SDNet/2 Installation Guidelines (For Circuits provided by HKT) Page 1 A) Installation Guidelines (For Circuits provided by HKT) 1. Network Equipment The following new network equipment will be provided and installed by HKT for the SDNet/2: For dual circuits, there will be 1 fibre termination box # , 2 routers, and 1 or 2 LAN switches (depending on number of trading devices on the segment). For single circuit, there will be 1 fibre termination box # , 1 router. It is applicable for BSS testing circuit. # Notes: HKT may make use of the existing fibre termination box if available. Below are the pictures of the router, LAN switches and Fibre termination box. Note: The routers provided are desktop version (Rack-mounted type is not supported) Access Router (Single) Access Routers (Dual) HKT Provided LAN Switch Fibre Termination Box Note: HKT may make use of the existing fibre termination box if available

Upload: others

Post on 12-Aug-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SDNet/2 Installation Guidelines - HKEX...SDNet/2 Installation Guidelines (For Circuits provided by HKT) Lan Page 3 3. Space Requirements Please refer to the following table for the

SDNet/2 Installation Guidelines (For Circuits provided by HKT)

Page 1

A) Installation Guidelines (For Circuits provided by HKT)

1. Network Equipment

The following new network equipment will be provided and installed by HKT for the SDNet/2:

For dual circuits, there will be 1 fibre termination box#, 2 routers, and 1 or 2 LAN switches (depending on number of trading devices on the segment).

For single circuit, there will be 1 fibre termination box#, 1 router. It is applicable for BSS testing circuit.

# Notes: HKT may make use of the existing fibre termination box if available.

Below are the pictures of the router, LAN switches and Fibre termination box.

Note: The routers provided are desktop version (Rack-mounted type is not supported)

Access Router

(Single)

Access Routers

(Dual)

HKT Provided

LAN Switch

Fibre Termination Box

Note: HKT may make use of the existing fibre termination box if available

Page 2: SDNet/2 Installation Guidelines - HKEX...SDNet/2 Installation Guidelines (For Circuits provided by HKT) Lan Page 3 3. Space Requirements Please refer to the following table for the

SDNet/2 Installation Guidelines (For Circuits provided by HKT)

Page 2

2. Accommodation Requirements

EPs should provide sufficient accommodation to house the equipment as follows.

# Note: HKT will make use of the existing fibre termination box if spare fibre is available or otherwise install new fibre termination box.

Cisco 1921 Cisco 2960S

: New Router : New Switch

Remarks:

Cisco 1921

Fibre Termination Box

8U

Dual

Single 5U

New

Cisco 2960S

Cisco 2960S

Cisco 2960S

Router and Switches

6U

Cisco 1921

Cisco 1921

New Cabinet

Page 3: SDNet/2 Installation Guidelines - HKEX...SDNet/2 Installation Guidelines (For Circuits provided by HKT) Lan Page 3 3. Space Requirements Please refer to the following table for the

SDNet/2 Installation Guidelines (For Circuits provided by HKT)

Page 3

3. Space Requirements

Please refer to the following table for the space requirement of different network packages:

Network Packages Access Router

and LAN Switch Fibre

Termination Box

Total Rack Space

Trays

1. Single Circuit 3U (5.5”/134mm) 6U (11.5”/ 267mm) 9U 1

2. Dual Circuits 6U (11.5”/ 267mm) 6U (11.5”/ 267mm) 12U 1

If Cabinet is not available, the space requirement for the network equipment is as follows:

Lan Switch

Lan Switch

Access Router

Access Router

Fiber

Termination Box

(Wall Mounted)

PC

Equipment Type Width Depth Height

Fibre Termination Box 5.5"

(140mm) 3"

(77mm) 9.5"

(242mm)

Access Router (Cisco 1921) 13.5"

(343mm) 10.8"

(275mm) 1.9"

(49mm)

Lan Switch (Cisco 2960S) 17.5"

(445mm) 11.8"

(300 mm) 1.75"

(45mm)

Page 4: SDNet/2 Installation Guidelines - HKEX...SDNet/2 Installation Guidelines (For Circuits provided by HKT) Lan Page 3 3. Space Requirements Please refer to the following table for the

SDNet/2 Installation Guidelines (For Circuits provided by HKT)

Page 4

4. LAN Set-up Arrangement

The following diagrams show the typical LAN set-up for different network packages:

Typical LAN Set-up for Single Circuit

SDNet/2

BSS Testing Server

LAN switch will be

provided if more than

one BSS testing server

connected to the

segment.

