screening report questionnaire - mid-states corridor€¦ · screening report questionnaire name:...
TRANSCRIPT
Screening Report Questionnaire
Name:
E-mail:
Which one of the following best describes your interest in the Mid-States Corridor Project?(Check all that apply)
I live in the project study area. I live elsewhere, but I travel in the area frequently.
I travel in the area infrequently, but I’m interested in the project.
Check to receive project updates
I work in the area.
Of the five routes moving forward for detailed study (B, C, M, O, P), please rank the routes in the order of your preference (1-5), with 1 being your top preference.
B
C
M
O
P
§̈¦69
Bloomington
Linton
Routes M/O/PRoutes B/C
Route B
Route C
Routes M/P(e)
Route O
Route P(w)
Route P(e)
Route MRoute P
Routes M/O
Routes B/C/M/O/P
¬«67
¬«58
£¤231¬«57
Sullivan
Bedford
Mitchell
French Lick Paoli
Petersburg
WashingtonLoogootee
Crane
Bloomfield
Jasper
Huntingburg
Dale
Santa Claus
ShoalsOrleans
Winslow
Boonville
NewburghTell City
£¤231
¬«54
¬«43
¬«54
¬«45
£¤50
¬«58
¬«446
¬«57
£¤50
¬«60
¬«60
£¤41
£¤50
£¤150
£¤150
¬«37
¬«37
¬«37¬«145
¬«356
¬«64
¬«64
¬«61
§̈¦64 §̈¦64
£¤231
¬«162
¬«161
¬«66
¬«66¬«37
¬«57
¬«66
§̈¦69
§̈¦69
2/12/2020
Mid-States Corridor Routes
§̈¦69
§̈¦69
§̈¦64 §̈¦64
§̈¦70 §̈¦69
Bloomington
Indianapolis
£¤231£¤41
£¤50
£¤50£¤50£¤150
´0 126 Miles
Legend
* Expressway^ Freeway+ Super 2
2000-ft Corridor within a 2-mile Study Band
1000-ft CorridorB/C/M/O/P
B *C * ^M * ^ +
P * ^ +O *
Zip Code:
Please read the descriptions of the following facility types and answer the following questions:• Freeway: A freeway includes at least two lanes in each direction of travel with access provided only at interchanges.
• Expressway: An expressway includes at least two lanes in each direction of travel with access provided by a combination of interchanges and at-grade intersections with state and local roads.
• Super-2: A Super-2 includes one travel lane in each direction, in addition to a passing/auxiliary lane and/or wider shoulders where appropriate.
Do you believe a freeway would meet the needs in the area?Yes No
Do you know of any natural or man-made features the Project Team should be aware of as it considersthe alternatives moving forward for detailed study?
What other comments would you like to share with the Project Team?
Do you believe an expressway would meet the needs in the area? Yes No
Do you believe a Super-2 would meet the needs in the area? Yes No
The core goals of the project include increased accessibility to major business markets, more efficient truck/freight travel to southern Indiana, reduced crashes in southern Indiana and increased access to major rail and air intermodal centers.
Deposit the completed form in the comment box or mail to: Mid-States Corridor Project Office Vincennes University Jasper Campus • Administration Building, Room 216 • 850 College Ave. • Jasper, IN 47546
Responses due Monday, March 23, 2020.