school board facilities planning workshop · 2019-05-31 · convert ples to k-1 grade config. $...
TRANSCRIPT
School Board Facilities
Planning WorkshopCommittee of the Whole: 2/8/18
1
Agenda:
Suggested Timeline
Agreed upon demographic parameters
School Capacities and required square footage
Project Option Review
Project Option Comparison vs. Listening Post Data
“Parking Lot” additions
2
Suggested Timeline
January 30th (Complete) – Parameters & project
options
February 8th – Project options
February 27th – RBC presentation, financial Q/A,
Follow-up project option information, Parking Lot
Answers
March meetings – Narrow options to two
April – Final decision making
3
Agreed Upon Items
Demographic Data
Utilization ParametersBased on Sundance Associates Demographic Report 12/13/2017
4
5
• Using the Sundance
Associates study, the
board agreed to use the
average student
projection in the near
term for the sizing of
each building.
• Utilization Factors were determined as 90% for
the elementary levels
and 85% for the
secondary levels
Building Grade
AGSD 2017
Enrollment
Future
Enrollment
Utilization
Factor
PLES K 299 281 90%
1 282 341 90%
2 319 348 90%
subtotal 900 971 90%
AGIS 3 368 372 90%
4 378 379 90%
5 393 392 90%
6 396 392 90%
subtotal 1,535 1,535 90%
FEMS 7 413 417 85%
8 417 422 85%
subtotal 830 839 85%
AGHS 9 435 447 85%
10 448 443 85%
11 458 435 85%
12 456 426 85%
subtotal 1,797 1,752 85%
5,062 5,096Grand Totals
6
School Capacities, Enrollment, and Required Square Footage
Based on agreed upon demographics & utilization factors
Existing Grade
AlignmentSchool Name
Existing Building SQFT
AGSD / CEFPI Functional Capacity1
2017 Enrollment
Current Utilization
Projected Future
Enrollment2
SQFT Added for Utilization
Targets3
New Building SQFT
K-2 Penn London Elementary 106,500 902 900 100% 971 12,178 118,6783-6 Avon Grove Intermediate 210,000 1488 1535 103% 1535 1,063 211,0637-8 Fred S. Engle Middle 117,490 807 830 103% 839 25,634 143,1249-12 Avon Grove High 214,104 1274 1797 141% 1752 125,990 340,094
1AGSD / CEFPI Functional Capacity not including Substandard or Modular Classrooms (per March 2015 Facility Study)2Period Average from Sundance Demographic Report3Board agreed on 90% for ES and Intermediate School, 85% for MS and HS
Future Grade
AlignmentSchool Name
Existing Building SQFT
AGSD / CEFPI Functional Capacity1
2017 Enrollment
Current Utilization
Projected Future
Enrollment2
SQFT Added for Utilization
Targets3
New Building SQFT
K-1 (realign) Penn London Elementary 106,500 902 900 100% 622 N/A 106,5002-5 (realign) Avon Grove Intermediate 210,000 1488 1535 103% 1,492 N/A 210,0006-8 (realign) Fred S. Engle Middle 117,490 807 830 103% 1,231 92,436 209,926
9-12 Avon Grove High 214,104 1274 1797 141% 1752 125,990 340,0941AGSD / CEFPI Functional Capacity not including Substandard or Modular Classrooms (per March 2015 Facility Study)2Period Average from Sundance Demographic Report3Board agreed on 90% for ES and Intermediate School, 85% for MS and HS
Project OptionsFor Further Consideration
7
Option 1aConvert PLES to K-1 grade configuration
Convert AGIS to 2-5 grade configuration
Build new HS on Sunnyside site
Renovate and convert existing HS to 6-8 MS
Abandon/demo/sell existing MS
NOTE: A sub-option can be developed from this option if
there is no reorganization of the MS grade structure.