Managed by HKT

Access router

Typical LAN Set-up for Dual Circuits

SDNet/2

OG

Single LAN switch will be

provided if standard OG

connected to the segment.

Dual LAN switches will be

provided if High

Availability OG connected

to the segment

Managed by HKT

Access router

LAN switches

5. AC Power Supplies

AC power supplies (220V) with standard 13A sockets should be provided by the EPs, before HKT pays visit for circuit installations. They should be adjacent to the new equipment to be installed, and distance from power sockets to the equipment should be less than 2 meters. Stable AC power supplies is required (UPS is recommended).

Page 5: SDNet/2 Installation Guidelines - HKEX...SDNet/2 Installation Guidelines (For Circuits provided by HKT) Lan Page 3 3. Space Requirements Please refer to the following table for the

SDNet/2 Installation Guidelines (For Circuits provided by HKT)

Page 5

For dual circuits: 4 power points are required with dual switches and 3 power points are required with single switch

For single circuit: 2 power points are required with switch and 1 power point is required for without switch.

One additional temporary power point is also required for circuit commissioning test use.

6. Important Notes and Precaution for Circuit Installation

Secure accommodation should be provided to house the new equipment. The location should be adjacent to the existing equipment to facilitate circuit cut-over (migration).

Do not bend the fibre cables and patching cords (yellow in colour).

Stable AC power supply is required (UPS is recommended).

For Dual Circuits, separate (dual) AC power feeds and fuses are recommended.

Environmental conditions: air-conditioned with ventilation is required

For fibre pre-wiring works at EP sites, HKT will make use of the cabling facilities provided by the EP as far as possible. If it is not feasible, HKT will provide basic facilities for cable fixing such as flexible conduit or protection along the route. In case relocation of the provided facilities is required in future, HKT will consider charging the EP the costs required for such alternation.

Page 6: SDNet/2 Installation Guidelines - HKEX...SDNet/2 Installation Guidelines (For Circuits provided by HKT) Lan Page 3 3. Space Requirements Please refer to the following table for the

SDNet/2 Installation Guidelines (For Circuits provided by HGC)

Page 6

B) Installation Guidelines (For Circuits provided by HGC)

1. Note: HGC Global Communications Limited (HGC) will cease to be a SDNet/2

Accredited Vendor effective from 1st May 2020. HGC will continue to provide SDNet/2

services up to 30th April 2020.

2. Network Equipment

The following new network equipment will be provided and installed by HGC for the SDNet/2:

For dual circuits, there will be 1 fibre patch panel, 2 routers and 1 or 2 LAN switches (depending on number of trading devices on the segment).

For single circuit, there will be 1 fibre patch panel, 1 router. It is applicable for BSS testing circuit.

Note: The routers provided are desktop version (rack-mounted type is not supported).

Access Router (Single)

Access Router (Dual)

HGC-provided LAN switch

Standard circuit

Fibre Patch Panel

Page 7: SDNet/2 Installation Guidelines - HKEX...SDNet/2 Installation Guidelines (For Circuits provided by HKT) Lan Page 3 3. Space Requirements Please refer to the following table for the

SDNet/2 Installation Guidelines (For Circuits provided by HGC)

Page 7

2. Accommodation Requirements

The EPs should provide sufficient accommodation to house the new equipment as follow (an example of dual circuit installation):

Standard 19” width cabinets

at participant site

SDNet/2 Routers and

Switches

1U

8U

Trays or partitions

provided by participant

LAN Switch 17.7”W x 11.8”D x 1.75”H (450mm W x 300mm D x 45mm H)

Access Router 13.5”W x 11.5” x 1.75” H (345mm W x 300 mm D x 45mm H)

Fibre Patch Panel 19” W x 19”D x 1.75”/5.25”H (450mm W x 450mm D x 45mm/134mm H)

Page 8: SDNet/2 Installation Guidelines - HKEX...SDNet/2 Installation Guidelines (For Circuits provided by HKT) Lan Page 3 3. Space Requirements Please refer to the following table for the

SDNet/2 Installation Guidelines (For Circuits provided by HGC)

Page 8

3. Space Requirements

Please refer to the following table for the space requirement of different network packages:

Network Packages Access Router and

LAN Switch Fibre Patch Panel

Total Rack

Space Trays

1. Single Circuit 5U (8.75”/ 223mm) 1U (1.75”/ 45mm)

*3U (5.25”/134mm)

