. Additionally, some of our large capital programs, such as the Transit-Plus Multimodal Corridor Program, seek to deliver bicycle improvements where appropriate. This multi-layered funding approach allows us to maximize the return on local public funding.

The Levy to Move Seattle provides $65 million over nine years with the goal to build protected bike lanes, bike lanes, buffered bike lanes, and neighborhood greenways. It also provides $7 million for programs (including maintenance and bicycle parking). On an annual basis, the

levy provides $8 million per year for BMP implementation, which includes $7.2 million for facilities and $0.8 million for programs. In November 2018, a levy assessment was published and the bicycle master plan program was identified as one of the programs that was challenged by program cost increases.

The funding assumptions include secured grants as well as estimates for grants we will be seeking in the future. If we receive grant funding at a higher or lower amount, it will affect the number, type, extent, and features of the projects we can construct. We will continue to partner with other agencies and programs, and to seek additional grants and funding sources to meet the Move Seattle mileage goals.

DRAFT

Page 24: Seattle Department of Transportation SEATTLE BICYCLE ... · 1 day ago · PBL NE 70th St PBL 0.20 2019 External agency coordination and weather. ... 28 Northgate to Maple Leaf Light

SEATTLE BICYCLE MASTER PLAN 2019-2024 PROPOSED IMPLEMENTATION PLAN | 23

DRAFT

Funding assumptions for 2019-2024 BMP implementation are provided in the table below.

BIKE MASTER PLAN IMPLEMENTATION - BIKE FACILITY FUNDING Adopted Budget 2019 2020 2021 2022 2023 2024 6-Year Total

Move Seattle Levy $9,114,000 $6,489,000 $13,210,000 $7,001,000 $5,868,000 $1,244,000 $42,926 ,000

Grants* $2,532,000 $4,821,000 $0 $0 $0 $0 $7,353,000

Washington State Convention Center

$1,600,000 $600,000 $2,400,000 $11,400,000 $0 $0 $16,000 ,000

Other** $3,037,000 $1,322,000 $1,293,000 $1,325,000 $1,358,000 $2,219,000 $10,553,000

Total $76,832,000

BIKE MASTER PLAN IMPLEMENTATION - BIKE FACILITY SPENDING PLAN2019 2020 2021 2022 2023 2024 6 -Year Total

Neighborhood Greenways Programatic management

$500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $3,000,000

Bike racks $300,000 $300,000 $300,000 $300,000 $300,000 $300,000 $1,800,000

Protected Bike Lanes/Bike lanes/Trails program management

$890,000 $890,000 $890,000 $890,000 $890,000 $890,000 $5,340,000

Total funding for Construction

$61,119,000

Total funding for Design $2,595,000

Contingency $2,978,000

Total $76,832,000

BIKE MASTER PLAN-PROGRAMMATIC MAINTENANCE & SPOT IMPROVEMENTSMove Seattle Levy $1,100,000 $1,200,000 $1,200,000 $1,133,000 $1,000,000 $1,000,000 $6,633,000

Other $167,000 $329,000 $322,000 $818,000

Total Funding $1,100,000 $1,200,000 $1,200,000 $1,300,000 $1,329,000 $1,322,000 $7,451,000

*The budget assumes a placeholder amount for assumed grants based on what we typically receive and acknowledges current uncertainty in obtaining federal grants. If we received grant funding at a higher or lower amount, this will affect the number, type, extent, and features of the projects we can construct.

**”Other” sources include Vehicle Licensing Fees, Urban Trails and Bikeways funding.

Note: Any budget surplus carries forward to the next year. Local sources include Vehicle Licensing Fees, Move Seattle Levy,and Urban Trails and Bikeways funding. Levy funding will vary year to year and project mileage will be adjusted. The budgetassumes a placeholder amount for assumed grants based on what we typically receive and acknowledges current uncertaintyin obtaining federal grants. If we received grant funding at a higher or lower amount, this will affect the number, type, extent,and features of the projects we can construct.

DRAFT

Page 25: Seattle Department of Transportation SEATTLE BICYCLE ... · 1 day ago · PBL NE 70th St PBL 0.20 2019 External agency coordination and weather. ... 28 Northgate to Maple Leaf Light

24 | SEATTLE DEPARTMENT OF TRANSPORTATION

COST ASSUMPTIONSTo develop estimates for new projects, we use data from recently completed projects and final estimates from projects about to begin construction. Project costs vary greatly due to the wide range of designs (from paint and post to fully raised and separated paths), site conditions (working downtown or near steep slopes can increase costs), and whether the project can be combined with other nearby projects.For the 2019 projects in this plan, preliminary cost estimates have been developed based on each project’s individual characteristics. With projects coming in at a higher cost than anticipated and less federal grants available, we are strategizing how to prioritize the projects in the implementation plan to build out the best network with what we have.

DRAFT

Page 26: Seattle Department of Transportation SEATTLE BICYCLE ... · 1 day ago · PBL NE 70th St PBL 0.20 2019 External agency coordination and weather. ... 28 Northgate to Maple Leaf Light

SEATTLE BICYCLE MASTER PLAN 2019-2024 PROPOSED IMPLEMENTATION PLAN | 25

APPENDIX 1: PERFORMANCE MEASURES

The 2014 Bicycle Master Plan includes performance measures to assess whether the plan is meeting its goals. The measures are focused on assessing progress over the long-term, and data is collected and analyzed either

annually or as the data is available to help track interim progress. The table below includes the BMP performance measures and progress towards those targets based on the most recently available data.

PERFORMANCE MEASURE TARGETSGoal Performance Measure Performance Target Performance Result

Ridership Number of people biking counted at locations throughout Seattle

Quadruple ridership between 2014 and 2030

2014-2015: 0.6% decrease12015-2016: 5.7% increase12016-2017: 0.9% decrease1

2017-2018: 12.1% increase1

Safety Bicycle collision rate Reduce bicycle collisions by half (50 percent) between 2013 and 2030

2014: 426 reported collisions2015: 469 reported collisions2016: 407 reported collisions2017: 346 reported collisions2018: 393 reported collisions2

Number of serious injuries and fatalities

Zero by 2030 2013: 27 serious injuries; 2 fatalities2014: 29 serious injuries; 1 fatality2015: 24 serious injuries; 1 fatality2016: 26 serious injuries; 2 fatalities2017: 12 serious injuries; 2 fatalities2018: 29 serious injuries1 fatality2

Connectivity Percentage of bicycle facility network completed

100 percent of bicycle system constructed by 2035

2013: 22% 2016: 28% (167/608 miles)2017: 29% (179/608 miles)

Equity Areas lacking bicycle facilities

Zero areas of City lacking bicycle facilities by 2030

2012: 7 census tracts2016: 7 census tracts2017: 7 census tracts2018: 7 census tracts

Livability Percentage of households within ¼ mile of an all ages and abilities bicycle facility

100% of households in Seattle within ¼ mile of an all ages and abilities bicycle facility by 2035

2013: 34%2016: 49%2017: 60%2018: 61%

1Percentages are based off bike counts taken at 5 locations where reliable data was available for 2014, 2015, 2016, 2017, and 2018.

2Based on January 2019 query.

DRAFT

DRAFT

Page 27: Seattle Department of Transportation SEATTLE BICYCLE ... · 1 day ago · PBL NE 70th St PBL 0.20 2019 External agency coordination and weather. ... 28 Northgate to Maple Leaf Light

26 | SEATTLE DEPARTMENT OF TRANSPORTATION

APPE

ND

IX 2

: STR

ATEG

IES

AND

ACTI

ONS

Prev

ious

impl

emen

tatio

n pl

an u

pdat

es a

re in

clud

ed to

pro

vide

con

sist

ent r

epor

ting.

BMP

Stra

tegy

Activ

ity20

16 S

tatu

s20

17 S

tatu

s 2

018

Stat

us20

19 S

tatu

sTH

E BI

CYCL

E NE

TWOR

K4.

