Fall 2006◦ Site survey◦ Flow rate calculations◦ Turbine research◦ Turbine selection
Spring 2007◦ Economics
Turbine Cost Dam Reconstruction Power Company Lifecycle Cost Analysis
◦ Environmental Impacts◦Overall Feasibility
Multiple Options Recommendations
![Page 3: Scott Craig Cody Maher Jesse Ross Brian Van Stratum](https://reader035.vdocuments.us/reader035/viewer/2022062301/56649f1c5503460f94c333c2/html5/thumbnails/3.jpg)
![Page 4: Scott Craig Cody Maher Jesse Ross Brian Van Stratum](https://reader035.vdocuments.us/reader035/viewer/2022062301/56649f1c5503460f94c333c2/html5/thumbnails/4.jpg)
![Page 5: Scott Craig Cody Maher Jesse Ross Brian Van Stratum](https://reader035.vdocuments.us/reader035/viewer/2022062301/56649f1c5503460f94c333c2/html5/thumbnails/5.jpg)
All in one Design
Not available yet
Would need two to accommodate flow at Minors Millpond
![Page 6: Scott Craig Cody Maher Jesse Ross Brian Van Stratum](https://reader035.vdocuments.us/reader035/viewer/2022062301/56649f1c5503460f94c333c2/html5/thumbnails/6.jpg)
HydroWatt Wheel
Water Wheel Factory
![Page 7: Scott Craig Cody Maher Jesse Ross Brian Van Stratum](https://reader035.vdocuments.us/reader035/viewer/2022062301/56649f1c5503460f94c333c2/html5/thumbnails/7.jpg)
hrsmandaysmen *72015*6
00.10800$*
15**720 hrman
dallarshrsman
00.32400$00.10800$*3*3 paymentstimatetotalCostE
00.4320$3**
15*8*2*6 hrman
dollars
day
hrsdaysmen
Construction Cost Estimation for Water Wheel:
Demolition:
Materials: Concrete and Rebar $4000.00Consulting: $1300.00Equipment: $3000.00
Permitting: $15.00-$25.00Total: $45045.00
![Page 8: Scott Craig Cody Maher Jesse Ross Brian Van Stratum](https://reader035.vdocuments.us/reader035/viewer/2022062301/56649f1c5503460f94c333c2/html5/thumbnails/8.jpg)
Voith Siemens U.C.M. Resita Water WheelTurbine/Wheel Cost $50,000.00 $60,000.00 $9,000.00Installation $3,000.00 $1,000.00 $2,000.00Redesign of Dam $67,567.50 $32,000.00 $45,045.00Efficiency 95% 90% 70%Turbine Life 50 yrs 25 yrs 12 yrMaintainance Costs per Year $100.00 $200 $25.00
![Page 9: Scott Craig Cody Maher Jesse Ross Brian Van Stratum](https://reader035.vdocuments.us/reader035/viewer/2022062301/56649f1c5503460f94c333c2/html5/thumbnails/9.jpg)
Rate0.0655
kW hr
Pexpavg Rate 30 day 266.339
Pexpavg Rate 1 yr 3.243 103
Pexpavg Rate 50 yr 1.621 105Note: No inflation is figured in these calculations
![Page 10: Scott Craig Cody Maher Jesse Ross Brian Van Stratum](https://reader035.vdocuments.us/reader035/viewer/2022062301/56649f1c5503460f94c333c2/html5/thumbnails/10.jpg)
Buyback Rate Tax Benefits Rate at Which Energy Cost Increases IEEE 1547
![Page 11: Scott Craig Cody Maher Jesse Ross Brian Van Stratum](https://reader035.vdocuments.us/reader035/viewer/2022062301/56649f1c5503460f94c333c2/html5/thumbnails/11.jpg)
www.fsuhydroturbine.com Link on BlackBoard website Will detail progress made in
the spring semester of 2007 Will host all available
information and multimedia obtained throughout project
![Page 12: Scott Craig Cody Maher Jesse Ross Brian Van Stratum](https://reader035.vdocuments.us/reader035/viewer/2022062301/56649f1c5503460f94c333c2/html5/thumbnails/12.jpg)