scott e. potter current resume

19
Scott E. Potter Environmental Specialist 865-300-5844 CELL [email protected] SUMMARY OF QUALIFICATIONS Over 20 years experience as a Safety Technician, Industrial Hygiene Technician, Radiological Control Technician, Laboratory Technician, and Waste Management Technician. EDUCATION Roane State Community College, Harriman Tennessee A.A.S. Environmental Sciences / Industrial Hygiene and Waste Management Options, 1999 A.A.S. Environmental Sciences / Health Physics Option, 1991 A.A.S. Police Science, 1987 PROFESSIONAL EXPERIENCE BHI Energy, Weymouth, MA. Radiation Protection/Control Technician Provided support for Nuclear Power Plant operations during periods of outage to include: refueling, MSR replacement, Valve breach and repair job coverage, and inspections. Supported DOE in Decontamination and Decommissioning of Plutonium Facility. Performed the following actions: Sequoyah Nuclear Plant, Soddy Daisy, TN (November 21, 2016 – December 15, 2016) Provided support in the Aux Building of a Pressurized Water Reactor Maintained control of Access Point to the controlled areas of the plant. Provided pre job surveys of valves and component and provided job coverage for the breach of contaminated systems including air sampling. Performed routine contamination and radiation surveys and checked posting and radiation boundaries as required. Respond to Personnel Contamination Events and properly determine the contamination levels and perform proper De-con when necessary Performed release surveys for material and equipment for the release to the public or for unrestricted use

Upload: scott-potter

Post on 12-Feb-2017

12 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Scott E. Potter Current Resume

Scott E. PotterEnvironmental Specialist

865-300-5844 [email protected]

SUMMARY OF QUALIFICATIONSOver 20 years experience as a Safety Technician, Industrial Hygiene Technician, Radiological Control Technician, Laboratory Technician, and Waste Management Technician.

EDUCATIONRoane State Community College, Harriman TennesseeA.A.S. Environmental Sciences / Industrial Hygiene and Waste Management Options, 1999A.A.S. Environmental Sciences / Health Physics Option, 1991A.A.S. Police Science, 1987

PROFESSIONAL EXPERIENCEBHI Energy, Weymouth, MA. Radiation Protection/Control Technician Provided support for Nuclear Power Plant operations during periods of outage to include: refueling, MSR replacement, Valve breach and repair job coverage, and inspections. Supported DOE in Decontamination and Decommissioning of Plutonium Facility. Performed the following actions:Sequoyah Nuclear Plant, Soddy Daisy, TN (November 21, 2016 – December 15, 2016) Provided support in the Aux Building of a Pressurized Water Reactor

Maintained control of Access Point to the controlled areas of the plant. Provided pre job surveys of valves and component and provided job coverage for the breach of

contaminated systems including air sampling. Performed routine contamination and radiation surveys and checked posting and radiation

boundaries as required. Respond to Personnel Contamination Events and properly determine the contamination levels

and perform proper De-con when necessary Performed release surveys for material and equipment for the release to the public or for

unrestricted use Performed Lock High Radiation Area and High Radiation Area entries

Browns Ferry Nuclear Plant, Athens, AL (September 29, 2016 – October 21, 2016) Provided support in the Radiation Protection Group for Turbine Building of a Boiling Water Reactor

Performed radiation and contamination surveys in the Turbine Building. Documented computer data base surveys and paperwork as needed for procedure compliance Performed High Radiation and Locked High Radiation entries and job coverage.

Browns Ferry Nuclear Plant, Athens, AL (February 16, 2016 – March 25, 2016) Provided support in the Radiation Protection Group for Turbine Building of a Boiling Water Reactor

Performed radiation and contamination surveys in the Turbine Building. Documented computer data base surveys and paperwork as needed for procedure compliance Performed High Radiation and Locked High Radiation entries and job coverage.

Sequoyah Nuclear Plant, Soddy Daisy, TN (April 6, 2015 – May 11, 2015) Provided support in the Aux Building of a Pressurized Water Reactor

Maintained control of Access Point to the controlled areas of the plant.