1 –

4.6

Impl

emen

t the

bi

cycl

e fa

cilit

ies

See

proj

ect l

ists

for

proj

ects

to b

e st

udie

d,

desi

gned

, and

impl

emen

ted

in 2

018-

2022

. SDO

T w

ill

cont

inue

to re

sear

ch a

nd

inco

rpor

ate

best

pra

ctic

es,

leve

rage

oth

er c

apita

l pr

ojec

t inv

estm

ents

, and

de

velo

p ed

ucat

iona

l too

ls.

SDOT

com

plet

ed 8

.65

mile

s.SD

OT c

ompl

eted

10.

81

mile

sSD

OT c

ompl

eted

10.

26SD

OT w

ill c

ontin

ue w

orki

ng

to m

eet t

arge

ts.

4.7

Impl

emen

t up

grad

es o

f ex

istin

g bi

cycl

e fa

cilit

ies

Bicy

cle

faci

litie

s up

grad

e pr

ojec

ts w

ill b

e id

entif

ied

thro

ugh

BMP

proj

ect

prio

ritiz

atio

n an

d th

roug

h sa

fety

cor

ridor

pro

ject

s.

Refe

r to

stra

tegy

7.3

and

7.

13 fo

r rel

ated

wor

k

SDOT

will

wor

k to

mee

t ta

rget

sSD

OT w

ill w

ork

to m

eet

targ

ets

SDOT

upg

rade

d 3

NGW

and

co

mpl

eted

12

spot

saf

ety

proj

ects

SDOT

will

con

tinue

wor

king

to

mee

t tar

gets

. Thi

s w

ill in

clud

e lo

okin

g at

co

llabo

ratio

n op

port

uniti

es

with

Vis

ion

Zero

cor

ridor

pr

ojec

ts a

nd A

rter

ial

Asph

alt a

nd C

oncr

ete

Prog

ram

.4.

8 In

stal

l bic

ycle

de

tect

ion

at tr

affic

si

gnal

s in

eve

ry

new

bic

ycle

faci

lity,

as w

ell a

s w

ith a

ll st

reet

repl

acem

ent

proj

ects

SDOT

will

dev

elop

co

nsis

tent

bic

ycle

det

ectio

n st

anda

rds

by b

icyc

le fa

cilit

y ty

pe, i

nven

tory

exi

stin

g de

tect

ion

on h

igh

prio

rity

bike

faci

litie

s to

det

erm

ine

upgr

ade

need

s, a

nd

deve

lop

a pr

iorit

ized

wor

k pl

an fo

r im

plem

enta

tion.

SDOT

has

bee

n re

com

men

ding

app

ropr

iate

bi

cycl

e de

tect

ion

on a

cas

e-by

-cas

e ba

sis,

and

may

st

art d

evel

opin

g gu

idel

ines

ba

sed

on fa

cilit

y ty

pe a

nd

inte

rsec

tion

geom

etry

in

2016

. Inv

ento

ry w

ill b

egin

in

201

6, if

sta

ffing

allo

ws

for t

his

effo

rt.

SDOT

has

bee

n im

plem

entin

g bi

cycl

e de

tect

ion

at tr

affic

sig

nals

on

a c

ase-

by-c

ase

basi

s w

hen

it de

velo

ps a

bic

ycle

fa

cilit

y th

at c

ross

es a

m

ajor

str

eet a

t a s

igna

lized

in

ters

ectio

n.

SDOT

con

tinue

s to

im

plem

ent b

icyc

le

dete

ctio

n at

traf

fic s

igna

ls

on a

cas

e-by

-cas

e ba

sis

whe

n it

deve

lops

a b

icyc

le

faci

lity

that

cro

sses

a

maj

or s

tree

t at a

sig

naliz

ed

inte

rsec

tion.

SDOT

will

con

tinue

its

curr

ent p

ract

ices

4.10

Des

ign

all

bicy

cle

faci

litie

s to

mee

t or e

xcee

d th

e la

test

fede

ral,

stat

e an

d lo

cal

guid

elin

es

This

is S

DOT’

s st

anda

rd

prac

tice.

In a

dditi

on, t

he

upda

te o

f the

Sea

ttle

Righ

t-of

-Way

Impr

ovem

ents

M

anua

l will

incl

ude

bicy

cle

faci

lity

desi

gn g

uide

lines

.

SDOT

is c

urre

ntly

up

datin

g th

e Ri

ght-

of-

Way

Impr

ovem

ent M

anua

l (R

OWIM

), w

hich

incl

ude

bicy

cle

desi

gn g

uide

lines

. Di

rect

or’s

Rule

exp

ecte

d by

en

d of

the

year

.

SDOT

is c

urre

ntly

fin

ishi

ng th

e Ri

ght-

of-

Way

Impr

ovem

ent M

anua

l (R

OWIM

), w

hich

incl

udes

bi

cycl

e de

sign

gui

delin

es.

The

upda

te to

the

ROW

IM

was

com

plet

ed in

201

7. T

he

bicy

cle

desi

gn g

uide

lines

w

ere

com

plet

ed in

201

8.

SDOT

is d

esig

ning

bic

ycle

fa

cilit

ies

with

gui

danc

e fr

om th

e co

mpl

eted

Bic

ycle

De

sign

Gui

delin

es

DRAFT

Page 28: Seattle Department of Transportation SEATTLE BICYCLE ... · 1 day ago · PBL NE 70th St PBL 0.20 2019 External agency coordination and weather. ... 28 Northgate to Maple Leaf Light

SEATTLE BICYCLE MASTER PLAN 2019-2024 PROPOSED IMPLEMENTATION PLAN | 27

DRAFT

BMP

Stra

tegy

Activ

ity20

16 S

tatu

s20

17 S

tatu

s 2

018

Stat

us20

19 S

tatu

sTH

E BI

CYCL

E NE

TWOR

K4.

12 In

tegr

ate

a m

ultim

odal

de

cisi

on m

akin

g pr

oces

s in

to th

e up

date

of t

he

Com

preh

ensi

ve

Plan

SDOT

has

dev

elop

ed

a rig

ht-o

f-w

ay (R

OW)

allo

catio

n fr

amew

ork,

a

com

preh

ensi

ve

met

hodo

logy

, to

dete

rmin

e th

e us

es a

nd fu

nctio

ns o

f co

rrid

ors.

The

ROW

allo

catio

n fr

amew

ork

is w

ithin

the

draf

t Com

preh

ensi

ve P

lan

Upda

te fo

r con

side

ratio

n of

ad

optio

n.

Com

plet

e. T

he n

ew

Com

preh

ensi

ve P

lan

beca

me

effe

ctiv

e on

N

ovem

ber 2

8, 2

016

and

incl

udes

ROW

allo

catio

n fr

amew

ork.

Com

plet

ed in

201

6

END-

OF-T

RIP

FACI

LITI

ES5.

1 Up

date

the

Seat

tle M

unic

ipal

Co

de (S

MC)

bi

cycl

e pa

rkin

g re

quire

men

ts

SDOT

will

wor

k w

ith D

PD

to re

view

the

exis

ting

lang

uage

and

iden

tify

prop

osed

cha

nges

.

SDOT

has

pro

vide

d co

mm

ent t

o DP

D/SD

CI o

n la

nd u

se c

ode

chan

ges

for

bicy

cle

park

ing.

Upda

tes

to th

e SM

C ar

e cu

rren

tly u

nder

revi

ew

proc

ess

and

will

be

subm

itted

to C

ity C

ounc

il at

so

me

poin

t in

the

futu

re.

SDCI

has

sub

mitt

ed b

icyc

le

park

ing

code

upd

ates

to

City

Cou

ncil

Plan

ning

Lan

d Us

e, a

nd Z

onin

g Co

mm

ittee

w

ith th

e in

tent

to a

dopt

in

2018

SDCI

and

SDO

T ar

e re

view

ing

the

lang

uage

in

the

guid

elin

es to

iden

tify

pote

ntia

l cha

nges

to th

e la

nd u

se c

ode

with

a J

oint

di

rect

ors

rule

bet

wee

n SD

OT/S

DCI t

o be

sig

ned

som

etim

e in

201

9 5.

