1. Company Profile
2. Installations
3. Safety Cautions
4. Structures and Specifications
5. Operations
6. Touch Screen
7. Tips for Operation
Appendix: Packing list
ADD: First Floor, A# Dormitory, Nankeng First Industry Park,Bantian,Longgang District,
Shenzhen, China
Website: www.scotle.com
Tel: 8675589378931
E-mail: [email protected]
Shenzhen SCOTLE Technology ----------------------------------------------------------------------- Email:[email protected] Tel:8675589378931 http://www.scotle.com/
------------------------------------------------------------------------------------------------
2
1. Company Profile
SCOTLE Technology LTD is a manufacturer which specialized in design and research,
test and manufacture, sales and service of BGA Rework stations, BGA rework peripheral
accessories such as BGA pre-heaters, BGA reballing stations, BGA reballing stencil kits,
SMT/SMD stencils, different kinds of main board rework jigs, BGA solder fluxes, BGA
solder balls, BGA soldering wires, high temperature tapes and so on.
SCOTLE owns its own brand and trademark .SCOTLE BGA rework stations
using imported high quality ceramic and other precision material, and they are working
steady with high performance. Now, they are widely used in more than 80% BGA rework
areas such as mobile phones, computers, laptops, Switches, game consoles like Wii, Xbox,
PS3…
SCOTLE products passed the quality management system ISO9001:2000, obtained CE
certification and they are mainly exported to Europe, America, Mexico, Brazil, Australia,
South Africa and Southeast Asia, covering different countries and regions all over the world.
And has agents in some countries like America, Brazil, Spain, Mexico and gets high praise
from customers.
SCOTLE always insists the concept of using leading technology, providing top quality,
customers -oriented, and best service for all over the world. Its core value is integrity,
innovation, cooperation, and win-win situation.
SCOTLE never stops to learn from domestic and foreign industry development experience
and hear from customers and users’ good suggestions to improve and develop new
products to satisfy customers with better products. It is looking for long-term business
partner all over the world.
2. Installation of BGA Rework Station
(1)Place for installation
To ensure the rework station's useful life, installation should according to conditions
under below:
1. Away from combustibles and explosion-prone objects;
Shenzhen SCOTLE Technology ----------------------------------------------------------------------- Email:[email protected] Tel:8675589378931 http://www.scotle.com/
------------------------------------------------------------------------------------------------
3
2. Place won't be splashed with water or other liquids;
3. Dry place with good ventilation;
4. Stable and even place where not easy to be shaken;
5. Place with less dust;
6. Above control box heavy object is strictly prohibited;
7. Place won't be influenced directly by air flow of air conditioner, air heater or fan;
8. Reserve more than 30cm's place at the back of rework station, for move the machine
around.
(2)Power Requirements
Use a smaller power supply voltage fluctuation
Voltage fluctuations: 220V±10/ 110V±10
Frequency fluctuations: 50Hz±3
3. Safety Cautions 1、 Don't blow the rework station by fans or other devices directly when it is working, or
there will be a negative difference from the surface of the heating board, thus some parts
will be burnt out.
2、 After it is started, the high temperature area should not touch any objects, or it will lead
to a fire or explosion. The PCB and other parts should be put on the PCB bracket.
3、 No vibration. Handle it gently.
4、 Don't touch the heaters with your hands when it is working, or you will get hurt .
5、 Don't use combustible spray, liquefied and flammable gas near the rework station after
it is started.
6、 Don't try to re-equip the machine, or there may be a fire or an electric shock.
7、 There are high-pressure parts in the circuit box. Don't disassemble it.
8、 If some metals fall in the rework station when it is working, turn off the power
immediately. After it is cooled down, get the metal our, and clean the machine. If not, there
may a smell when the machine starts working next time.
9、 When the rework station's temperature rises abnormally or smokes, turn off the power
and inform the service technicians to repair it. Turn off the power of the circuit box and the
machine while moving the rework station. Hold the plug when we remove the wire, or it will
lead to a poor contact then the machine can't work very well.
10、Don't put the rework station on the wires, or there may be a failure, a fire, or an electric
shock.
11、Before you use the machine, you must read the instructions attentively.
