schools ferndale high school early childhood center ... · mkbd markerboard mldg moulding mo...

18
BUILDING STRUCTURAL MICHIGAN DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS, BUREAU OF CONSTRUCTION CODES, 2015 MICHIGAN BUILDING CODE, INCORPORATING THE 2015 EDITION OF THE INTERNATIONAL BUILDING CODE. MECHANICAL PLUMBING ELECTRICAL MICHIGAN DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS, BUREAU OF CONSTRUCTION CODES, 2015 MICHIGAN REHABILITATION CODE FOR EXISTING BUILDINGS, INCORPORATING THE 2015 EDITION OF THE INTERNATIONAL EXISTING BUILDING CODE. MICHIGAN DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS, BUREAU OF CONSTRUCTION CODES, 2015 MICHIGAN BUILDING CODE, INCORPORATING THE 2015 EDITION OF THE INTERNATIONAL BUILDING CODE. MICHIGAN DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS, BUREAU OF CONSTRUCTION CODES, 2015 MICHIGAN MECHANICAL CODE, INCORPORATING THE 2015 EDITION OF THE INTERNATIONAL MECHANICAL CODE. MICHIGAN DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS, BUREAU OF CONSTRUCTION CODES, 2015 MICHIGAN ELECTRICAL CODE, INCORPORATING THE 2015 EDITION OF THE INTERNATIONAL PLUMBING CODE. MICHIGAN DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS, BUREAU OF CONSTRUCTION CODES, 2014 MICHIGAN ELECTRICAL CODE, INCORPORATING THE 2014 EDITION OF THE NATIONAL ELECTRICAL CODE. FECC WOODWARD HTS I-696 FUEL FHS/ FMS W. MARSHALL PINECREST BURDETTE W OODW AR D FERNDALE PUBLIC SCHOOLS CENTRAL OFFICES NORTH Project Number Issue Date List of Drawings Code Information Registration Seal Date Signature Issued for Date Signature Date Signature Site Map c 2018 , LLC 1441 west long lake, suite 200 troy, michigan 48098 5211 cascade road SE, suite 300 grand rapids, michigan 49546 248.823.2100 www.ids-troy.com C:\Revit Local\17226 FPS Sinking [email protected] 1/24/2018 3:02:45 PM 17226-2000 Ferndale Public Schools Ferndale High School Early Childhood Center Ferndale Upper Elementary Flooring and Ceilings ARCHITECTURAL A0.1 Architectural Reference Information A0.3 FUEL - First Floor Composite Plan A0.4 FHS - First Floor Composite Plan A1.1 FECC - First Floor Demolition Plan A1.2a FUEL- First Floor Demolition Plan Area A A1.2b FUEL- First Floor Demolition Plan Area B A1.2c FUEL- First Floor Demolition Plan Area C A2.1 FECC - First Floor Finish Plan A2.2a FUEL - Finish Plan Area A A2.2b FUEL - Finish Plan Area B A2.2c FUEL - Finish Plan Area C A2.3 FHS Enlarged Demo, New Work, & Finish Plan A3.2a FUEL - First Floor Reflected Ceiling Plan Area A A3.2b FUEL - First Floor Reflected Ceiling Plan Area B A3.2c FUEL - First Floor Reflected Ceiling Plan Area C A6.1 Enlarged AM&E Plans & Details - Alternate No. 1 A9.1 Room Finish Schedule FERNDALE SCHOOLS Ferndale Early Childhood Center (FECC): 2920 Burdette, Ferndale, 48220 Ferndale Upper Elementary (FUEL): 24220 Rosewood, Oak Park, 48237 Ferndale High School (FUEL): 881 Pinecrest, Oak Park, 48220 50% Owner Review 1-9-18 Quality Management Review 1-16-18 Bids 1-23-18 Ferndale Public Schools Central Offices Ferndale High School, 3rd Floor, Room 326 871 Pinecrest Ferndale, Michigan 48220

Upload: lamnga

Post on 28-May-2019

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SCHOOLS Ferndale High School Early Childhood Center ... · mkbd markerboard mldg moulding mo masonry opening mrt marble threshold mtd mounted mull mullion no number nom nominal nrc

BUILDING

STRUCTURAL MICHIGAN DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS, BUREAU OF CONSTRUCTION CODES, 2015 MICHIGAN BUILDING CODE, INCORPORATING THE 2015 EDITION OF THE INTERNATIONAL BUILDING CODE.

MECHANICAL

PLUMBING

ELECTRICAL

MICHIGAN DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS, BUREAU OF CONSTRUCTION CODES, 2015 MICHIGAN REHABILITATION CODE FOR EXISTING BUILDINGS, INCORPORATING THE 2015 EDITION OF THE INTERNATIONAL EXISTING BUILDING CODE.

MICHIGAN DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS, BUREAU OF CONSTRUCTION CODES, 2015 MICHIGAN BUILDING CODE, INCORPORATING THE 2015 EDITION OF THE INTERNATIONAL BUILDING CODE.

MICHIGAN DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS, BUREAU OF CONSTRUCTION CODES, 2015 MICHIGAN MECHANICAL CODE, INCORPORATING THE 2015 EDITION OF THE INTERNATIONAL MECHANICAL CODE.

MICHIGAN DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS, BUREAU OF CONSTRUCTION CODES, 2015 MICHIGAN ELECTRICAL CODE, INCORPORATING THE 2015 EDITION OF THE INTERNATIONAL PLUMBING CODE.

MICHIGAN DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS, BUREAU OF CONSTRUCTION CODES, 2014 MICHIGAN ELECTRICAL CODE, INCORPORATING THE 2014 EDITION OF THE NATIONAL ELECTRICAL CODE.

FECC

WOODWARD HTS

I-696

FUEL

FHS/FMS

W. MARSHALL

PIN

EC

RE

ST

BU

RD

ET

TE

WO

OD

WA

RD

FERNDALE PUBLIC SCHOOLS CENTRAL OFFICES

NO

RT

H

Project Number

Issue DateList of Drawings Code Information

Registration Seal

Date

Signature

Issued for

Date

Signature

Date

Signature

Site Map

c 2018 , LLC

1441 west long lake, suite 200troy, michigan 48098

5211 cascade road SE, suite 300grand rapids, michigan 49546

248.823.2100www.ids-troy.com

C:\Revit Local\17226 FPS [email protected]

1/24/2018 3:02:45 PM

17226-2000

Ferndale Public Schools

Ferndale High SchoolEarly Childhood Center

Ferndale Upper ElementaryFlooring and Ceilings

ARCHITECTURALA0.1 Architectural Reference Information

A0.3 FUEL - First Floor Composite Plan

A0.4 FHS - First Floor Composite Plan

A1.1 FECC - First Floor Demolition Plan

A1.2a FUEL- First Floor Demolition Plan Area A

A1.2b FUEL- First Floor Demolition Plan Area B

A1.2c FUEL- First Floor Demolition Plan Area C

A2.1 FECC - First Floor Finish Plan

A2.2a FUEL - Finish Plan Area A

A2.2b FUEL - Finish Plan Area B

A2.2c FUEL - Finish Plan Area C

A2.3 FHS Enlarged Demo, New Work, & Finish Plan

A3.2a FUEL - First Floor Reflected Ceiling Plan Area A

A3.2b FUEL - First Floor Reflected Ceiling Plan Area B

A3.2c FUEL - First Floor Reflected Ceiling Plan Area C

A6.1 Enlarged AM&E Plans & Details - Alternate No. 1

A9.1 Room Finish Schedule

FERNDALE SCHOOLS

Ferndale Early Childhood Center (FECC):2920 Burdette, Ferndale, 48220

Ferndale Upper Elementary (FUEL):24220 Rosewood, Oak Park, 48237

Ferndale High School (FUEL):881 Pinecrest, Oak Park, 48220

50% Owner Review 1-9-18

Quality Management Review 1-16-18

Bids 1-23-18

Ferndale Public SchoolsCentral OfficesFerndale High School, 3rd Floor, Room 326871 Pinecrest Ferndale, Michigan 48220

Page 2: SCHOOLS Ferndale High School Early Childhood Center ... · mkbd markerboard mldg moulding mo masonry opening mrt marble threshold mtd mounted mull mullion no number nom nominal nrc

ABRSV

A

ABRASIVEACOUS ACOUSTIC, ACOUSTICAL

ACU

AFF

AIR CONDITIONING UNIT

ABOVE FINISH FLOORALT

ALUM

ALTERNATE

ANOD

ALUMINUM

ACS PNL

ANODIZED

APPROXACCESS PANEL

ARCH

APPROXIMATELY

AUTO

ARCHITECT, ARCHITECTURAL

AUTOMATIC

ADJ ADJACENT, ADJUSTABLE

BD

B

BOARD

BEV BEVEL, BEVELED

BF

BLKG

BARRIER FREE

BLOCKING

BN

BOT

BULLNOSE

BOTTOM

BLDG BUILDING

BRG BEARING

BRKT BRACKET

BSMT BASEMENT

CAB

C

CABINETCB CATCH BASIN

CCT

CHBD

CUBICLE CURTAIN TRACK

CHALKBOARD

CHKD PL

CJ

CHECKERED PLATE

CONTROL OR CONSTRUCION JOINT

CG CORNER GUARD

CLG CEILINGCMU CONCRETE MASONRY UNIT

CO CLEAN OUT

COL

COMPCOMPO

CONC

CONF

CONNCONSTR

CONT

CONTR

CONVCORR

COORD

CSWK

CTCSK

CUH

COLUMN

COMPACTEDCOMPOSITION

CONCRETE

CONFERENCE

CONNECT, CONNECTIONCONSTRUCTION

CONTINUE, CONTINUOUS

CONTRACTOR

CONVECTORCORRIDOR, CORRUGATED

COORDINATE

CASEWORK

CERAMIC TILECOUNTERSINK (SUNK)

CABINET UNIT HEATER

D

D

DEPTHDBL DOUBLE

DWTR DUMBWAITER

DT DR DUTCH DOOR

DEMO DEMOLISH, DEMOLITIONDEPR DEPRESSED

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAINDIA DIAMETER

DIAG DIAGONAL

DIFF DIFFUSER

DIM DIMENSIONDIR DIRECTORY

DEFS DIRECT APPLIED EXT FINISH SYSTEMDMPF DAMPPROOFING

DMT DEMOUNTABLEDN DOWN

DR OPNG DOOR OPENING

DR DOOR

DWG DRAWINGDT DRAIN TILE

EA

E

EACH

EF EXHAUST FAN

EIFS EXTERIOR INSULATION FINISH SYSTEMEJ EXPANSION JOINT

EL ELEVATION

ELEC ELECTRIC, ELECTRICAL

ELEV ELEVATORENCL ENCLOSURE

ENTR ENTRANCE, ENTRY

EP ELECTRIC PANEL

EQ EQUALEQUIP EQUIPMENT

EW EACH WAY

EWC ELECTRIC WATER HEATER

EXIST EXISTINGEXP EXPANDED, EXPANSION

EXP BT EXPANSION BOLT

EXT EXTERIOR

FACP

F

FIRE ALARM CONTROL PANEL

FD FLOOR DRAIN

FDC FIRE DEPARTMEN CONNECTION

FDTN FOUNDATIONFE FIRE EXTINGUISHER

FEB FIRE EXTINGUISHER AND BRACKET

FEC FIRE EXTINGUISHER CABINET

FIN FLR FINISH FLOOR

GA

G

GAGE / GUAGE

H

H

HIGH, HEIGHT

GALV GALVANIZEDGRFCGLASS FIBER REINFORCED CONCRETE

GI GALVANIZED IRON

GL GLASS

GR GRADEGRG GLASS REINFORCED GYSPSUM

GRL GRILLE

GYP BD GYPSUM BOARD

ID

I

INSIDE DIAMETER

JC

J

JANITOR CLOSET

KD

K

KNOCK DOWN

L

L

LONG, LENGTH

MAINT

M

MAINTENANCE

NIC

N

NOT IN CONTRACT

OC

O

ON CENTER

PA

P

PUBLIC ADDRESS

QT

Q

QUARRY TILE

R

R

RISER

SC SOLID CORE

VCT

V

VINYL COMPOSITION TILE

W

W

WIDE, WIDTH

HB HOSE BIBBHC HOLLOW CORE

HDW HARDWARE

HDWD HARDWOOD

HM HOLLOW METALHORIZ HORIZONTAL, HORIZONTALLY

HORIZB HORIZONTAL BLINDS

HP HIGH POINT

HR HOUR

IE INVERT ELEVATION

INCL INCLUDE, INCLUDING

INFO INFORMATION

IN INCH, INCHESINSUL INSULATE, INSULATION

INT INTERIOR

JT JOINT

JST JOIST

KIT KITCHEN

LAB LABORATORY

LAM LAMINATE, LAMINATIONLAV LAVATORY

LBL LABEL

LBS POUNDS

LF LINEAR FOOTLH LEFT HAND

LHR LEFT HAND REVERSE

LKR LOCKER

LLH LONG LEG HORIZONTALLLV LONG LEG VERTICAL

LO LOUVER OPENING

LPT LOW POINT

LPRF LIGHT PROOF

S

MATL MATERIAL

MAX MAXIMUM

MCC MULTI COLOR COATING

MDS METAL DIVIDING STRIPMECH MECHANICAL

MET METAL OR METALLIC

MT METAL THRESHOLD

MEZZ MEZZANINEMFR MANUFACTURER

MH MANHOLE

MIN MINIMUM

MISC MISCELLANEOUSMKBD MARKERBOARD

MLDG MOULDING

MO MASONRY OPENING

MRT MARBLE THRESHOLDMTD MOUNTED

MULL MULLION

NO NUMBER

NOM NOMINAL

NRC NOISE REDUCTION COEFFICIENTNTS NOT TO SCALE

OD OUTSIDE DIAMETER

O/H OVERHEAD

OPNG OPENINGOPP HD OPPOSITE HAND

ORN ORNAMENTAL

OZ OUNCE

PTN PARTITIONPBD PARTICLEBOARD

P/C PRECAST

PC PIECE

PORC EN PORCELAIN ENAMELPERF PERFORATED

PERIM PERIMETER

PRKG PARKING

PLBG PLUMBINGPLAS PLASTER

PLAM PLASTIC LAMINATE

PLYWD PLYWOOD

POL POLISH, POLISHEDPOR POROUS

PORC PORCELAIN

PR PAIR

PREFAB PREFABRICATEDPS PROJECTION SCREEN

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PAINTPVC POLYVINYLCHLORIDE

PVW PROTECTIVE VINYL WALL COVERING

RAD RADIUS

RC RAIN CONDUCTOR

REF REFER, REFERENCE

REFL REFLECTED , REFLECTIVEREFRIG REFRIGERATOR

REINF REINFORCE, REINFORCEMENT, REINFORCING

REQD REQUIRED

RESIL RESILIENT

REV REVISED, REVISIONRFG ROOFING

SCHED SCHEDULE

SCR SHOWER CURTAIN ROD

SECT SECTION

SF SQUARE FEET (FOOT)SGFT STRUCTURAL GLAZED FACING TILE

SH/P SHELF AND POLE

SIM SIMILAR

SPEC SPECIFICATIONSSQ SQUARE

SS SERVICE SINK

STAG STAGGERED

STC SOUND TRANSMISSION CLASSSTD STANDARD

STL STEEL

STRUCT STRUCTURAL

ST STL STAINLESS STEEL

UC

U

UNDERCUT

UL UNDERWRITERS LABORATORIES,INC.