2 De

velo

p a

bicy

cle

Park

ing

impl

emen

tatio

n pr

ogra

m

SDOT

will

dev

elop

a

met

hodo

logy

to id

entif

y an

d pr

iorit

ize h

igh-

dem

and

loca

tions

for b

icyc

le p

arki

ng

in 2

015,

and

will

com

plet

e a

Clie

nt A

ssis

tanc

e M

emo

(CAM

) for

inst

alla

tion

of

priva

te b

icyc

le ra

cks

in th

e pu

blic

righ

t-of

-way

.

Inte

rnal

gui

delin

es fo

r pr

ivat

e bi

cycl

e ra

ck

inst

alla

tion

in th

e pu

blic

Ri

ght-

of-W

ay a

re b

eing

de

velo

ped

and

a CA

M w

ill

be d

evel

oped

late

r in

2016

.

SDOT

will

be

deve

lopi

ng a

n ill

ustr

ated

gui

de to

bic

ycle

pa

rkin

g to

pro

vide

cle

arer

an

d m

ore

dire

ct a

ssis

tanc

e to

bus

ines

s ow

ners

and

de

velo

pers

that

wis

h to

in

stal

l bik

e pa

rkin

g in

the

publ

ic ri

ght-

of-w

ay.

In a

dditi

on to

SDO

T’s

curr

ent p

ract

ices

, SDO

T w

ill ta

rget

sch

ools

and

hi

stor

ic d

istr

icts

that

hav

e id

entif

ied

defic

its in

bic

ycle

pa

rkin

g fo

r new

bik

e pa

rkin

g

Bike

Par

king

Gui

delin

es

will

be

publ

icly

acc

essi

ble

onlin

e. P

DD w

ill p

artn

er

with

Bik

e Sh

are

prog

ram

to

inst

all 1

500

bike

par

king

sp

aces

dur

ing

the

one

year

bi

ke s

hare

per

mit

cycl

e.

5.3

Deve

lop

a pr

oces

s fo

r ab

ando

ned

bicy

cle

rem

oval

w

ith re

purp

osin

g op

tions

Aban

done

d bi

cycl

es th

at

are

tagg

ed a

nd re

mov

ed

by S

DOT

pers

onne

l are

do

nate

d to

Bik

eWor

ks.

SDOT

will

con

tinue

to

dona

te a

band

oned

bic

ycle

s to

Bik

eWor

ks. N

o tim

elin

e ex

ists

for a

par

tner

ship

w

ith S

PD to

cre

ate

a po

licy

to d

onat

e ab

ando

ned

bike

s.

SDOT

con

tinue

s to

rem

ove

aban

done

d bi

cycl

es fr

om

publ

ic b

icyc

le ra

cks

afte

r is

suin

g a

72 h

our n

otic

e.

SDOT

will

con

tinue

its

curr

ent p

ract

ices

rela

ted

to

aban

done

d bi

cycl

es

SDOT

will

con

tinue

its

curr

ent p

ract

ices

rela

ted

to

aban

done

d bi

cycl

es

5.5

Prov

ide

shor

t-

and

long

-ter

m

secu

re b

icyc

le

park

ing

at h

igh-

capa

city

tran

sit

stat

ions

, tra

nsit

hubs

, and

hea

vily

-us

ed b

us s

tops

SDOT

will

par

tner

w

ith o

ther

age

ncie

s to

co

ordi

nate

the

deve

lopm

ent

of lo

ng-t

erm

sec

ure

bicy

cle

park

ing.

Secu

red

bicy

cle

park

ing

is in

corp

orat

ed in

the

Nor

thga

te a

nd J

udki

ns

Park

sta

tion

desi

gns.

SDO

T w

ill c

ontin

ue to

mon

itor

need

s at

exi

stin

g st

atio

ns,

futu

re s

tatio

ns in

ST3

, an

d th

e Se

attle

Rap

idRi

de

expa

nsio

n pr

ogra

m.

SDOT

con

tinue

s to

mon

itor

bicy

cle

park

ing

need

s at

exi

stin

g an

d fu

ture

st

atio

ns, i

nclu

ding

thos

e in

ST3

, Sea

ttle’

s Ra

pidR

ide

expa

nsio

n pr

ogra

m, a

nd

othe

r hig

h ca

paci

ty tr

ansi

t lo

catio

ns.

SDOT

con

tinue

s to

mon

itor

bicy

cle

park

ing

need

s at

exi

stin

g an

d fu

ture

st

atio

ns, i

nclu

ding

thos

e in

ST3

, Sea

ttle’

s Ra

pidR

ide

expa

nsio

n pr

ogra

m, a

nd

othe

r hig

h ca

paci

ty tr

ansi

t lo

catio

ns.

SDOT

con

tinue

s to

mon

itor

bicy

cle

park

ing

need

s at

exi

stin

g an

d fu

ture

st

atio

ns, i

nclu

ding

thos

e in

ST3

, Sea

ttle’

s Ra

pidR

ide

expa

nsio

n pr

ogra

m, a

nd

othe

r hig

h ca

paci

ty tr

ansi

t lo

catio

ns.

DRAFT

Page 29: Seattle Department of Transportation SEATTLE BICYCLE ... · 1 day ago · PBL NE 70th St PBL 0.20 2019 External agency coordination and weather. ... 28 Northgate to Maple Leaf Light

28 | SEATTLE DEPARTMENT OF TRANSPORTATION

BMP

Stra

tegy

Activ

ity20

16 S

tatu

s20

17 S

tatu

s 2

018

Stat

us20

19 S

tatu

sPR

OGRA

MS

6.1

Deve

lop

a bi

cycl

e sa

fety

pr

ogra

m

SDOT

will

con

tinue

to

build

upo

n ex

istin

g sa

fety

edu

catio

nal a

nd

enco

urag

emen

t pro

gram

s,

and

crea

te n

ew p

rogr

ams.

To

war

ds th

is e

ffort

SDO

T w

ill:

1. P

rovi

de b

icyc

le e

duca

tion

for p

rimar

y sc

hool

chi

ldre

n

2. A

sses

s fe

asib

ility

and

co

st o

f inc

ludi

ng m

iddl

e sc

hool

and

hig

h sc

hool

ro

adw

ay s

afet

y ed

ucat

ion

(as

part

of t

he S

choo

l Roa

d Sa

fety

pla

n).

3. C

olla

bora

te w

ith

part

ners

to d

evel

op,

stre

ngth

en, a

nd d

istr

ibut

e ex

istin

g “B

ike

101”

m

ater

ials

to a

ssis

t a w

ide

rang

e of

cur

rent

and

new

rid

ers

4. E

ngag

e w

ith S

eattl

e Pu

blic

Sch

ools

to c

ontin

ue

Safe

Rou

tes

to S

choo

l pa

rtne

rshi

ps fo

r tra

ffic

safe

ty e

duca

tion

and

enco

urag

emen

t of w

alki

ng

and

biki

ng to

sch

ool

1. S

DOT

is co

llabo

ratin

g w

ith S

eattl

e Pu

blic

Sch

ools

an

d Ca

scad

e Bi

cycl

e Cl

ub to

dev

elop

a n

ew

pede

stria

n an

d bi

cycl

e sa

fety

cur

ricul

um th

at w

ill

be im

plem

ente

d in

all

publ

ic

elem

enta

ry s

choo

ls. T

he

curr

icul

um p

rogr

am w

ill b

e im

plem

ente

d in

all

72 p

ublic

K-

5 an

d K-

8 sc

hool

s in

Se

ptem

ber 2

016.

2. P

endi

ng th

e su

cces

s of

the

elem

enta

ry s

choo

l pr

ogra

m a

nd fu

ndin

g av

aila

bilit

y, SD

OT w

ill

expa

nd th

e ed

ucat

ion

prog

ram

to m

iddl

e an

d hi

gh

scho

ol s

tude

nts

in 2

019.

3. In

201

6, S

DOT

will

co

ntin

ue to

pub

lish

an

upda

ted

bike

map

; a

mag

azin

e si

mila

r to

the

2015

pilo

t Bik

eLife

; an

d ed

ucat

ion

and

enco

urag

emen

t mat

eria

ls

whe

n pr

ojec

ts s

uch

as th

e Ea

stla

ke a

nd R

oose

velt

Prot

ecte

d Bi

cycl

e La

nes

are

com

plet

e.

