school configuration committee (scc) · 4/25/12 11/13/12 1 school configuration committee (scc)...

30
TFR Updates 9/28/11 10/26/11 11/22/11 1/25/12 9/12/12 Study Sessions 4/25/12 11/13/12 1 School Configuration Committee (SCC) Board Study Session Update II November 13, 2012 (Update VII)

Upload: others

Post on 16-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: School Configuration Committee (SCC) · 4/25/12 11/13/12 1 School Configuration Committee (SCC) Board Study Session Update II November 13, 2012 (Update VII) Purpose • Provide the

TFR Updates9/28/1110/26/1111/22/111/25/129/12/12

Study Sessions4/25/1211/13/12

1

School Configuration Committee(SCC)

Board Study Session Update IINovember 13, 2012

(Update VII)

Page 2: School Configuration Committee (SCC) · 4/25/12 11/13/12 1 School Configuration Committee (SCC) Board Study Session Update II November 13, 2012 (Update VII) Purpose • Provide the

Purpose

• Provide the School Board An Update On The Current State Of The School Configuration Committee Work This Fall

2

Page 3: School Configuration Committee (SCC) · 4/25/12 11/13/12 1 School Configuration Committee (SCC) Board Study Session Update II November 13, 2012 (Update VII) Purpose • Provide the

Agenda• Review Timelines• Review Tasks• Review Definitions• Review Facts, Assumptions, Considerations and Key

Questions• 7-12 Pros and Cons “DRAFT”• Costs of Facilities for Each Option – In Progress• Way Ahead

3

Page 4: School Configuration Committee (SCC) · 4/25/12 11/13/12 1 School Configuration Committee (SCC) Board Study Session Update II November 13, 2012 (Update VII) Purpose • Provide the

Committee Membership4

Elem or Sec

School Affiliation Voting? Group Name First Name Last

Elem Admin Yes Administrator Peggy EllisElem BR Yes Certificated - elem Philip WetherbyElem CC Yes Certificated - elem Sheri ShipeElem PI Yes Classified - elem Cheri MlodzikElem CV Yes Certificated Tim McNettElem EH Yes Certificated - elem Debbie AllensworthElem EM Yes Adminstrator - Elem Greg ClevenElem EM Yes Certificated - elem Denyse HemmersbachElem GM Yes Parent Ann SveenElem JP Yes Parent Anne LundenElem SR Yes Adminstrator - Elem Julie McKeanElem SR Yes Parent Ann HoftiezerElem EM Yes Parent Scott WoehrmanSec Admin Yes Administrator Franklyn MacKenzieSec CKHS Yes Administrator Steve CoonsSec CKHS Yes Classified - sec Jo ConnerSec CKHS Yes Parent Laurie Moore

Elem or Sec

School Affiliation Voting? Group Name First Name Last

Sec CKJH Yes Administrator Susan JungSec CKJH Yes Classified - Sec Linda RobertsSec FVJH Yes Certificated - sec Andy CampbellSec FVJH Yes Certificated - sec Jeremy FaxonSec FVJH Yes Classified - Sec Carla YenkoSec FVJH Yes Parent J. R. FernandezSec KSS Yes Adminstrator - Sec Jodie WoolfSec OHS Yes Adminstrator - Sec Doyle ClouserSec OHS Yes Parent John McGannonSec RIJH Yes Certificated - sec Matt StanfordSec RIJH Yes Parent Laura Murrayn/a Admin NO Administrator Jeanne Beckonn/a Admin NO Administrator David McVickern/a Admin NO Administrator Patti Woolfn/a Admin NO Administrator Sue Coreyn/a n/a NO Bargaining Unit Nate Andrewsn/a n/a NO Bargaining Unit Kari Clitheron/a n/a NO Bargaining Unit Kirstin Nicholsonn/a Special Ed Yes Administrator Katie Coleman

Page 5: School Configuration Committee (SCC) · 4/25/12 11/13/12 1 School Configuration Committee (SCC) Board Study Session Update II November 13, 2012 (Update VII) Purpose • Provide the

School Configuration Tasks• Complete Pros and Cons 7-12• Data Analysis (costs for each option)

• Research• Curriculum• Staffing• Special Programs• Extra Curricular• Transportation• Facilities

• Plan and provide input to Community/Staff Meetings• Participate in Community/ Staff Meetings• Analyze and review feedback from Meetings• Review/Finalize Pros/Cons• Superintendent Recommendation to Board

5

Page 6: School Configuration Committee (SCC) · 4/25/12 11/13/12 1 School Configuration Committee (SCC) Board Study Session Update II November 13, 2012 (Update VII) Purpose • Provide the

School Configuration WorkSY 2012‐13

Oct 15‐ 7‐12 Pros/Cons‐ Facilities‐ Definitions ‐ Communication‐ 7‐12 Clarification‐ Committee Replacement

Oct 29‐ Facilities

Nov 26‐ Staffing

Nov 28

Board Review?