6U

8U

2

2. Dual Circuits 8U (14”/ 356mm) 1U (1.75”/ 45mm)

*3U (5.25”/134mm)

9U

11U

2

* In general practice, 1U fibre patch panel will be used for fibre termination. 3U fibre patch panel will be used for exceptional case, subject to site condition

If Cabinet is not available, the space requirement for the network equipment is as follows:

Standard circuit model

Access Router 13.5”W x 11.5” x 1.75” H (345mm W x 300 mm D x 45mm H)

Space Requirement: if cabinet is

NOT available

Fibre Box (wall-mount) 23.7” W x 6”D x 15.7”H (500mm W x 150mm D x 400mm H)

LAN Switch 17.7”W x 11.8”D x 1.75”H (450mm W x 300mm D x 45mm H)

Page 9: SDNet/2 Installation Guidelines - HKEX...SDNet/2 Installation Guidelines (For Circuits provided by HKT) Lan Page 3 3. Space Requirements Please refer to the following table for the

SDNet/2 Installation Guidelines (For Circuits provided by HGC)

Page 9

4. LAN Set-up Arrangement

The following diagrams show the typical LAN set-up for different network packages:

Typical LAN Set-up for Single Circuit

SDNet/2

BSS Testing Server

LAN switch will be

provided if more than

one BSS testing server

connected to the

segment.

Managed by HGC

Access router

Typical LAN Set-up for Dual Circuits

Page 10: SDNet/2 Installation Guidelines - HKEX...SDNet/2 Installation Guidelines (For Circuits provided by HKT) Lan Page 3 3. Space Requirements Please refer to the following table for the

SDNet/2 Installation Guidelines (For Circuits provided by HGC)

Page 10

SDNet/2

OG

Single LAN switch will be

provided if standard OG

connected to the segment.

Dual LAN switches will be

provided if High

Availability OG connected

to the segment

Managed by HGC

Access router

LAN switches

5. AC Power Supplies

AC power supplies (220V) with standard 13A sockets should be provided by the EPs, before HGC pays visit for participant circuit installations. They should be adjacent to the new equipment to be installed, and distance from power sockets to the equipment should be less than 2 metres. Stable AC power supplies is required (UPS is recommended).

For dual circuits: 4 power points are required with dual switches and 3 power points are required with single switch.

For single circuit: 2 power points are required with switch and 1 power point is required for without switch.

One additional temporary power point is also required for circuit commissioning test use.

6. Important Notes and Precaution for Circuit Installation

Secure accommodation should be provided to house the new equipment. The location should be adjacent to the existing equipment to facilitate circuit cut-over (migration).

Do not bend the fibre cables and patching cords (yellow in colour).

Stable AC power supply is required (UPS is recommended).

For Dual Circuits, separate (dual) AC power feeds and fuses are recommended.

Environmental conditions: air-conditioned with ventilation

Page 11: SDNet/2 Installation Guidelines - HKEX...SDNet/2 Installation Guidelines (For Circuits provided by HKT) Lan Page 3 3. Space Requirements Please refer to the following table for the

SDNet/2 Installation Guidelines (For Circuits provided by HGC)

Page 11

For fibre pre-wiring works at EP sites, HGC will make use of the cabling facilities provided by the EP as far as possible. If it is not feasible, HGC will provide basic facilities for cable fixing or protection along the route. In case relocation of the provided facilities is required in future, HGC will charge the EP the costs required for such alternation.

Page 12: SDNet/2 Installation Guidelines - HKEX...SDNet/2 Installation Guidelines (For Circuits provided by HKT) Lan Page 3 3. Space Requirements Please refer to the following table for the

SDNet2 Installation Guidelines (For Circuits provided by WTT)

Page 12

C) Installation Guidelines (For Circuits provided by WTT)

1. Network Equipment

The following new network equipment will be provided and installed by WTT for the SDNet/2:

For dual circuits, there will be 1 fibre termination box, 2 Routers and 1 or 2 LAN switches (depending on number of trading devices on the segment).

For single circuit, there will be 1 fibre termination box, 1 router. It is applicable for BSS testing circuit.

Note: The routers provided are desktop version (rack-mounted type is not supported).

Access Router

WTT-provided LAN switch

Cabinet-mount fiber box Wall-mount fiber boxCabinet-mount fiber box Wall-mount fiber box

Page 13: SDNet/2 Installation Guidelines - HKEX...SDNet/2 Installation Guidelines (For Circuits provided by HKT) Lan Page 3 3. Space Requirements Please refer to the following table for the

SDNet2 Installation Guidelines (For Circuits provided by WTT)

Page 13

2. Accommodation Requirements

The EPs should provide sufficient accommodation to house the new equipment as follows.