4. S

DOT

will

con

tinue

to

part

icip

ate

in th

e Sc

hool

Tr

affic

Saf

ety

Com

mitt

ee,

enga

ge w

ith a

dvoc

acy

grou

ps a

nd th

e Se

attle

Pu

blic

Sch

ools

to p

rom

ote

wal

king

and

bik

ing

to

scho

ol.

1. S

DOT

reac

hed

ever

y 3r

d, 4

th, a

nd 5

th g

rade

ph

ysic

al e

duca

tion

clas

s at

Se

attle

Pub

lic S

choo

ls in

pa

rtne

rshi

p w

ith C

asca

de

Bicy

cle

Club

, and

pla

ns to

cont

inue

to d

o so

for

the

next

sev

en ye

ars.

2. S

DOT

will

ass

ess

prog

ram

exp

ansi

on to

m

iddl

e sc

hool

and

hig

h sc

hool

cla

sses

.

3. S

DOT

will

con

tinue

to p

ublis

h an

ann

ual

prin

ted

bike

map

and

dist

ribut

e ed

ucat

ion

and

enco

urag

emen

tm

ater

ials

whe

npr

ojec

ts s

uch

asth

e W

estla

ke a

ndRo

osev

elt P

rote

cted

Bicy

cle

Lane

s ar

eco

mpl

ete.

4. S

DOT

will

con

tinue

to p

artic

ipat

e in

the

Scho

ol T

raffi

c Sa

fety

Com

mitt

ee, e

ngag

ew

ith a

dvoc

acy

grou

psan

d th

e Se

attle

Publ

ic S

choo

ls to

enco

urag

e w

alki

ngan

d bi

king

to s

choo

l.

1. S

DOT

cont

inue

s su

ppor

ting

the

in-c

lass

ro

om e

duca

tion

at a

ll Se

attle

Pub

lic S

choo

ls.

2. S

DOT

pilo

ted

in-

clas

sroo

m e

duca

tion

in

Seat

tle M

iddl

e Sc

hool

s in

fa

ll 20

18.

3. S

DOT

cont

inue

s to

di

strib

ute

educ

atio

n m

ater

ials

whe

n ne

w b

icyc

le

faci

litie

s ar

e co

mpl

ete.

4. S

DOT

will

con

tinue

to p

artic

ipat

e in

the

Scho

ol T

raffi

c Sa

fety

Com

mitt

ee, e

ngag

ew

ith a

dvoc

acy

grou

psan

d th

e Se

attle

Publ

ic S

choo

ls to

enco

urag

e w

alki

ngan

d bi

king

to s

choo

l

1. S

DOT

cont

inue

s su

ppor

ting

the

in-c

lass

ro

om e

duca

tion

at a

ll Se

attle

Pub

lic S

choo

ls.

2. S

DOT

pilo

ted

in-

clas

sroo

m e

duca

tion

in

Seat

tle M

iddl

e Sc

hool

s in

fa

ll 20

18.

3. S

DOT

cont

inue

s to

di

strib

ute

educ

atio

n m

ater

ials

whe

n ne

w b

icyc

le

faci

litie

s ar

e co

mpl

ete.

4. S

DOT

will

con

tinue

to p

artic

ipat

e in

the

Scho

ol T

raffi

c Sa

fety

Com

mitt

ee, e

ngag

ew

ith a

dvoc

acy

grou

psan

d th

e Se

attle

Publ

ic S

choo

ls to

enco

urag

e w

alki

ngan

d bi

king

to s

choo

l

DRAFT

Page 30: Seattle Department of Transportation SEATTLE BICYCLE ... · 1 day ago · PBL NE 70th St PBL 0.20 2019 External agency coordination and weather. ... 28 Northgate to Maple Leaf Light

SEATTLE BICYCLE MASTER PLAN 2019-2024 PROPOSED IMPLEMENTATION PLAN | 29

DRAFT

BMP

Stra

tegy

Activ

ity20

16 S

tatu

s20

17 S

tatu

s 2

018

Stat

us20

19 S

tatu

sPR

OGRA

MS

6.2

Impr

ove

way

findi

ng a

nd

trip

-pla

nnin

g op

port

uniti

es fo

r pe

ople

on

bicy

cles

SDOT

will

upd

ate

the

prin

ted

bicy

cle

map

an

nual

ly.

On tr

ack.

SDOT

con

tinue

s to

ann

ually

re

leas

e a

prin

ted

bicy

cle

map

. SDO

T al

so re

leas

ed

bicy

cle-

rela

ted

data

to th

e pu

blic

via

dat

a. s

eattl

e.go

v, an

d is

exp

lorin

g m

ore

optio

ns to

enh

ance

pub

lic

data

ava

ilabi

lity.

SDOT

con

tinue

s to

ann

ually

re

leas

e a

prin

ted

bicy

cle

map

. SDO

T w

ill u

tiliz

ed a

n up

date

d bi

cycl

e w

ayfin

ding

in

del

iver

y of

new

pro

ject

s

SDOT

con

tinue

s its

cur

rent

pr

actic

es

6.4

Supp

ort

econ

omic

and

com

mun

ityde

velo

pmen

t th

roug

hbi

cycl

e re

late

dac

tiviti

es

SDOT

will

atte

nd a

nd

supp

ort e

vent

s w

ith s

imila

r m

issi

on a

nd fo

cus

that

en

cour

age

neig

hbor

hood

-le

vel a

ctiv

e tr

ansp

orta

tion.

SDOT

will

con

tinue

to

atte

nd a

nd s

uppo

rt

even

ts s

uch

as S

umm

er

Park

way

s, B

icyc

le S

unda

ys,

Kidi

cal M

ass,

and

the

SR-

520

bicy

cle

ride.

SDOT

will

con

tinue

to

atte

nd a

nd s

uppo

rt

even

ts s

uch

as S

umm

er

Park

way

s, B

icyc

le S

unda

ys,

Kidi

cal M

ass,

and

oth

er

bicy

cle

rela

ted

activ

ities

.

SDOT

will

con

tinue

to

atte

nd a

nd s

uppo

rt e

vent

s su

ch a

s Bi

cycl

e Su

nday

s,

Kidi

cal M

ass,

and

oth

er

bicy

cle

rela

ted

activ

ities

.

SDOT

will

con

tinue

to

atte

nd a

nd s

uppo

rt e

vent

s su

ch a

s Bi

cycl

e Su

nday

s,

Kidi

cal M

ass,

and

oth

er

bicy

cle

rela

ted

activ

ities

SDOT

will

con

tinue

to

wor

k w

ith C

TR e

mpl

oyer

s an

d TM

P pl

ans

to p

rovi

de

bicy

cle

wor

ksho

ps, c

o-sp

onso

r the

sec

ond

Annu

al

Empl

oyer

Bik

e Su

mm

it,

and

prom

ote

the

2016

Bik

e Co

mm

ute

Chal

leng

e.

In 2

016

and

2017

, 97

bike

ra

cks

will

be

inst

alle

d at

loca

tions

out

side

Ce

nter

City

adj

acen

t to

CTR

em

ploy

er

loca

tions

or b

uild

ings

w

ith T

rans

port

atio

n M

anag

emen

t Pro

gram

re

quire

men

ts. T

his

will

pr

ogra

m w

ill re

sult

in p

ublic

bik

e ra

cks

outs

ide

all C

TR a

nd T

MP

loca

tions

. Ten

mor

e bi

cycl

e co

mm

uter

wor

ksho

ps

will

be

cond

ucte

d in

201

6 an

d th

en a

gain

in 2

017

(by

Com

mut

e Se

attle

).

SDOT

has

inst

alle

d pu

blic

bi

ke ra

cks

at a

ll fe

asib

le

CTR

and

TMP

loca

tions

, an

d w

ill c

ontin

ue to

co

nduc

t bic

ycle

com

mut

er

wor

ksho

ps a

nd o

ther

pr

ogra

ms.