UON UNLESS OTHERWISE NOTED

VERT VERTICAL, VERTICALLY

VERTB VERTICAL BLINDSVIF VERIFY IN FIELD

VIT VITREOUS

VR VAPOR RETARDER

VRS VINYL REDUCER STRIPVTR VENT THRU ROOF

VWC VINYL WALL COVERING

WBR WALL BUMPER RAIL

WSCT WAINSCOTW/ WITH

WD WOOD

WM WIRE MESH

WO WINDOW OPENINGW/O WITHOUT

WP WATERPROOFING

WPF WEATHERPROOF

WP WORKING POINTWS WATERSTOP

WSTPG WEATHERSTRIPPING

WWF WELDED WIRE FABRIC

CBB CEMENT BACKER BOARD

BUR BUILT UP ROOFING SYSTEM

B/D BOTTOM OF DECK

DWL DOWELDWR DRAWER

FLR

F

FLOOR

FPRFG FIREPROOFINGFR FRAME

FT FEET / FOOT

FTG FOOTING

FTR FIN TUBE RADIATIONFVC FIRE VALVE CABINET

FWC FABRIC WALL COVERING

FH FIRE HYDRANT

FHC FIRE HOSE CABINET

FHR FIRE HOSE RACK

FIN FINSH, FINISHEDFLASH FLASHING

(CONT)

LT WT LIGHTWEIGHT

RH

R

RIGHT HANDRHR RIGHT HAND REVERSE

RO ROUGH OPENING

ROW RIGHT OF WAY

RR RAILROADRS ROOF SUMP

RSD ROLLER SHADERT RUBBER TILE

(CONT)

T TREAD

T

T & B TOP AND BOTTOM

T & G TOUNGE AND GROOVE

TKBD TACKBOARD

T/C TOP OF COVER OR CURBTEL TELEPHONE

TEMP GL TEMPERED GLASS

TER TERRAZZO

T/F TOP OF FOOTINGTHK THICK, THICKNESS

TKSP TACK STRIP

TOM TOP OF MASONRY

TOS TOP OF STEELTRANS TRANSOM

TV TELEVISION

TOW TOP OF WALL

TYP TYPICAL

L ANGLE

X BY

CENTERLINE

DIAMETER

' FEET, FOOT

# NUMBER OR POUND

PLATE

WEATHERPROOF

T TEE

SURF SURFACESUSP SUSPEND, SUSPENSION

SYM SYMBOL

SYMM SYMMETRICAL

CHANNEL

DEGREE OR DEGREES

" INCH, INCHES

ABBREVIATIONS

SOIL

CONCRETE

CONCRETE MASONRY UNIT

BRICK

ACOUSTICAL PANEL ORACOUSTICAL TILE

MATERIAL LEGEND

ASPHALT /CONCRETE

GRANULAR FILL

GRAVEL

GLAZED CMU

STRUCTURAL GLAZED FACING TILE

STONE

MARBLE

METALS - LARGE SCALE

METALS - SMALL SCALE

FINISH WOOD

PLYWOOD

CONTINUOUS WOOD BLOCKING

INTERRUPTED WOOD BLOCKING OR SHIMS

BATT INSULATION

RIGID INSULATION

PREMOLDED EXPANSIONJOINT OR COMPRESSIBLEFILLER STRIP

GLASS OR PLASTIC GLAZING

PLASTER OR GYPSUM BOARD

CERAMIC OR QUARRY TILE

TERRAZZO

EXISTING MATERIAL(NO DELINEATION)

72"

72"

MIN

48"

48"

SEE PLAN

5'-4

" M

AX

48"

MA

X

36"M

AX

BF

48"

BF

48"

BF

27"M

IN

27"M

IN 48"

48"

84"

UO

N

PUSH

TO

WE

LD

ISP

EN

SE

R

TO

WE

LD

ISP

EN

SE

R &

RE

CE

PT

AC

LE

WA

ST

ER

EC

EP

TA

CLE

SA

NIT

AR

YN

AP

KIN

DIS

PE

NS

ER

SH

ELF

TO

WE

LD

ISP

EN

SE

R

FIR

E H

OS

E O

RE

XT

ING

UIS

HE

RC

AB

INE

T

FIR

EE

XT

ING

UIS

HE

R

VA

LVE

CA

BIN

ET

WA

LL O

RE

ME

RG

EN

CY

TE

LEP

HO

NE

FO

UN

TA

IN

TO

WE

L B

AR

PA

Y T

ELE

PH

ON

EW

/ SH

ELF

FIR

E H

OS

E O

R

MIR

RO

R

HO

OK

ST

RIP

SH

ELF

W/ M

OP

& B

RO

OM

HO

LDE

RS

AN

D H

OO

KS

(18"

x60"

MIN

)

EW

C O

R D

RIN

KIN

GF

ULL

HE

IGH

T

MA

RK

ER

BO

AR

DC

HA

LK B

OA

RD

OR

TA

CK

BO

AR

D

TO

P O

F R

OT

OP

OF

RO

MASONRY COURSING

TO

P O

F R

O

42"

ST

D

CLE

AR

BF

64"

ST

D

CLE

AR

BF

64"

ST

D

6" 36"

34"

24"

17"-

19"

30" MIN

48"

12"

48"M

AX

24"S

TD

4"

7"7"

4"

34"

40"

48" 48"

BF

12"

2'-1

0"

12"

48"

48"

MA

X

34"

MA

X

27"

MIN

40"

MA

X

3"18

"6"

6"30

"

12"42"

18"

12"

NA

PK

IN D

ISP

OS

AL

GR

AB

BA

R (

TY

PE

5)

HA

ND

DR

YE

R

HA

IR D

RY

ER

HA

ND

RA

IL A

T R

AM

P

SO

AP

DIS

PE

NS

ER

GR

AB

BA

R (

TY

PE

2)

NA

PK

IN D

ISP

OS

AL

ST

D S

AN

ITA

RY

DIA

PE

R C

HA

NG

ING

ST

AT

ION

SE

AT

CO

VE

R D

ISP

EN

SE

R

(18"

x30"

MIN

)B

F S

AN

ITA

RY

BF

FR

AM

ED

MIR

RO

RH

OLD

ER

JUM

BO

TO

ILE

T P

AP

ER

JUM

BO

TO

ILE

T P

AP

ER

HO

LDE

R

ST

D T

OIL

ET

PA

PE

R H

OLD

ER

UR

INA

L S

CR

EE

N

GR

AB

BA

R (

TY

PE

1)

FLU

SH

VA

LVE

HA

ND

LE

RIM

HE

IGH

T

FLU

SH

VA

LVE

HA

ND

LE

BF WATER CLOSET

BA

CK

WA

LL

BF WATER CLOSET STD WATER CLOSET

SID

E W

ALL

SID

E W

ALL

STD & BF LAVATORY

URINAL

BF

TO

ILE

TP

AP

ER

HO

LDE

R

CLEAR

72"

ST

D -

ME

N64

" S

TD

- W

OM

EN

UO

N

17"M

AX

BF

BF

34"

BF

60"CLEAR 30" MIN

6" MAX 6" MAX

34"

34"

42"

6" MAX 6" MAX

17"

78"

78"

78"

BF

60"CLEAR

BF

30" MIN

6" MAX

48"

MA

X

34"

48"

MA

X

18"

15"

78"

72"±

38"

MIN

72"±

38"

MIN

SH

OW

ER

CU

RT

AIN

RO

D

SH

OW

ER

CU

RT

AIN

RO

D

SH

OW

ER

CU

RT

AIN

RO

D

SH

OW

ER

CU

RT

AIN

RO

D

GR

AB

BA

R(T

YP

E 7

)

GR

AB

BA

R(T

YP

E 6

)

CO

NT

RO

LW

ALL

SH

OW

ER

BE

NC

H

WA

TE

R C

ON

TR

OL/

SID

E W

ALL

BF ROLL-IN SHOWER WITH BENCH

BF ROLL-IN SHOWER W/O BENCH

WA

TE

R C

ON

TR

OL/

SID

E W

ALL

GR

AB

BA

R (

TY

PE

8)

CO

NT

RO

L W

ALL

GR

AB

BA

R (

TY

PE

7)

HA

ND

SH

OW

ER

HA

ND

SH

OW

ER

FIX

ED

SH

OW

ER

HE

AD

HE

AD

FIX

ED

SH

OW

ER

HA

ND

SH

OW

ER

HA

ND

SH

OW

ER

36"6"

5"MAX

17"-

19" 34

"

36"

36"CLEAR

BF

18"

34"

30" 4"18

"

36"CLEAR

BF

60"

60"

80"

72"

MIN

60"

MIN

60"

42"

2" 2"

4"

17"48

" M

AX

78"

34"

18"

18"

38"

MIN

72"±

MEN

FLO

OR

DE

SIG

NA

TIO

N

ELE

VA

TO

R L

AN

DIN

GC

ALL

BU

TT

ON

S

(BO

TH

JA

MB

S)

RO

OM

SIG

NA

GE

BLD

G E

NT

RA

NC

ES

YM

BO

L O

FA

CC

ES

SIB

ILIT

Y

EX

TE

RIO

R P

OS

TM

TD

SIG

N

EX

TE

RIO

R W

ALL

MT

D S

IGN

HA

LLLA

NT

ER

N

SH

OW

ER

BE

NC

H

SH

OW

ER

CU

RT

AIN

RO

D

INT

ER

IOR

WA

LL M

TD

GR

AB

BA

R (

TY

PE

3)

GR

AB

BA

R (

TY

PE

3)

CO

NT

RO

LW

ALL

SID

E W

ALL

FLU

SH

VA

LVE

HA

ND

LE

BF WATER CLOSET

BA

CK

WA

LL

BF TRANSFER SHOWER

GR

AB

BA

R (

TY

PE

4)

(2 P

IEC

ES

)

WA

TE

R C

ON

TR

OL/

HA

ND

SH

OW

ER

HA

ND

SH

OW

ER

GR

AB

BA

R(T

YP

E 5

)

FIX

ED

SH

OW

ER

HE

AD

MOUNTING HEIGHTSMOUNTING HEIGHTS SHOWN ARE BASED UPON RECOGNIZEDDESIGN STANDARDS AND/OR BARRIER FREE CODEREQUIREMENTS. IT IS INTENDED THAT LIKE DEVICES ALLBE MOUNTED AT THE SAME HEIGHT THROUGHOUT THE ENTIREPROJECT. RECESSED DEVICES IN MASONRY WALLS MAYDICTATE A DEVIATION ( 2") FROM THESE HEIGHTS(WHEN PERMITTED BY CODE) SO AS TO ALLOW THE BOTTOMOR THE TOP OF THE DEVICE RECESS TO ALIGN WITHMASONRY COURSING. COORDINATE THESE DEVIATIONSWITH THE ARCHITECT'S/OWNER'S REPRESENTATIVE.

MOUNTING HEIGHTS ARE TYPICALUNLESS OTHERWISE NOTED ON DRAWINGS

DRAWING WHERE BUILDING SECTION IS DRAWN

1

A 4.1

1

A 4.1

DETAILDETAIL SCALE

DETAIL IDENTIFICATION

2

A 2.1

DRAWING WHERE DETAIL IS REFERENCED OR CUT

BUILDING SECTION LOCATORDETAIL SYMBOL

DETAIL IDENTIFICATION

2

A 9.1

DRAWING WHERE DETAIL IS DRAWN

DETAIL LOCATOR PLAN OR DETAIL ENLARGEMENT

DETAIL OR DETAILIDENTIFICATION

DRAWING WHEREPLAN OR DETAIL

IS DRAWN

COLUMN CENTERLINE

EXISTING

NEW

MATERIAL KEYNOTE

PROJECT MANUAL SECTIONIDENTIFICATION

08920

A101

ROOM NAME

ROOM

FLOOR

BUILDING OR UNIT (IF ANY)

ROOM NAME AND NUMBER

PARTITION TYPE

X0X

PARTITION TYPE IDENTIFICATION(REFER TO FLOOR PLAN LEGEND)

DOOR NUMBER

A101

ROOM

FLOOR

BUILDING OR UNIT (IF ANY)

NEW DOOREXISTING DOOR

A10

1

ELEVATION IDENTIFICATION

DRAWING WHERE ELEVATION IS DRAWN

1

4

3 A8.1

2

SYMBOL LEGEND

ELEVATION SYMBOL

A4.1

1

INTERIOR

EXTERIOR

1

A 6.1

Project Title

Key Plan

c

Project Designer

Q.M. Review

Approved

Drawing Scale

Project Number

Project Architect / Engineer

Drawn By

Project Administrator

2018 , LLC

Drawing Number

Reference Finish Floor Elevation: XXX'-X"

Issued for Issue Date

IDS Drawing Title

As Noted

www.XXXXX.com

1441 west long lake, suite 200troy, michigan 48098

5211 cascade road SE, suite 300grand rapids, michigan 49546

248.823.2100www.ids-troy.com

FERNDALE SCHOOLS

C:\

Revi

t Local\17226 F

PS

Sinkin

g Fund-A

17_jc

outu

re@

ids-

troy.

com

.rvt

1/24/2018 3

:02:4

9 P

M

D. Giroux

B. Sundberg

J. Couture

A0.1

Couture/Easthope

C. Azar

J. Couture

Ferndale Public Schools

Ferndale High SchoolEarly Childhood Center

Ferndale Upper ElementaryFlooring and Ceilings

17226-2000

Architectural ReferenceInformation

50% Owner Review 1-9-18

Quality Management Review 1-16-18

Bids 1-23-18

Page 3: SCHOOLS Ferndale High School Early Childhood Center ... · mkbd markerboard mldg moulding mo masonry opening mrt marble threshold mtd mounted mull mullion no number nom nominal nrc

UP

B

C

D

E

F

G

J

K

M

L

1 2 3 4 5 7 9 10 12 15 17 19 21 23 25 27 32 34 35 36 37 40

01

CLASSROOM

02

CLASSROOM

03

ORCHESTRA

04

MUSIC

10

CLASSROOM

11

CLASSROOM

12

CLASSROOM

13

CLASSROOM

14

CLASSROOM

21

CLASSROOM

22

CLASSROOM

23

CLASSROOM

24

CLASSROOM

31

CLASSROOM

32

CLASSROOM

33

CLASSROOM

34

CLASSROOM

41

CLASSROOM

42

CLASSROOM

43

CLASSROOM

44

CLASSROOM

05

CAFETERIA

06

TEACHERPLANNING

07

WORKROOM08

CORRIDOR

09

CORRIDOR

15

CORRIDOR

16

CORRIDOR

17

CORRIDOR

18

CORRIDOR

19

CORRIDOR

20

CORRIDOR

25

MAINOFFICE

26

OFFICE27

OFFICE

28

WORKROOM

29

WORKROOM

35

CLASSROOM

36

MEDIACENTER

37

CLASSROOM

44A

CORRIDOR

42A

CORRIDOR

41A

STORAGE

45

CLASSROOM

46

CLASSROOM

47

GYMNASIUM36A

SPEECHOFFICE

34A

CORRIDOR

32A

CORRIDOR

31A

STORAGE21A

STORAGE

24A

CORRIDOR

25A

TOILET

11A

STORAGE

14A

CORRIDOR

12A

CORRIDOR

05A

STORAGE

05B

CORRIDOR

08A

CORRIDOR

08B

CORRIDOR

MA

TC

H L

INE

A3.

2A

A2.

2A

A1.

2A

A3.

2B

A2.

2B

A1.

2B

MA

TC

H L

INE

A3.

2B

A2.

2B

A1.

2B

A3.

2C

A2.

2C

A1.

