scrum mythbusters': ilan goldstein @ colombo agile conference 2014
TRANSCRIPT
![Page 2: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/2.jpg)
Popularity of Agile Development
7th Annual State of Agile Development Survey 2013 by Version One (Sample size = 4048 respondents)
Organisations practicing Agile
84% 16%
More than 84% of respondents said their organisations were practicing Agile development, up from 80% in 2011 (sample size = 4048).
YES NO
3400 respondents
648 respondents
![Page 3: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/3.jpg)
Scrum
![Page 4: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/4.jpg)
Recognition
Implementation ?
![Page 5: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/5.jpg)
Myth 1
![Page 6: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/6.jpg)
S c r u m is an acronym
![Page 7: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/7.jpg)
S C R U M Speaker Claims to Really Understand Myths
![Page 8: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/8.jpg)
![Page 9: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/9.jpg)
Tight, self-organising, collaborative teamwork
![Page 10: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/10.jpg)
![Page 11: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/11.jpg)
Ancient Spartan shield-locking phalanx
![Page 12: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/12.jpg)
is an acronym
S C R U M
![Page 13: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/13.jpg)
Myth 2
![Page 14: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/14.jpg)
Sprints
S P E E D =
![Page 15: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/15.jpg)
![Page 16: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/16.jpg)
![Page 17: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/17.jpg)
![Page 18: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/18.jpg)
84%?
![Page 19: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/19.jpg)
Agile processes promote
The team should be able to maintain a
sustainable development.
constant pace indefinitely
Agile Manifesto 8th principle
![Page 20: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/20.jpg)
Focus Vs No end...
![Page 21: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/21.jpg)
Feature
![Page 22: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/22.jpg)
Sprints
S P E E D =
![Page 23: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/23.jpg)
Myth 3
![Page 24: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/24.jpg)
only for software
development
Scrum is an approach
![Page 25: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/25.jpg)
Software???
Engineering???
![Page 26: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/26.jpg)
§ Schools § Homes § Research § Training materials
SAAB Gripen Fighter Jet
WikiSpeed Car
![Page 27: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/27.jpg)
![Page 28: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/28.jpg)
only for software
development
Scrum is an approach
![Page 29: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/29.jpg)
Myth 4
![Page 30: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/30.jpg)
![Page 31: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/31.jpg)
As a something user, I want to perform a certain function to achieve some benefit.
![Page 32: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/32.jpg)
Individuals and interactions over processes and tools
Working software over comprehensive documentation
Customer collaboration over contract negotiation
Responding to change over following a plan
That is, while there is value in the items on the right, we value the items on the
LEFT MORE. Thanks to: Agile Alliance
![Page 33: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/33.jpg)
We don’t document, we’re agile!
![Page 34: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/34.jpg)
Individuals and interactions over processes and tools
Working software over comprehensive documentation
Customer collaboration over contract negotiation
Responding to change over following a plan
That is, while there is value in the items on the right, we value the items on the
LEFT MORE. Thanks to: Agile Alliance
![Page 35: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/35.jpg)
![Page 36: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/36.jpg)
![Page 37: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/37.jpg)
Not just 1 0 0 0 1 0 1 0 1 0 1 0 0 1 1 0 1 0 1 0 1 1 1 1 1 0 1 0 1 1 0 0 1 0 0 1 1 0 1 0 1 0 1 1 1 1 0 0 1 1 1 0 0 0 1
Code
Testing
Documentation
Audit
Support
User
![Page 38: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/38.jpg)
Memory Control upfront
![Page 39: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/39.jpg)
of detail at the Right level
right time
![Page 40: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/40.jpg)
anti- documentation
Scrum is
![Page 41: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/41.jpg)
Myth 5
![Page 42: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/42.jpg)
User Story
Scrum teams must use the
format
![Page 43: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/43.jpg)
As a something user, I want to perform a certain function to achieve some benefit.
![Page 44: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/44.jpg)
Product Backlog Items
User Stories
Bugs
Technical Work
Knowledge Acquisition
The product backlog can be cosmopolitan
![Page 45: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/45.jpg)
User Story
Scrum teams must use the
format
![Page 46: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/46.jpg)
Myth 6
![Page 47: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/47.jpg)
Planning Poker
Sprint Task Board Sprint Burndown Chart
![Page 48: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/48.jpg)
Planning Poker
100 40 20 13 8
5 3 2 1 1 2
∞
![Page 49: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/49.jpg)
Estimation is optional
![Page 50: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/50.jpg)
Not Started
In Progress
Ready to Verify Done!!!