Page 2: Scott E. Potter Current Resume

2

Provided pre job surveys of valves and component and provided job coverage for the breach of contaminated systems including air sampling.

Performed routine contamination and radiation surveys and checked posting and radiation boundaries as required.

Respond to Personnel Contamination Events and properly determine the contamination levels and perform proper De-con when necessary

Performed release surveys for material and equipment for the release to the public or for unrestricted use

Performed Lock High Radiation Area and High Radiation Area entriesBrowns Ferry Nuclear Plant, Athens, AL (February 17, 2015 – April 3, 2015) Provided support in the Radiation Protection Group for Turbine Building of a Boiling Water Reactor

Performed RWP pre-job briefs and job coverage. Performed radiation and contamination surveys in the Turbine Building. Documented computer data base surveys and paperwork as needed for procedure compliance Performed High Radiation and Locked High Radiation entries and job coverage. Provided air sampling for routines and job coverage.

Browns Ferry Nuclear Plant, Athens, AL (September 22 – October 26, 2014) Provided support in the Radiation Protection Group for Turbine Building of a Boiling Water Reactor

Performed RWP pre-job briefs and job coverage. Performed radiation and contamination surveys in the Turbine Building. Documented computer data base surveys and paperwork as needed for procedure compliance Performed High Radiation and Locked High Radiation entries and job coverage. Provided air sampling for routines and job coverage.

Point Beach Nuclear Power Plant, Two Rivers, WI. (March 31, 2014 – April 12, 2014) Provided support in Radiation Protection of a Pressurized Water Reactor to support the end of a refuel outage

Supported activities on the refuel floor Performed routine contamination and radiation surveys and checked posting and radiation

boundaries as required. Performed Lock High Radiation Area and High Radiation Area entries and job coverage

St. Lucie Nuclear Power Plant, Ft. Pierce, FL. (February 23, 2014 – March 29, 2014) Provided support in Radiation Protection of a Pressurized Water Reactor

Maintained control of Access Point to the controlled areas of the plant. Provided pre job surveys of valves and component and provided job coverage for the breach of

contaminated systems including air sampling. Performed routine contamination and radiation surveys and checked posting and radiation

boundaries as required. Respond to Personnel Contamination Events and properly determine the contamination levels

and perform proper De-con when necessary Performed release surveys for material and equipment for the release to the public or for

unrestricted use Performed Lock High Radiation Area and High Radiation Area entries

Watts Bar Nuclear Plant, Spring City, TN. (June 2011 – January 2014) Provided support in the Radiation Protection Instrumentation Group of a Pressurized Water Reactor

Performed source checks on survey meters, laboratory counters, personnel contamination monitors, and portal monitors.

Page 3: Scott E. Potter Current Resume

3

Performed respirator and PAPR monthly inspections and maintenance. Performed minor repairs and maintenance on survey instruments. Maintained electronic dosimeters by performing minor repairs and source checks, configured ED’s

for various uses, and set up and maintained transmitters and systems. Maintained computer data base and paperwork as needed for procedure compliance Support Radiation Control Department as needed in release survey activities, job coverage, and

material and personnel release.Sequoyah Nuclear Plant, Soddy Daisy, TN (May - June 2011) Provided support in the Aux Building of a Pressurized Water Reactor

Maintained control of Access Point to the controlled areas of the plant. Provided pre job surveys of valves and component and provided job coverage for the breach of

contaminated systems including air sampling. Performed routine contamination and radiation surveys and checked posting and radiation

boundaries as required. Respond to Personnel Contamination Events and properly determine the contamination levels

and perform proper De-con when necessary Performed release surveys for material and equipment for the release to the public or for

unrestricted use Performed Lock High Radiation Area and High Radiation Area entries Performed job coverage and surveys for entering containment under power

Watts Bar Nuclear Plant, Spring City, TN. (March-May 2011 ) Provided support in the Radiation Protection Instrumentation Group of a Pressurized Water Reactor

Performed source checks on survey meters, laboratory counters, personnel contamination monitors, and portal monitors.