2C

44B

MECH

34B

MECH

24B

MECH

14B

MECH

42B

MECH

32B

MECH

22B

MECH

12B

MECH22A

CORRIDOR

________A2.2a

1

________A2.2b

1

________A2.2c

1

19A

FOYER

03A

STORAGE

03B

STORAGE

05A

RAMP

8C

CORRIDOR

30

HEADEND RM

39

FOYER

39A

RAMP

35A

CUSTODIAL

RP-2

NORTH

Project Title

Key Plan

c

Project Designer

Q.M. Review

Approved

Drawing Scale

Project Number

Project Architect / Engineer

Drawn By

Project Administrator

2018 , LLC

Drawing Number

Reference Finish Floor Elevation: XXX'-X"

Issued for Issue Date

IDS Drawing Title

www.XXXXX.com

1441 west long lake, suite 200troy, michigan 48098

5211 cascade road SE, suite 300grand rapids, michigan 49546

248.823.2100www.ids-troy.com

FERNDALE SCHOOLS

C:\

Revi

t Local\17226 F

PS

Sinkin

g Fund-A

17_jc

outu

re@

ids-

troy.

com

.rvt

1/24/2018 3

:02:5

0 P

M

D. Giroux

B. Sundberg

J. Couture

A0.3

Couture/Easthope

C. Azar

J. Couture

Ferndale Public Schools

Ferndale High SchoolEarly Childhood Center

Ferndale Upper ElementaryFlooring and Ceilings

1/16" = 1'-0"

17226-2000

FUEL - First Floor CompositePlan

50% Owner Review 1-9-18

Quality Management Review 1-16-18

Bids 1-23-18

Page 4: SCHOOLS Ferndale High School Early Childhood Center ... · mkbd markerboard mldg moulding mo masonry opening mrt marble threshold mtd mounted mull mullion no number nom nominal nrc

DN

DN

UP

DN

UP

DN

DN

UP

DNUP

DN

UP

COURTYARD

COURTYARD

COURTYARD

________A2.3

1

222

CLASSROOM

223

CLASSROOM

224

OFFICE

________A2.3

2________A2.3

3

NO

RT

H

Project Title

Key Plan

c

Project Designer

Q.M. Review

Approved

Drawing Scale

Project Number

Project Architect / Engineer

Drawn By

Project Administrator

2018 , LLC

Drawing Number

Reference Finish Floor Elevation: XXX'-X"

Issued for Issue Date

IDS Drawing Title

www.XXXXX.com

1441 west long lake, suite 200troy, michigan 48098

5211 cascade road SE, suite 300grand rapids, michigan 49546

248.823.2100www.ids-troy.com

FERNDALE SCHOOLS

C:\

Revi

t Local\17226 F

PS

Sinkin

g Fund-A

17_jc

outu

re@

ids-

troy.

com

.rvt

1/24/2018 3

:02:5

1 P

M

D. Giroux

B. Sundberg

J. Couture

A0.4

Couture/Easthope

C. Azar

J. Couture

Ferndale Public Schools

Ferndale High SchoolEarly Childhood Center

Ferndale Upper ElementaryFlooring and Ceilings

1/32" = 1'-0"

17226-2000

FHS - First Floor Composite Plan

50% Owner Review 1-9-18

Quality Management Review 1-16-18

Bids 1-23-18

Page 5: SCHOOLS Ferndale High School Early Childhood Center ... · mkbd markerboard mldg moulding mo masonry opening mrt marble threshold mtd mounted mull mullion no number nom nominal nrc

DEMOLITION

A. ALL DEMOLITION WORK REQUIRED IS NOT NECESSARILY LIMITED TO WHAT IS SHOWN ON THE DEMOLITION PLAN. THE INTENT IS TO REMOVE ALL MECHANICAL, ELECTRICAL, AND ARCHITECTURAL ITEMS AS REQUIRED TO FACILITATE NEW CONSTRUCTION.

B. CONTRACTOR SHALL PROVIDE TEMPORARY DUSTPROOF PARTITIONS WITH DOORS AT LOCATIONS INDICATED AND/OR AS REQUIRED TO ADEQUATELY SEPARATE OCCUPIED AREAS FROM CONSTRUCTION HAZARDS, NOISE AND/OR DUST. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION. COORDINATE ALL LOCATIONS WITH ARCHITECT'S/OWNER'S REPRESENTATIVE.

C. CONTRACTOR SHALL PROVIDE DUST MATS AT ALL CONSTRUCTION AREA ENTRANCES AND EXIT LOCATIONS. COORDINATE ALL LOCATION'S WITH ARCHITECT'S/OWNER'S REPRESENTATIVES.

D. CONTRACTOR SHALL CONTINUOUSLY MAINTAIN ALL MEANS OF EGRESS AND ALL FIRE PROTECTION FEATURES FOR PORTIONS OF THE BUILDING THAT REMAIN OCCUPIED DURING CONSTRUCTION.

E. COORDINATE SCOPE AND EXTENT OF DEMOLITION WITH NEW WORK PLANS AND DETAILS.

GENERAL NOTESLEGENDDEMOLITION PLANNOTE: NOT ALL SYMBOLS MAY BE USED

EXISTING TO REMAIN

EXISTING CEILINGTO BE REMOVED

EXISTING FLOOR/FINISHTO BE REMOVED

EXISTING TO BE REMOVED

SAWCUT AND REMOVE PORTION OF CONC SLAB

COORDINATE W/ MECH REQUIREMENTS AND NEW WORK

KEYNOTESDEMOLITIONNOTE: NOT ALL NOTES MAY BE USED

D1 REMOVE ACOUSTICAL CEILING PANELS. GRID TOREMAIN.

D2 REMOVE CARPET AND RESILIENT WALL BASE

D3 REMOVE VCT FLOORING AND VINYL BASE

D4 REMOVE RESILIENT WAll BASE

D5 REMOVE RESILIENT STAIR TREADS AND RISERS

D6 REMOVE CARPET STAIR TREADS, RISERS, AND RESILNOSING.

D7 WALK OFF CARPET TO REMAIN

D8 ALUMINUM TRANSITION STRIP TO BE RE-USED

D2

D2 D2

D3

D2

D2

D2

08

CLASSROOM

13

CLASSROOM

12

CLASSROOM

11

CLASSROOM

10

CLASSROOM

9

CLASSROOM

26

WORKRM

27

MAINTENANCE

23

CORRIDOR

24

GYMNASIUM

25

STORAGE

28

CORRIDOR

07

CLASSROOM

06

CLASSROOM

05

CLASSROOM

04

CLASSROOM

03

CLASSROOM

18

COLLABORATION

17

CORRIDOR

02

CLASSROOM

01

MAINOFFICE

15

RESOURCERM

21

STORAGE20

OFFICE

18A

OFFICE

19

LOUNGE

18B

DHSOFFICE

14

MOTORRM

16

CORRIDOR

22

CORRIDOR

9A

CONFERNECE

D2

D3

D3

D2

D2

D2

D2

D2

D2

D3

D2

D3

D2

D3 D3

D3

D2

D3

D3

D2

D2

D2 D2

D2D2D2D2 D3 D3

D3

D2

D2 D3D2 D3

D3

D3

D3

D3

24A

GYMENTRANCE

D2

18C

HEADEND RM

01B

OFFICE

01A

OFFICE

01C

STORAGE

01D

TOILET

D8

D8

NORTH

Project Title

Key Plan

c

Project Designer

Q.M. Review

Approved

Drawing Scale

Project Number

Project Architect / Engineer

Drawn By

Project Administrator

2018 , LLC

Drawing Number

Reference Finish Floor Elevation: XXX'-X"

Issued for Issue Date

IDS Drawing Title

www.XXXXX.com

1441 west long lake, suite 200troy, michigan 48098

5211 cascade road SE, suite 300grand rapids, michigan 49546

248.823.2100www.ids-troy.com

FERNDALE SCHOOLS

C:\

Revi

t Local\17226 F

PS

Sinkin

g Fund-A

17_jc

outu

re@

ids-

troy.

com

.rvt

1/24/2018 3

:02:5

2 P

M

D. Giroux

B. Sundberg

J. Couture

A1.1

Couture/Easthope

C. Azar

J. Couture

Ferndale Public Schools

Ferndale High SchoolEarly Childhood Center

Ferndale Upper ElementaryFlooring and Ceilings

1/8" = 1'-0"

17226-2000

FECC - First Floor DemolitionPlan

50% Owner Review 1-9-18

Quality Management Review 1-16-18

Bids 1-23-18

Page 6: SCHOOLS Ferndale High School Early Childhood Center ... · mkbd markerboard mldg moulding mo masonry opening mrt marble threshold mtd mounted mull mullion no number nom nominal nrc

C

D

E

F

G

J

K

M

L

1 2 34

41

CLASSROOM

42

CLASSROOM

43

CLASSROOM

44

CLASSROOM

20

CORRIDOR

37

ROOM

D3

D3 D3

D3

D3

D3

D2

D2

D2

D2

D2

D2

D3

D3

D1

D1

D2

D1

D1

D1

D1 D1 D1

D1

D1

D1

D2

D1

D2

D2

D2

D2

D2

41A

STORAGE31A

STORAGE

44B

MECH

42B

MECH

D3

D3

D3

D3

19

CORRIDOR

17

CORRIDOR

D7

D7

DEMOLITION

A. ALL DEMOLITION WORK REQUIRED IS NOT NECESSARILY LIMITED TO WHAT IS SHOWN ON THE DEMOLITION PLAN. THE INTENT IS TO REMOVE ALL MECHANICAL, ELECTRICAL, AND ARCHITECTURAL ITEMS AS REQUIRED TO FACILITATE NEW CONSTRUCTION.

B. CONTRACTOR SHALL PROVIDE TEMPORARY DUSTPROOF PARTITIONS WITH DOORS AT LOCATIONS INDICATED AND/OR AS REQUIRED TO ADEQUATELY SEPARATE OCCUPIED AREAS FROM CONSTRUCTION HAZARDS, NOISE AND/OR DUST. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION. COORDINATE ALL LOCATIONS WITH ARCHITECT'S/OWNER'S REPRESENTATIVE.

C. CONTRACTOR SHALL PROVIDE DUST MATS AT ALL CONSTRUCTION AREA ENTRANCES AND EXIT LOCATIONS. COORDINATE ALL LOCATION'S WITH ARCHITECT'S/OWNER'S REPRESENTATIVES.

D. CONTRACTOR SHALL CONTINUOUSLY MAINTAIN ALL MEANS OF EGRESS AND ALL FIRE PROTECTION FEATURES FOR PORTIONS OF THE BUILDING THAT REMAIN OCCUPIED DURING CONSTRUCTION.

E. COORDINATE SCOPE AND EXTENT OF DEMOLITION WITH NEW WORK PLANS AND DETAILS.

GENERAL NOTES

LEGENDDEMOLITION PLANNOTE: NOT ALL SYMBOLS MAY BE USED

EXISTING TO REMAIN

EXISTING CEILINGTO BE REMOVED

EXISTING FLOOR/FINISHTO BE REMOVED

EXISTING TO BE REMOVED

SAWCUT AND REMOVE PORTION OF CONC SLAB

COORDINATE W/ MECH REQUIREMENTS AND NEW WORK

KEYNOTESDEMOLITIONNOTE: NOT ALL NOTES MAY BE USED

D1 REMOVE ACOUSTICAL CEILING PANELS. GRID TOREMAIN.

D2 REMOVE CARPET AND RESILIENT WALL BASE

D3 REMOVE VCT FLOORING AND VINYL BASE

D4 REMOVE RESILIENT WAll BASE

D5 REMOVE RESILIENT STAIR TREADS AND RISERS

D6 REMOVE CARPET STAIR TREADS, RISERS, AND RESILNOSING.

D7 WALK OFF CARPET TO REMAIN

D8 ALUMINUM TRANSITION STRIP TO BE RE-USED

NORTH

Project Title

Key Plan

c

Project Designer

Q.M. Review

Approved

Drawing Scale

Project Number

Project Architect / Engineer

Drawn By

Project Administrator

2018 , LLC

Drawing Number

Reference Finish Floor Elevation: XXX'-X"

Issued for Issue Date

IDS Drawing Title

A

www.XXXXX.com

1441 west long lake, suite 200troy, michigan 48098

5211 cascade road SE, suite 300grand rapids, michigan 49546

248.823.2100www.ids-troy.com

FERNDALE SCHOOLS

C:\

Revi

t Local\17226 F

PS

Sinkin

g Fund-A

17_jc

outu

re@

ids-

troy.

com

.rvt

1/24/2018 3

:02:5

3 P

M

D. Giroux

B. Sundberg

J. Couture

A1.2a

Couture/Easthope

C. Azar

J. Couture

Ferndale Public Schools

Ferndale High SchoolEarly Childhood Center

Ferndale Upper ElementaryFlooring and Ceilings

1/8" = 1'-0"

17226-2000

FUEL- First FloorDemolition Plan Area A

50% Owner Review 1-9-18

Quality Management Review 1-16-18

Bids 1-23-18

Page 7: SCHOOLS Ferndale High School Early Childhood Center ... · mkbd markerboard mldg moulding mo masonry opening mrt marble threshold mtd mounted mull mullion no number nom nominal nrc

UP

DEMOLITION

A. ALL DEMOLITION WORK REQUIRED IS NOT NECESSARILY LIMITED TO WHAT IS SHOWN ON THE DEMOLITION PLAN. THE INTENT IS TO REMOVE ALL MECHANICAL, ELECTRICAL, AND ARCHITECTURAL ITEMS AS REQUIRED TO FACILITATE NEW CONSTRUCTION.

B. CONTRACTOR SHALL PROVIDE TEMPORARY DUSTPROOF PARTITIONS WITH DOORS AT LOCATIONS INDICATED AND/OR AS REQUIRED TO ADEQUATELY SEPARATE OCCUPIED AREAS FROM CONSTRUCTION HAZARDS, NOISE AND/OR DUST. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION. COORDINATE ALL LOCATIONS WITH ARCHITECT'S/OWNER'S REPRESENTATIVE.

C. CONTRACTOR SHALL PROVIDE DUST MATS AT ALL CONSTRUCTION AREA ENTRANCES AND EXIT LOCATIONS. COORDINATE ALL LOCATION'S WITH ARCHITECT'S/OWNER'S REPRESENTATIVES.

D. CONTRACTOR SHALL CONTINUOUSLY MAINTAIN ALL MEANS OF EGRESS AND ALL FIRE PROTECTION FEATURES FOR PORTIONS OF THE BUILDING THAT REMAIN OCCUPIED DURING CONSTRUCTION.

E. COORDINATE SCOPE AND EXTENT OF DEMOLITION WITH NEW WORK PLANS AND DETAILS.

GENERAL NOTES

LEGENDDEMOLITION PLANNOTE: NOT ALL SYMBOLS MAY BE USED

EXISTING TO REMAIN

EXISTING CEILINGTO BE REMOVED

EXISTING FLOOR/FINISHTO BE REMOVED

EXISTING TO BE REMOVED

SAWCUT AND REMOVE PORTION OF CONC SLAB

COORDINATE W/ MECH REQUIREMENTS AND NEW WORK

KEYNOTESDEMOLITIONNOTE: NOT ALL NOTES MAY BE USED

D1 REMOVE ACOUSTICAL CEILING PANELS. GRID TOREMAIN.

D2 REMOVE CARPET AND RESILIENT WALL BASE

D3 REMOVE VCT FLOORING AND VINYL BASE

D4 REMOVE RESILIENT WAll BASE

D5 REMOVE RESILIENT STAIR TREADS AND RISERS

D6 REMOVE CARPET STAIR TREADS, RISERS, AND RESILNOSING.

D7 WALK OFF CARPET TO REMAIN

D8 ALUMINUM TRANSITION STRIP TO BE RE-USED

B

C

D

E

F

G

J

K

M

L

5

7 9 10 12 15 17 19

21

CLASSROOM

22

CLASSROOM

23

CLASSROOM

24

CLASSROOM

31

CLASSROOM

32

CLASSROOM

33

CLASSROOM

34

CLASSROOM

15

CORRIDOR

16

CORRIDOR

18

CORRIDOR

25

ROOM

26

ROOM27

ROOM

28

ROOM

29

ROOM

30

HEADEND RM

35

ROOM

36

ROOM

D3

D2

D2

D2

D2

D2 D1

D2

D1

D1

D1

D2

D1

D2

D2

D2

D2

D2

D3

D2

D2

D2

D2

D2 D1

D2

D1

D1

D1

D2

D1

D2

D2

D2

D2

D2

D2

D1

D2

D1

D2

D1

D2

D1

D2

D1

D2

D1

D2

D1

D2

D1

D3D3

D3

D1

D2

D1

MA

TC

H L

INE

A3.

1A

A2.

1A

A1.

1A

A3.

2B

A2.

2B

A1.