SDOT

con

tinue

d to

offe

r va

rious

bik

e ev

ents

and

pr

ogra

mm

ing

for S

eattl

e em

ploy

ers,

whi

ch a

re o

ften

open

to th

e pu

blic

. 20

18

prog

ram

min

g w

ill in

clud

e M

ay B

ike

to W

ork

Day

(Bik

e M

onth

Cel

ebra

tion)

and

Bi

ke 1

01 fo

r em

ploy

ers.

SDOT

con

tinue

s to

offe

r va

rious

bik

e ev

ents

and

pr

ogra

mm

ing

for S

eattl

e em

ploy

ers,

whi

ch a

re o

ften

open

to th

e pu

blic

. 201

9 pr

ogra

mm

ing

will

incl

ude

May

Bik

e to

Wor

k Da

y an

d Oc

tobe

r Lig

ht U

p Yo

ur

Com

mut

e.

DRAFT

Page 31: Seattle Department of Transportation SEATTLE BICYCLE ... · 1 day ago · PBL NE 70th St PBL 0.20 2019 External agency coordination and weather. ... 28 Northgate to Maple Leaf Light

30 | SEATTLE DEPARTMENT OF TRANSPORTATION

BMP

Stra

tegy

Activ

ity20

16 S

tatu

s20

17 S

tatu

s 2

018

Stat

us20

19 S

tatu

sIM

PLEM

ENTA

TION

APP

ROAC

H7.

1 an

d 7.

2 De

velo

p an

d st

reng

then

pr

oced

ures

and

pr

oces

ses

for

bicy

cle

proj

ect

deliv

ery

SDOT

has

a w

ell-

deve

lope

d ev

alua

tion,

des

ign

and

publ

ic e

ngag

emen

t pr

oces

s fo

r nei

ghbo

rhoo

d gr

eenw

ays.

In 2

016,

SDO

T w

ill c

ontin

ue to

use

and

re

fine

this

pro

cess

, and

will

ad

apt i

t for

oth

er p

roje

cts

type

s su

ch a

s pr

otec

ted

bicy

cle

lane

s. In

add

ition

, SD

OT w

ill:

• Al

low

tem

pora

ry

impl

emen

tatio

n of

bi

cycl

e fa

cilit

ies

SDOT

will

con

tinue

to

cond

uct d

ata

driv

en

plan

ning

pro

cess

es,

colle

ctin

g qu

antit

ativ

e “b

efor

e” d

ata

and

adm

inis

terin

g pe

rcep

tion

surv

eys

as fu

ndin

g al

low

s.

SDOT

will

con

tinue

to

supp

ort P

ARKi

ng d

ay ty

pe

of te

mpo

rary

inst

alla

tion

of

bicy

cle

faci

litie

s.

SDOT

con

tinue

s to

mak

e da

ta-d

riven

dec

isio

ns.

We

are

impr

ovin

g ou

r Pr

ogra

m &

Pro

ject

M

anag

emen

t pro

cess

es,

whi

ch in

clud

es im

prov

ed

cost

est

imat

ing

tool

s, a

nd

stre

amlin

ing

our d

eliv

ery

and

cont

ract

ing

met

hods

. Th

ese

impr

ovem

ents

ar

e ex

pect

ed to

resu

lt in

qu

icke

r im

plem

enta

tion

of b

icyc

le p

roje

cts

and

redu

ced

cost

s.

SDOT

con

tinue

s to

refin

e ou

r pro

ject

del

iver

y pr

oces

ses

with

a fo

cus

on

inte

rnal

col

labo

ratio

n. In

20

18, w

e ar

e co

nduc

ting

initi

al fe

asib

ility

stu

dies

of

bik

e pr

ojec

ts th

at o

ccur

in

cor

ridor

s w

ith h

igh

dem

and

from

oth

er m

odes

. Th

is in

form

atio

n w

ill

allo

w fo

r mor

e st

rate

gic

inve

stm

ents

.

SDOT

con

tinue

s to

look

at

pro

cess

es to

ass

ist i

n de

liver

ing

proj

ects

on

time

and

with

in b

udge

t.

7.3

and

7.13

Re

view

bic

ycle

-re

late

d co

llisi

ons,

co

llisi

on ra

tes

and

freq

uenc

ies

over

tim

e an

d id

entif

y an

d im

plem

ent

safe

ty s

trat

egie

s.

Impr

ove

bicy

cle

faci

litie

s as

ne

eded

, bas

ed

on p

erfo

rman

ce

crite

ria.

SDOT

will

bui

ld o

n th

e ex

istin

g co

llisi

on re

view

pr

ogra

m a

nd w

ill:

• An

alyz

e bi

cycl

e-in

volv

ed c

ollis

ions

per

fa

cilit

y ty

pe to

iden

tify

tren

ds, b

ehav

iors

, and

en

gine

erin

g so

lutio

ns•

Crea

te a

dat

a-dr

iven

proc

ess

to id

entif

y sp

ot a

nd/o

r cor

ridor

im

prov

emen

t pro

ject

s De

velo

p a

prio

ritize

d lis

t of

spo

t im

prov

emen

t pr

ojec

ts

SDOT

is d

evel

opin

g a

Bicy

cle

and

Pede

stria

n Sa

fety

Ana

lysi

s (B

PSA)

to

addr

ess

thes

e co

ncer

ns.

The

draf

t rep

ort i

s ex

pect

ed

by th

e en

d of

Apr

il an

d w

ill h

elp

prio

ritiz

e sp

ot

impr

ovem

ents

for 2

016

wor

k pr

ogra

m a

nd b

eyon

d.

SDOT

has

com

plet

ed

deve

lopm

ent o

f the

BPS

A an

d w

ill u

se th

is re

port

to

wor

k to

war

ds p

roac

tivel

y m

akin

g Se

attle

's s

tree

ts

even

saf

er. S

DOT

will

co

ntin

ue to

col

labo

rate

w

ith S

PD o

n in

crea

sing

da

ta s

harin

g an

d da

ta

colle

ctio

n be

twee

n th

e tw

o de

part

men

ts.

SDOT

laun

ched

Pha

se II

of

the

BPSA

in 2

018.

The

re

sults

of t

he w

ork

will

fu

rthe

r allo

w S

DOT

to b

e pr

oact

ive

in m

akin

g ou

r st

reet

s sa

fer.

SDOT

exp

ects

to c

ompl

ete

Phas

e II

of th

e BP

SA in

20

19.

7.5

and

7.14

Cr

eate

a m

ultiu

se

trai

ls u

pgra

de

and

mai

nten

ance

pl

an. N

egot

iate

m

aint

enan

ce

agre

emen

ts w

ith

part

ners

.

SDOT

will

dev

elop

a tr

ails

up

grad

e pl

an in

201

5,

whi

ch w

ill g

uide

futu

re

upgr

ades

to th

e m

ulti-

use

trai

ls.

SDOT

is d

evel

opin

g a

Trai

ls

Upgr

ade

Plan

to g

uide

fu

ture

inve

stm

ents

. The

dr

aft r

epor

t is

expe

cted

by

the

end

of A

pril.

Upd

ated

m

aint

enan

ce a

gree

men

ts

with

par

tner

s w

ill b

e w

orke

d on

follo

win

g th

e Tr

ails

Upg

rade

Pla

n ef

fort

s (ti

mel

ine

unkn

own)

.

SDOT

has

com

plet

ed th

e Tr

ails

Upg

rade

Pla

nSD

OT u

ses

the

Trai

ls

Upgr

ade

Plan

to g

uide

m

aint

enan

ce a

nd s

pot

impr

ovem

ents

thro

ugho

ut

our T

rail

netw

ork

SDOT

con

tinue

s to

use

th

e Tr

ails

Upg

rade

Pla

n to

gui

de m

aint

enan

ce a

nd

spot

impr

ovem

ents

DRAFT

Page 32: Seattle Department of Transportation SEATTLE BICYCLE ... · 1 day ago · PBL NE 70th St PBL 0.20 2019 External agency coordination and weather. ... 28 Northgate to Maple Leaf Light

SEATTLE BICYCLE MASTER PLAN 2019-2024 PROPOSED IMPLEMENTATION PLAN | 31

DRAFT

BMP

Stra

tegy

Activ

ity20

16 S

tatu

s20

17 S

tatu

s 2

018

Stat

us20

19 S

tatu

sIM

PLEM

ENTA

TION

APP

ROAC

H7.