4.Scotle-HR6000 Specification:
Shenzhen SCOTLE Technology ----------------------------------------------------------------------- Email:[email protected] Tel:8675589378931 http://www.scotle.com/
------------------------------------------------------------------------------------------------
4
Total power 2000W
Top heater power 800W
Bottom heater power 1200W
Power voltage and
frequency AC220V±10% 50/60Hz
Dimensions L470×W370×H500 mm
Positioning V-groove, PCB support can be adjusted in
X,Ydirection with external universal fixture
Temperature control K thermocouple (K Sensor)Closed loop
Temp accuracy ±2 degree
PCB size Max 280mmⅹ280mm Min20mmⅹ20mm
BGA chip 5*5~55*55
Minimum chip spacing 0.15mm
Net weight About 14.5KG
Description: 1. This machine designed with 2 temperature zones , the upper heated by hot air and the
lower part by IR, the upper and lower temperature are controlled separately, collocated with
high-precision temperature control instrument, which can set 8 heating and cooling
temperature segment, and store 10 groups of temperature meanwhile.
2. It uses high precise k-type thermocouple closed-loop control and automatic temperature
compensation system, with PLC and temperature module to enable precise temperature
deviation to add and subtract 2 degrees. Meanwhile, external temperature measurement
connector enables temperature diction and accurate analysis of real time temperature
curve.
3. The PCB layer board uses an external movable stand, very flexible and convenient.
V-groove PCB works for rapid, convenient and accurate positioning, which can meet all
kinds of PCB board of positioning.
4. Flexible and convenient removable fixture on the PCB board can protect the PCB fringe
devices from damaging and transmuting. It can also adapt to various BGA chip’s repaired.
5. Various sizes of BGA alloy nozzles, which can be adjusted 360 degree for easily
installation and replacement. Overflow launder on the top of to prevent components around
BGA chip from damaged by blow hot during heating.
6. 8 liters (down) and 8 segments constant temperature control. External lighting,
convenient for work and observation
7. After demolition and completion of welding, operators should make relevant preparations
as hearing the warning voice; meanwhile it should use a large flow cross-flow fan by auto /
manual to cooling of the PCB board, to prevent the deformation of PCB board to ensure the
Shenzhen SCOTLE Technology ----------------------------------------------------------------------- Email:[email protected] Tel:8675589378931 http://www.scotle.com/
------------------------------------------------------------------------------------------------
5
welding results.
8. It approved CE certification, and this appliance was equipped with emergency stop
switch and automatic power-off protection device when emergency happens.
5. Operations:
1、Preheat
Preheat the PCB board and BGA chip, and the temperature of constant temperature oven
is set at 80 ℃ -100 ℃, for 4-8 hours to remove internal moisture of the PCB and BGA, to
prevent the burst phenomenon when heating.
2、Remove
Place the PCB board into the bracket on the repair station, and select the appropriate hot
air reflow nozzle, and set the appropriate soldering curve, press the open button until it
finishes, and then move the hot air manually, to suck the BGA chip away with the vacuum
suction pen.
3、Clean-up welding
The BGA pad clean-up , one is to use desoldering line to drag flat, one is by iron; Best to
remove the tin a short time after the BGA removed , then BGA has not completely cooled ,
and the temperature difference make less damage to the pad; use the flux can improve the
activity of soldering tin, better to clean the soldering tin. Particular attention not to damage
the PCB pad, and in order to ensure the reliability of BGA solder, when the cleaning pad to
make use of some of the solder paste residues with more volatile solvents , such as plate
washer water, industrial alcohol.
4、BGA reballing
Wipe the paste flux equably with the brush pen on the BGA pad, choose the right steel
mesh, and then plant tin beads by the re-balling kit on the right pad.
5、BGA tin beads welding
Heat the bottom heating zone of BGA re-balling station and then weld the tin beads on the
pad.
6、Brush flux
Wipe the paste flux with the brush pen on the PCB pad. If you wipe so much, it will cause
connected welding, on the contrary, it will cause null welding. In order to wipe off dust and
impurity of tin balls, and enhance welding effect, the welding paste must be wiped equally.
7、Place the BGA chip
Shenzhen SCOTLE Technology ----------------------------------------------------------------------- Email:[email protected] Tel:8675589378931 http://www.scotle.com/
------------------------------------------------------------------------------------------------
6
Place the BGA chip on the PCB board with manual alignment and silk-screen borders,
meanwhile the tension of the solder joint when melt will have a good self- alignment effect.