Dec 10‐ Extra‐curricular

Jan 14‐ Research‐ Transportation

Feb 11‐ Curriculum‐ Special Programs

Feb 25‐ Provide input toinput process

Mar 11‐

Mar 25, Apr 8

InputMeetings

Apr 22‐ Analyze input

May 13‐ Analyze input‐ Draft final Pros/Cons

June 3‐ Review Supt.Recommendation

June 5, 12, 

19 or 26?

Board Meeting?

School Board

Staff/Community Meeting

KEY

6

Page 7: School Configuration Committee (SCC) · 4/25/12 11/13/12 1 School Configuration Committee (SCC) Board Study Session Update II November 13, 2012 (Update VII) Purpose • Provide the

School Configuration “Other” Major Events

2012 20182013 2014 2015 2016 2017

Jackson Park Open

Aug 2014

SilverdaleOpen

Aug 2016

Transp/FS/Warehouse

OpenDec 2017

Capital Projects Levy Phase One (2012‐2016)

Facilities Committee Work 

(Sept 2013‐Jan 2015)

District Event

Community Event

KEY

Technology (CPL)

Repairs Across District (CPL)

SchoolSupportLevy

Feb 2014

CapitalProjectsMeasureFeb 2016

HB 2776 and 2661 Full 

Implementation

SCC Work (Oct 2012‐June 

2013)

Phase II Election Planning 

(Feb 2015‐Feb 2016)

7

Page 8: School Configuration Committee (SCC) · 4/25/12 11/13/12 1 School Configuration Committee (SCC) Board Study Session Update II November 13, 2012 (Update VII) Purpose • Provide the

S M T W T F S S M T W T F S S M T W T F S1 1 2 3 4 5 6 1 2 3

2 3 4 5 6 7 8 7 8 9 10 11 12 13 4 5 6 7 8 9 109 10 11 12 13 14 15 14 15 16 17 18 19 20 11 12 13 14 15 16 1716 17 18 19 20 21 22 21 22 23 24 25 26 27 18 19 20 21 22 23 2423 24 25 26 27 28 29 28 29 30 31 25 26 27 28 29 3030 30 31

S M T W T F S S M T W T F S S M T W T F S1 1 2 3 4 5 1 2

2 3 4 5 6 7 8 6 7 8 9 10 11 12 3 4 5 6 7 8 99 10 11 12 13 14 15 13 14 15 16 17 18 19 10 11 12 13 14 15 1616 17 18 19 20 21 22 20 21 22 23 24 25 26 17 18 19 20 21 22 2323 24 25 26 27 28 29 27 28 29 30 31 24 25 26 27 2830 31

S M T W T F S S M T W T F S S M T W T F S1 2 1 2 3 4 5 6 12 13 14 15 16 17 18

3 4 5 6 7 8 9 7 8 9 10 11 12 13 19 20 21 22 23 24 2510 11 12 13 14 15 16 14 15 16 17 18 19 2017 18 19 20 21 22 23 21 22 23 24 25 26 27 S M T W T F S24 25 26 27 28 29 30 28 29 30 2 3 4 5 6 7 831 9 10 11 12 13 14 15

SCC 2012-13 Tentative Meeting Calendar

Sep-12 Oct-12 Nov-12

Feb-13

Jun-13

Mar-13 Apr-13 May-13

Dec-12 Jan-13

8

Page 9: School Configuration Committee (SCC) · 4/25/12 11/13/12 1 School Configuration Committee (SCC) Board Study Session Update II November 13, 2012 (Update VII) Purpose • Provide the

School ConfigurationFour Phases

Phase I Configuration Options K-8

Support Plans

Phase II Cost of Options K-12

Phase III Boundary Options K-12

Phase IV Implementation Options K-12

9

Page 10: School Configuration Committee (SCC) · 4/25/12 11/13/12 1 School Configuration Committee (SCC) Board Study Session Update II November 13, 2012 (Update VII) Purpose • Provide the

Definitions• Extracurricular is defined as optional non-credit student

activities that are either Cultural, Athletic, Recreational, or Social in nature.

