![Page 1: SDMyers Carilec Transformer Maintenance and Reliability](https://reader034.vdocuments.us/reader034/viewer/2022052300/58d147541a28ab455d8b65fb/html5/thumbnails/1.jpg)
Transformer Maintenance
and Reliability
Aris Peña, CRL Senior Business Development
Manager
![Page 2: SDMyers Carilec Transformer Maintenance and Reliability](https://reader034.vdocuments.us/reader034/viewer/2022052300/58d147541a28ab455d8b65fb/html5/thumbnails/2.jpg)
• Introduction
• Maintenance, aging
and testing
• Life-extension services
• Moisture reduction
• Reliability
• Conclusions
Content Overview
![Page 3: SDMyers Carilec Transformer Maintenance and Reliability](https://reader034.vdocuments.us/reader034/viewer/2022052300/58d147541a28ab455d8b65fb/html5/thumbnails/3.jpg)
• Maintenance and reliability
are inseparable
• Influencing factors in
maintenance decisions
• Maintenance and monitoring
methods
Introduction
![Page 4: SDMyers Carilec Transformer Maintenance and Reliability](https://reader034.vdocuments.us/reader034/viewer/2022052300/58d147541a28ab455d8b65fb/html5/thumbnails/4.jpg)
Maintenance, Aging and Testing
Corrective Maintenance
Reacting to problems when they occur
Preventive Maintenance
Routine repairs and maintenance
Predictive Maintenance
Utilizes trending data for optimal performance
![Page 5: SDMyers Carilec Transformer Maintenance and Reliability](https://reader034.vdocuments.us/reader034/viewer/2022052300/58d147541a28ab455d8b65fb/html5/thumbnails/5.jpg)
Maintenance, Aging and Testing
Life of transformer = Life of paper
Oxidation attacks and
destroys paper
![Page 6: SDMyers Carilec Transformer Maintenance and Reliability](https://reader034.vdocuments.us/reader034/viewer/2022052300/58d147541a28ab455d8b65fb/html5/thumbnails/6.jpg)
Life-extension Services
Acid level in oil: Data from 5,000+ transformers
Non-serviced group: Elevated acid levels
Average acid level: 0.11 mg KOH/g
Serviced group: Oil reclamation had been performed
Average acid level: 0.03 mg KOH/g
![Page 7: SDMyers Carilec Transformer Maintenance and Reliability](https://reader034.vdocuments.us/reader034/viewer/2022052300/58d147541a28ab455d8b65fb/html5/thumbnails/7.jpg)
0.00
0.05
0.10
0.15
0.20
0.25
0.30
0.35
0.40
0.45
0.50
0 10 20 30 40 50 60 70 80 90 100
Aci
d N
o. (m
g K
OH
/g)
Age (Years)
Acid Number as a function of Age(5,839 oil-filled transformers >500 kVA)
Non-serviced (1,675)
Serviced (4,164)
![Page 8: SDMyers Carilec Transformer Maintenance and Reliability](https://reader034.vdocuments.us/reader034/viewer/2022052300/58d147541a28ab455d8b65fb/html5/thumbnails/8.jpg)
Life-extension Services
Acids attack insulating paper
Insulating paper loses tensile strength
The paper is irreversibly weakened
WHEN PAPER STRENGTH
DECREASES, THE RISK
OF FAILURE INCREASES
![Page 9: SDMyers Carilec Transformer Maintenance and Reliability](https://reader034.vdocuments.us/reader034/viewer/2022052300/58d147541a28ab455d8b65fb/html5/thumbnails/9.jpg)
750x Magnification
Acid’s Effect on Paper: 0.05% Acid
![Page 10: SDMyers Carilec Transformer Maintenance and Reliability](https://reader034.vdocuments.us/reader034/viewer/2022052300/58d147541a28ab455d8b65fb/html5/thumbnails/10.jpg)
750x Magnification
Acid’s Effect on Paper: 0.30% Acid
![Page 11: SDMyers Carilec Transformer Maintenance and Reliability](https://reader034.vdocuments.us/reader034/viewer/2022052300/58d147541a28ab455d8b65fb/html5/thumbnails/11.jpg)
Life-extension Services
Study of 1,534 oil-filled transformers
Oil services include…
• Reclamation
• Moisture Reduction
• Oxidation Inhibitor Restoration