2B

D2

D3D3 D1

D1

D1D1

D2

D1 D2

D1

D1

D1

31A

STORAGE

21A

STORAGE

11A

STORAGE

24B

MECH

34B

MECH

32B

MECH22B

MECH

D1

36A

SPEECHOFFICE

D6

D3

D3

D3

D3

D3

D3

D3

D3

D7

D7

NORTH

Project Title

Key Plan

c

Project Designer

Q.M. Review

Approved

Drawing Scale

Project Number

Project Architect / Engineer

Drawn By

Project Administrator

2018 , LLC

Drawing Number

Reference Finish Floor Elevation: XXX'-X"

Issued for Issue Date

IDS Drawing Title

B

www.XXXXX.com

1441 west long lake, suite 200troy, michigan 48098

5211 cascade road SE, suite 300grand rapids, michigan 49546

248.823.2100www.ids-troy.com

FERNDALE SCHOOLS

C:\

Revi

t Local\17226 F

PS

Sinkin

g Fund-A

17_jc

outu

re@

ids-

troy.

com

.rvt

1/24/2018 3

:02:5

4 P

M

D. Giroux

B. Sundberg

J. Couture

A1.2b

Couture/Easthope

C. Azar

J. Couture

Ferndale Public Schools

Ferndale High SchoolEarly Childhood Center

Ferndale Upper ElementaryFlooring and Ceilings

1/8" = 1'-0"

17226-2000

FUEL- First Floor Demolition PlanArea B

D5

50% Owner Review 1-9-18

Quality Management Review 1-16-18

Bids 1-23-18

Page 8: SCHOOLS Ferndale High School Early Childhood Center ... · mkbd markerboard mldg moulding mo masonry opening mrt marble threshold mtd mounted mull mullion no number nom nominal nrc

DEMOLITION

A. ALL DEMOLITION WORK REQUIRED IS NOT NECESSARILY LIMITED TO WHAT IS SHOWN ON THE DEMOLITION PLAN. THE INTENT IS TO REMOVE ALL MECHANICAL, ELECTRICAL, AND ARCHITECTURAL ITEMS AS REQUIRED TO FACILITATE NEW CONSTRUCTION.

B. CONTRACTOR SHALL PROVIDE TEMPORARY DUSTPROOF PARTITIONS WITH DOORS AT LOCATIONS INDICATED AND/OR AS REQUIRED TO ADEQUATELY SEPARATE OCCUPIED AREAS FROM CONSTRUCTION HAZARDS, NOISE AND/OR DUST. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION. COORDINATE ALL LOCATIONS WITH ARCHITECT'S/OWNER'S REPRESENTATIVE.

C. CONTRACTOR SHALL PROVIDE DUST MATS AT ALL CONSTRUCTION AREA ENTRANCES AND EXIT LOCATIONS. COORDINATE ALL LOCATION'S WITH ARCHITECT'S/OWNER'S REPRESENTATIVES.

D. CONTRACTOR SHALL CONTINUOUSLY MAINTAIN ALL MEANS OF EGRESS AND ALL FIRE PROTECTION FEATURES FOR PORTIONS OF THE BUILDING THAT REMAIN OCCUPIED DURING CONSTRUCTION.

E. COORDINATE SCOPE AND EXTENT OF DEMOLITION WITH NEW WORK PLANS AND DETAILS.

GENERAL NOTES

LEGENDDEMOLITION PLANNOTE: NOT ALL SYMBOLS MAY BE USED

EXISTING TO REMAIN

EXISTING CEILINGTO BE REMOVED

EXISTING FLOOR/FINISHTO BE REMOVED

EXISTING TO BE REMOVED

SAWCUT AND REMOVE PORTION OF CONC SLAB

COORDINATE W/ MECH REQUIREMENTS AND NEW WORK

KEYNOTESDEMOLITIONNOTE: NOT ALL NOTES MAY BE USED

D1 REMOVE ACOUSTICAL CEILING PANELS. GRID TOREMAIN.

D2 REMOVE CARPET AND RESILIENT WALL BASE

D3 REMOVE VCT FLOORING AND VINYL BASE

D4 REMOVE RESILIENT WAll BASE

D5 REMOVE RESILIENT STAIR TREADS AND RISERS

D6 REMOVE CARPET STAIR TREADS, RISERS, AND RESILNOSING.

D7 WALK OFF CARPET TO REMAIN

D8 ALUMINUM TRANSITION STRIP TO BE RE-USED

23 25 27 32 34 35 36

37 40

1

CLASSROOM

2

CLASSROOM

3

ORCHESTRA

4

MUSIC

10

FACULTYLOUNGE

11

CLASSROOM

12

CLASSROOM

13

CLASSROOM

14

CLASSROOM

5

CAFETERIA

6

ROOM

7

WORKROOM

8

CORRIDOR

9

CORRIDOR

D3

D2

D2

D2

D2

D2 D1

D2

D1

D1

D1

D2

D1

D2

D2

D2

D2

D2

D3

D1

D2

D1

D3

D1

D2

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

MA

TC

H L

INE

A3.

1B

A2.

1B

A1.

1B

A3.

2C

A2.

2C

A1.

2C

D1

14B

MECH

05A

STORAGE

12B

MECH

5A

RAMP

8A

RAMP

8B

CORRIDOR

8C

CORRIDOR

D4

D4

D4

D4

D4

D4

D4

D4

D4D4

D5

D4

D4

D4

D4

D4

D4

D4

05B

CORRIDOR

D1D1

D3

D3

D3

D3

D7

D1

NORTH

Project Title

Key Plan

c

Project Designer

Q.M. Review

Approved

Drawing Scale

Project Number

Project Architect / Engineer

Drawn By

Project Administrator

2018 , LLC

Drawing Number

Reference Finish Floor Elevation: XXX'-X"

Issued for Issue Date

IDS Drawing Title

C

www.XXXXX.com

1441 west long lake, suite 200troy, michigan 48098

5211 cascade road SE, suite 300grand rapids, michigan 49546

248.823.2100www.ids-troy.com

FERNDALE SCHOOLS

C:\

Revi

t Local\17226 F

PS

Sinkin

g Fund-A

17_jc

outu

re@

ids-

troy.

com

.rvt

1/24/2018 3

:02:5

5 P

M

D. Giroux

B. Sundberg

J. Couture

A1.2c

Couture/Easthope

C. Azar

J. Couture

Ferndale Public Schools

Ferndale High SchoolEarly Childhood Center

Ferndale Upper ElementaryFlooring and Ceilings

1/8" = 1'-0"

17226-2000

FUEL- First Floor Demolition PlanArea C

50% Owner Review 1-9-18

Quality Management Review 1-16-18

Bids 1-23-18

Page 9: SCHOOLS Ferndale High School Early Childhood Center ... · mkbd markerboard mldg moulding mo masonry opening mrt marble threshold mtd mounted mull mullion no number nom nominal nrc

A. REFER TO ROOM FINSH SCHEDULE AND COLOR CODES FOR MORE INFORMATION.B. 09 6513 ALL IRREGULAR TRANSITIONS SHALL RECEIVE CURVED RUBBER

TRANSITION STRIP.

FINISH PLANS

GENERAL NOTES KEYNOTESFINISH PLANSNOTE: NOT ALL NOTES MAY BE USED

F1 NEW VINYL BASE

F2 EXISTING WALK OFF TILE TO REMAIN

F3 NEW RUBBER NOSING N-01

F4 NEW RUBBER STAIR TREAD AND RISER RTR-01

F5 REMOVE ALUM THRESHOLD. 03 3000 PATCH ANDREPAIR CONCRETE AT AS REQUIRED. APPLY 07 9200SEALANT AND REINSTALL THRESHOLD. REF DETAIL1/A9.1

LEGENDFINISH PLANNOTE: NOT ALL SYMBOLS MAY BE USED

09 6813 WALK OFF CARPET TILE CPT-04

09 6816 CARPET CPT-01

XX-XXFLOOR COLOR CODE TAG- REFER TO

ROOM FINISH SCHEDULE DRAWING A9.1

09 6813 TILE CARPETING INSTALLATION METHOD - ASHLAR

09 6813 TILE CARPETING INSTALLATION METHOD - MONOLITHIC

FLOOR MATERIAL TRANSITION TAGREFER TO A-- FOR TRANSITION/ SILL DETAILS

09 6813 CARPET TILE CPT-02

09 6816 CARPET CPT-03

09 6519 RESILIENT TILE FLOORING LVT-01

09 6813 TILE CARPETING INSTALLATION METHOD - QUARTER

TURN

N-D

09 6813 TILE CARPETING INSTALLATION METHOD - NON-

DIRECTIONAL

09 6519 RESILIENT TILE FLOORING LVT-02

09 6519 RESILIENT TILE FLOORING LVT-03

INDICATES INSTALL DIRECTION OF FLOORING MATERIAL - REF TO RFS

FOR ADDTIONAL INFORMATION

08

CLASSROOM

13

CLASSROOM

12

CLASSROOM

11

CLASSROOM

10

CLASSROOM

9

CLASSROOM

26

WORKRM

27

MAINTENANCE

23

CORRIDOR

24

GYMNASIUM

25

STORAGE

28

CORRIDOR

07

CLASSROOM

06

CLASSROOM

05

CLASSROOM

04

CLASSROOM

03

CLASSROOM

18

COLLABORATION

17

CORRIDOR

02

CLASSROOM

01

MAINOFFICE

15

RESOURCERM

21

STORAGE

20

OFFICE18A

OFFICE

19

LOUNGE

18B

DHSOFFICE14

MOTORRM

16

CORRIDOR

22

CORRIDOR

9A

CONFERNECE

TYP9' - 8"

TYP4' - 10"

6' - 3 3/8"

10' - 8 3/4"

10' -

1 1

/2"

2' -

10"

R 9' - 5 1/8"

TYP4' - 10"

TYP9' - 8"

TYP9' - 8"

TYP4' - 10"

TYP9' - 8"

TYP4' - 10"

TYP9' - 8"

TYP4' - 10"

4' - 11 1/2"

3' - 10"

23' - 5"

TYP9' - 8"

TYP4' - 10"

TYP9' - 8"

TYP4' - 10"

TYP9' - 8"

TYP4' - 10"

CPT-01 CPT-01 CPT-01 CPT-01CPT-01

CPT-01

CPT-01

CPT-01CPT-01

CPT-01CPT-01CPT-01CPT-01

CPT-01

CPT-01

CPT-01

LVT-01

CPT-01

CPT-01

CPT-01

CPT-01

CPT-01

CPT-01

CPT-01

TYP6' - 10"

TYP5' - 7" 6'

- 1

0 1/

2"9'

- 5

"8'

- 5

5/8

"

TYP9' - 5"

5' -

3 3

/4"

TYP6' - 10"

TYP5' - 7" 6'

- 1

0 1/

2"9'

- 5

"8'

- 5

5/8

"

TYP9' - 5"

5' -

3 3

/4"

TYP6' - 10"

TYP5' - 7" 6'

- 1

0 1/

2"9'

- 5

"8'

- 5

5/8

"

TYP9' - 5"

5' -

3 3

/4"

6' -

10

1/2"

9' -

5"

8' -

5 5

/8"

5' -

3 3

/4"

7' -

8 1

/2"

5' -

1 5

/8"

TYP5' - 7"

TYP6' - 10"

TYP9' - 5"

13' -

5 7

/8"

8' - 3 1/8"

3' -

9"

10' - 10"

1' - 1 3/4"

5' -

7 1

/8"

9' -

8"

9' -

7"

6' -

5"

4' -

11

5/8"

7' -

8 1

/2"

8' -

11

1/4"

5' -

9 1

/2"

5' - 6 1/2"3' - 6"

2' - 5 1/2"2' - 5 1/2"

4' - 8 1/2"

6' -

6"

5' -

0"

5' -

10

1/4"

7' -

9 1

/2"

9' -

1 1

/4"

5' - 6 1/2"3' - 6 1/8"

2' - 5 3/8"

2' - 5 1/2"

4' - 8 1/2"

7' -

1"

4' -

0 1

/4"

9' -

2 1

/8"

9' -

10"

3' - 7 1/4" 5' - 10 1/2"

2' - 11 3/4"

2' - 8 1/8"

2' - 2 1/8"

3' - 6 1/2"

TYP6' - 10"

TYP5' - 7"

TYP9' - 5"

TYP6' - 10"

TYP5' - 7"

TYP9' - 5"

TYP6' - 10"

TYP5' - 7"

TYP9' - 5"

TYP6' - 10"

TYP5' - 7"

TYP9' - 5"

23' - 10"

4' - 9 1/2"

19' - 10 1/2"

4' -

9 5

/8"

8' -

10"

4' -

3 5

/8"

4' -

8 1

/4"

8' -

5 1

/2"

8' - 0"

10' - 0 1/8"

6' - 8 1/4"

11' - 4 1/8"

14' - 8 7/8"

15' - 11"

10' -

3 1

/8"

6' -

7"

3' -

7"

3' -

2"

7' -

5 7

/8"

LVT-01 LVT-01 LVT-01 LVT-01

LVT-01

LVT-01

LVT-01

LVT-01 LVT-01 LVT-01 LVT-01LVT-01

LVT-01

LVT-01

LVT-01

LVT-01

LVT-01

24A

GYMENTRANCE

18C

HEADEND RM

CPT LVT CPT LVT CPT LVT CPT LVT

CPT LVT

CP

TLV

T

LVT

CP

T

LVT

CP

TC

PT

LVT

LVT

CP

T

LVT

CP

T

(E) CPT

LVT CPT

(E) LVT LVT (E)

(E) LVT LVT (E)

LVT

(E)

LVT

(E)

LVT

(E)

LVT

(E)

LVT

(E)

LVT (E)

LVT (E)

LVT CPT

(E) LVT

CPT LVT

CPT LVT

CPT LVT CPT LVT CPT LVT CPT LVTCPT LVT

CPT LVT

CP

TLV

T

CPT LVT

LVT CPT

R 24' - 9 3/4"

R 2

4' -

9 3/

4"

R 14' - 8 5/8"

R 1

4' -

8 5/

8"

30' - 3"6' - 9" 5' - 0"

2' - 2 1/2"LVT-01 LVT-01

LVT-01 LVT-01

10 1

/4"

24' -

0 1

/4"

24' -

0 1

/4"

7' - 2"

7' - 2"

10 3

/8"

2' - 2 3/8"

4' -

7 3

/8"

7' -

6 1

/2"

7' -

6 3

/8"

4' -

7 3

/8"

01D

TOILET

01B

OFFICE01A

OFFICE

01C

STORAGE

F5 F5 F5 F5 F5 F5

F5

F5

F5 F5 F5 F5

F5 F5

F5

1

A9.1

________

NORTH

Project Title

Key Plan

c

Project Designer

Q.M. Review

Approved

Drawing Scale

Project Number

Project Architect / Engineer

Drawn By

Project Administrator

2018 , LLC

Drawing Number

Reference Finish Floor Elevation: XXX'-X"

Issued for Issue Date

IDS Drawing Title

www.XXXXX.com

1441 west long lake, suite 200troy, michigan 48098

5211 cascade road SE, suite 300grand rapids, michigan 49546

248.823.2100www.ids-troy.com

FERNDALE SCHOOLS

C:\

Revi

t Local\17226 F

PS

Sinkin

g Fund-A

17_jc

outu

re@

ids-

troy.

com

.rvt

1/24/2018 3

:02:5

7 P

M

D. Giroux

B. Sundberg

T. Easthope

A2.1

Couture/Easthope

C. Azar

J. Couture

Ferndale Public Schools

Ferndale High SchoolEarly Childhood Center

Ferndale Upper ElementaryFlooring and Ceilings

1/8" = 1'-0"

17226-2000

FECC - First Floor FinishPlan

50% Owner Review 1-9-18

Quality Management Review 1-16-18

Bids 1-23-18

Page 10: SCHOOLS Ferndale High School Early Childhood Center ... · mkbd markerboard mldg moulding mo masonry opening mrt marble threshold mtd mounted mull mullion no number nom nominal nrc