6 Up

date

the

Bicy

cle

Mas

ter

Plan

SDOT

will

upd

ate

the

Bicy

cle

Mas

ter P

lan

ever

y 5-

7 ye

ars

SDOT

is re

quire

d by

Cou

ncil

Reso

lutio

n to

upd

ate

the

BMP

and

will

beg

in w

ork

to

upda

te in

201

8, a

imin

g fo

r a

com

plet

ed u

pdat

e in

202

1,

inco

rpor

atin

g H

ALA

and

othe

r maj

or c

ity in

itiat

ives

.

The

BMP

upda

te w

ill b

egin

in

201

9.

7.10

– 7

.12

Mai

ntai

n on

-st

reet

and

off-

stre

et b

icyc

le

faci

litie

s. C

onsi

der

mai

nten

ance

cost

s,

proc

edur

es, a

nd

long

-ter

m fu

ndin

g m

echa

nism

s ar

e a

part

of

all n

ew b

icyc

le

faci

lity

proj

ects

. En

cour

age

peop

le to

repo

rt

impr

ovem

ents

re

ques

ts to

SDO

T

To a

ddre

ss m

aint

enan

ce,

SDOT

will

:Cr

eate

life

-cyc

le c

osts

pe

r bic

ycle

faci

lity

to

bette

r und

erst

and

and

gaug

e cu

rren

t and

futu

re

mai

nten

ance

nee

ds

As w

e co

ntin

ue to

bui

ld

prot

ecte

d bi

ke la

nes,

tr

acki

ng m

aint

enan

ce

cost

s is

impo

rtan

t. SD

OT is

cu

rren

tly re

sear

chin

g be

st

prac

tices

from

pee

r citi

es

SDOT

con

tinue

s to

rese

arch

be

st p

ract

ices

rela

ted

to

mai

nten

ance

cos

ts fo

r our

ne

wes

t fac

ility

type

s.

SDOT

con

tinue

s to

rese

arch

be

st p

ract

ices

rela

ted

to

mai

nten

ance

cos

ts fo

r our

ne

wes

t fac

ility

type

s.

SDOT

has

allo

cate

d ad

ditio

nal f

unds

to fa

cilit

ate

mai

nten

ance

of s

ome

of

our m

ost u

sed

faci

litie

s.

Coor

dina

te p

roje

cts

with

St

reet

Mai

nten

ance

Pav

ing

plan

As p

art o

f the

201

6-20

20

BMP

IMP

Plan

, SDO

T is

co

ordi

natin

g up

com

ing

pavi

ng p

roje

cts

and

prop

osed

bic

ycle

faci

litie

s fo

r bet

ter a

lignm

ent.

As p

art o

f the

201

7- 2

021

Impl

emen

tatio

n Pl

an S

DOT

look

ed fo

r opp

ortu

nitie

s to

co

ordi

nate

pav

ing

proj

ects

an

d pr

opos

ed b

icyc

le

faci

litie

s.

As p

art o

f the

201

8- 2

022

Impl

emen

tatio

n Pl

an S

DOT

look

ed fo

r opp

ortu

nitie

s to

co

ordi

nate

pav

ing

proj

ects

an

d pr

opos

ed b

icyc

le

faci

litie

s.

As p

art o

f thi

s 20

19- 2

024

Impl

emen

tatio

n Pl

an

SDOT

con

tinue

s to

look

for

oppo

rtun

ities

to c

oord

inat

e pa

ving

proj

ects

and

pr

opos

ed b

icyc

le fa

cilit

ies,

an

d w

ill c

ontin

ue to

do

so in

th

e fu

ture

.Ev

alua

te a

dditi

onal

bik

e fa

cilit

y sw

eepi

ng a

s pa

rt

of th

e SP

U/SD

OT s

tree

t sw

eepi

ng p

rogr

am

As th

e ci

ty b

uild

s a

criti

cal

mas

s of

pro

tect

ed b

ike

lane

s, S

DOT

will

iden

tify

the

mos

t cos

t effe

ctiv

e w

ay

to s

wee

p bi

cycl

e fa

cilit

ies.

SDOT

con

tinue

s to

rese

arch

co

st-e

ffect

ive

way

s to

sw

eep

our p

rote

cted

bik

e la

nes.

SDOT

con

tinue

d to

rese

arch

co

st-e

ffect

ive

way

s to

sw

eep

our p

rote

cted

bik

e la

nes

SDOT

con

tinue

s to

rese

arch

co

st-e

ffect

ive

way

s to

sw

eep

our p

rote

cted

bik

e la

nes

Cont

inue

to p

rom

ote

exis

ting

way

s fo

r peo

ple

to

repo

rt m

aint

enan

ce a

nd

impr

ovem

ents

requ

ests

SDOT

and

the

May

or’s

Of

fice

are

cont

inui

ng to

pr

omot

e th

e w

eb b

ased

, Fi

nd It

, Fix

It, a

pplic

atio

n to

impr

ove

repo

rtin

g of

m

aint

enan

ce re

ques

ts.

SDOT

and

the

May

or's

Of

fice

part

icip

ate

in

Find

It, F

ix It

wal

ks w

ith

com

mun

ity m

embe

rs th

at

aim

to p

rom

ote

use

of

the

app

whi

le re

port

ing

mai

nten

ance

nee

ds.

SDOT

con

tinue

d to

util

ize

the

Find

It, F

ix It

app

as

wel

l as

part

icip

ate

in th

e Fi

nd It

, Fix

wal

ks w

ith

com

mun

ity m

embe

rs.

SDOT

con

tinue

s to

util

ize

the

Find

It, F

ix It

app

as

wel

l as

part

icip

ate

in th

e Fi

nd It

, Fix

wal

ks w

ith

com

mun

ity m

embe

rs.

7.17

Est

ablis

h a

broa

d ba

sed

fund

ing

appr

oach

SDOT

will

con

tinue

to

rese

arch

and

pur

sue

gran

ts, a

nd o

ther

fund

ing

oppo

rtun

ities

.

The

Tran

spor

tatio

n Le

vy

to M

ove

Seat

tle w

as

appr

oved

by

vote

rs in

201

5.

Ther

e is

$65

M fo

r bic

ycle

im

prov

emen

ts o

ver t

he

nine

year

levy

tim

efra

me.

SDOT

con

tinue

d to

look

fo

r gra

nt a

nd p

artn

ersh

ip

oppo

rtun

ities

to d

eliv

er

mor

e an

d m

ake

the

mos

t ou

t of o

ur M

ove

Seat

tle

fund

ing.

SDOT

con

tinue

d to

look

fo

r gra

nt a

nd p

artn

ersh

ip

oppo

rtun

ities

. In

2018

SD

OT re

ceiv

ed $

16 M

from

th

e W

ashi

ngto

n St

ate

Conv

entio

n Ce

nter

to b

uild

ke

y el

emen

ts fo

r the

Cen

ter

City

Bik

e N

etw

ork.

SDOT

con

tinue

s to

look

fo

r gra

nt a

nd p

artn

ersh

ip

oppo

rtun

ities

to d

eliv

er

mor

e an

d m

ake

the

mos

t ou

t of o

ur M

ove

Seat

tle

fund

ing.