![Page 12: SDMyers Carilec Transformer Maintenance and Reliability](https://reader034.vdocuments.us/reader034/viewer/2022052300/58d147541a28ab455d8b65fb/html5/thumbnails/12.jpg)
Life-extension Services
![Page 13: SDMyers Carilec Transformer Maintenance and Reliability](https://reader034.vdocuments.us/reader034/viewer/2022052300/58d147541a28ab455d8b65fb/html5/thumbnails/13.jpg)
Moisture Reduction Passive online drying systems
Specs: 38,000 liters
Primary: 345 kVA
Secondary: 154 kVA
Duration: 12 months on 11 months off
![Page 14: SDMyers Carilec Transformer Maintenance and Reliability](https://reader034.vdocuments.us/reader034/viewer/2022052300/58d147541a28ab455d8b65fb/html5/thumbnails/14.jpg)
Reliability Looking to the future
A contingency plan is essential
• Spare transformer
• Double-connected
substation
• Available rental
• Mobile substation
![Page 15: SDMyers Carilec Transformer Maintenance and Reliability](https://reader034.vdocuments.us/reader034/viewer/2022052300/58d147541a28ab455d8b65fb/html5/thumbnails/15.jpg)
Reliability
![Page 16: SDMyers Carilec Transformer Maintenance and Reliability](https://reader034.vdocuments.us/reader034/viewer/2022052300/58d147541a28ab455d8b65fb/html5/thumbnails/16.jpg)
Reliability
![Page 17: SDMyers Carilec Transformer Maintenance and Reliability](https://reader034.vdocuments.us/reader034/viewer/2022052300/58d147541a28ab455d8b65fb/html5/thumbnails/17.jpg)
Reliability
![Page 18: SDMyers Carilec Transformer Maintenance and Reliability](https://reader034.vdocuments.us/reader034/viewer/2022052300/58d147541a28ab455d8b65fb/html5/thumbnails/18.jpg)
Reliability
![Page 19: SDMyers Carilec Transformer Maintenance and Reliability](https://reader034.vdocuments.us/reader034/viewer/2022052300/58d147541a28ab455d8b65fb/html5/thumbnails/19.jpg)
Reliability
![Page 20: SDMyers Carilec Transformer Maintenance and Reliability](https://reader034.vdocuments.us/reader034/viewer/2022052300/58d147541a28ab455d8b65fb/html5/thumbnails/20.jpg)
DGA Monitoring
Reliability
![Page 21: SDMyers Carilec Transformer Maintenance and Reliability](https://reader034.vdocuments.us/reader034/viewer/2022052300/58d147541a28ab455d8b65fb/html5/thumbnails/21.jpg)
• Degassing
• Removal of Acid and Sludge
• Moisture Reduction
• Processing | Equipment
• Fault Gas Monitoring
• Inspection and Repair
• Regasketing
• Full Electrical Testing
Reliability Actions Transformer PM and PdM Strategies
![Page 22: SDMyers Carilec Transformer Maintenance and Reliability](https://reader034.vdocuments.us/reader034/viewer/2022052300/58d147541a28ab455d8b65fb/html5/thumbnails/22.jpg)
DGA Monitoring
• 1-gas monitor
Hydrogen present in most faults
• 8-gas monitor
Very effective solution
Higher-budget applications
• Intuitive data presentation
• Complete data management system
![Page 23: SDMyers Carilec Transformer Maintenance and Reliability](https://reader034.vdocuments.us/reader034/viewer/2022052300/58d147541a28ab455d8b65fb/html5/thumbnails/23.jpg)
Data Management Transformer Dashboard®
Mechanical and
Maintenance
Fluid
Analysis
Health
Center
Monitor
Data
ET and IR
Data
![Page 24: SDMyers Carilec Transformer Maintenance and Reliability](https://reader034.vdocuments.us/reader034/viewer/2022052300/58d147541a28ab455d8b65fb/html5/thumbnails/24.jpg)
Assessing risk is essential to securing a
reliable electrical system
Aging infrastructure demands an ambitious
maintenance strategy
Proactive steps contribute to valuable
uptime and life extension
Conclusions
![Page 25: SDMyers Carilec Transformer Maintenance and Reliability](https://reader034.vdocuments.us/reader034/viewer/2022052300/58d147541a28ab455d8b65fb/html5/thumbnails/25.jpg)
Aris Peña Business Development