E

F

G

J

K

M

L

1 2 3 4

41

CLASSROOM

42

CLASSROOM

43

CLASSROOM

44

CLASSROOM

17

CORRIDOR

18

CORRIDOR

19

CORRIDOR

20

CORRIDOR

37

CLASSROOM

19A

FOYER

41A

STORAGE

44A

CORRIDOR

42A

CORRIDOR

45

CLASSROOM

46

CLASSROOM

47

GYMNASIUM

31A

STORAGE

44B

MECH

42B

MECH

LVT-03LVT-03

LVT-03

LVT-03

LVT-03

LVT-03

LVT-03

CPT-03

CPT-03

CPT-03

CPT-03

LVT-01

LVT-01

LVT-02

CPT-03

CP

TLV

T

(E) LVT

LVT (E)

LVT

(E)

LVT

(E)

LVT

(E)

LVT

(E)

(E)

LVT

(E)

LVT

CPT LVT

CPT LVT

CPT LVT

CPT LVT

LVT

CP

TLV

TC

PT

LVT

CP

TLV

TC

PT

LVT

CP

T

TYP6' - 9"

TYP10' - 0"

TY

P13

' - 0

"T

YP

6' -

8 1

/2"

TY

P5'

- 1

1"T

YP

5' -

11"

CPT-03

CPT-03

(E) CPT

(E) CPT

(E) CPT

CPT (E)

(E) CPT

(E) CPT

(E) CPT

CPT (E)

(E) LVT

CPT-04

LVT CPT

LVT-01

F2

TY

P5'

- 1

1"T

YP

5' -

11"

LEGENDFINISH PLANNOTE: NOT ALL SYMBOLS MAY BE USED

09 6813 WALK OFF CARPET TILE CPT-04

09 6816 CARPET CPT-01

XX-XXFLOOR COLOR CODE TAG- REFER TO

ROOM FINISH SCHEDULE DRAWING A9.1

09 6813 TILE CARPETING INSTALLATION METHOD - ASHLAR

09 6813 TILE CARPETING INSTALLATION METHOD - MONOLITHIC

FLOOR MATERIAL TRANSITION TAGREFER TO A-- FOR TRANSITION/ SILL DETAILS

09 6813 CARPET TILE CPT-02

09 6816 CARPET CPT-03

09 6519 RESILIENT TILE FLOORING LVT-01

09 6813 TILE CARPETING INSTALLATION METHOD - QUARTER

TURN

N-D

09 6813 TILE CARPETING INSTALLATION METHOD - NON-

DIRECTIONAL

09 6519 RESILIENT TILE FLOORING LVT-02

09 6519 RESILIENT TILE FLOORING LVT-03

INDICATES INSTALL DIRECTION OF FLOORING MATERIAL - REF TO RFS

FOR ADDTIONAL INFORMATION

KEYNOTESFINISH PLANSNOTE: NOT ALL NOTES MAY BE USED

F1 NEW VINYL BASE

F2 EXISTING WALK OFF TILE TO REMAIN

F3 NEW RUBBER NOSING N-01

F4 NEW RUBBER STAIR TREAD AND RISER RTR-01

F5 REMOVE ALUM THRESHOLD. 03 3000 PATCH ANDREPAIR CONCRETE AT AS REQUIRED. APPLY 07 9200SEALANT AND REINSTALL THRESHOLD. REF DETAIL1/A9.1

A. REFER TO ROOM FINSH SCHEDULE AND COLOR CODES FOR MORE INFORMATION.B. 09 6513 ALL IRREGULAR TRANSITIONS SHALL RECEIVE CURVED RUBBER

TRANSITION STRIP.

FINISH PLANS

GENERAL NOTES

NORTH

Project Title

Key Plan

c

Project Designer

Q.M. Review

Approved

Drawing Scale

Project Number

Project Architect / Engineer

Drawn By

Project Administrator

2018 , LLC

Drawing Number

Reference Finish Floor Elevation: XXX'-X"

Issued for Issue Date

IDS Drawing Title

A

www.XXXXX.com

1441 west long lake, suite 200troy, michigan 48098

5211 cascade road SE, suite 300grand rapids, michigan 49546

248.823.2100www.ids-troy.com

FERNDALE SCHOOLS

C:\

Revi

t Local\17226 F

PS

Sinkin

g Fund-A

17_jc

outu

re@

ids-

troy.

com

.rvt

1/24/2018 3

:02:5

8 P

M

D. Giroux

B. Sundberg

T.Easthope

A2.2a

Couture/Easthope

C. Azar

J. Couture

Ferndale Public Schools

Ferndale High SchoolEarly Childhood Center

Ferndale Upper ElementaryFlooring and Ceilings

1/8" = 1'-0"

17226-2000

FUEL - Finish Plan Area A

50% Owner Review 1-9-18

Quality Management Review 1-16-18

Bids 1-23-18

Page 11: SCHOOLS Ferndale High School Early Childhood Center ... · mkbd markerboard mldg moulding mo masonry opening mrt marble threshold mtd mounted mull mullion no number nom nominal nrc

B

C

D

E

F

G

J

K

M

L

5 7 9 10 12 15 17 19

21

CLASSROOM

22

CLASSROOM

23

CLASSROOM

24

CLASSROOM

31

CLASSROOM

32

CLASSROOM

33

CLASSROOM

34

CLASSROOM

15

CORRIDOR

16

CORRIDOR

25

MAINOFFICE

26

OFFICE

27

OFFICE

28

WORKROOM

29

WORKROOM

35

CLASSROOM

36

MEDIACENTER

36A

SPEECHOFFICE

34A

CORRIDOR

32A

CORRIDOR

31A

STORAGE21A

STORAGE

24A

CORRIDOR

25A

TOILET

11A

STORAGE

34B

MECH

24B

MECH

32B

MECH

22B

MECH22A

CORRIDOR

TY

P5'

- 1

1"

TYP10' - 0"

TY

P13

' - 0

"

TYP6' - 9"

TYP10' - 0"

TY

P13

' - 0

"

TYP6' - 9"

CPT-03

CPT-03

LVT-01

CPT-03

LVT-03

CPT-03

LVT-03

CPT-03

LVT-03

LVT-01

LVT-03

CPT-03

LVT-03

LVT-02

LVT-03

LVT-01

CPT-03

LVT-03

CPT-03

LVT-03

CPT-03

LVT-03

CPT-03

LVT-03

CPT-03

CPT-03

LVT-02

LVT-01

CPT-03

CPT-03

CPT-03

CPT-03

CPT-03CPT-03

CPT-03

CPT-03

LVT-03

CPT-03 CPT-03

CPT-03

CPT-03

CPT-03

LVT

CP

T

CPT LVT

LVT

CP

T

CP

TLV

T

CPT LVT

CPT LVT

CPT LVT

CP

TLV

T

CP

TLV

T

CP

TLV

T

CP

TLV

T

(E)

LVT

(E)

CP

T

(E) CPT

LVT CPT

(E) CPT

CPT (E)CP

TLV

T

CP

TLV

TC

PT

LVT

LVT

CP

TLV

TC

PT

CPT LVT

CPT LVT

CPT LVT

CPT LVT

(E) CPT

(E) CPT

(E) CPT CPT (E)

(E) CPT

CPT (E)(E) CPT

(E) CPT

LVT

CP

T

(E) CPT

CPT (E)(E) CPT

(E) CPT

(E) CPT

CPT (E)(E) CPT

(E) CPT

LVT-01

LVT CPT

CPT-04

LVT CPT

CPT-04

LVT-01

F2

F2

30

HEADEND RM

18

CORRIDOR

39A

RAMP

39

FOYER

F4

F3

F3

TY

P5'

- 1

1"T

YP

5' -

11"

TY

P5'

- 1

1"

TY

P5'

- 1

1"T

YP

5' -

11"

TY

P5'

- 1

1"T

YP

5' -

11"

TY

P6'

- 8

1/2

"

TY

P6'

- 8

1/2

"

LEGENDFINISH PLANNOTE: NOT ALL SYMBOLS MAY BE USED

09 6813 WALK OFF CARPET TILE CPT-04

09 6816 CARPET CPT-01

XX-XXFLOOR COLOR CODE TAG- REFER TO

ROOM FINISH SCHEDULE DRAWING A9.1

09 6813 TILE CARPETING INSTALLATION METHOD - ASHLAR

09 6813 TILE CARPETING INSTALLATION METHOD - MONOLITHIC

FLOOR MATERIAL TRANSITION TAGREFER TO A-- FOR TRANSITION/ SILL DETAILS

09 6813 CARPET TILE CPT-02

09 6816 CARPET CPT-03

09 6519 RESILIENT TILE FLOORING LVT-01

09 6813 TILE CARPETING INSTALLATION METHOD - QUARTER

TURN

N-D

09 6813 TILE CARPETING INSTALLATION METHOD - NON-

DIRECTIONAL

09 6519 RESILIENT TILE FLOORING LVT-02

09 6519 RESILIENT TILE FLOORING LVT-03

INDICATES INSTALL DIRECTION OF FLOORING MATERIAL - REF TO RFS

FOR ADDTIONAL INFORMATION

A. REFER TO ROOM FINSH SCHEDULE AND COLOR CODES FOR MORE INFORMATION.B. 09 6513 ALL IRREGULAR TRANSITIONS SHALL RECEIVE CURVED RUBBER

TRANSITION STRIP.

FINISH PLANS

GENERAL NOTES

KEYNOTESFINISH PLANSNOTE: NOT ALL NOTES MAY BE USED

F1 NEW VINYL BASE

F2 EXISTING WALK OFF TILE TO REMAIN

F3 NEW RUBBER NOSING N-01

F4 NEW RUBBER STAIR TREAD AND RISER RTR-01

F5 REMOVE ALUM THRESHOLD. 03 3000 PATCH ANDREPAIR CONCRETE AT AS REQUIRED. APPLY 07 9200SEALANT AND REINSTALL THRESHOLD. REF DETAIL1/A9.1

NORTH

Project Title

Key Plan

c

Project Designer

Q.M. Review

Approved

Drawing Scale

Project Number

Project Architect / Engineer

Drawn By

Project Administrator

2018 , LLC

Drawing Number

Reference Finish Floor Elevation: XXX'-X"

Issued for Issue Date

IDS Drawing Title

B

www.XXXXX.com

1441 west long lake, suite 200troy, michigan 48098

5211 cascade road SE, suite 300grand rapids, michigan 49546

248.823.2100www.ids-troy.com

FERNDALE SCHOOLS

C:\

Revi

t Local\17226 F

PS

Sinkin

g Fund-A

17_jc

outu

re@

ids-

troy.

com

.rvt

1/24/2018 3

:03:0

0 P

M

D. Giroux

B. Sundberg

T. Easthope

A2.2b

Couture/Easthope

C. Azar

J. Couture

Ferndale Public Schools

Ferndale High SchoolEarly Childhood Center

Ferndale Upper ElementaryFlooring and Ceilings

1/8" = 1'-0"

17226-2000

FUEL - Finish Plan Area B

50% Owner Review 1-9-18

Quality Management Review 1-16-18

Bids 1-23-18

Page 12: SCHOOLS Ferndale High School Early Childhood Center ... · mkbd markerboard mldg moulding mo masonry opening mrt marble threshold mtd mounted mull mullion no number nom nominal nrc

D

E

F

G

J

K

M

L

23 25 27 32 34 35 36

37 40

01

CLASSROOM

02

CLASSROOM

03

ORCHESTRA

04

MUSIC

10

CLASSROOM

11

CLASSROOM

12

CLASSROOM

13

CLASSROOM

14

CLASSROOM

05

CAFETERIA

06

TEACHERPLANNING

07

WORKROOM08

CORRIDOR

09

CORRIDOR

14A

CORRIDOR

12A

CORRIDOR

05A

STORAGE

05B

CORRIDOR

08A

CORRIDOR

08B

CORRIDOR

03A

STORAGE

03B

STORAGE

05A

RAMP

14B

MECH

12B

MECH

8C

CORRIDOR

TYP10' - 0"

TY

P13

' - 0

"

TYP6' - 9"

TY

P5'

- 1

1"T

YP

5' -

11"

LVT-03

LVT-02

CPT-03

LVT-03

CPT-03

LVT-03

CPT-03

LVT-03

CPT-03

LVT-03

LVT-01

LVT-03

LVT-01

CPT-03

CPT-03

CPT-03

CPT-03

CPT LVT

CPT LVT

CPT LVT

CPT LVT

CP

TLV

TLV

TC

PT

LVT

CP

T

LVT

CP

T

CP

TLV

T

(E) CPT

(E) CPT

(E) CPT

CPT (E)

(E) CPT

(E) CPT

(E) CPT

CPT (E)

CPT (E)LVT CPTC

PT

(E)

CP

T(E

)

CPT (E)

LVT (E)

LVT CPT

CPT-04LVT-01

F1

F1

F1

F1

F1

F1

F1

F2

F1

F4

TY

P5'

- 1

1"T

YP

5' -

11"

TY

P6'

- 8

1/2

"

LEGENDFINISH PLANNOTE: NOT ALL SYMBOLS MAY BE USED

09 6813 WALK OFF CARPET TILE CPT-04

09 6816 CARPET CPT-01

XX-XXFLOOR COLOR CODE TAG- REFER TO

ROOM FINISH SCHEDULE DRAWING A9.1

09 6813 TILE CARPETING INSTALLATION METHOD - ASHLAR

09 6813 TILE CARPETING INSTALLATION METHOD - MONOLITHIC

FLOOR MATERIAL TRANSITION TAGREFER TO A-- FOR TRANSITION/ SILL DETAILS

09 6813 CARPET TILE CPT-02

09 6816 CARPET CPT-03

09 6519 RESILIENT TILE FLOORING LVT-01

09 6813 TILE CARPETING INSTALLATION METHOD - QUARTER

TURN

N-D

09 6813 TILE CARPETING INSTALLATION METHOD - NON-

DIRECTIONAL

09 6519 RESILIENT TILE FLOORING LVT-02

09 6519 RESILIENT TILE FLOORING LVT-03

INDICATES INSTALL DIRECTION OF FLOORING MATERIAL - REF TO RFS

FOR ADDTIONAL INFORMATION

A. REFER TO ROOM FINSH SCHEDULE AND COLOR CODES FOR MORE INFORMATION.B. 09 6513 ALL IRREGULAR TRANSITIONS SHALL RECEIVE CURVED RUBBER

TRANSITION STRIP.

FINISH PLANS

GENERAL NOTES

KEYNOTESFINISH PLANSNOTE: NOT ALL NOTES MAY BE USED

F1 NEW VINYL BASE

F2 EXISTING WALK OFF TILE TO REMAIN

F3 NEW RUBBER NOSING N-01

F4 NEW RUBBER STAIR TREAD AND RISER RTR-01

F5 REMOVE ALUM THRESHOLD. 03 3000 PATCH ANDREPAIR CONCRETE AT AS REQUIRED. APPLY 07 9200SEALANT AND REINSTALL THRESHOLD. REF DETAIL1/A9.1

NORTH

Project Title

Key Plan

c

Project Designer

Q.M. Review

Approved

Drawing Scale

Project Number

Project Architect / Engineer

Drawn By

Project Administrator

2018 , LLC

Drawing Number

Reference Finish Floor Elevation: XXX'-X"

Issued for Issue Date

IDS Drawing Title

C

www.XXXXX.com

1441 west long lake, suite 200troy, michigan 48098

5211 cascade road SE, suite 300grand rapids, michigan 49546

248.823.2100www.ids-troy.com

FERNDALE SCHOOLS

C:\

Revi

t Local\17226 F

PS

Sinkin

g Fund-A

17_jc

outu

re@

ids-

troy.

com

.rvt

1/24/2018 3

:03:0

1 P

M

D. Giroux

B. Sundberg

T. Easthope

A2.2c

Couture/Easthope

C. Azar

J. Couture

Ferndale Public Schools

Ferndale High SchoolEarly Childhood Center

Ferndale Upper ElementaryFlooring and Ceilings

1/8" = 1'-0"

17226-2000

FUEL - Finish Plan Area C

50% Owner Review 1-9-18

Quality Management Review 1-16-18

Bids 1-23-18

Page 13: SCHOOLS Ferndale High School Early Childhood Center ... · mkbd markerboard mldg moulding mo masonry opening mrt marble threshold mtd mounted mull mullion no number nom nominal nrc

S

222

CLASSROOM

223

CLASSROOM

224

OFFICE

A1A1A1

A2

A2A2

A2

A2A2

A2

A2

NOTE: REFER TO SHEET 2.3B FOR NEW FINISHES

NEW WORK FLOOR PLANS

A. REFER TO DRAWING A9.1 FOR FINISH SCHEDULE AND COLORS.

B. PARTIAL WALL POCHEING IS SHOWN THROUGHOUT THIS PLAN AND THE TERMINATION OF SAME SHALL NOT BE CONSTRUED TO REPRESENT A CHANGE IN WALL MATERIAL. VERIFY WALL MATERIALS WITH PARTITION TYPES AND SCHEDULES.

