sdd 13a9 concrete rumble strips at intersection · prior to installation. the engineer may modify...
TRANSCRIPT
CL
25’
18"
GROOVES @ 1’ O.C.
PLACE 4" x �"
25’
25’
DIS
TA
NC
E
A
DIS
TA
NC
E
BW3-1
(STOP AHEAD)
EDGE OF
TRAVEL LANE
SHOULDER
EDGE OF
EDGE OF TRAVEL LANE
..
.. .... ..
..
.
..
.. . . .. .
... . .
25’
25’
650’
325’
275’
225’
175’
125’
425’
450’
400’
1
1
1
800’
650’
550’
475’
425’
POSTED
SPEED
(mph)
DISTANCE TO
RUMBLE STRIP
DIST. A DIST B DIST.C
< -
TRAFFIC LANE RUMBLE STRIP
CL
CONTRACTOR SHALL CONFIRM RUMBLE STRIP LOCATION WITH THE ENGINEER
GENERAL NOTES
R1-1
(STOP)
25’
18"
LC
12"
W14-3
(NO PASSING ZONE)
55
50
45
40
35
30
24 GROOVES (TYP)
PAVEMENT MARKING AND SIGNING DETAILS AND SPECIFICATIONS ARE PROVIDED
ELSEWHERE IN THE CONTRACT.
24
GR
OO
VES (T
YP.)
500’ S
OLID
YE
LL
OW
.
.
..
..
..
. ...
4"
GROOVES @
�" MIN.
�" MAX.
12" C-C 1"+-
.
...
..
..
. ...
.
..
.
GROOVES @
12" C-C 1"+-
4"
3"
MILLED-IN
PRIOR TO INSTALLATION. THE ENGINEER MAY MODIFY THE RUMBLE STRIP
LOCATION AS FIELD CONDITIONS DICTATE.
ARROW SYMBOL ( ) SHOWS DIRECTION OF TRAVEL
1
200’
DIS
TA
NC
E
C
2
2
2
ELIMINATE THE MIDDLE SET OF RUMBLE
STRIPS.
LOCATE RUMBLE STRIP 200’ IN ADVANCE
IN PLACE, USE DISTANCE C.
TYPICAL VERTICAL VARIATION BETWEEN
PEAKS AND VALLEYS WITHIN THE CUT
APPROXIMATELY �"
3
3
�" MIN.
�" MAX.
8"
4"
10"
4"
10"
8"
.... .
. .
PLAN VIEW
ELEVATION VIEW
PLAN VIEW
RUMBLE STRIP LOCATION
1000’
DEPARTMENT OF TRANSPORTATION
STATE OF WISCONSIN
APPROVED
DATE
FHWA
66
S.D.D. 13
A
9-1
S.D.D. 13
A
9-1
AT INTERSECTION
CONCRETE RUMBLE STRIPS
EXTEND CONCRETE FROM THE TO THE EDGE OF TRAVEL WAY.
PAVEMENT
CONCRETE
....
..
.
.
.. . .
..
.
.. ...
.
..
.
..
.
.
... . .
... . .
..
9"FULL DEPTH
PAVEMENT
CONCRETE
ASPHALTIC
REPLACEMENT
PAVEMENT
INLAID CONCRETE
PAVEMENT REPLACEMENT
OR INLAID CONCRETE
CONCRETE PAVEMENT
FORMED
44
CONTRACTION JOINT
15’ MAX. SPACING FOR TRANSVERSE
CONCRETE PAVEMENT MILLED-IN OR TOOLED-IN
15’ MAX.
LANE
TRAVEL
EDGE OF
4
ENGINEER
ROADWAY STANDARDS DEVELOPMENT
TRANSVERSE CONTRACTION JOINT
OF W3-1 SIGN AS SHOWN. IF W3-1 IS NOT
LANE
TRAVELED
EDGE OF
YELLOW
SOLID
5
5
LINE AND THE EDGE OF THE RUMBLE
12" CLEAR BETWEEN THE SOLID YELLOW
8-17-2011 /S/ Jerry H. Zogg
SDD 13a9 Concrete Rumble Strips at Intersection
Version 1 Standard Detail Drawing 13A9 August 16, 2011
Concrete Rumble Strips at Intersection
References:
NONE
Bid items associated with this drawing:
ITEM NUMBER DESCRIPTION UNIT
416.1180 Concrete Intersection Rumble Strips .................................................................. SY
Standardized Special Provisions associated with this drawing:
STSP NUMBER TITLE
NONE
Other SDDs associated with this drawing:
NONE
Design Notes:
This SDD should typically be used where there is a 4-way stop condition or even a 2-way stop condition where there is some fear that the motorist may not see or expect a stop condition ahead.
The designer should be particularly aware of residences in the immediate area of the rumble strips. The sound generated from rumble strips may carry for a long distance, particularly at night when the ambient noise is quieter than in the daytime.
The designer should also be aware of sight obstruction from trees or other signs that may be too close to the proposed W3-1 (STOP AHEAD) sign.
This detail is not intended to address the pavement marking required at the approach to the intersection, the stop bar or other signs such as the No Passing Zone pennant. The designer must address pavement marking and signing details and specifications elsewhere in the contract as the general notes stipulate.
Contact Person:
Mark Zander (608) 267-7327