Performed respirator and PAPR monthly inspections and maintenance. Performed minor repairs and maintenance on survey instruments. Maintained electronic dosimeters by performing minor repairs and source checks, configured ED’s

for various uses, and set up and maintained transmitters and systems. Maintained computer data base and paperwork as needed for procedure compliance Support Radiation Control Department as needed in release survey activities, job coverage, and

material and personnel release.Browns Ferry Nuclear Plant, Athens, AL (February – March 2011) Provided support in the Radiation Protection Group for Lower Pressure Turbine Upgrade of a Boiling Water Reactor

Performed release surveys for vender equipment used in the Low Pressure Turbine Project. Performed RWP pre-job briefs and job coverage. Performed radiation and contamination surveys on the Low Pressure Turbine and surrounding

areas on the Turbine Deck. Documented computer data base surveys and paperwork as needed for procedure compliance Support Radiation Control Department in the drywell providing job coverage. Performed High Radiation and Locked High Radiation entries and job coverage. Provided air sampling for routines and job coverage.

Fermi 2 Nuclear Power Plant, Monroe, MI. (October 2010 – February 2011) Provided support in the Reactor Building of a Boiling Water Reactor

Supported drywell control point accessing work orders and assigning radiological controls for the jobs.

Page 4: Scott E. Potter Current Resume

4

Provided support for CRD pulls and transport to shop for rebuilds. Performed radiation surveys of areas to determine proper posting and down-posting

requirements of area. Monitored use of personnel protective equipment for worker safety and the control of the spread

of contamination Performed job coverage of system breaches to include pre-job, job coverage, air sampling, and

post job surveys Respond to Personnel Contamination Events and properly determine the contamination levels

and perform proper De-con when necessary Perform Lock High Radiation Area entries and High Radiation Material Transfer Provided job coverage support for Structural Steal Upgrades for the Refuel Floor Crane Project. Supported clean up and decontamination work in the Rad. Waste Building after large Resin spill

in the Rad. Waste Building. Provided job coverage and Health Physics support in the Drywell during forced outage.

Fermi 2 Nuclear Power Plant, Monroe, MI. (March – April 2009) Provided support in the Reactor Building of a Boiling Water Reactor

Supported drywell control point accessing work orders and assigning radiological controls for the jobs.

Provided support for CRD pulls and transport to shop for rebuilds. Performed radiation surveys of areas to determine proper posting and down-posting

requirements of area. Monitored use of personnel protective equipment for worker safety and the control of the spread

of contamination Performed job coverage of system breaches to include pre-job, job coverage, air sampling, and

post job surveys Respond to Personnel Contamination Events and properly determine the contamination levels

and perform proper De-con when necessary Perform Lock High Radiation Area entries and High Radiation Material Transfer

Watts Bar Nuclear Plant, Spring City, TN. (June 2008- March 2009) Provided support in the Radiation Protection Instrumentation Group of a Pressurized Water Reactor in support of release survey of uncompleted reactor unit for construction activities

Performed source checks on survey meters, laboratory counters, personnel contamination monitors, and portal monitors.

Performed respirator and PAPR monthly inspections and maintenance. Performed minor repairs and maintenance on survey instruments. Maintained electronic dosimeters by performing minor repairs and source checks, configured ED’s

for various uses, and set up and maintained transmitters and systems. Maintained computer data base and paperwork as needed for procedure compliance Support Radiation Control Department as needed in release survey activities, job coverage, and

material and personnel release.Browns Ferry Nuclear Plant, Athens, AL (March – May 2008) Provided support in the Radiation Protection Group for Generator Rewind Project and Drywell work of a Boiling Water Reactor

Performed release surveys for the whole generator and all the area around the generator. Provided support for work on the generator rewind project to include releasing items for use in

the area and personnel monitoring.

Page 5: Scott E. Potter Current Resume

5

Performed RWP pre-job briefs and job coverage. Performed radiation and contamination surveys on the generator project and in the drywell. Documented computer data base surveys and paperwork as needed for procedure compliance Support Radiation Control Department in the drywell providing job coverage and material and

personnel release. Performed High Radiation and Locked High Radiation entries and job coverage. Provided air sampling for routines and job coverage.