8、Soldering
First, put the PCB board which is pasted with BGA chip on the positioning stand, and then
move the hot wind head to the working place. Second, choose the appropriate backflow
nozzle and set right welding temperature curve, start heating, open the switch, and then run
the welding process. Besides, after the welding process is finished, you have to cool the
BGA by the cooling fan. Hoist the upper hot wind head and make the bottom of hot wind
nozzle apart from the surface of BGA 3-5mm, and stay 30-40 seconds, or, you can move
the hot wind head after the starting switch is put out, withdraw the hot wind head. Finally,
take away the PCB board from the heating zones.
(1) Empty soldering:
Because of counterpoint by hand will cause deviation between chip and welding plate,
surface tension of tin ball will make BGA chip and welding plate in the process of automatic
correction. Once heating, BGA falls not evenly, which cause the chip drops not evenly. If
stop reflowing at this time, the chip will not fall normally, which will cause the phenomenon
of empty welding and false welding. So you need to extent time of the third and fourth
temperature zones or adds the bottom pre-heating temperature to make, the tin balls
meltdown and drop evenly.
(2) short circuit:
When the ball reached the melting point, it is in a liquid state , if too long or too high
temperature and pressure, it will destroy surface tension of solder balls and the supporting
role, resulting in short-circuit phenomenon when reflows, the chips fall entirely on the PCB
pads the , so we need to appropriately reduce the heating section of the third and fourth
soldering temperature and time , or reduce the bottom of the preheat temperature.
Note: In normal use rework station it will produce small quantities of bad smelly, in order to
ensure comfortable, safe and healthy operating environment, pls keep indoor and outdoor
air flow.
6. Touch screen
1. Open the control power, the BGA rework station can connect with electricity. Upper
temperature control instruments will be showing the following screen:
Shenzhen SCOTLE Technology ----------------------------------------------------------------------- Email:[email protected] Tel:8675589378931 http://www.scotle.com/
------------------------------------------------------------------------------------------------
7
Note:
SV: setting temperature ,PV: test temperature
PTN: which group of storage temperture
The upper meter shows the case of upper heating
2. Set the temperature by pressing the button , when it shows the
screen , it means we can set the rate of the first heating speed.
3. After finishing setting the first heating speed we can press the ,and then into the
next step to set the fist highest temperature with the screen .
4. After the first highest temperature’s setting, press the button again to set the
first constant time, and the screen will change to
5. The setting of the first heating process is finished after the first constant time setting.
When presses the button again, to go on the following process, and operation is
same with the first process setting.
Shenzhen SCOTLE Technology ----------------------------------------------------------------------- Email:[email protected] Tel:8675589378931 http://www.scotle.com/
------------------------------------------------------------------------------------------------
8
6. Set the lower heating temperature. Press the button in the second meter, then
press the button to adjust the temperature, and also to press and
to get the target temperature.
7. After setting is done, click "Start" button start heating, when it finishes, you can start the
cooling fan on the right bottom to cool the PCB.
NOTE:
When it alarm because of stoppage, all function buttons are in
locked state! After managing the stoppage and starting up, it can
recover to normal state!
Usual Temperature Parameters:
Lead temperature curve welding
41*41 BGA chip welding temperature setting
First Second Third Fourth Fifth
Upper
heating 160 185 210 220 225
Speed
rate 3 3 3 3 3
Constant
time 30 30 35 40 20
IR
preheatin
g
180
Constant
time 300
Shenzhen SCOTLE Technology ----------------------------------------------------------------------- Email:[email protected] Tel:8675589378931 http://www.scotle.com/
------------------------------------------------------------------------------------------------
9
38*38 BGA chip welding temperature setting
31*31 BGA chip welding temperature setting
Above is lead type BGA chip reference temperature.