C. PATCH AND/OR REPAIR ALL EXISTING FLOOR, WALL AND OR CEILING FINISHES AS REQUIRED TO MATCH EXISTING OR TO ACCEPT NEW FINISHES AS SCHEDULED AT ALL AREAS AFFECTED BY THE DEMOLITION WORK. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL SCOPE OF WORK.

D. INFILL ALL OPENINGS IN EXISTING WALLS ABOVE CEILINGS THAT ARE THE RESULT OF MECHANICAL OR ELECTRICAL DEMOLITION. OPENINGS IN MASONRY WALLS SHALL BE FILLED WITH MASONRY OF SIMILAR TYPES AND THICKNESS AS EXISTING. OPENINGS IN OTHER TYPES OF WALL CONSTRUCTION SHALL MATCH EXISTING MATERIALS. FINISHES AND WALL THICKNESS. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR SCOPE OF WORK..

E. PROVIDE POSITIVE SLOPE TO ALL FLOOR DRAINS WHILE KEEPING FLOOR LEVEL AT WALL BASE..

GENERAL NOTES

LEGENDNEW WORK FLOOR PLANNOTE: NOT ALL SYMBOLS MAY BE USED

SHALL COMPLY WITHBARRIER FREE

REQUIREMENTS

PARTITION TYPE - REFER TO PARTITION DETAILS DRAWING AX.X

SIGN NUMBER - REFER TO SCHEDULE DRAWING AX.X

EXISTING CONSTRUCTION

NEW CONSTRUCTION

X0X

CASEWORK/ MILLWORK TAGREFER TO AX.X FOR PLAN DETAILS

XXXX

CORNER GUARD

KEYNOTESNEW WORK FLOOR PLANNOTE: NOT ALL NOTES MAY BE USED

A1 PROVIDE 03 5416 HYDRAULIC CEMENTUNDERLAYMENT IN AREAS OF UNLEVEL CONCRETE.V.I.F.

A2 09 9100 PATCH WALLS AS REQID AND PAINT WALLS.REFER TO FINISH SCHEDULE.

222

CLASSROOM

223

CLASSROOM

224

OFFICE

D2D2D2

29' - 5 3/8" 31' - 5" 11' - 1 1/2"

39' -

2 1

/2"

DEMOLITION

A. ALL DEMOLITION WORK REQUIRED IS NOT NECESSARILY LIMITED TO WHAT IS SHOWN ON THE DEMOLITION PLAN. THE INTENT IS TO REMOVE ALL MECHANICAL, ELECTRICAL, AND ARCHITECTURAL ITEMS AS REQUIRED TO FACILITATE NEW CONSTRUCTION.

B. CONTRACTOR SHALL PROVIDE TEMPORARY DUSTPROOF PARTITIONS WITH DOORS AT LOCATIONS INDICATED AND/OR AS REQUIRED TO ADEQUATELY SEPARATE OCCUPIED AREAS FROM CONSTRUCTION HAZARDS, NOISE AND/OR DUST. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION. COORDINATE ALL LOCATIONS WITH ARCHITECT'S/OWNER'S REPRESENTATIVE.

C. CONTRACTOR SHALL PROVIDE DUST MATS AT ALL CONSTRUCTION AREA ENTRANCES AND EXIT LOCATIONS. COORDINATE ALL LOCATION'S WITH ARCHITECT'S/OWNER'S REPRESENTATIVES.

D. CONTRACTOR SHALL CONTINUOUSLY MAINTAIN ALL MEANS OF EGRESS AND ALL FIRE PROTECTION FEATURES FOR PORTIONS OF THE BUILDING THAT REMAIN OCCUPIED DURING CONSTRUCTION.

E. COORDINATE SCOPE AND EXTENT OF DEMOLITION WITH NEW WORK PLANS AND DETAILS.

GENERAL NOTES

LEGENDDEMOLITION PLANNOTE: NOT ALL SYMBOLS MAY BE USED

EXISTING TO REMAIN

EXISTING CEILINGTO BE REMOVED

EXISTING FLOOR/FINISHTO BE REMOVED

EXISTING TO BE REMOVED

SAWCUT AND REMOVE PORTION OF CONC SLAB

COORDINATE W/ MECH REQUIREMENTS AND NEW WORK

KEYNOTESDEMOLITIONNOTE: NOT ALL NOTES MAY BE USED

D1 REMOVE ACOUSTICAL CEILING PANELS. GRID TOREMAIN.

D2 REMOVE CARPET AND RESILIENT WALL BASE

D3 REMOVE VCT FLOORING AND VINYL BASE

D4 REMOVE RESILIENT WAll BASE

D5 REMOVE RESILIENT STAIR TREADS AND RISERS

D6 REMOVE CARPET STAIR TREADS, RISERS, AND RESILNOSING.

D7 WALK OFF CARPET TO REMAIN

D8 ALUMINUM TRANSITION STRIP TO BE RE-USED

KEYNOTESFINISH PLANSNOTE: NOT ALL NOTES MAY BE USED

F1 NEW VINYL BASE

F2 EXISTING WALK OFF TILE TO REMAIN

F3 NEW RUBBER NOSING N-01

F4 NEW RUBBER STAIR TREAD AND RISER RTR-01

F5 REMOVE ALUM THRESHOLD. 03 3000 PATCH ANDREPAIR CONCRETE AT AS REQUIRED. APPLY 07 9200SEALANT AND REINSTALL THRESHOLD. REF DETAIL1/A9.1

A. REFER TO ROOM FINSH SCHEDULE AND COLOR CODES FOR MORE INFORMATION.B. 09 6513 ALL IRREGULAR TRANSITIONS SHALL RECEIVE CURVED RUBBER

TRANSITION STRIP.

FINISH PLANS

GENERAL NOTES

LEGENDFINISH PLANNOTE: NOT ALL SYMBOLS MAY BE USED

09 6813 WALK OFF CARPET TILE CPT-04

09 6816 CARPET CPT-01

XX-XXFLOOR COLOR CODE TAG- REFER TO

ROOM FINISH SCHEDULE DRAWING A9.1

09 6813 TILE CARPETING INSTALLATION METHOD - ASHLAR

09 6813 TILE CARPETING INSTALLATION METHOD - MONOLITHIC

FLOOR MATERIAL TRANSITION TAGREFER TO A-- FOR TRANSITION/ SILL DETAILS

09 6813 CARPET TILE CPT-02

09 6816 CARPET CPT-03

09 6519 RESILIENT TILE FLOORING LVT-01

09 6813 TILE CARPETING INSTALLATION METHOD - QUARTER

TURN

N-D

09 6813 TILE CARPETING INSTALLATION METHOD - NON-

DIRECTIONAL

09 6519 RESILIENT TILE FLOORING LVT-02

09 6519 RESILIENT TILE FLOORING LVT-03

INDICATES INSTALL DIRECTION OF FLOORING MATERIAL - REF TO RFS

FOR ADDTIONAL INFORMATION

CP

T(E

) T

ER

R

CP

T(E

) T

ER

R

CP

T(E

) T

ER

R

CP

T(E

) T

ER

R

222

CLASSROOM

223

CLASSROOM

224

OFFICE

CPT-02 CPT-02 CPT-02

SSS

S

D N

D N

U P

D N

U P

D N

D N

U P

D NU P

D N

U P

COURTYARD

COURT YARD

COURTYARD

Project Title

Key Plan

c

Project Designer

Q.M. Review

Approved

Drawing Scale

Project Number

Project Architect / Engineer

Drawn By

Project Administrator

2018 , LLC

Drawing Number

Reference Finish Floor Elevation: XXX'-X"

Issued for Issue Date

IDS Drawing Title

www.XXXXX.com

1441 west long lake, suite 200troy, michigan 48098

5211 cascade road SE, suite 300grand rapids, michigan 49546

248.823.2100www.ids-troy.com

FERNDALE SCHOOLS

C:\

Revi

t Local\17226 F

PS

Sinkin

g Fund-A

17_jc

outu

re@

ids-

troy.

com

.rvt

1/24/2018 3

:03:0

3 P

M

D. Giroux

B. Sundberg

J. Couture

A2.3

Couture/Easthope

C. Azar

J. Couture

Ferndale Public Schools

Ferndale High SchoolEarly Childhood Center

Ferndale Upper ElementaryFlooring and Ceilings

1/8" = 1'-0"

17226-2000

FHS Enlarged Demo, New Work,& Finish Plan

1/8" = 1'-0"A0.4

ENLARGED NEW WORK PLAN1

1/8" = 1'-0"A0.4

ENLARGED DEMOLITION PLAN2

NEW WORK

1/8" = 1'-0"A0.4

ENLARGED FINISH PLAN3

50% Owner Review 1-9-18

Quality Management Review 1-16-18

Bids 1-23-18

Page 14: SCHOOLS Ferndale High School Early Childhood Center ... · mkbd markerboard mldg moulding mo masonry opening mrt marble threshold mtd mounted mull mullion no number nom nominal nrc

NEW WORK REFLECTED CEILING PLANS

A. DISCONNECT AND RE CONNECT CEILING MOUNTED DEVICES AS REQUIRED TO INSTALL CEILING PADS INCLUDING, BUT NOT LIMITED TO: SPRINKLER HEADS, WIRELESS ACCESS POINTS, OCCUPANCY SENSORS, SPEAKERS AND FIRE ALARM DEVICES. NOT ALL DEVICES ARE LOCATED ON THE DRAWINGS. FIELD VERIFY

B. HANDLING OF ANY DEVICE CONNECTED TO THE FIRE ALARM SYSTEM NEEDS TO BE COORDINATED, AND RE-CERIFIED BY THE OWNER'S FIRE ALARM SERVICE CONTRACTOR.

C. CEILING HEIGHTS ARE 9'-0" UNLESS OTHERWISE NOTED

GENERAL NOTES

RECESSED DOWNLIGHT

RECESSED LINEAR LIGHT FIXTURE

PENDANT LIGHT FIXTURE

PENDANT LINEAR LIGHT FIXTURE

LIGHT FIXTURE

LINEAR RETURN DIFFUSER

LINEAR SUPPLY DIFFUSER

RETURN AIR REGISTER/GRILLS

SUPPLY AIR DIFFUSER

LIGHTING OCCUPANCY SENSOR

FIRE ALARM DEVICE

SPEAKER

SPRINKLER HEAD

CEILING PAD REPLACEMENT AND

PAINT EXIST GRID

LEGENDREFLECTED CEILING PLANNOTE: NOT ALL SYMBOLS MAY BE USED

INDUSTRIAL LIGHT FIXTURE

MICROPHONE

PHOTOELECTRIC SWITCH

EXIT SIGN

ACCESS PANEL (24X24 UON)

WIRELESS ACCESS POINT

RADIANT CEILING PANEL

F

KEYNOTESREFLECTED CEILING PLANNOTE: NOT ALL NOTES MAY BE USED

C1 09 5113 ACOUSTICAL TILE CEILING PANEL AND 09 9100PAINT EXISTING GRID

C2 EXISTING GYPSUM BOARD

B

C

D

E

F

G

J

K

M

L

1 2 3 4

41

CLASSROOM

42

CLASSROOM

43

CLASSROOM

44

CLASSROOM

17

CORRIDOR

19

CORRIDOR

20

CORRIDOR

37

CLASSROOM

C2

C1

C2

C2

C2

C2

C1

C2

C2

C1C2C2C1C1

C1

C2

C2

C1

C1

C2

C2 C2

C1

19A

FOYER

41A

STORAGE

44A

CORRIDOR

42A

CORRIDOR

45

CLASSROOM

46

CLASSROOM

47

GYMNASIUM

31A

STORAGE

18

CORRIDOR

18

CORRIDOR

18

CORRIDOR

18

CORRIDOR

NORTH

Project Title

Key Plan

c

Project Designer

Q.M. Review

Approved

Drawing Scale

Project Number

Project Architect / Engineer

Drawn By

Project Administrator

2018 , LLC

Drawing Number

Reference Finish Floor Elevation: XXX'-X"

Issued for Issue Date

IDS Drawing Title

A

www.XXXXX.com

1441 west long lake, suite 200troy, michigan 48098

5211 cascade road SE, suite 300grand rapids, michigan 49546

248.823.2100www.ids-troy.com

FERNDALE SCHOOLS

C:\

Revi

t Local\17226 F

PS

Sinkin

g Fund-A

17_jc

outu

re@

ids-

troy.

com

.rvt

1/24/2018 3

:03:0

5 P

M

D. Giroux

B. Sundberg

J. Couture

A3.2a

Couture/Easthope

C. Azar

J. Couture

Ferndale Public Schools

Ferndale High SchoolEarly Childhood Center

Ferndale Upper ElementaryFlooring and Ceilings

1/8" = 1'-0"

17226-2000

FUEL - First Floor ReflectedCeiling Plan Area A

50% Owner Review 1-9-18

Quality Management Review 1-16-18

Bids 1-23-18

Page 15: SCHOOLS Ferndale High School Early Childhood Center ... · mkbd markerboard mldg moulding mo masonry opening mrt marble threshold mtd mounted mull mullion no number nom nominal nrc

B

C

D

E

F

G

J

K

M

L

5 7 9 10 12 15 17 19 21

09

CORRIDOR

26

OFFICE

21

CLASSROOM

22

CLASSROOM

23

CLASSROOM

24

CLASSROOM

31

CLASSROOM

32

CLASSROOM

33

CLASSROOM

34

CLASSROOM

15

CORRIDOR

16

CORRIDOR

18

CORRIDOR

25

MAINOFFICE

27

OFFICE

28

WORKROOM

29

WORKROOM

35

CLASSROOM

36

MEDIACENTER

OPEN TO ABOVE

C1

C1

C1

C1 C1 C1

C1

C1

C1

C1

C1C1

C1

EXIST GYP BD

EXIST GYP BD

EXIST GYP BD

EXIST GYP BD

C2

C2

C2

C2

C2

C2

C2

C1

C2C1 C1

C1

C1

C1

C1

C1

C1

36A

SPEECHOFFICE

34A

CORRIDOR

32A

CORRIDOR

21A

STORAGE

24A

CORRIDOR

25A

TOILET

11A

STORAGE

________A6.1

1ALTERNATE NO. 1

MA

TC

H L

INE

A3.

1B

A2.

1B

A1.

1B

A3.

2C

A2.

2C

A1.

2C

MA

TC

H L

INE

A3.

1A

A2.

1A

A1.

1A

A3.

2B

A2.

2B

A1.

2B

C1

C1

________A6.1

6________A6.1

5

39

FOYER39A

RAMP

N.I.C.

NEW WORK REFLECTED CEILING PLANS

A. DISCONNECT AND RE CONNECT CEILING MOUNTED DEVICES AS REQUIRED TO INSTALL CEILING PADS INCLUDING, BUT NOT LIMITED TO: SPRINKLER HEADS, WIRELESS ACCESS POINTS, OCCUPANCY SENSORS, SPEAKERS AND FIRE ALARM DEVICES. NOT ALL DEVICES ARE LOCATED ON THE DRAWINGS. FIELD VERIFY

B. HANDLING OF ANY DEVICE CONNECTED TO THE FIRE ALARM SYSTEM NEEDS TO BE COORDINATED, AND RE-CERIFIED BY THE OWNER'S FIRE ALARM SERVICE CONTRACTOR.