DRAFT

Page 33: Seattle Department of Transportation SEATTLE BICYCLE ... · 1 day ago · PBL NE 70th St PBL 0.20 2019 External agency coordination and weather. ... 28 Northgate to Maple Leaf Light

32 | SEATTLE DEPARTMENT OF TRANSPORTATION

PROJECTS FUNDED THROUGH CONSTRUCTION WITH LOW RISKSProject

Number Project Name TypeLength (miles)

Target year Risk

1 AAC - S Columbian Way/S Alaska St (2018 AAC Package)

PBL 1.11 2019 Low Risk

2 AAC - S Dearborn St PBL 0.46 2019 Low Risk3 AAC - Swift/Myrtle/Othello (2018 AAC Package) PBL 1.75 2019 Low Risk4 AAC - Wilson Ave S (2018 AAC Package) PBL 0.81 2019 Low RiskSpot Aurora and 83rd signal (2019 AAC Package) Other 0 (spot) 2019 Low Risk, requires WSDOT

Coordination5 MMC - Union PBL PBL 0.67 2019 Low Risk61 NE 70th St PBL PBL 0.10 2019 Low Risk, requires WSDOT

Coordination61 NE 70th St Connection to PBL NGW 0.17 2019 Low Risk, connects to WSDOT

Coordinated PBL7 North Seattle NGW NGW 2.70 2019 Low Risk8 SRTS (High Point Loop) NGW 0.88 2019 Low Risk9 VZ - NE 65th St Vision Zero Safety Corridor PBL 0.74 2019 Low Risk10 West Seattle Phase 1 NGW 2.21 2019 Low Risk11 12th Ave S PBL- Golf Dr to S King St PBL 0.25 2020 Low Risk, requires Load Zone &

Transit Access Coordination12 AAC - Green Lake Park Loop (2019 AAC Package) PBL 2.55 2020 Low Risk, requires Right of Way

acquisition, requires coordination with Parks.

13 AAC - N 50th St (2019 AAC Package) BL 0.27 2020 Low RiskSpot AAC - N 80th St (2019 AAC Package)-Green Lake

PBLOther 0 (spot) 2020 Low Risk

14 AAC - SW Avalon Way and 35th Ave SW (2019 AAC Package)

PBL 0.90 2020 Low Risk, requires Load Zone & Transit Access Coordination

15 Center City - 9th Ave N PBL 0.24 2020 Low Risk, requires Private Development Coordination

16 Green Lake to Interurban Connection NGW 0.38 2020 Low Risk17 Judkins Park Connection NGW 0.26 2020 Low Risk181 Melrose Promenade (NGW segment) NGW 0.83 2020 Low Risk181 Melrose Promenade (PBL segment) PBL 0.10 2020 Low Risk, potential for minor

parking and loading impacts19 N 34th St Mobility Improvements PBL 0.33 2020 Low Risk20 NGW Connection to Missing Link 1 NGW 0.35 2020 Low Risk, Dependent upon

Missing Link project21 NGW Connection to Missing Link 2 NGW 0.05 2020 Low Risk, Dependent upon

Missing Link project22 S Lander Street Bridge Trail 0.24 2020 Low Risk23 SRTS (Highland Park Connection Ph 1) NGW 1.45 2020 Low Risk

DRAFTAPPENDIX 3: PROJECT LISTS

Page 34: Seattle Department of Transportation SEATTLE BICYCLE ... · 1 day ago · PBL NE 70th St PBL 0.20 2019 External agency coordination and weather. ... 28 Northgate to Maple Leaf Light

SEATTLE BICYCLE MASTER PLAN 2019-2024 PROPOSED IMPLEMENTATION PLAN | 33

DRAFT

PROJECTS FUNDED THROUGH CONSTRUCTION WITH LOW RISKSProject

Number Project Name TypeLength (miles)

Target year Risk

24 SRTS (Lowell - Meany Connection) NGW 0.79 2020 Low Risk25 SRTS (Viewlands Connection) NGW 1.09 2020 Low Risk26 SRTS (Wing Luke Elementary Connection) NGW 0.80 2020 Low Risk27 West Seattle Phase 2a NGW 0.17 2020 Low Risk28 Northgate to Maple Leaf Light Rail Connection NGW 1.13 2021 Low Risk29 Northgate to Pinehurst Light Rail Connection NGW 1.12 2021 Low Risk30 SRTS (Ingraham HS Connection Ph 1) NGW 1.25 2021 Low Risk31 West Seattle - 35th Ave SW Alternative - Camp

Long ConnectionNGW 0.72 2021 Low Risk, Dependent upon VZ

signal project32 West Seattle Phase 2b NGW 1.21 2020 Low Risk33 SRTS (Hazel Wolf K-8) Pinehurst Connection NGW 0.89 2022 Low Risk, Dependent upon SRTS/

PMP signal project342 Center City -4th Ave (segment 1 Pine to Spring) PBL 0.36 2020 Low Risk, potential for parking

and loading impacts35 Central Ridge Phase 1 NGW 0.75 2020 Low Risk, Previous commitment

7th Ave PBL 0.20 2020 Low Risk, construction by Amazon

Battery St BL 0.20 2020 Low Risk, construction by WSDOT

Grand Totals 30.49

PROJECTS FUNDED THROUGH CONSTRUCTION WITH RISKSProject

Number Project Name Type Length (miles)Target Year Risk

342 Center City - 4th Ave (segment 2 Vine to Pine) PBL 0.61 2021 Funding and Depending on design, level of service impacts, paving impacts

342 Center City - 4th Ave (segment 3 Spring to Main)

PBL 0.53 2021 Funding and Depending on design, level of service impacts, paving impacts

363 Center City - 8th Ave -Interim PBL 0.55 2019 Potential for parking and loading impacts

373 Center City - Pike/Pine Interim PBL 0.60 2019 Potential for parking and loading impacts

38 King Street - 2019/2020 Delivery NGW 1.05 2019 Private development to construct part

39 Burke Gilman Trail - Missing Link Trail 1.42 2020 Legal challenges40 Key Arena - NODO - Queen Anne/1st PBL 0.47 2020 Private Developer to

design and construct40 Key Arena - NODO - 1st/Broad st PBL 0.25 2020 Partnership-dependentSpot King Street - 12th & King NGW 0 (spot) 2020 Design to coordinate with

adjacent projectsSpot King Street - Under I-5 NGW 0 (spot) 2020 Funding risk41 Rainier Valley N-S Phase 2 NGW 0.67 2020 Requires trail lease

agreement WSDOT42 SRTS (Lincoln HS Connection) NGW 0.35 2020 Potential for parking and

loading impacts43 VZ -Wedgwood to Roosevelt Connection NGW 1.39 2020 Coordinate with 15th AAC

DRAFT

Page 35: Seattle Department of Transportation SEATTLE BICYCLE ... · 1 day ago · PBL NE 70th St PBL 0.20 2019 External agency coordination and weather. ... 28 Northgate to Maple Leaf Light

34 | SEATTLE DEPARTMENT OF TRANSPORTATION

PROJECTS FUNDED THROUGH CONSTRUCTION WITH RISKSProject

Number Project Name Type Length (miles)Target Year Risk

363 Center City - 8th Ave PBL Mileage will match interim design

2021 SDOT contractually obligated by Washington state convention center on funding amounts

373 Center City - Pike/Pine PBL Mileage will match interim design

2021 SDOT contractually obligated by Washington state convention center on funding amounts

44 Central Water Front (Alaskan Way Viaduct Replacement)

PBL 0.67 2021 Partnership-dependent

454 Northgate Light Rail- 1st Ave NE PBL (formerly Northgate Light Rail Station Project (Seg 2)

PBL 0.13 2021 Sound Transit partnership

46 Northgate Light Rail - Northgate Pedestrian and Bicycle Bridge

Trail 0.27 2021 Sound Transit partnership

454 Northgate Light Rail- 1st Ave NE Multi-Use Path (formerly Northgate Light Rail Station (Seg 3)

Trail 0.38 2021 Sound Transit partnership

454 Northgate Light Rail- 1st Ave NE PBL (formerly Northgate Light Rail Station Project (Seg 1)

PBL 0.38 2021 Sound Transit partnership

47 SRTS (Washington MS Connection) NGW 0.60 2021 Coordination with Metro48 Key Arena - Thomas St (Seattle Center to

Waterfront)NGW 0.37 2022 Design limited by available

budget49 Key Arena-Thomas St (Seattle Center to

Eastlake)NGW 0.86 2022 Design limited by available

budget50 Lake City to Maple Leaf NGW CROSSING NGW 0.34 2022 Coordinate with WSDOT

Paving (Requires signal approval)

51 SRTS (Emerson ES Connection) NGW 1.06 2022 Design Dependent on Rainier Phase 3

52 Center City - Bell St PBL PBL 0.22 2019 Coordination with Metro and Private Development. Requires major signal work.

535 AAC - 15th Ave NE (AAC Package)-North Segment

PBL 0.94 2020 Low Risk

535 AAC - 15th Ave NE (AAC Package)-South Segment

BL 0.25 2020 Low Risk

54 Center City -South End Connection PBL 0.27 2020 Metro and Sound Transit coordination

55 Multi Modal Corridor-Delridge RR TBD 3.10 2021 Transit Plus Multi-modal Corridor dependent

35 Central Ridge Phase 2 NGW 1.41 2024 Dependent on Madison RapidRide construction

56 AMB: Mt Baker Bicycle Connection TBD TBD 2023 Preferred route impacts Transit and travel times

Grand Totals 19.12

DRAFT

Page 36: Seattle Department of Transportation SEATTLE BICYCLE ... · 1 day ago · PBL NE 70th St PBL 0.20 2019 External agency coordination and weather. ... 28 Northgate to Maple Leaf Light

SEATTLE BICYCLE MASTER PLAN 2019-2024 PROPOSED IMPLEMENTATION PLAN | 35

1This project is broken into a greenway segment and a protected bike lane segment.