• Co-Curricular would be those activities that are somehow connected to a curricular program. Examples are DECA, FCCLA, Choir, Journalism, Newspaper, Yearbook, Band, Drama, The Orchestra

• Middle Level We will not use• Middle School Grades 5-8, 6-8, 7-8• Junior High Grades 7-9

10

Page 11: School Configuration Committee (SCC) · 4/25/12 11/13/12 1 School Configuration Committee (SCC) Board Study Session Update II November 13, 2012 (Update VII) Purpose • Provide the

Facts After much study, the School Configuration Committee (SCC) is

reviewing three alternate configuration options

9th graders will move up to high school in both all alternate configurations

Transitions impact student achievement

Current Junior High and High School buildings have additional capacity.

Few elementary schools have additional capacity

The School Board will make a decision after receiving a recommendation from the Superintendent following review of all data, options, and pros and cons from the SCC including feedback opportunities for community and staff

11

Page 12: School Configuration Committee (SCC) · 4/25/12 11/13/12 1 School Configuration Committee (SCC) Board Study Session Update II November 13, 2012 (Update VII) Purpose • Provide the

Facts Implementation of any changes would begin not sooner than 2015-

16

2012 Demographic Study indicates that enrollment will continue to decline slightly for five years and then level-off

Other districts have studied configuration, and for the most part have gone to a K-5, 6-8, 9-12

A configuration decision will be required to complete the Facilities Committee work on Phase Two of the Capital Projects Long Range Plan

HB 2776 includes recommendations for reductions in K-3 class size and statewide implementation of All Day Kindergarten

The Superintendent’s recommendation is scheduled for June 2013

12

Page 13: School Configuration Committee (SCC) · 4/25/12 11/13/12 1 School Configuration Committee (SCC) Board Study Session Update II November 13, 2012 (Update VII) Purpose • Provide the

Assumptions• One or more schools may close

• Over time, reconfiguration will provide a savings

• In terms of infrastructure and organizational resources, we have the capacity to reconfigure

• Reconfiguration may require facilities changes

• Any change made would have benefits for students

13

Page 14: School Configuration Committee (SCC) · 4/25/12 11/13/12 1 School Configuration Committee (SCC) Board Study Session Update II November 13, 2012 (Update VII) Purpose • Provide the

Considerations• Early identification of individual student needs for

support/intervention• Maximize options for student achievement• Professional Development – support and time• Emotional impact for students, families, staff• Balanced and efficient enrollments• Improve feeder system• Voter Confidence- timing of 2014 SSL election• Implementation plan• Grading Model integration• Cost integration with Capital Projects Phase Two• Time on the bus

14

Page 15: School Configuration Committee (SCC) · 4/25/12 11/13/12 1 School Configuration Committee (SCC) Board Study Session Update II November 13, 2012 (Update VII) Purpose • Provide the

Considerations• Athletic and activity programs • High School Athletic Classifications

(1A, 2A, 3A, 4A)• Building start and end times• Capacity for gym space, science labs, art classrooms,

music performance, special education and specialized Career and Technical Education (CTE) courses

• Non-District (ND) and Non-School (NS) transfer student data (in and out) along with student data for enrollment in online programs outside the district

• Grandfathering of current transfers

15

Page 16: School Configuration Committee (SCC) · 4/25/12 11/13/12 1 School Configuration Committee (SCC) Board Study Session Update II November 13, 2012 (Update VII) Purpose • Provide the

Key Questions• What are optimal building sizes?

• Elementary 450-500, Middle/JH 700-900, HS 1100-1300• What does the demographic study tell us about our future

enrollment?• Enrollment will continue to slowly decline over the next five years

mostly at the secondary level before leveling out somewhere above 10,000 students.

• What is the capacity for each building?• See additional worksheets (link)

• What facility modifications will be required and how will we pay for them?• Depends upon which configuration is selected. Modifications will

require Capital Projects Funds. Currently, all funds are committed except future Emergent Critical Repairs, which means that modifications would need to be included in Capital Projects Phase II

16

Page 17: School Configuration Committee (SCC) · 4/25/12 11/13/12 1 School Configuration Committee (SCC) Board Study Session Update II November 13, 2012 (Update VII) Purpose • Provide the

Key Questions• How will configuration meet the need of special education,

including preschool?• Does reconfiguration for all schools need to occur

simultaneously?• Will either option produce potential school closure?