Watts Bar Nuclear Plant, Spring City, TN. (January – March 2008) Provided support in the Radiation Protection Instrumentation Group of a Pressurized Water Reactor

Performed source checks on survey meters, laboratory counters, personnel contamination monitors, and portal monitors.

Performed respirator and PAPR monthly inspections and maintenance. Performed minor repairs and maintenance on survey instruments. Maintained electronic dosimeters by performing minor repairs and source checks, configured ED’s

for various uses, and set up and maintained transmitters and systems. Maintained computer data base and paperwork as needed for procedure compliance Support Radiation Control Department as needed in job coverage and material and personnel

release.Fermi 2 Nuclear Power Plant, Monroe, MI. (September - November 2007) Provided support in the Turbine Building of a Boiling Water Reactor

Supported main control point accessing work orders and assigning radiological controls for the jobs.

Performed radiation surveys of areas to determine proper posting and down-posting requirements of area.

Monitored use of personnel protective equipment for worker safety and the control of the spread of contamination

Performed job coverage of system breaches to include pre-job, job coverage, air sampling, and post job surveys

Respond to Personnel Contamination Events and properly determine the contamination levels and perform proper De-con when necessary

Perform Lock High Radiation Area entries and High Radiation Material Transfers Performed job coverage for Hot Machine Shop work Worked on refuel floor taking air samples and performing analysis and trend tracking.

H. B. Robinson Nuclear Plant, Hartsville, SC (April 2007) Provided support in the Aux Building of a Pressurized Water Reactor

Maintained control of Access Points to the controlled areas of the Aux Building Posted and down-posted area in support of the job requirements Aux Building work. Provided pre job surveys of valves and component and provided job coverage for the breach of

contaminated systems including air sampling. Performed routine contamination and radiation surveys and checked posting and radiation

boundaries as required. Respond to Personnel Contamination Events and properly determine the contamination levels

and perform proper De-con when necessary Performed release surveys for material and equipment for the release to the public or for

unrestricted use

Page 6: Scott E. Potter Current Resume

6

Performed Lock High Radiation Area and High Radiation Area entries Provided support for Radiography Testing

Brunswick Nuclear Plant, Southport, NC (February - March 2007) Provided support in the Turbine Building of a Boiling Water Reactor

Maintained control of Access Points to the controlled areas of the Turbine Building Posted and down-posted area in support of the job requirements of the MSR, turbine, and valve

inspection. Provided pre job surveys of valves and component and provided job coverage for the breach of

contaminated systems. Monitored use of personnel protective equipment for worker safety and the control of the spread

of contamination Perform release surveys for material and equipment for the release to the public or for unrestricted

useOconee Nuclear Power Station, Central, SC (September - December 2006) Provided support in the Turbine Building of a Pressurized Water Reactor

Maintained control of Single Points of Access to the controlled areas of the Turbine Building Posting and down-posting area in support of the job requirements of the turbine and valve

inspection. Provided pre job surveys of valves and component and provided job coverage for the breach of

contaminated systems. Monitored use of personnel protective equipment for worker safety and the control of the spread

of contamination Respond to Personnel Contamination Events and properly determine the contamination levels

and perform proper De-con when necessary Perform release surveys for material and equipment for the release to the public or for unrestricted

useFermi 2 Nuclear Power Plant, Monroe, MI. (March - April 2006) Provided support in the Turbine Building of a Boiling Water Reactor

Supported main control point accessing work orders and assigning radiological controls for the jobs.

Performed radiation surveys of areas to determine proper posting and down-posting requirements of area.

Monitored use of personnel protective equipment for worker safety and the control of the spread of contamination

Performed job coverage of system breaches to include pre-job, job coverage, air sampling, and post job surveys

Respond to Personnel Contamination Events and properly determine the contamination levels and perform proper De-con when necessary

Perform Lock High Radiation Area entries and High Radiation Material TransfersRocky Flatts Plant; Golden, CO - Denver, CO. (September 2002 - September 2004) Supported D&D operations to include:

Supervision of technicians and/or work crews in radiological areas as lead technician Ensured hazardous areas were properly identified, marked and maintained according to

regulations Monitored use of protective clothing for worker safety and controlling the spread of contaminants

