seamless acceptance update. 2 seamless approach value stream mapping (measure) –initial mailers:...

13
Seamless Acceptance Update

Upload: darcy-lynch

Post on 15-Jan-2016

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Seamless Acceptance Update. 2 Seamless Approach  Value Stream Mapping (Measure) –Initial mailers: IWCO (08/22-26), Arandell, DST(10/4), Quad, PBPS –Map

Seamless AcceptanceUpdate

Page 2: Seamless Acceptance Update. 2 Seamless Approach  Value Stream Mapping (Measure) –Initial mailers: IWCO (08/22-26), Arandell, DST(10/4), Quad, PBPS –Map

2

Seamless Approach

Value Stream Mapping (Measure)– Initial mailers: IWCO (08/22-26), Arandell, DST(10/4), Quad, PBPS

– Map current mailer and acceptance and verification process

– Integrated team from USPS HQ, USPS local, and mailers

– Results from each DMU site to be shared with MTAC 143

Develop Future State (Analyze)– Uses results from value stream mapping

– Identify activities to be automated

– Define value proposition with mailers

Proof-of-Concept (Improve) – Test future state processes and verifications in a limited environment

– Validate USPS and mailer capabilities

– Identify changes needed prior to full implementation

– Report results to MTAC 143

Develop/Implement Requirements, Pilot, Parallel, Launch

2

Page 3: Seamless Acceptance Update. 2 Seamless Approach  Value Stream Mapping (Measure) –Initial mailers: IWCO (08/22-26), Arandell, DST(10/4), Quad, PBPS –Map

3

IWCO Direct Business Profile

End-to-end provider of direct marketing solutions Financial services, insurance, travel, membership,

telecommunications, non-profit, healthcare/pharmaceutical, education,

Manufacturing and distribution locations in CA, MN, and PA List mailings & Commingled Mailings Continuous Mailing Environment – 24 hr production Predominantly (95%) standard mail letters, Some First-Class Standard Mail dropship to 300 possible induction points

(SCF/NDC) All pallets and handling units with unique barcodes

Full-Service 88%

Non-Full-Service 12%

3

Page 4: Seamless Acceptance Update. 2 Seamless Approach  Value Stream Mapping (Measure) –Initial mailers: IWCO (08/22-26), Arandell, DST(10/4), Quad, PBPS –Map

4

USPS DMU @ IWCO Direct Hamburg

DMU on site– 6 Clerks: 2 clerks X 3 tours

– Staffed 24 hr/day

5 AMS verification/day 8 Verification Results Storage Records (VRSR)/day

– MERLIN, Tap test, PVDS

Mailpiece Count Verification (MPCV) for commingled mailings

Paper intensive process

4

Page 5: Seamless Acceptance Update. 2 Seamless Approach  Value Stream Mapping (Measure) –Initial mailers: IWCO (08/22-26), Arandell, DST(10/4), Quad, PBPS –Map

5

IWCO-Direct Entry – Current State 1

5

Blue = USPS Activity

Pick = Mailer Activity

Page 6: Seamless Acceptance Update. 2 Seamless Approach  Value Stream Mapping (Measure) –Initial mailers: IWCO (08/22-26), Arandell, DST(10/4), Quad, PBPS –Map

6

IWCO-Direct Entry – Current State 2

6

Page 7: Seamless Acceptance Update. 2 Seamless Approach  Value Stream Mapping (Measure) –Initial mailers: IWCO (08/22-26), Arandell, DST(10/4), Quad, PBPS –Map

7

IWCO-Direct Entry – Current State 3

7

Page 8: Seamless Acceptance Update. 2 Seamless Approach  Value Stream Mapping (Measure) –Initial mailers: IWCO (08/22-26), Arandell, DST(10/4), Quad, PBPS –Map

8

IWCO-Direct Entry – Current State 4

8

Page 9: Seamless Acceptance Update. 2 Seamless Approach  Value Stream Mapping (Measure) –Initial mailers: IWCO (08/22-26), Arandell, DST(10/4), Quad, PBPS –Map

9

IWCO - Co-Mingle - Current State 1

Page 10: Seamless Acceptance Update. 2 Seamless Approach  Value Stream Mapping (Measure) –Initial mailers: IWCO (08/22-26), Arandell, DST(10/4), Quad, PBPS –Map

10

IWCO - Commingle - Current State 2

Page 11: Seamless Acceptance Update. 2 Seamless Approach  Value Stream Mapping (Measure) –Initial mailers: IWCO (08/22-26), Arandell, DST(10/4), Quad, PBPS –Map

11

IWCO - Commingle - Current State 3

Page 12: Seamless Acceptance Update. 2 Seamless Approach  Value Stream Mapping (Measure) –Initial mailers: IWCO (08/22-26), Arandell, DST(10/4), Quad, PBPS –Map

12

Opportunities to Streamline DMU

Opportunity Impact on Mailer Impact on USPS

AMS and VRSR for direct mail add 47 min to the release of a mailing

Mailer needs to build time into production plan for verification

Work hours for verification

Multiple handling of mailings to facilitate verification

Additional labor and equipment required due to multi-handlings

Commingle pallets held for 49hr due to verification

Mailer needs to build time into production plan for verification, storage space for mail awaiting clearance.

Work hours for verification

IWCO Direct gives DMU paper estimated postage statements

Mailer uses eDocs, wasted paper Work hours for handling/tracking paper statements

AMS verifications Additional time and handling to accomplish verification

Work hours for verification

USPS verification used as key QC step

Mailer holds mail, disassembles pallet if error found

Work hours for verification

Pallets for VRSR sit for entire day, 2-3 verified per shift

Mailer needs to build time into production plan for verification

DMU staffed for entire day

12

Page 13: Seamless Acceptance Update. 2 Seamless Approach  Value Stream Mapping (Measure) –Initial mailers: IWCO (08/22-26), Arandell, DST(10/4), Quad, PBPS –Map

13

Thank you