Fiber Termination Panel 16.93” W x 13.78”D x 1.77”H

(430mm W x 350mm D x 45mm H)

Access Router (per unit) 11.02”W x 7.04”D x 1.73”H

(280mm W x 181mm D x 44mm H)

LAN Switch (per unit) 17.5”W x 9.52”D x 1.75”H

(445mm W x 242mm D x 45mm H)

Page 14: SDNet/2 Installation Guidelines - HKEX...SDNet/2 Installation Guidelines (For Circuits provided by HKT) Lan Page 3 3. Space Requirements Please refer to the following table for the

SDNet2 Installation Guidelines (For Circuits provided by WTT)

Page 14

3. Space Requirements

Please refer to the following table for the space requirement of different network packages:

Network

Packages

Access Router and

LAN Switch

Fibre

Termination

Box

Total Rack

Space

Trays

1. Single Circuit 4U (7”/178mm) 2U (3.5”/ 89mm) 6U 2

2. Dual Circuits 6U (10.5”/ 267mm) 2U (3.5”/ 89mm) 8U 2

If cabinet is not available, the space requirement for the network equipment is as follows:

Wall-mounted

Fiber Termination Box

(wall-mount)

access router (desktop)

Fiber Termination Box

11.02” W x 3.15”D x 11.42”H

Access Router (per unit)

11.02”W x 7.04”D x 1.73”H(280mm W x 181mm D x 44mm H)

LAN Switch (per unit)

17.5”W x 9.52”D x 1.75”H(445mm W x 242mm D x 45mm H)

LAN switch

Connection to customer devices

Fiber Termination Box

(wall-mount)

access router (desktop)

Fiber Termination Box

11.02” W x 3.15”D x 11.42”H

Access Router (per unit)

11.02”W x 7.04”D x 1.73”H(280mm W x 181mm D x 44mm H)

LAN Switch (per unit)

17.5”W x 9.52”D x 1.75”H(445mm W x 242mm D x 45mm H)

LAN switch

Connection to customer devices

Page 15: SDNet/2 Installation Guidelines - HKEX...SDNet/2 Installation Guidelines (For Circuits provided by HKT) Lan Page 3 3. Space Requirements Please refer to the following table for the

SDNet2 Installation Guidelines (For Circuits provided by WTT)

Page 15

4. LAN Set-up Arrangement

The following diagrams show the typical LAN set-up for different network packages:

Typical LAN Set-up for Single Circuit

SDNet/2

BSS Testing Server

LAN switch will be

provided if more than

one BSS testing server

connected to the

segment.

Managed by WTT

Access router

Typical LAN Set-up for Dual Circuits

SDNet/2

OG

Single LAN switch will be

provided if standard OG

connected to the segment.

Dual LAN switches will be

provided if High

Availability OG connected

to the segment

Managed by WTT

Access router

LAN switches

Page 16: SDNet/2 Installation Guidelines - HKEX...SDNet/2 Installation Guidelines (For Circuits provided by HKT) Lan Page 3 3. Space Requirements Please refer to the following table for the

SDNet2 Installation Guidelines (For Circuits provided by WTT)

Page 16

5. AC Power Supplies

AC power supplies (220V) with standard 13A sockets should be provided by the EPs, before WTT pays visit for circuit installations. They should be adjacent to the new equipment to be installed, and distance from power sockets to the equipment should be less than 2 metres. Stable AC power supplies is required (UPS is recommended).

For dual circuits: 4 power points are required with dual switches and 3 power points are required with single switch.

For single circuit: 2 power points are required with switch and 1 power point is required for without switch.

One additional temporary power point is also required for circuit commissioning test use.

6. Important Notes and Precaution for Circuit Installation

Secure accommodation should be provided to house the new equipment. The location should be adjacent to the existing equipment to facilitate circuit cut-over (migration).

Do not bend the fibre cables and patching cords (yellow in colour).

Stable AC power supply is required (UPS is recommended).

For Dual Circuits, separate (dual) AC power feeds and fuses are recommended.

Environmental conditions: air-conditioned with ventilation is required

For fibre pre-wiring works at EP sites, WTT will make use of the cabling facilities provided by the EP as far as possible. If it is not feasible, WTT will provide basic facilities for cable protection along the route. In case relocation of the provided facilities is required in future, WTT will consider charging the EP the costs required for such alternation.