• If the current class sizes (or close to current) continue, most options will produce a potential school closure. If K-3 class size is reduced, this answer could change based on the state funding, configuration selected and Capital Projects Phase II

• Is data available about 6th -12th grade students riding the same bus?

17

Page 18: School Configuration Committee (SCC) · 4/25/12 11/13/12 1 School Configuration Committee (SCC) Board Study Session Update II November 13, 2012 (Update VII) Purpose • Provide the

Key Questions: Boundaries

• What data tool do we use to determine the current grade levels and numbers within the current boundary lines? • PowerSchool

• Are clean feeders a requirement to our boundaries?• Any boundary changes have not been completed. There are

benefits for clean feeders, yet this may not be possible when boundaries are redrawn.

• What impact do NS/ND students have on creating new boundaries?• None. The option for NS and ND students waivers will be

determined after new boundaries are drawn.

18

Page 19: School Configuration Committee (SCC) · 4/25/12 11/13/12 1 School Configuration Committee (SCC) Board Study Session Update II November 13, 2012 (Update VII) Purpose • Provide the

Key Questions: Implementation

• What is our middle school structure/school philosophy, including sixth graders?• This question will be part of the implementation phase and highly

dependent upon which configuration is selected.• What Professional Development will support the changes?• How will student transitions be accomplished?• What athletic and activities programs will exist?• Will we extend or change special programs (TEAM,

Montessori, Venture, Special Education)?• What is the plan for implementation for the transfer/moving

process?• The implementation plan will be developed following a determination

of what configuration we will use moving forward.

19

Page 20: School Configuration Committee (SCC) · 4/25/12 11/13/12 1 School Configuration Committee (SCC) Board Study Session Update II November 13, 2012 (Update VII) Purpose • Provide the

Key Questions: Implementation• What support is required for students, staff and parents?• How will configuration impact the cost of transportation?

• The cost of transportation will be completed in the analysis of each configuration

• What is the communications plan?• The current communication plan will be focused on providing

updates and preparing for staff and community input opportunities.

20

Page 21: School Configuration Committee (SCC) · 4/25/12 11/13/12 1 School Configuration Committee (SCC) Board Study Session Update II November 13, 2012 (Update VII) Purpose • Provide the

Scoring Resultswith K-6, 7-12

• Previous scoring

21

Page 22: School Configuration Committee (SCC) · 4/25/12 11/13/12 1 School Configuration Committee (SCC) Board Study Session Update II November 13, 2012 (Update VII) Purpose • Provide the

Options and the Facility Impact of HB 2261 and 2776• Potential for State Funded All Day Kindergarten• Potential for K-3 Class Size Reduction• Implementation Schedule – Not Later than 2018-19

• McCleary Decision• Legislative Authority

• Planning for Multiple Alternatives

22

Page 23: School Configuration Committee (SCC) · 4/25/12 11/13/12 1 School Configuration Committee (SCC) Board Study Session Update II November 13, 2012 (Update VII) Purpose • Provide the

23

Option

A

K-6, 7-

8, 9-1

2 KSS 7-12

Option

B

K-5, 6-

8, 9-1

2, KSS 6-12

Option

E

K-6, 7-

12 (a

ll sch

ools)

Option

F

K-6, 7-

12 (K

SS all o

thers

as "c

ampu

s")

K-6, 7-

9, 10

-12 and 7

-12

(curre

nt co

nfigura

tion)

Board Crite

ria

Maxim

ize Stud

ent 

Achievem

ent Organization -Curriculum

OSPI

Research - Middle School Structure (Transitions)

Staffin

gEfficiency

Staffing

Equity

Program Impact

Extra and Co-Curricular

Return on 

Investmen

t

Facilities

Safety

Transportation and Food Services

Cost Effectiv

e

Board Crite

ria

Maxim

ize Stud

ent 

Achievem

ent

Summary of Costs

Page 24: School Configuration Committee (SCC) · 4/25/12 11/13/12 1 School Configuration Committee (SCC) Board Study Session Update II November 13, 2012 (Update VII) Purpose • Provide the