Page 7: Scott E. Potter Current Resume

7

Calibrated field survey instruments and perform daily operations checks Complete proper paperwork for surveys Worked with Plutonium limits and surveys Perform DOT Radiological Shipment Surveys for packages and for vehicles Provided job coverage for asbestos abatement jobs, D&D operations, and construction crews in

radiological areas Performed dose rate surveys Performed contamination survey and air sampling for radiological areas Performed release surveys of equipment and material for release to the public Responded to CAM alarms and completed all activities to release the area Worked in respirator for extended periods of time

Carls Services, INC; Oak Ridge, TN. Health Physics Technician – (June 2009 – Sept 2010) Provided Health Physics support for Energy Solution at the Gallaher Rd and the Bear Creek Facilities:

Performed free release survey for Sea Land Shipping Container at Gallaher Road Facility Provided job coverage for D&D operation at the WOF site at Bear Creek Facility. Source check field instruments. Provide Health Physics support for ventilation monitoring and filter changes. Performed free release, pre-decon, down posting, and routine surveys of areas and equipment. Provided job coverage for waste processing of Resin and other materials. Provided high radiation job coverage and control of areas. Provided job coverage for Alpha containment work on glove boxes Perform surveys and screening for waste sorting operations

Environmental, Safety & Health, Inc., Knoxville, TN. Industrial Hygiene / Safety Technician – Supported remediation and construction contractors at the Department of Energy, Oak Ridge Operations (DOE ORO) facilities in Oak Ridge, TN, for the National Park Service and other clients. Performed the following actions:National Park Service; Big South Fork National Recreational Area; Scott County, TN (October – November 2005) Site Superintendent and Safety Officer for repaving of all camp sites on Loops B, C, & D; Loops B, C, & D roads; and entrance/check-in.

Maintained daily log and records of activities Ensured boundaries were properly identified, marked, and maintained for protection of the public Served as liaison between National Park Service and Paving Contractor Monitored use of protective equipment for worker safety

Tennessee Valley Authority; Oak Ridge, TN (December 2005 – February 2006 & May - August 2006) Site Safety Officer for construction of transformer pad, installation of transformers, power line construction and construction of support facilities for new power source for the Oak Ridge National Laboratory, Oak Ridge, TN.

Monitor area for sound level and temperature Ensured hazardous areas were properly identified, marked and maintained according to

regulations Monitored use of protective equipment for worker safety Perform accident and near miss investigations Evaluate and issue confined space permits, hot work permits, and lift plans

Avisco, Inc; Oak Ridge, TN (May - July 2005) Site Safety Officer for construction of Storm Drain and Sewer Line for the Oak Ridge National Laboratory, Oak Ridge, TN.

Page 8: Scott E. Potter Current Resume

8

Monitor area for sound level and temperature Ensured hazardous areas were properly identified, marked and maintained according to

regulations Monitored proper use of protective equipment for worker safety Served as liaison between Bechtel Jacobs and Department of Energy Safety Departments and

Contractor Evaluate and monitor confined space and permit required confined space entries Evaluate, issue and supervise critical lift plans Conduct daily safety meetings Perform Environmental Impact Weekly Inspections

Corporate Work; Various Locations (September 2005) Provided office paperwork support and field sampling.

Monitor area for hazardous chemicals levels in work area Write Site Safety and Health Plans, Job Hazard Analysis, Quality Assurance Plans, and Reports. Perform Safety assessment for maintenance garage and write up findings Calibrated field survey instruments and perform daily operations checks

National Security Complex (Y-12 Weapons Plant) BWXT; Oak Ridge, TN. Industrial Hygiene Technician (March - April 2002) – Supported production, waste management, and D&D actions to include:

Ensured hazardous areas were properly identified, marked and maintained according to regulations

Monitored use of protective clothing for worker Calibrated field survey instruments and perform daily operations checks Complete proper paperwork for surveys Provided job coverage for production crews, D&D operations, and construction crews Performed safety oversight for construction crews in support for the safety department Assisted in asbestos sampling of building material Performed nuisance dust air sampling Performed monitoring for O2, LEL, Carbon Monoxide, and Hydrogen Sulfate Monitored for sound levels, light levels, and temperature

