  • 8/18/2019 Seapac2011 37p Hughes

    1/10

    1

     Austral ia

     AP B5

    SEAPAC 2011

     Aust ral ia

     AP B5

    SEAPAC 2011

    Experiences of IEC 61850

    Engineering – Designing good

    systems the right way

    1

     Author Company Emai l

    Rod Hughes Rod Hughes Consult ing Pty Ltd [email protected]

    Christoph Brunner It4power LLC [email protected]

     Aust ral ia

     AP B5

    SEAPAC 2011

     A new type of spec

    • System Overview and Architecture

    • SAS Interfaces – external and internal

    • SAS Functionality

    • IEC Implementation Constraints

    • System Security Provisions and SecurityGovernance

    • Engineering Processes, Documentation and Tools

    for the SAS Life Cycle

    • Equipment Procurement Requirements

    • Test, Operation and Maintenance Facilities and

    Procedures

    2

  • 8/18/2019 Seapac2011 37p Hughes

    2/10

    2

     Austral ia

     AP B5

    SEAPAC 2011

     Aust ral ia

     AP B5

    SEAPAC 2011

    File Hierarchy

    Specification

    project1.ssd

    • SLD

    • FunctionsSubstation

     Aust ral ia

     AP B5

    SEAPAC 2011

    File Hierarchy

    (Class)

    C_Class.(icd)

    Specification

    project1.ssd

    (Class)

     A_Class.(icd)

    • SLD

    • FunctionsSubstation

     A1.icd

    “TEMPLATE

    ” A2.icd

    “TEMPLATE

    ”B1.icd

    “TEMPLATE

    ”C2.icd

    “TEMPLATE

    ”C1.icd

    “TEMPLATE

  • 8/18/2019 Seapac2011 37p Hughes

    3/10

  • 8/18/2019 Seapac2011 37p Hughes

    4/10

  • 8/18/2019 Seapac2011 37p Hughes

    5/10

    5

     Austral ia

     AP B5

    SEAPAC 2011

     Aust ral ia

     AP B5

    SEAPAC 2011

    Model Modification

    project1.scd

    “IED1” “IED2”

    Communications

    Substation“IED4” “IED5” “IED6” “IEDn”

    “ IED3”

    IED3.cid

    C

    S

    • Logic

    • HMI

    • Settings

    “Sub1”

    Project1.sedC

    S

    “n”“n”“n”

    “IE

    D3”

    “IE

    D3”

     Aust ral ia

     AP B5

    SEAPAC 2011

    Feeder 

  • 8/18/2019 Seapac2011 37p Hughes

    6/10

    6

     Austral ia

     AP B5

    SEAPAC 2011

     Aust ral ia

     AP B5

    SEAPAC 2011

    Bus Bar Protection

     Aust ral ia

     AP B5

    SEAPAC 2011

    Network Engineering

  • 8/18/2019 Seapac2011 37p Hughes

    7/10

    7

     Austral ia

     AP B5

    SEAPAC 2011

     Aust ral ia

     AP B5

    SEAPAC 2011

    Some Issues (1)

    • Modelling interpretation

    • 3 zone, Ph-G & Ph-Ph distance relay requires

    how many PDIS?• One per zone

    • Two per zone

    13

     Aust ral ia

     AP B5

    SEAPAC 2011

    Some Issues (2)

    • How many TCTR are required per CT

     – Per CT

    • One

    • One per phase input to IED

    • One per phase plus neutral input – Per Physical device

    14

  • 8/18/2019 Seapac2011 37p Hughes

    8/10

    8

     Austral ia

     AP B5

    SEAPAC 2011

     Aust ral ia

     AP B5

    SEAPAC 2011

    HeirarchialDependancy

    • Remotely outside of the substation

     – Local at the substation HMI or operator laptop

    connected to the SAS LAN

    • Local at the bay panel through the bay controller 

    • Local in the bay through a switch on the panel

     – Direct in the field (mechanical control on the switchgearmechanism)

    15

     Aust ral ia

     AP B5

    SEAPAC 2011

    Heirarchial

    Dependancy

    • Remotely outside of the substation

     – Local at the substation HMI or operator laptop

    connected to the SAS LAN

    • Local at the bay panel through the bay controller 

    • Local in the bay through a switch on the panel – Direct in the field (mechanical control on the switchgear

    mechanism)

    16

  • 8/18/2019 Seapac2011 37p Hughes

    9/10

    9

     Austral ia

     AP B5

    SEAPAC 2011

     Aust ral ia

     AP B5

    SEAPAC 2011

    Human Interoperablity

    • Design for Test & Operation

    17

    Complete Scheme Test

    IED Test Partial Scheme test

    IED 1 IED 3IED 2Signal

    Inputs

    Operation

    Output

     Aust ral ia

     AP B5

    SEAPAC 2011

    Testing – Impact of

    LAN18

    LAN A LAN B

     

    Station

    Bus Lan

     

    LAN

    ProcessBus

    LAN

  • 8/18/2019 Seapac2011 37p Hughes

    10/10

    10

     Austral ia

     AP B5

    SEAPAC 2011

     Aust ral ia

     AP B5

    SEAPAC 2011

    Conventional Systems

    Bay 1 CBBay 1 Panel

    CBF

     A/R

    Px

    Intertrip

    BBP

    BusBar Protection Panel

    Comms Panel

     Aust ral ia

     AP B5

    SEAPAC 2011

    Thank You20