Facilities Costs Update24

Current 12‐13 Class Size K‐3 Class Size 17:1ADK Paid by State ADK Paid by State

Costs Savings  Elementary

Costs Savings

Budget Impacted

Classrooms Available 10 $0 10 $0.00

Classrooms Needed 0 $0 46‐10=36 ** ‐$3,600,000 Capital Proj

Increased Staffing Costs (ADK) 14 sections +1.0 Specialist ‐$75,000 14 sections +1.0 Specialist ‐$75,000 Gen Fund

Increased Staffing Costs (17:1) 0 $0 46+5=51 ‐$255,000 Gen Fund

School Closure Potential None None Gen Fund

Small School Cost 1 small school 1 small school Gen Fund

Costs Savings  Secondary 

Costs Savings 

Budget Impacted

Science Labs Needed 1 Lab CKHS ‐$300,000 1 Lab CKHS ‐$300,000 Capital Proj

Gym Space Needed KSS (Phase 2) "current" KSS (Phase 2) "current" Capital Proj

Art, Music, Special Ed, CTE Modifications None required None required Capital Proj

School Closure Potential Up to one (1) $1,000,000 Up to one $1,000,000 Gen Fund

Small School Cost 2 small schools 2 small schools Gen Fund

General Fund Added Costs/Savings $925,000 $670,000 Gen Fund

Capital Projects Added Costs/Savings Science Lab ‐$300,000 Portables/Science Lab ‐$3,900,000 Capital Proj

** Other option in lieu of 18‐23 portables would be another elementary school = approx ‐$27,500,000 in 2012 dollarsIf this option was selected, the total Capital Projects costs would be $27.5 M + $1.8 M + $300K = ‐$29,600,000

Secondary 

Elementary 

Option A:  K‐6, 7‐8, 9‐12, 7‐12 KSSAssumptions Assumptions

No Elem Bound ChangesIncludes Space for ADK

No Elem Boundary ChangesIncludes Space for ADK

Page 25: School Configuration Committee (SCC) · 4/25/12 11/13/12 1 School Configuration Committee (SCC) Board Study Session Update II November 13, 2012 (Update VII) Purpose • Provide the

25

Current 12‐13 Class Size K‐3 Class Size 17:1ADK Paid by State ADK Paid by State

Costs Savings  Elementary

Costs Savings

Budget Impacted

Classrooms Available 41 $0 10 $0.00

Classrooms Needed 0 $0 46‐41=5 ‐$400,000 Capital Proj

Increased Staffing Costs (ADK) 14 sections +1.0 Specialist ‐$75,000 14 sections +1.0 Specialist ‐$75,000 Gen Fund

Increased Staffing Costs (17:1) 0 $0 46+5=51 ‐$255,000 Gen Fund

School Closure Potential Up to two (2) $1,600,000Up to one (1) Closure Adds 19 Portables ## $800,000 Gen Fund

Small School Cost (no closure) 7 small schools 7 small schools Gen Fund

Costs Savings  Secondary 

Costs Savings 

Budget Impacted

Science Labs Needed 1 Lab CKHS ‐$300,000 1 Lab CKHS ‐$300,000 Capital Proj

Gym Space Needed KSS Gym** ‐$3,000,000 KSS Gym** ‐$3,000,000 Capital Proj

Art, Music, Special Ed, CTE Modifications None required None required Capital Proj

School Closure Potential None None Gen Fund

Small School Cost  None (enrollment?) None (enrollment?) Gen Fund

General Fund Added Costs/Savings $1,525,000 (Increases Portables)## $470,000 Gen Fund

Capital Projects Added Costs/Savings Science Lab/Gym ‐$3,300,000Portables/Science 

Lab/Gym ‐$3,700,000 Capital Proj

** If move to a 6‐12 KSS could wait for Phase 2, then there would be no additional cost ‐ similar to K‐6, 7‐8, 9‐12, 7‐12 optionIf waited for implementation then Capital Projects additional costs would be reduced by $3,000,000 for each scenario## If this options selected then 19 portables would be needed if one elementary closed = $1,900,000 Additional Cost

Option B:  K‐5, 6‐8, 9‐12, 6‐12 KSS

Elementary 

Secondary 

Assumptions AssumptionsNo Sec Bound ChangesIncludes Space for ADK

No Sec Boundary ChangesIncludes Space for ADK

Page 26: School Configuration Committee (SCC) · 4/25/12 11/13/12 1 School Configuration Committee (SCC) Board Study Session Update II November 13, 2012 (Update VII) Purpose • Provide the

