SCS – A world of possibilities
SCS SYSTEM
The Evolution of Building Technology
•Unique pre-engineered custom-made lost-in-place formwork system consisting of Modular Wall Formwork Panels.
•Components of SCS System
Fiber Cement Board
Light Gauge Galvanized Steel Studs
Reinforced Concrete
Expanded Polystyrene
FORM-A-WALL is a permanent form work comprising of galvanized steel stud framing and fiber cement board, that serves as a finish wall surface. When filled with concrete forms a monolithic structural bearing wall and shear wall.
112162112162
ThicknessThickness Height (mm)Height (mm)
Width (mm)Width (mm)
2440,2745,2850,40502440,2745,2850,4050
min 153 to 1220 maxmin 153 to 1220 max
Standard SizesStandard Sizes
Typical Section Custom made sizes can be arrangement to suit any design requirements.
Components
BEAM FORMS
COLUMN FORMS
FORM-A-WALL
BEAM AND COLUMN FORMS
- Whenever required, beams and columns forms can be Pre-manufactured to any size to suit design
requirements.
Components
THERMA-WALL - 6” Thk wall with insulation on External side. Used for extreme temperatures regions.
INSULATION
INTERNAL SIDE
FIBER CEMENT BOARD
EXTERNAL SIDE
Components
- Form-a-wall Panel is then slide into starter bars and rest vertically on the bottom track after which, check for plumpness and provide diagonal bracing to hold the panel temporarily.- Screw panel on the bottom tracks.
Metal bracing
Installation:
- Completed ground floor wall panels with optional metal door and window jambs.
- Upon completion of panel installation, electrical and sanitary rough-ins that goes into the wall should be in placed before pouring concrete.
- Additional horizontal reinforcements are placed inside the panel at an interval of 340mm on centers. (As per code requirements)
- Pouring of concrete are done in intervals of 300mm per layer with Slump ratio equivalent to 7.
Installation:
PVC CONDUIT
-No Chipping required for conduit and utility boxes inside the walls.-Conduits are slide into the panel before pouring concrete. Cut appropriate opening for utility box.
- Placing of electrical conduit into the wall.
Integration with other services:Electrical Conduits
Same procedure with electrical conduits, pipes are slid into the panels and cut appropriate holes for connection to bathroom fixture.
PVC PIPE
FAUCET
Integration with other services:Plumbing Lines
ROOF TRUSS TO WALL DETAIL
- Roof truss are anchored on the wall by welding anchor bar into the embedded angle bar on top of the panel.
1”ANGLE BARS
METAL TRUSS
WALLPANEL
XX XXX
J-BARS
Installation:
- Recessed panel edges assures seamless finish.
- Apply initial coat of jointing compound on the recessed edge, then attach the mess tape and set dry before putting a final coat .- Level excess jointing compound using fine grain sandpaper.
Mesh Tape
Joint Compound
Form-a-wall Panel
Installation:Panel Jointing
Drawing Details:Typical Corner Connection Detail
Drawing Details:Typical T-Joint Connection Detail
Drawing Details:Typical Wall Panel To Slab Connection Detail
12mm THK GYPSUM BOARDCEILING ON GALVANIZEDMETAL FURRING.
- Metal ceiling joist at ground level.
Integration with other services:False Ceiling
USP
Our USPs…•PROVEN SYSTEM : Tried and tested, established in several countries
•SPEED : Walls erected in at least 1/3 rd less the time compared to conventional construction
• QUALITY: Plumb, line and level, proper edges, no cracks or defects
• DURABILITY: Earthquake resistant
• NO BRICKWORK : No worry about brickwork quality, soaking in water, mortar, shortage of good masons
• NO PLASTERING : No messy mixing at site, workmanship issues, curing, repairing cracks
•TECHNICAL SUPPORT : Full back-up engineering and structural design support
Advantages & Benefits:
1. Speedier “Design Execution” phase in project execution
2. Elimination of tedious, time-consuming manpower intensive processes
3. High quality James Hardie fibre cement boards guarantee long life of the structure
A. Faster return on capital invested
B. Lower dependency on unorganized labor & increased reliability on completion schedules
C. Reduced maintenance / repairs
Advantages & Benefits:
4. Inlaid plumbing & electrical lines, superior quality finish surface eliminates plastering
5. Bill of quantities defined before start of work
6. Thinner walls but as strong as those made from conventional methods
D. Faster availability of super structure for finishing & other value addition works
E. Better predictability of costs & hence better control
F. Increased floor area
Target market segments – advantages for specific applications
•Low rise buildings
Apartments
Villas
Hotels
Commercial Buildings
Malls etc.
•Can be used for high rise building also with a slight modification in the wall design.
APPLICATIONS
ProjectPhotographs
Wood grained elevation features
Completed buildings – High end Resort houses
Completed building – Luxury Houses and Villas
Completed buildings – Villa Complexes
Completed buildings – Farm Houses
Completed buildings – Resort Housing
Wood grained elevation features
SCS – From Villas to Commercial Buildings, Apartments and High Rises
Sterling Low Cost Affordable housing in the Philippines
Sterling in the Middle East - Qatar
Over 350 high quality luxury duplex villas built
SCS MODULAR Systems – Cost Effective, Relocatable, Flat-Pack System
Steel Decking SlabSteel Decking Slab
PRECAST SLABS
Elevation features incorporated during panel manufacturing
SCS IN INDIA
• Current Projects
TUSCANY TERRACES
TT- Mockup TT- Mock upTT- Mock up
Current projects
TUSCANY TERRACES
TUSCANY TERRACES
TUSCANY TERRACES
WARAI WOODS CHALET
WARAI WOODS CHALET
WARAI WOODS CHALET
TANAJI MALUSARE CITY
TANAJI MALUSARE CITY
PRESENT STATUS OF CLUSTER 1
Manufacturing Facility
Manufacturing facility
Manufacturing Facility