2This project is broken into segments with different phases.

3This project is broken into an interim and a permanent phase.

4Northgate project broken into 3 segments.

5Project broken into 2 segments.

PROJECTS FUNDED THROUGH DESIGN WITH LOW RISKSProject

Number Project Name TypeLength (miles)

Target Year Risk

57 SRTS (Stevens ES Connection) NGW 0.63 2020 Low Risk, Dependent on SRTS partnership

58 SRTS (Orca K-8 Connection) NGW 1.27 2021 Low Risk505 Lake City/Maple Leaf NGW Connection to Wedgewood NGW 1.05 2022 Low Risk59 SRTS (Beacon Hill ES) NGW 0.80 2022 Low Risk60 E Marginal Way PBL 1.30 2021 Low Risk, Multi-agency

coordination and grant funding

61 Georgetown to South Park PBL/Trail

TBD TBD Low Risk, Funding and Depending on design, level of service impacts

Grand Totals 5.04

PROJECTS FUNDED THROUGH DESIGN WITH KNOWN RISKSProject

Number Project Name TypeLength (miles)

Target Year Risk

62 VZ- Interurban to Greenwood Connection NGW 0.25 2020 Partnership-dependent63 Lake Washington Loop NGW 2.31 2024 Construction coordination64 Multi Modal Corridor-Roosevelt RR PBL 3.39 2023 Fully funded through

construction pending FTA funds

65 SRTS (Olympic Hills to Cedar Park) NGW 1.12 2023 Design dependent on signal approval and funding

66 SODO Trail Trail 0.42 TBD Multi-agency agreements, funding includes construction costs

67 Eastlake (Fairview to Stewart) PBL 0.80 TBD Multi-agency partnering and funding

Grand Totals 8.29 DRAFT

DRAFT

Page 37: Seattle Department of Transportation SEATTLE BICYCLE ... · 1 day ago · PBL NE 70th St PBL 0.20 2019 External agency coordination and weather. ... 28 Northgate to Maple Leaf Light

36 | SEATTLE DEPARTMENT OF TRANSPORTATION

PROJECTS REMOVED SINCE 2017 IMPLEMENTATION PLAN

Project Name TypeLength (miles) Removal Reason

35th Ave N PBLs (Paving Project) PBL 1.20 Removed due to parking and travel impactsBallard/Crown Hill to Greenwood NGW 2.60 SBAB Removed - 2018 Imp Plan; confirmed not a

priority project in 2019 Imp PlanBeacon Hill to Mt Baker Phase 2 NGW 1.50 SBAB Removed - 2019 Imp PlanFauntleroy Way SW PBL PBL 1.30 SBAB Removed - 2019 Imp PlanGreenwood Ave N PBL PBL 1.20 SBAB Removed - 2019 Imp PlanMontlake Blvd NE PBL PBL 0.60 SBAB Removed - 2019 Imp PlanNE 100th St PBL PBL 0.30 SBAB Removed - 2019 Imp PlanNorthgate Light Rail Station Corridor - Segment 4

PBL 0.50 SBAB Removed - 2019 Imp Plan

One Center City - Broad Street PBL PBL TBD SBAB Removed - 2019 Imp PlanOne Center City - Yesler Way PBL PBL TBD SBAB Removed - 2019 Imp PlanRoosevelt PBL Extension PBL 0.50 SBAB Removed - 2019 Imp PlanS Henderson St/Seward Park Ave S BL 0.70 SBAB Removed - 2019 Imp PlanValley Street PBL PBL 0.30 SBAB Removed - 2019 Imp Plan12th Ave NE PBL-NE 67th to NE 75th St PBL 0.50 Partnership - AAC delayed to after the LevyN 130th St 2021 Paving PBL 1.60 Partnership - AAC delayed to after the LevySW Roxbury 2021 Paving PBL 1.00 Partnership - AAC delayed to after the LevyNW Market St 2020 Paving BL 0.60 Partnership - AAC Extents changedMarket/45th Transit Improvement Area TBD 0.50 Partnership - No longer funded as a multi-modal

corridorRainier Ave S Paving/RR PBL 0.90 To mitigate risk, project designed to match funding.

Focus on spot transit improvements First Hill Streetcar: Broadway Extension PBL 0.60 Project remains in BMP. Partnership - Streetcar Project

put on hold.Chief Sealth Trail Connections TRL 0.30 City Light CoordinationFauntleroy Way SW Boulevard PBL 0.30 Fauntleroy Blvd. project put on holdMadison MMC Complementary: 9th/University/Union

NGW 0.50 Previously considered with Madison BRT complementary route.

Madison MMC Complementary: Arthur/27th NGW 0.80 Previously considered with Madison BRT complementary route.

Madison MMC Complementary: Thomas/24th

NGW 0.80 Previously considered with Madison BRT complementary route.

N 40th St (2019 AAC package) PBL 0.29 Removed due to design constraints & funding risk.Madison MMC Complementary: Denny Way NGW 0.76 Previously considered with Madison BRT

complementary route.West Seattle North Admiral Connection NGW 1.94 Removed due to design constraints & funding risk.15th Ave S AAC Coordination (16th Ave S NGW)

NGW 0.28 Bike Lanes in previous plan. Complete streets evaluation resulted in parallel greenway on 16th as recommended. However, NGW Connection dependent upon NSF project currently in design review.

S Alaska St Connection: Columbia City NGW 0.42 Stakeholder investment in connection. Removed due to design constraints & funding risk.

S Alaska St PBL PBL 0.29 Stakeholder investment in connection. Removed due to design constraints & funding risk.

DRAFT

Page 38: Seattle Department of Transportation SEATTLE BICYCLE ... · 1 day ago · PBL NE 70th St PBL 0.20 2019 External agency coordination and weather. ... 28 Northgate to Maple Leaf Light

SEATTLE BICYCLE MASTER PLAN 2019-2024 PROPOSED IMPLEMENTATION PLAN | 37

PROJECTS REMOVED SINCE 2017 IMPLEMENTATION PLAN

Project Name TypeLength (miles) Removal Reason

Beacon Ave S PBL Study Only PBL 0.87 SBAB Removed - 2019 Imp PlanMyers Way S PBL 1.24 SBAB Recommended for 2019 plan. Removed due to

design constraints & funding risk.Center City: Alaskan (Virginia to Elliot Bay Trail)

TBD 0.38 Did not receive grant or private funding.

Grand Total 25.57

DRAFT

DRAFT

Page 39: Seattle Department of Transportation SEATTLE BICYCLE ... · 1 day ago · PBL NE 70th St PBL 0.20 2019 External agency coordination and weather. ... 28 Northgate to Maple Leaf Light

38 | SEATTLE DEPARTMENT OF TRANSPORTATION

The Seattle Department of Transportation700 5th Avenue, Suite 3800PO Box 34996Seattle, WA 98124-4996(206) 684-ROAD (7623)www.seattle.gov/transportation 3.2019