C. CEILING HEIGHTS ARE 9'-0" UNLESS OTHERWISE NOTED

GENERAL NOTES

RECESSED DOWNLIGHT

RECESSED LINEAR LIGHT FIXTURE

PENDANT LIGHT FIXTURE

PENDANT LINEAR LIGHT FIXTURE

LIGHT FIXTURE

LINEAR RETURN DIFFUSER

LINEAR SUPPLY DIFFUSER

RETURN AIR REGISTER/GRILLS

SUPPLY AIR DIFFUSER

LIGHTING OCCUPANCY SENSOR

FIRE ALARM DEVICE

SPEAKER

SPRINKLER HEAD

CEILING PAD REPLACEMENT AND

PAINT EXIST GRID

LEGENDREFLECTED CEILING PLANNOTE: NOT ALL SYMBOLS MAY BE USED

INDUSTRIAL LIGHT FIXTURE

MICROPHONE

PHOTOELECTRIC SWITCH

EXIT SIGN

ACCESS PANEL (24X24 UON)

WIRELESS ACCESS POINT

RADIANT CEILING PANEL

F

KEYNOTESREFLECTED CEILING PLANNOTE: NOT ALL NOTES MAY BE USED

C1 09 5113 ACOUSTICAL TILE CEILING PANEL AND 09 9100PAINT EXISTING GRID

C2 EXISTING GYPSUM BOARD

NORTH

Project Title

Key Plan

c

Project Designer

Q.M. Review

Approved

Drawing Scale

Project Number

Project Architect / Engineer

Drawn By

Project Administrator

2018 , LLC

Drawing Number

Reference Finish Floor Elevation: XXX'-X"

Issued for Issue Date

IDS Drawing Title

B

www.XXXXX.com

1441 west long lake, suite 200troy, michigan 48098

5211 cascade road SE, suite 300grand rapids, michigan 49546

248.823.2100www.ids-troy.com

FERNDALE SCHOOLS

C:\

Revi

t Local\17226 F

PS

Sinkin

g Fund-A

17_jc

outu

re@

ids-

troy.

com

.rvt

1/24/2018 3

:03:0

6 P

M

D. Giroux

B. Sundberg

J. Couture

A3.2b

Couture/Easthope

C. Azar

J. Couture

Ferndale Public Schools

Ferndale High SchoolEarly Childhood Center

Ferndale Upper ElementaryFlooring and Ceilings

1/8" = 1'-0"

17226-2000

FUEL - First Floor ReflectedCeiling Plan Area B

50% Owner Review 1-9-18

Quality Management Review 1-16-18

Bids 1-23-18

Page 16: SCHOOLS Ferndale High School Early Childhood Center ... · mkbd markerboard mldg moulding mo masonry opening mrt marble threshold mtd mounted mull mullion no number nom nominal nrc

E

21

21

23

23

25

25

27

27

32

32

34

34

35

35

36

36

37

37

40

40

01

CLASSROOM

02

CLASSROOM

03

ORCHESTRA

04

MUSIC

10

CLASSROOM

11

CLASSROOM

12

CLASSROOM

13

CLASSROOM

14

CLASSROOM

05

CAFETERIA

06

TEACHERPLANNING

07

WORKROOM

08

CORRIDOR

09

CORRIDOR

SLOPED CEILING HIGH POINT 21'-9"

SLOPED CEILING LOW POINT 17'-4"

SLOPED CEILING LOW POINT 17'-4"

14A

CORRIDOR

12A

CORRIDOR

05A

STORAGE

05B

CORRIDOR

08A

CORRIDOR08B

CORRIDOR

03A

STORAGE

03B

STORAGE

05A

RAMP

22' - 0"

MA

TC

H L

INE

A3.

1B

A2.

1B

A1.

1B

A3.

2C

A2.

2C

A1.

2C

NEW WORK REFLECTED CEILING PLANS

A. DISCONNECT AND RE CONNECT CEILING MOUNTED DEVICES AS REQUIRED TO INSTALL CEILING PADS INCLUDING, BUT NOT LIMITED TO: SPRINKLER HEADS, WIRELESS ACCESS POINTS, OCCUPANCY SENSORS, SPEAKERS AND FIRE ALARM DEVICES. NOT ALL DEVICES ARE LOCATED ON THE DRAWINGS. FIELD VERIFY

B. HANDLING OF ANY DEVICE CONNECTED TO THE FIRE ALARM SYSTEM NEEDS TO BE COORDINATED, AND RE-CERIFIED BY THE OWNER'S FIRE ALARM SERVICE CONTRACTOR.

C. CEILING HEIGHTS ARE 9'-0" UNLESS OTHERWISE NOTED

GENERAL NOTES

RECESSED DOWNLIGHT

RECESSED LINEAR LIGHT FIXTURE

PENDANT LIGHT FIXTURE

PENDANT LINEAR LIGHT FIXTURE

LIGHT FIXTURE

LINEAR RETURN DIFFUSER

LINEAR SUPPLY DIFFUSER

RETURN AIR REGISTER/GRILLS

SUPPLY AIR DIFFUSER

LIGHTING OCCUPANCY SENSOR

FIRE ALARM DEVICE

SPEAKER

SPRINKLER HEAD

CEILING PAD REPLACEMENT AND

PAINT EXIST GRID

LEGENDREFLECTED CEILING PLANNOTE: NOT ALL SYMBOLS MAY BE USED

INDUSTRIAL LIGHT FIXTURE

MICROPHONE

PHOTOELECTRIC SWITCH

EXIT SIGN

ACCESS PANEL (24X24 UON)

WIRELESS ACCESS POINT

RADIANT CEILING PANEL

F

KEYNOTESREFLECTED CEILING PLANNOTE: NOT ALL NOTES MAY BE USED

C1 09 5113 ACOUSTICAL TILE CEILING PANEL AND 09 9100PAINT EXISTING GRID

C2 EXISTING GYPSUM BOARD

NORTH

Project Title

Key Plan

c

Project Designer

Q.M. Review

Approved

Drawing Scale

Project Number

Project Architect / Engineer

Drawn By

Project Administrator

2018 , LLC

Drawing Number

Reference Finish Floor Elevation: XXX'-X"

Issued for Issue Date

IDS Drawing Title

C

www.XXXXX.com

1441 west long lake, suite 200troy, michigan 48098

5211 cascade road SE, suite 300grand rapids, michigan 49546

248.823.2100www.ids-troy.com

FERNDALE SCHOOLS

C:\

Revi

t Local\17226 F

PS

Sinkin

g Fund-A

17_jc

outu

re@

ids-

troy.

com

.rvt

1/24/2018 3

:03:0

7 P

M

D. Giroux

B. Sundberg

J. Couture

A3.2c

Couture/Easthope

C. Azar

J. Couture

Ferndale Public Schools

Ferndale High SchoolEarly Childhood Center

Ferndale Upper ElementaryFlooring and Ceilings

1/8" = 1'-0"

17226-2000

FUEL - First Floor ReflectedCeiling Plan Area C

50% Owner Review 1-9-18

Quality Management Review 1-16-18

Bids 1-23-18

Page 17: SCHOOLS Ferndale High School Early Childhood Center ... · mkbd markerboard mldg moulding mo masonry opening mrt marble threshold mtd mounted mull mullion no number nom nominal nrc

4

A6.1

________

________A6.1

2

3"

3"

3"

3"

3"

3"

3"

2 1/2"

3"

3"

3"

3"

3"

5' - 7" 5' - 6 1/2" 3' - 5 5/8"

5' - 7" 5' - 6 1/2" 5' - 4 1/8"

5' - 7" 5' - 6 1/2" 1' - 7 5/8"

10 1

/4"

4' -

3 1

/8"

5' -

4 3

/8"

5' -

10

3/4"

3' -

9"

5' -

4 3

/8"

9' - 3"

8' - 4"

DASHED LINE OF STEPS BELOW

09 8436 2" SOUND ABSORBING CEILING UNIT

NEW HVAC SUPPLY DIFFUSER BY OWNER.MFR: PRICE MODEL SDMP (WHITE).EXTEND EXISTING 10" DIA FLEX

EXISTING SUPPLY DIFFUSER TO BE REMOVED. EXTEND FLEX DUCT AND PROVIDE NEW DIFFUSER IN NEW LOCATION

LEGEND

09 8436 SOUND ABSORBING CEILING UNIT FP-01 (GREY)

09 8436 SOUND ABSORBING CEILING UNIT FP-02 (WHITE)

4

A6.1

________

6"

3' - 3 7/8"

60.00°

60.00°

60.0

60.00°

60.00°

60.0

________A6.1

3

3" TYP.

4" DIA PENDANT LIGHT "LB"N.I.C.

1' - 4 3/8"

8 3/8"1' - 3 1/8" 1' - 3 1/8"

1' - 4 3/8"

S.P.

S.P.

S.P.S.P.

S.P.

S.P.S.P.

S.P.09 8436 SOUND ABSORBING CEILING UNIT

3' - 4 1/4"

R 11 1/8"

R 1 3/8"R 1 3/8"

FIRST FLOOR100' - 0"

8' -

0"

9' -

3"

8' -

4"

09 8436 2 " SOUND ABSORBING CEILING UNIT (ALTERNATE NO.1)

09 5113 ACOUSTICAL PANELS IN EXISTING GRID (BASE BID)

NEW HVAC SUPPLY DIFFUSER BY OWNER.MFR: PRICE MODEL SDMP (WHITE).EXTEND EXISTING 10" DIA FLEX

EXIST DUCT

S S

DISCONNECT AND REMOVE LAY-IN FIXTURES

NL

TO EXIST LTG.IN VESTIBULE

NL

TYPE "LB"MTD @ 8'-4" FLUSH WITH BOTTOM OF SOUND ABSORBING CEILING UNIT

"LB"NL

"LB"

"LB"

"LB"

"LB"

"LB"

"LB"

"LB"NL

"LB"NL

"LA""LA"

PB-44 BUTTON DIGITALSWITCH

NL

TYPE "LC", TYPMOUNTED TO TOP OF 09 8436 SOUND ABSORBING CEILING UNIT; RCP-1-3, BUTTON 3, UPLIGHTS ON/OFF

TO EXIST DOWNLIGHTIN CORRIDOR

RCP-1-1,BUTTON 1, CORRIDORLIGHTS ON/OFF

RCP-1-2,BUTTON 2DOWN LIGHTS ON/OFF

RCP-1-4,BUTTON 4,VESTIBULE ON/OFF

39

FOYER

27

OFFICE

18

CORRIDOR

1. CONNECT FIXTURES TO EXISTING CIRCUIT PREVIOUSLY FEEDING THIS AREA. VERIFY RP-2, CUSTODIAL CLOSET (ROOM 35A).2. COORDINATE ALL CEILING TRIMS AND MOUNTING HARDWARE WITH ARCH TRADES.3 PROVIDE RELAY PANEL BY LC&D, ACUITY BLUE BOX LT-8 WITH AUTO OFF SET AT 12:00 AM FOR MICHIGAN ENERGY COMPLIANCE. BLINK TWICE BEFORE FIXTURES GO OFF. PB-4 SHALL TURN LIGHTS ON AND OFF. PROVIDED BY LC&D: CHELSEA DIGITAL SWITCH. 4 BUTTON STATION ENGRAVED W/ WHITE FINISH. 4. CONNECT RCP-1 TO SPARE 102V-20A SINGLE POLE CIRCUIT IN EXIST RP-2 PANEL.

NOTES:

Project Title

Key Plan

c

Project Designer

Q.M. Review

Approved

Drawing Scale

Project Number

Project Architect / Engineer

Drawn By

Project Administrator

2018 , LLC

Drawing Number

Reference Finish Floor Elevation: XXX'-X"

Issued for Issue Date

IDS Drawing Title

As Noted

www.XXXXX.com

1441 west long lake, suite 200troy, michigan 48098

5211 cascade road SE, suite 300grand rapids, michigan 49546

248.823.2100www.ids-troy.com

FERNDALE SCHOOLS

C:\

Revi

t Local\17226 F

PS

Sinkin

g Fund-A

17_jc

outu

re@

ids-

troy.

com

.rvt

1/24/2018 3

:03:0

9 P

M

D. Giroux

B. Sundberg

J. Couture

A6.1

Couture/Easthope

C. Azar

J. Couture

Ferndale Public Schools

Ferndale High SchoolEarly Childhood Center

Ferndale Upper ElementaryFlooring and Ceilings

17226-2000

Enlarged AM&E Plans & Details -Alternate No. 1

3/8" = 1'-0"A3.2b

ENLARGED REFLECTED CEILING PLAN - ALT NO. 11

1" = 1'-0"A6.1

PANEL ARANGEMENT DETAIL2

3" = 1'-0"A6.1

SOUND ABSORBING CEILING UNIT DETAIL3

1/4" = 1'-0"A6.1

SECTION4

1/4" = 1'-0"A3.2b

ELECTRICAL DEMOLITION PLAN5

1/4" = 1'-0"A3.2b

LIGHTING PLAN6

FIXTURE SCHEDULE

N.I.C.

Quality Management Review 1-16-18

Bids 1-23-18

NOTE: SLASH MARKS INDICATE ELECTRICAL EQUIPMENT TO BE REMOVED

Page 18: SCHOOLS Ferndale High School Early Childhood Center ... · mkbd markerboard mldg moulding mo masonry opening mrt marble threshold mtd mounted mull mullion no number nom nominal nrc

ROOM FINISH SCHEDULEABBREVIATIONS

AC PANEL ACOUSTICAL PANELAC TILE ACOUSTICAL TILEAC WP ACOUSTICAL WALL PANELCC COLOR CODECMU CONCRETE MASONRY UNITCT CERAMIC TILECEM PLAS CEMENT PLASTERCONC CONCRETEDEFS DIRECT APPLIED EXTERIOR FINISH SYSTEM(E) EXISTING FINISHEIFS EXTERIOR INSULATION FINISH SYSTEME PT EPOXY PAINTEDE TERR EPOXY TERRAZZOENTR MAT ENTRY MAT SYSTEMEXP CONST EXPOSED CONSTRUCTIONFWC FABRIC WALL COVERINGGF CMU GROUND FACE CONCRETE MASONRY UNITGL CMU GLAZED CONCRETE MASONRY UNITGYP BD GYPSUM BOARDHD/SLR HARDENER/ SEALERIR GYP BD IMPACT RESISTANT GYPSUM BOARDLIMEST LIMESTONELIN MET LINEAR METALLINO LINOLEUMMCC MULTI-COLORED COATINGMET PANEL METAL PANELP'LAM PLASTIC LAMINATEPAVER T PAVER TILEPLAS PLASTERPOL CONC POLISHED CONCRETEPORC T PORCELAIN TILEPT PAINTQT QUARRY TILERT RUBBER TILERESIN FLR RESINOUS FLOORINGRESIL RESILIENTSGFT STRUCTURAL GLAZED FACING TILESHT V SHEET VINYLSLD SURF SOLID SURFACE MATERIALSS STAINLESS STEELSTN STAINTC TRAFFIC COATINGTERR TERRAZZOVCT VINYL COMPOSITION TILEVWC VINYL WALLCOVERINGVEN PLAS VENEER PLASTERWD WOOD

ROOM FINISH SCHEDULEGENERAL REMARKS

* REFER TO ABBREVIATIONS LIST FOR MATERIAL CODE DESCRIPTIONS

A. "ROOM NUMBER AND ROOM NAME" CORRESPOND TO THE NUMBER AND NAMES INDICATED ON THE DRAWINGS.

B. "MATERIAL/FINISH" INDICATE THE SPECIFIC MATERIALS AND FINISHES TO BE USED TO CONSTRUCT AND FINISH THE FLOORS, BASE, WALLS AND CEILINGS.

C. "CC" INDICATES THE COLOR CODE FOR EACH MATERIAL AND/OR FINISH, REFER TO "COLOR CODES".

D. "REMARKS" INDICATES ANY SPECIAL REQUIREMENTS FOR THE MATERIAL AND FINISH IN A ROOM - SEE "ROOM FINISH SCHEDULE REMARKS".