Lead-free temperature curve welding
41*41 BGA chip welding temperature setting
First Second Third Fourth Fifth
Upper
heating 160 185 210 215 220
Speed
rate 3 3 3 3 3
Constant
time 30 30 35 40 20
IR
preheatin
g
180
Constant
time 300
First Second Third Fourth Fifth
Upper
heating 160 180 200 210 215
Speed
rate 3 3 3 3 3
Constant
time 30 30 35 40 20
IR
preheatin
g
180
Constant
time 300
Shenzhen SCOTLE Technology ----------------------------------------------------------------------- Email:[email protected] Tel:8675589378931 http://www.scotle.com/
------------------------------------------------------------------------------------------------
10
38*38 BGA chip welding temperature setting
31*31 BGA
chip welding temperature setting
First Second Third Fourth Fifth
Upper
heating 165 190 225 245 255
Speed
rate 3 3 3 3 3
Constant
time 30 30 35 40 40
IR
preheatin
g
180 1
Constant
time 300
First Second Third Fourth Fifth
Upper
heating 165 190 225 245 250
Speed
rate 3 3 3 3 3
Constant
time 30 30 35 40 40
IR
preheatin
g
180
Constant
time 300
Shenzhen SCOTLE Technology ----------------------------------------------------------------------- Email:[email protected] Tel:8675589378931 http://www.scotle.com/
------------------------------------------------------------------------------------------------
11
Above is
lead-free
type BGA
reference temperature.
7. Handling Precautions
1. After openi ng the power, firs t ly you should check whe the r the upper and
bottom hot air nozzles have cold wind. If not, starting the power is strictly prohibited. or the
heaters will be burnt. The bottom infrared heating areas are all controlled by switch, and
you can choose the bottom heating areas depend on the PCB board si ze .
2. You should set different temperature curves when repair different BGA,each temperature
should not higher than 300℃;Lead-free rework setting can refer to welding temperature
curve of BGA tin bead.
3. When demount BGA,the cooling fan and vacuum should be setted to automatic
transmission, the buzzer will warn automatically when temperature curve runs to the end.
Meanwhile, remove the BGA from PCB board with vacuum pen, and then remove the PCB
board from the positioning frame.
4.When welding the BGA chip, set the cooling fan to manual grade、close vaccum. After the
temperature curve runs to the end, the buzzer will alarm automatically, the cooling fan
begins to cooling the BGA chip and bottom heating zone,meanwhile,the warm heating head
will blow a cold wind. Then elevate the upper heater, make the gap has 3-5mm space
between the bottom of nozzle and the upper surface of BGA chip and keep cooling for
30-40 seconds, or move away the main heater after the starting light is off, finally take away
the PCB board from the support.
5. Be fo re i ns ta l lation o f B GA chip, i t is necessary to check that i f the PCB pad
and B GA ti n bead are a l l i n good condition. A fte r weldi ng , i t have to check the
First Second Third Fourth Fifth
Upper
heating 165 190 220 240 245
Speed
rate 3 3 3 3 3
Constant
time 30 30 35 40 40
IR
preheatin
g
180
Constant
time 300
Shenzhen SCOTLE Technology ----------------------------------------------------------------------- Email:[email protected] Tel:8675589378931 http://www.scotle.com/
------------------------------------------------------------------------------------------------
12
exte rior appearance by piece , i f i t is unusua l, i t should stop the BGA chip
installation and test the temperature, and it has to be adjusted properly before welding,
otherwise it will be damage the BGA chip or PCB board.
6. The machine surface needs to be clean at regular time, especially the infrared heating
board.
Avoid the dirt stay on the board, because the dirt can lead to heat radiation unnormally, bad
welding quality and shorten the using time of infrared heating element.
If the heating element was burn out because of these,
our company is not responsible for free change!
Packing list: NO Item Specification Unit Qty
1 BGA rework s tation
SCOTLE -HR6000
Set 1
2 Instruction manual
SCOTLE -HR6000
Copy 1
3 Hot-air nozzle 31*31 -41*41 Pcs 3
4 Shaped clip Pcs 6
5 Plum knob Pcs 6
6
Cross-flow cooling fan
Pc 1
7 Supporting screw Pcs 8
Shenzhen SCOTLE Technology ----------------------------------------------------------------------- Email:[email protected] Tel:8675589378931 http://www.scotle.com/
------------------------------------------------------------------------------------------------
13
Scotle other famous ho t sell ing B GA rework sta tions:
Scotle i r360
Scolte i r360 pro
Scot le HR460C
Scot le HR360