As a…… I want to…… So that……
As a…… I want to…… So that……
As a…… I want to…… So that……
![Page 51: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/51.jpg)
Total hours of w
ork left to do on
expected days
300
270
240
210
180
150
120
90
60
30
0 1 2 3 4 5 6 7 8 9 10
Days
? Sprint Burndown
![Page 52: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/52.jpg)
![Page 53: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/53.jpg)
Total hours of w
ork left to do on
expected days
300
270
240
210
180
150
120
90
60
30
0 1 2 3 4 5 6 7 8 9 10
Days
Team tallies up duration of collective sprint tasks
![Page 54: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/54.jpg)
Total hours of w
ork left to do on
expected days
300
270
240
210
180
150
120
90
60
30
0 1 2 3 4 5 6 7 8 9 10
Days
Daily tally
![Page 55: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/55.jpg)
Total hours of w
ork left to do on
expected days
300
270
240
210
180
150
120
90
60
30
0 1 2 3 4 5 6 7 8 9 10
Days
![Page 56: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/56.jpg)
Total hours of w
ork left to do on
expected days
300
270
240
210
180
150
120
90
60
30
0 1 2 3 4 5 6 7 8 9 10
Days
![Page 57: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/57.jpg)
YOU GUYS SUCK! You’re already
behind and you’ve barely started!
![Page 58: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/58.jpg)
Total hours of w
ork left to do on
expected days
300
270
240
210
180
150
120
90
60
30
0 1 2 3 4 5 6 7 8 9 10
Days
![Page 59: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/59.jpg)
It’s not all bad….
Swarming
![Page 60: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/60.jpg)
USE WITH CARE
![Page 61: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/61.jpg)
are fundamental to Scrum
Planning Poker
Sprint Task Board Sprint Burndown
![Page 62: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/62.jpg)
Myth 7
![Page 63: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/63.jpg)
two weeks
Pre-work must fit into
![Page 64: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/64.jpg)
Work before first delivery Sprint
![Page 65: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/65.jpg)
Official
Mandated
Sprint Zero
![Page 66: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/66.jpg)
Initial Product Backlog
Formulation
SM D PO
Vision Creation
Team Formation Sourcing Environments
![Page 67: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/67.jpg)
Sprint 0
= 2 weeks???
![Page 68: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/68.jpg)
FOR PURPOSE
F T I
![Page 69: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/69.jpg)
two weeks
Pre-work must fit into
![Page 70: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/70.jpg)
Myth 8
![Page 71: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/71.jpg)
end
You must ship
or can only ship
at the
of every Sprint
![Page 72: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/72.jpg)
Potentially shippable
increment product
Potentially
![Page 73: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/73.jpg)
T E S
D
V A L I D T
D E M O N S T R E B L A T E D
![Page 74: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/74.jpg)
Release after multiple sprints
Release every sprint
Release every feature
![Page 75: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/75.jpg)
Scrum is no longer agile
enough!
![Page 76: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/76.jpg)
At LEAST have
something potentially shippable
![Page 77: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/77.jpg)
end
You must ship
or can only ship
at the
of every Sprint
![Page 78: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/78.jpg)
Myth 9
![Page 79: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/79.jpg)
Product Owner
Sprint Review is the event
to engage the
![Page 80: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/80.jpg)
![Page 81: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/81.jpg)
Scrum Team
D D D
D PO SM
SH SH SH
Broader stakeholder community
![Page 82: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/82.jpg)
PO D
Walkthrough
![Page 83: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/83.jpg)
G PASenerally G
ccepted A crum S
ractice P
![Page 84: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/84.jpg)
Product Owner
Sprint Review is the event
to engage the
![Page 85: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/85.jpg)
Myth 10
![Page 86: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/86.jpg)
failure Sprint is a
when the team does not complete
everything in the Sprint Backlog
![Page 87: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/87.jpg)
Sprint Backlog
Sprint Commitment =
![Page 88: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/88.jpg)
Team commits to do their best
“ ”
![Page 89: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/89.jpg)
SPRINT COMMITMENT
![Page 90: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/90.jpg)
PLAN GUARANTEE ≠
PERFECT KNOWLEDGE
WHEN DONE =
![Page 91: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/91.jpg)
Commitment
Forecast
![Page 92: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/92.jpg)
Sprint
Is my Sprint a success or failure?