26

Current 12‐13 Class Size K‐3 Class Size 17:1ADK Paid by State ADK Paid by State

Costs Savings  Elementary

Costs Savings

Budget Impacted

Classrooms Available 10 $0 10 $0.00

Classrooms Needed 0 $0 46‐10=36** ‐$3,600,000 Capital Proj

Increased Staffing Costs (ADK) 14 sections +1.0 Specialist ‐$75,000 14 sections +1.0 Specialist ‐$75,000 Gen Fund

Increased Staffing Costs (17:1) 0 $0 46+5=51 ‐$255,000 Gen Fund

School Closure Potential None $0 None Gen Fund

Small School Cost (no closure) 1 small school 1 small school Gen Fund

Costs Savings  Secondary 

Costs Savings 

Budget Impacted

Science Labs Needed 1 Lab CKHS ‐$300,000 1 Lab CKHS ‐$300,000 Capital Proj

Gym Space Needed KSS Gym## ‐$3,000,000 KSS Gym** ‐$3,000,000 Capital ProjGym Space Needed CKHS, OHS, RTJH## ‐$9,000,000 CKHS, OHS, RTJH ‐$9,000,000 Capital Proj

Art, Music, Special Ed, CTE Modifications None required None required Capital Proj

School Closure Potential Up to two (2) $2,000,000 Up to two (2) $2,000,000 Gen Fund

Small School Cost  None (enrollment?) None (enrollment?) Gen Fund

General Fund Added Costs/Savings $1,925,000 $1,670,000 Gen Fund

Capital Projects Added Costs/Savings Science Lab/Gym ‐$12,300,000Portables/Science 

Lab/Gym ‐$15,900,000 Capital Proj

** Other option in lieu of 18‐23 elem portables would be another elementary school = approx $27,500,000 in 2012 dollars## This is an estimate and will need to be adjusted based on additional study and each particular building situation

Elementary 

Secondary 

Option E:  K‐6, 7‐12 All BldgsAssumptions Assumptions

No Elem Boundary Changes No Elem Bound ChangesIncludes Space for ADK Includes Space for ADK

Page 27: School Configuration Committee (SCC) · 4/25/12 11/13/12 1 School Configuration Committee (SCC) Board Study Session Update II November 13, 2012 (Update VII) Purpose • Provide the

27

Current 12‐13 Class Size K‐3 Class Size 17:1ADK Paid by State ADK Paid by State

Costs Savings  Elementary

Costs Savings

 Budget Impacted

Classrooms Available 10 $0 10 $0.00

Classrooms Needed 0 $0 46‐10=36** ‐$3,600,000 Capital Proj

Increased Staffing Costs (ADK) 14 sections +1.0 Specialist ‐$75,000 14 sections +1.0 Specialist ‐$75,000 Gen Fund

Increased Staffing Costs (17:1) 0 $0 46+5=51 ‐$255,000 Gen Fund

School Closure Potential None $0 None Gen Fund

Small School Cost (no closure) 1 small school 1 small school Gen Fund

Costs Savings  Secondary 

Costs Savings 

Budget Impacted

Science Labs Needed 1 Lab CKHS ‐$300,000 1 Lab CKHS ‐$300,000 Capital Proj

Gym Space Needed KSS (Phase Two) "current" KSS (Phase Two) "current" Capital Proj

Art, Music, Special Ed, CTE Modifications None required None required Capital Proj

School Closure Potential Up to one (1) $1,000,000 Up to one (1) $1,000,000 Gen Fund

Small School Cost  None (enrollment?) None (enrollment?) Gen Fund

General Fund Added Costs/Savings $925,000 $670,000 Gen Fund

Capital Projects Added Costs/Savings Science Lab/Gym ‐$300,000Portables/Science 

Lab/Gym ‐$3,900,000 Capital Proj

** Other option in lieu of 18‐23 elem portables would be another elementary school = approx $27,500,000 in 2012 dollarsIf this option was selected, the total Capital Projects costs would be $27.5 M + $1.8 M + $300K = ‐$29,600,000This Option will have to be adjusted over time in Phase Two and Phase Three of Capital Projects Long Range Plan This option will not be time specific currently and could house buildings near or attached to each other