Safety and Ecology Corporation; Knoxville, TN. Radiological Control / Industrial Hygiene Technician Supported DOE Oak Ridge Operations at various sites to include:Oak Ridge National Laboratory; Oak Ridge, TN. Radiological Control Technician (December 1999 – September 2000) - Supported D&D actions to include:

Ensured hazardous areas were properly identified, marked and maintained according to regulations

Monitored use of protective clothing for worker safety and controlling the spread of contaminants Perform daily operations checks Provided radiological support for dredging operations of radioactive material collection ponds,

hydro-laser underground tanks, and building demolition Complete proper paperwork for surveys Provided computer graphic support for routine contamination surveys to include maps and forms Worked with Uranium and Transuranics limits and surveys Perform DOT Radiological Shipment Surveys for packages and for vehicles Performed contamination survey and air sampling for radiological areas

Page 9: Scott E. Potter Current Resume

9

Performed release surveys of equipment and material for release to the publicPaducah Gaseous Diffusion Plant; Paducah, KY. Radiological Control Technician - (February – March 2000) On temporary assignments to the Paducah Gaseous Diffusion Plant to include:

Perform daily operations checks Complete proper paperwork for surveys Worked with Uranium limits and surveys Supported DOE Inspectors during their investigation of top secret, contaminated documents stored

in B-25 boxes and a production building on the Paducah SiteK-25 Gaseous Diffusion Plant; Oak Ridge, TN. Radiological Control Technician - (October - November 1999) Supported d D&D actions to include:

Ensured hazardous areas were properly identified, marked and maintained according to regulations

Perform daily operations checks Complete proper paperwork for surveys Worked with Uranium limits and surveys Performed release surveys of equipment and material for release to the public

Portsmouth Gaseous Diffusion Plant; Piketon, OH. Radiological Control Technician and Industrial Hygiene Technician- (June – October 1999) Supported waste management and D&D actions to include:

Ensured hazardous areas were properly identified, marked and maintained according to regulations

Monitored use of protective clothing for worker safety and controlling the spread of contaminants Calibrated field survey instruments and perform daily operations checks Complete proper paperwork for surveys Worked with Uranium limits and surveys Perform DOT Radiological Shipment Surveys for packages and for vehicles Performed contamination survey and air sampling for radiological areas Performed release surveys of equipment and material for release to the public Provided job coverage for waste drum characterization and D&D operations in radiological areas Performed monitoring for O2, LEL, Carbon Monoxide, Hydrogen Sulfate, and VOC Provided safety and industrial hygiene support for opening unknown drums

Eberline Services; Oak Ridge, TN. Health Physics Technician and Industrial Hygiene Technician – (November – December 2000 and September – November 2001) Supported various contracts for jobs in various locations around the country to include:

Performed bore hole and surface soil sampling and logging and smear sampling for radiological analysis

Calibrated field survey instruments and perform daily operations checks Assisted in the formulation and writing of reports, complete proper paperwork for surveys Worked with Uranium, Thorium, and Transuranics limits and surveys Perform DOT Radiological Shipment Surveys for packages and for vehicles Performed gamma scan walkover and alpha beta scans of areas Evaluate and monitor confined space entries Performed contamination survey and air sampling for radiological areas Performed release surveys of equipment and material for release to the public

Page 10: Scott E. Potter Current Resume

10

ETE Consulting Engineering INC; Oak Ridge, TN. Radiological Control Technician – Supported construction and D&D actions to include: National Security Complex (Y-12 Weapons Plant); Oak Ridge, TN. (October 1998 – May 1999)

Ensured hazardous areas were properly identified, marked and maintained according to regulations

Monitored use of protective clothing for worker safety and controlling the spread of contaminants Calibrated field survey instruments and perform daily operations checks Complete proper paperwork for surveys Provided computer graphic support for routine contamination surveys to include maps and forms Worked with Uranium and Transuranics limits for surveys Performed DOT Radiological Shipment Surveys for packages and for vehicles Provided job coverage for production crews, D&D operations, and construction crews in

radiological areas Performed contamination survey and air sampling for radiological areas Performed dose rate and pregnant worker surveys Performed contamination surveys for radiological material and areas Performed release surveys of equipment and material for release to the public