Success Failure
![Page 93: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/93.jpg)
100% 0%
Team 1
0% 100%
Team 2
![Page 94: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/94.jpg)
BONU
Constant accuracy is a false economy
![Page 95: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/95.jpg)
Day Tester Programmer 1 Programmer 2
1
2
3
4
5
6
7
8
9
10
Test Design
Test Design
Test Design
Programming
Programming
Programming
Programming
Programming
Programming
Test Automation
Test Design
Test Automation Programming
Programming
Programming
Test Automation
Programming
Programming
Rework
Programming
Programming
Test Automation
Programming
Backlog Refinement
Exploratory Testing
Confirm Adjustments
Backlog Refinement
Walkthrough
Sprint Planning
Review and Retrospective Rework Rework
Walkthrough
Walkthrough
Exploratory Testing
![Page 96: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/96.jpg)
Fear of over-extending
![Page 97: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/97.jpg)
NEAR HORIZON PLANNING
![Page 98: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/98.jpg)
Swarm to deliver product increments
Swarming
![Page 99: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/99.jpg)
LESS
MORE
![Page 100: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/100.jpg)
100% ACCURATE FORECAST
CULTURE OF
FEAR =
![Page 101: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/101.jpg)
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
0% 100%
PLANNED
PLANNED
PLANNED
PLANNED
0% 100%
Sometimes over
EXTRA
Sometimes under
PLANNED
![Page 102: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/102.jpg)
CONTINUOUS IMPROVEMENT
![Page 103: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/103.jpg)
failure Sprint is a
when the team does not complete
everything in the Sprint Backlog
![Page 104: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/104.jpg)
Myth 11
![Page 105: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/105.jpg)
end-to-end
Requirement must
in the one Sprint
be completed
![Page 106: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/106.jpg)
D D
D
D D
![Page 107: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/107.jpg)
FUNCTIONAL DESIGN
TECHNICAL DESIGN
TEST DESIGN
DEVELOPMENT
TESTING
PB
I A
SP
RIN
T 3
![Page 108: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/108.jpg)
![Page 109: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/109.jpg)
Sprint...
![Page 110: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/110.jpg)
often unpredictability =Functional
design
requires socialization
![Page 111: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/111.jpg)
Delays
Waste
Confusion
![Page 112: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/112.jpg)
![Page 113: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/113.jpg)
end-to-end
Requirement must
in the one Sprint
be completed
![Page 114: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/114.jpg)
Myth 12
![Page 115: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/115.jpg)
cross- functional
All Scrum team
members must be
![Page 116: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/116.jpg)
Design Team
Front-end Development
Team
Testing Team
Back-end Development
Team
![Page 117: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/117.jpg)
![Page 118: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/118.jpg)
TESTING
TECHNICAL WRITING
US
ER
EX
PE
RIE
NC
E
![Page 119: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/119.jpg)
Can a UX designer
potentially conduct
some testing?
![Page 120: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/120.jpg)
Teamwork
![Page 121: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/121.jpg)
D
My bit is done, it’s your
problem now
D
![Page 122: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/122.jpg)
cross- functional
All Scrum team
members must be
![Page 123: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/123.jpg)
Final Myth...
![Page 124: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/124.jpg)
D D
D
D D
![Page 125: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/125.jpg)
SCRUMBUT
Scrum but We try to do we have to
conduct a testing Sprint from time to time
“ ”
![Page 126: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/126.jpg)
Rome wasn’t built in a day!
![Page 127: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/127.jpg)
SCRUMBUT
SCRUM IN PROGRESS
![Page 128: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/128.jpg)
HYPOCRITICAL
![Page 129: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/129.jpg)
Incrementally
iteratively improve
products
process of Scrum
&
not just our
but also the
![Page 130: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/130.jpg)
It’s not about loops and lists...
![Page 131: Scrum Mythbusters': Ilan Goldstein @ Colombo Agile Conference 2014](https://reader036.vdocuments.us/reader036/viewer/2022062905/53f4f5cd8d7f7297528b7517/html5/thumbnails/131.jpg)
Close feedback loops as soon as possible
Continuously improve both product & process