Elementary 

Secondary 

Option F:  K‐6, 7‐12 CampusAssumptions Assumptions

No Elem Boundary Changes No Elem Bound ChangesIncludes Space for ADK Includes Space for ADK

Page 28: School Configuration Committee (SCC) · 4/25/12 11/13/12 1 School Configuration Committee (SCC) Board Study Session Update II November 13, 2012 (Update VII) Purpose • Provide the

28

Current 12‐13 Class  Size K‐3 Class  Size 17:1ADK Paid by State ADK Paid by State

Costs Savings  Elementary Costs Savings  Budget Impacted

Classrooms  Available 10 $0 10 $0.00

Classrooms  Needed 0 $0 46‐10=36** ‐$3,600,000 Capital  Proj

Increased Staffing Costs  (ADK) 14 sections  +1.0 Specialist ‐$75,000 14 sections  +1.0 Specialist ‐$75,000 Gen Fund

Increased Staffing Costs  (17:1) 0 $0 46+5=51 ‐$255,000 Gen Fund

School  Closure Potential None $0 None $0 Gen Fund

Small  School  Cost (no closure) 1 small  school 1 small  school Gen Fund

Costs Savings  Junior High School Costs Savings  Budget Impacted

Science Labs  Needed None $0 None $0 Capital  Proj

Gym Space Needed None None Capital  Proj

Art, Music, Special  Ed, CTE Modifications None Required $0 None Required $0 Capital  Proj

School  Closure Potential Up to one (1) $1,000,000 Up to one (1) $1,000,000 Gen Fund

Small  School  Cost 2 small  schools 2 small  schools Gen Fund

Costs Savings  High School Costs Savings  Budget Impacted

Science Labs  Needed 1 Lab CKHS ‐$300,000 1 Lab CKHS ‐$300,000 Capital  Proj

Gym Space Needed KSS (Phase Two) "current" KSS (Phase Two) "current" Capital  Proj

Art, Music, Special  Ed, CTE Modifications None required None required Capital  Proj

School  Closure Potential None $0 None $0 Gen Fund

Small  School  Cost  None (enrollment?) None (enrollment?) Gen Fund

General Fund Added Costs/Savings $925,000 $670,000 Gen Fund

Capital Projects Added Costs/Savings Science Lab/Gym ‐$300,000 Portables/Science Lab/Gym ‐$3,900,000 Capital Proj

** Other option in l ieu of 18‐23 elem portables  would be another elementary school  = approx $27,500,000 in 2012 dollarsIf this option was  selected, the total  Capital  Projects  costs  would be $27.5 M + $1.8 M + $300K = ‐$29,600,000

Elementary 

High School

Junior High School

Current:  K‐6, 7‐9, 10‐12, KSS 7‐12Assumptions Assumptions

No Elem Boundary Changes No Elem Bound ChangesIncludes  Space for ADK Includes  Space for ADK

Page 29: School Configuration Committee (SCC) · 4/25/12 11/13/12 1 School Configuration Committee (SCC) Board Study Session Update II November 13, 2012 (Update VII) Purpose • Provide the

Facilities Costs - Summary

29

Option

Current Class Size K‐3 Class Size 17:1

GF Added Costs/Savings#

CP Added Costs/Savings

GF Added Costs/Savings#

CP Added Costs/Savings

Option A: K‐6, 7‐8, 9‐12, KSS 7‐12

$925,000 ‐$300,000 $670,000 ‐$3,900,000*

Option B: K‐5, 6‐8, 9‐12, KSS 6‐12 $1,525,000 ‐$3,300,000 $470,000 ‐$3,700,000

Option E: K‐6, 7‐12 All Bldgs $1,925,000 ‐$12,300,000 $1,670,000 ‐$15,900,000*

Option F: K‐6, 7‐12 Campus $925,000 ‐$300,000 $670,000 ‐$3,900,000*

Current: K‐6, 7‐910‐12, KSS 7‐12 $925,000 ‐$300,000 $670,000 ‐$3,900,000*

# Includes savings from potential school closure* Uses up to 36 portables or requires additional elementary at $27.5M

Page 30: School Configuration Committee (SCC) · 4/25/12 11/13/12 1 School Configuration Committee (SCC) Board Study Session Update II November 13, 2012 (Update VII) Purpose • Provide the

The Way Ahead• Next Update - Late January Early February 2013

• Facilities Final Cost Summary• Staffing Costs• Extra and Co – Curricular Costs• Transportation Costs

30