Oak Ridge Associated Universities; Oak Ridge, TN. Radiological Control / Health Physics Technician – Performing environmental radiological surveys for NRC, DOE, and FUSRAP and supported production, waste management, and D&D actions to include:National Security Complex (Y-12 Weapons Plant); Oak Ridge, TN. (October 1995 – September 1998)

Ensured hazardous areas were properly identified, marked and maintained according to regulations

Monitored use of protective clothing for worker safety and controlling the spread of contaminants Calibrated field survey instruments and perform daily operations checks Complete proper paperwork for surveys Provided computer graphic support for routine contamination surveys to include maps and forms Worked with Uranium and Transuranics limits for surveys Performed DOT Radiological Shipment Surveys for packages and for vehicles Provided job coverage for production crews, D&D operations, and construction crews in

radiological areas Performed contamination survey and air sampling for radiological areas Performed dose rate and pregnant worker surveys Performed contamination surveys for radiological material and areas Performed release surveys of equipment and material for release to the public Worked with REACTS providing technical support during training exercises.

The Environmental Site Survey and Assessment Program (December 1989 – September 1995) Supervision of technicians as lead technician Performed soil, water, building material, vegetation, and smear sampling for radiological analysis Perform archiving of paperwork and samples for survey site and daily records Calibrated field survey instruments and perform daily operations checks Extracted and analyzed samples for Alpha Spec and Strontium Assisted in the formulation and writing of reports, complete proper paperwork for surveys Provided computer graphic support for routine contamination surveys to include maps and forms

Page 11: Scott E. Potter Current Resume

11

Worked with Uranium, Plutonium, and Transuranics limits and surveys Perform DOT Radiological Shipment Surveys for packages and for vehicles Performed soil sample preparation and gamma spec analysis Performed gamma scan walkover and alpha beta scans of areas Provided safety inspections and tracked vehicle maintenance for survey vehicles Taught first aid and CPR classes

Oak Ridge National Laboratory; Oak Ridge, TN. Health Physics Internship (May- December 1989) – Trained in the field techniques to become technician to include:

Perform daily operations checks Complete proper paperwork for surveys Learn Uranium and Transuranics limits and how to perform surveys Provided job coverage construction crews in radiological areas Performed dose rate and pregnant worker survey Performed contamination and radiation survey Performed release surveys of equipment and material for release to the public

East Tennessee Baptist Hospital; Knoxville, TN. Medical Laboratory Technician – (October 1986 – June 1987) Provided laboratory coverage for hospital laboratory on night shift:

Collect both arterial and venous blood samples and perform EKG in the Emergency Room and in house patients

Perform chemistry, hematology, and microbiology procedures on samples Complete report on finding and post information on charts

University of Tennessee Medical Center; Knoxville, TN. Medical Laboratory Technician – (October 1982 – February 1986) Provided laboratory coverage for hospital pediatrics laboratory on evening shift:

Collect venous blood samples and perform EKG in the Emergency Room and in house patients Perform chemistry and hematology procedures on samples Complete report on finding and post information on charts

United States Air Force; Various Bases across the Southeast. Medical Laboratory Technician – (October 1976 – August 1982) Provided laboratory coverage for military hospital laboratory on all shifts:

Collect venous blood samples for outpatients, the Emergency Room and in house patients Perform chemistry, hematology, blood banking, microbiology, and serology procedures on

samples Served on Air Transportable Hospital with deployment in 1980

TRAINING: Radiation Control Technician Core/ RAD Worker II (2016) DOT Transportation and Shipping Training DOE Health Physics Technician Qualifications Training DOE Facilities Site Specific Training Certified Beryllium Worker Asbestos Awareness Training American Red Cross Instructor - Workplace and Community First Aid and Safety

Preventing Disease Transmission 30-hour OSHA Training course in Construction Safety

Page 12: Scott E. Potter Current Resume

12

Excavation Competent Person Northeast Utilities Exam Completed (March 2011) DOE Qns Clearance (Last active 2002)