E. "STAIR NUMBER" CORRESPONDS TO THE NUMBERS INDICATED ON THE DRAWINGS.

F. "LEVEL" INDICATES THE BUILDING FLOOR LINE FROM WHICH MATERIALS AND FINISHES ARE DESCRIBED AND EXTENDS TO THE BUILDING FLOOR LINE ABOVE.

G. "FLOORS" OCCUR AT BUILDING FLOOR LINES AND "LANDINGS" OCCUR IN BETWEEN BUILDING FLOOR LINES.

H. "CEILING" IS THE MATERIAL AND FINISH AT THE UNDERSIDE OF THE FLOOR OR ROOF ABOVE. "SOFFIT" IS THE MATERIAL AND FINISH AT THE UNDERSIDE OF THE STAIR RUN.

I. REFER TO A10 SERIES FOR FLOOR TILE PATTERNS AND MATERIALS.

J. REFER TO A8 SERIES INTERIOR ELEVATIONS FOR LIMITS AND LOCATIONS.

K. "E" PREFIX TO THE "PT" CODE REFER TO EPOXY PAINT MATERIAL (E PT-XX).

ROOM FINISH SCHEDULEREMARKS

1. PARTIAL CEILING PAD REPLACEMENT2. ALTERNATE 01: 09 8436 SOUND ABSORBING CEILING UNIT SUSPENDED BELOW AC-01

TOP OF FLOOR SLAB

FACE OF WALL BEYOND

EXIST EXTERIOR DOOR

REMOVE AND RE-INSTALL EXIST ALUM THRESHOLD TO OVER LAP NEW LVT

03 3000 PATCH AND GRIND SMOOTH (AS REQUIRED) AREAS OF CONCRETE UNDER EXIST THRESHOLD AND AREAS OF LVT AT DOOR

9200 SEALANT

EXTERIOR PAVEMENT

FLOOR FINISH AS SCHEDULED

Project Title

Key Plan

c

Project Designer

Q.M. Review

Approved

Drawing Scale

Project Number

Project Architect / Engineer

Drawn By

Project Administrator

2018 , LLC

Drawing Number

Reference Finish Floor Elevation: XXX'-X"

Issued for Issue Date

IDS Drawing Title

As Noted

www.XXXXX.com

1441 west long lake, suite 200troy, michigan 48098

5211 cascade road SE, suite 300grand rapids, michigan 49546

248.823.2100www.ids-troy.com

FERNDALE SCHOOLS

C:\

Revi

t Local\17226 F

PS

Sinkin

g Fund-A

17_jc

outu

re@

ids-

troy.

com

.rvt

1/24/2018 3

:03:0

9 P

M

D. Giroux

B. Sundberg

J. Couture

A9.1

Couture/Easthope

C. Azar

J. Couture

Ferndale Public Schools

Ferndale High SchoolEarly Childhood Center

Ferndale Upper ElementaryFlooring and Ceilings

17226-2000

Room Finish Schedule

SCHEDULE - ROOM FINISH

NUMBER NAME

FLOOR BASE WALL CEILING

REMARKSFLOOR MATERIAL/FINISH N S E W N S E WCEILING

MATERIAL/FINISH

FECC

01 MAIN OFFICE CPT-01 B-01 B-01 B-01 B-01 - - - - -

01A OFFICE CPT-01 B-01 B-01 B-01 B-01 - - - - -

01B OFFICE CPT-01 B-01 B-01 B-01 B-01 - - - - -

01C STORAGE LVT-01 B-01 B-01 B-01 B-01 - - - - -

01D TOILET LVT-01 B-01 B-01 B-01 B-01 - - - - -

02 CLASSROOM CPT-01, LVT-01 B-01 B-01 B-01 B-01 - - - - -

03 CLASSROOM CPT-01, LVT-01 B-01 B-01 B-01 B-01 - - - - -

04 CLASSROOM CPT-01, LVT-01 B-01 B-01 B-01 B-01 - - - - -

05 CLASSROOM CPT-01, LVT-01 B-01 B-01 B-01 B-01 - - - - -

06 CLASSROOM CPT-01, LVT-01 B-01 B-01 B-01 B-01 - - - - -

07 CLASSROOM CPT-01, LVT-01 B-01 B-01 B-01 B-01 - - - - -

08 CLASSROOM CPT-01, LVT-01 B-01 B-01 B-01 B-01 - - - - -

9 CLASSROOM CPT-01, LVT-01 B-01 B-01 B-01 B-01 - - - - -

9A CONFERNECE CPT-01 B-01 B-01 B-01 B-01 - - - - -

10 CLASSROOM CPT-01, LVT-01 B-01 B-01 B-01 B-01 - - - - -

11 CLASSROOM CPT-01, LVT-01 B-01 B-01 B-01 B-01 - - - - -

12 CLASSROOM CPT-01, LVT-01 B-01 B-01 B-01 B-01 - - - - -

13 CLASSROOM CPT-01, LVT-01 B-01 B-01 B-01 B-01 - - - - -

14 MOTOR RM CPT-01, LVT-01 B-01 B-01 B-01 B-01 - - - - -

15 RESOURCE RM CPT-01, LVT-01 B-01 B-01 B-01 B-01 - - - - -

16 CORRIDOR LVT-01 B-01 B-01 B-01 B-01 -

18 COLLABORATION CPT-01, LVT-01 B-01 B-01 B-01 B-01 - - - - -

18B DHS OFFICE CPT-01 B-01 B-01 B-01 B-01 - - - - -

18C HEAD END RM - - - - - - - - - -

19 LOUNGE CPT-01, LVT-01 B-01 B-01 B-01 B-01 - - - - -

20 OFFICE CPT-01 B-01 B-01 B-01 B-01 - - - - -

21 STORAGE - - - - - - - - - -

22 CORRIDOR LVT-01 B-01 B-01 B-01 B-01 - - - - -

23 CORRIDOR LVT-01 B-01 B-01 B-01 B-01 - - - - -

24 GYMNASIUM - - - - - - - - - -

24A GYM ENTRANCE LVT-01 B-01 B-01 B-01 B-01 - - - - -

25 STORAGE - - - - - - - - - -

26 WORK RM - - - - - - - - - -

27 MAINTENANCE - - - - - - - - - -

28 CORRIDOR LVT-01 B-01 B-01 B-01 B-01 - - - - -

FHS

222 CLASSROOM CPT-02 B-02 B-02 B-02 B-02 PT-ME PT-ME PT-ME PT-ME -

223 CLASSROOM CPT-02 B-02 B-02 B-02 B-02 PT-ME PT-ME PT-ME PT-ME -

224 OFFICE CPT-02 B-02 B-02 B-02 B-02 PT-ME PT-ME PT-ME PT-ME -

FUEL

01 CLASSROOM - - - - - - - - - AC PANEL 1

02 CLASSROOM - - - - - - - - - AC PANEL 1

03 ORCHESTRA - B-01 B-01 B-01 B-01 - - - - AC PANEL

03A STORAGE - - - - - - - - - AC PANEL

03B STORAGE - - - - - - - - - AC PANEL

04 MUSIC - B-01 B-01 B-01 B-01 - - - - AC PANEL

05 CAFETERIA - B-01 B-01 B-01 B-01 - - - - AC PANEL

05A STORAGE - - - - - - - - - -

05A RAMP - B-01 B-01 B-01 B-01 - - - - AC PANEL

05B CORRIDOR - B-01 B-01 B-01 B-01 - - - - AC PANEL

06 TEACHER PLANNING CPT-03 B-01 B-01 B-01 B-01 - - - - AC PANEL

07 WORK ROOM CPT-03 B-01 B-01 B-01 B-01 - - - - AC PANEL

08 CORRIDOR CPT-04, LVT-01, LVT-02 B-01 B-01 B-01 B-01 - - - - AC PANEL

08A CORRIDOR - B-01 B-01 B-01 B-01 - - - - AC PANEL

08B CORRIDOR - B-01 B-01 B-01 B-01 - - - - AC PANEL

8C CORRIDOR - B-01 B-01 B-01 B-01

09 CORRIDOR LVT-02, LVT-03 B-01 B-01 B-01 B-01 - - - - AC PANEL

10 CLASSROOM - - - - - - - - - -

11 CLASSROOM CPT-03, LVT-03 B-01 B-01 B-01 B-01 - - - - EXPOSED

11A STORAGE - - - - - - - - - -

12 CLASSROOM CPT-03, LVT-03 B-01 B-01 B-01 B-01 - - - - EXPOSED

12A CORRIDOR CPT-03 B-01 B-01 B-01 B-01 - - - - AC PANEL

12B MECH - - - - - - - - - -

13 CLASSROOM CPT-03, LVT-03 B-01 B-01 B-01 B-01 - - - - EXPOSED

14 CLASSROOM CPT-03, LVT-03 B-01 B-01 B-01 B-01 - - - - EXPOSED

14A CORRIDOR CPT-03 B-01 B-01 B-01 B-01 - - - - AC PANEL

14B MECH - - - - - - - - -

15 CORRIDOR CPT-04, LVT-01, LVT-02 B-01 B-01 B-01 B-01 - - - - AC PANEL

16 CORRIDOR CPT-04, LVT-01, LVT-02 B-01 B-01 B-01 B-01 - - - - AC PANEL

17 CORRIDOR CPT-04, LVT-01, LVT-02 B-01 B-01 B-01 B-01 - - - - AC PANEL

18 CORRIDOR LVT-03 B-01 B-01 B-01 B-01 - - - - AC PANEL

19 CORRIDOR LVT-02, LVT-03 B-01 B-01 B-01 B-01 - - - - AC PANEL

19A FOYER - B-01 B-01 B-01 B-01 - - - - AC PANEL

20 CORRIDOR LVT-03 B-01 B-01 B-01 B-01 - - - - AC PANEL

21 CLASSROOM CPT-03, LVT-03 B-01 B-01 B-01 B-01 - - - - EXPOSED

21A STORAGE - - - - - - - - - -

22 CLASSROOM CPT-03, LVT-03 B-01 B-01 B-01 B-01 - - - - EXPOSED

22A CORRIDOR CPT-03 B-01 B-01 B-01 B-01 - - - - AC PANEL

22B MECH - - - - - - - - - -

23 CLASSROOM CPT-03, LVT-03 B-01 B-01 B-01 B-01 - - - - EXPOSED

24 CLASSROOM CPT-03, LVT-03 B-01 B-01 B-01 B-01 - - - - EXPOSED

24A CORRIDOR CPT-03 B-01 B-01 B-01 B-01 - - - - AC PANEL

24B MECH - - - - - - - - - -

25 MAIN OFFICE CPT-03 B-01 B-01 B-01 B-01 - - - - AC PANEL

25A TOILET - - - - - - - - - AC PANEL

26 OFFICE CPT-03 B-01 B-01 B-01 B-01 - - - - AC PANEL

27 OFFICE CPT-03 B-01 B-01 B-01 B-01 - - - - AC PANEL

28 WORK ROOM CPT-03 B-01 B-01 B-01 B-01 - - - - AC PANEL

29 WORK ROOM CPT-03 B-01 B-01 B-01 B-01 - - - - AC PANEL

30 HEAD END RM - - - - - - - - - -

31 CLASSROOM CPT-03, LVT-03 B-01 B-01 B-01 B-01 - - - - EXPOSED

31A STORAGE - - - - - - - - - -

32 CLASSROOM CPT-03, LVT-03 B-01 B-01 B-01 B-01 - - - - EXPOSED

32A CORRIDOR CPT-03 B-01 B-01 B-01 B-01 - - - - AC PANEL

32B MECH - - - - - - - - - -

33 CLASSROOM CPT-03, LVT-03 B-01 B-01 B-01 B-01 - - - - EXPOSED

34 CLASSROOM CPT-03, LVT-03 B-01 B-01 B-01 B-01 - - - - EXPOSED

34A CORRIDOR CPT-03 B-01 B-01 B-01 B-01 - - - - AC PANEL

34B MECH - - - - - - - - - -

35 CLASSROOM CPT-03 B-01 B-01 B-01 B-01 - - - - AC PANEL

35A CUSTODIAL - - - - - - - - - -

36 MEDIA CENTER CPT-03 B-01 B-01 B-01 B-01 - - - - AC PANEL

36A SPEECH OFFICE CPT-03 B-01 B-01 B-01 B-01 - - - - AC PANEL

37 CLASSROOM CPT-03 B-01 B-01 B-01 B-01 - - - - AC PANEL

39 FOYER (E) CPT-04 - - - - - - - - AC PANEL 2

39A RAMP LVT-03 B-01 B-01 B-01 B-01 - - - - AC PANEL

41 CLASSROOM CPT-03, LVT-03 B-01 B-01 B-01 B-01 - - - - EXPOSED

41A STORAGE - - - - - - - - - -

42 CLASSROOM CPT-03, LVT-03 B-01 B-01 B-01 B-01 - - - - EXPOSED

42A CORRIDOR CPT-03 B-01 B-01 B-01 B-01 - - - - AC PANEL

42B MECH - - - - - - - - - -

43 CLASSROOM CPT-03, LVT-03 B-01 B-01 B-01 B-01 - - - - EXPOSED

44 CLASSROOM CPT-03, LVT-03 B-01 B-01 B-01 B-01 - - - - EXPOSED

44A CORRIDOR CPT-03 B-01 B-01 B-01 B-01 - - - - AC PANEL

44B MECH - - - - - - - - -

45 CLASSROOM - - - - - - - - - -

46 CLASSROOM - - - - - - - - - -

47 GYMNASIUM - B-01 B-01 B-01 B-01 - - - - -

SCHEDULE- COLOR CODESCOLOR CODES PRODUCT/ MATERIAL CON DOC NO. MANUFACTURER PRODUCT NAME PRODUCT NUMBER COLOR NAME/ NUMBER FINISH NOTES

AC-01 ACOUSTICAL CEILING TILE 09 5123 USG MILLENNIA ILLUSION 78780 WHITE

B-01 RESIL BASE 09 6513 JOHNSONITE TRADITIONAL RUBBER WALLBASE

63 BURNT UMBER 63 4"H COVE

B-02 RESIL BASE 09 6513 MATCH EXISTING

CPT-01 CARPET 09 6816 TANDUS CENTIVA NOVA 04707 6296190005 FALLING STAR 51505 POWER BOND CHEMICAL SEAL

CPT-02 CARPET TILE 09 6813 SHAW CONTRACT TRANSPARENT TILE 59563 CLEARVIEW BLUE MOON FHS

CPT-03 CARPET 09 6816 TANDUS CENTIVA AFTERMATH ll 03026 629879029 FLEECE 23508 POWER BOND CHEMICAL SEAL

CPT-04 WALK OFF CARPET TILE 09 6813 TANDUS CENTIVA ABRASIVE ACTION II 02578 CHARCOAL 19100 WALK OFF

FP-01 SOUND ABSORBING CEILING UNIT 09 8436 CARNEGIE STRIE 6423-807 GREY CEILING PANELS

FP-02 SOUND ABSORBING CEILING UNIT 09 8436 CARNEGIE STRIE 6423-813 WHITE CEILING PANELS

LVT-01 RESILIENT TILE FLOORING 09 6519 SHAW CONTRACT UNVEIL 0601V 01103 FADED 30 MIL 9"x36"

LVT-02 RESILIENT TILE FLOORING 09 6519 PATCRAFT STRATIFIED+ 1321V 00790 SHALE 20 MIL 6"x24"

LVT-03 RESILIENT TILE FLOORING 09 6519 SHAW CONTRACT UNVEIL 0601V 01530 30 MIL 9"x36"

N-01 RUBBER NOSING 09 6513 JOHNSONITE SLIM LINE NOSING SLN-63-B BURNT UMBER 63

PT-ME PAINT 09 9100 MATCH EXISTING

RTR- 01 RUBBER TREAD RISER 09 6519 JOHNSONITE CUTR-63B BURNT UMBER 63 CUBIS TEXTURE

50% Owner Review 1-9-18

Quality Management Review 1-16-18

Bids 1-23-18

6" = 1'-0"A2.1

SILL REPAIR DETAIL1