8
Option 1a:
Renovation Assumptions & Risks
• Moving the MS into the HS footprint without adding square footage results in 97% utilization
• Sunnyside Site may not be able to support stadium or desired fields due to environmental limitations
• A determination would need to be made for the future fate of FEMS
Potential Option Cost Reduction
• Limited renovation of converted HS (deferred maintenance needs and light renovation only)
• Reduced square footage of new HS (negative educational impact)
• No reorganization of elementary grade level (use option 4a elementary costs)
Option 1aConvert PLES to K-1 Grade Config. 49,980$ Remove modulars, restore siteConvert AGIS to 2-5 Grade Config. -$ No addition neededRenovate and convert existing HS to 6-8 MS 38,794,906$ Renovating existing 214,104 ft2 (no addition) $181.20Build new HS on Sunnyside Site 99,245,287$ New 340,094 ft2 HS for 1,752 students $306.79 Optional Stadium at HS 4,997,963$ Demo existing Fred Engle MS 1,174,421$ Demo 117,490 ft2 $10.00Renovate existing District Office 2,085,960$ 1,800 ft2 addition, renovating existing ft2 $182.98Total Option Cost 138,090,172$ 8,258,345$ Potential PLANCON Reimbursement 13,804,019$
$/SQFTNotesBrief Scope Description Immediate NeedLonger Term
Need
Option 1a:
Advantages
Addresses Five Year capital plan at HS & MS
Increased number of athletic fields
Removes 50+ year old MS out of portfolio
Renovation of HS to MS is roughly half the cost of
expanding HS
New HS building will fully support 21st Century
Education
Relieves parking and traffic issues at old site
Provides HS in faster timeframe than other options
Least impactful construction scenario to education
Overall construction timeframe is the shortest of all
contemplated options
• Convert PLES to K-1 grade configuration
• Convert AGIS to 2-5 grade configuration
• Build new HS on Sunnyside site
• Renovate and convert existing HS to 6-8 MS
• Abandon or demo existing MS.
Disadvantages Option may not be feasible based on financial
scenarios presented
Building capacities do not support target utilization at the MS
Existing HS building is roughly 60 years old
Stadium remains at the new MS campus
Existing MEP recently upgraded at MS
MS reorganization delayed to later time frame
Ecological Site limitations at Sunnyside Property. Site tight/not large enough for needed outdoor items such as parking, sports fields, and storm water
Multiple variances required for construction at Sunnyside site
Timeline requirements for site improvements to fulfil contingent land agreement (multiple parcels)
Consideration of what to do with existing FEMS
FIG Option 1c.Convert PLES to K-1 grade configuration
Convert AGIS to 2-5 grade configuration
Build new grade 6-8 MS on Sunnyside site
Renovate existing HS, Build new Core Facilities
between HS/MS combine to make a HS Campus.
11
Option 1c:
Renovation Assumptions & Risks• Will need waivers/variances for added impervious surface, building height• Existing site will require PA Fish & Boat Commission as well as US Fish & Wildlife Study• Traffic Study required• Storm water modifications likely required
Potential Option Cost Reduction • Limited renovation of converted MS Section (deferred maintenance needs and light renovation only)• Reduced square footage of new HS core (reuse more of the existing buildings)
Option 1c Convert PLES to K-1 Grade Config. 49,980$ Remove modulars, restore siteConvert AGIS to 2-5 Grade Config. -$ No addition neededBuild new 6-8 MS on Sunnyside Site 63,578,509$ New 209,926 ft2 MS for 1,231 students $302.86
Demo portion of HS (Common area wing) 577,265$ Demo 57,750 ft2 $10.00
Addition between existing HS & MS 19,453,045$ 66,250 ft2 addition (total size of building is 340,094
ft2) $293.63 Renovate HS (remaining SQFT) 27,418,338$ Renovating existing 156,354 ft2 remaining in HS $175.36 Renovate Fred Engle MS (existing space) 20,139,637$ Renovating existing 117,490 ft2 in FEMS Bldg. $171.42 FF&E Allowance 3,123,727$ Furniture allowance Site Work 2,923,684$ Earthwork, utilities, paving, etc. Athletic Field Reorganization 1,250,000$ Renovate existing District Office 2,085,960$ 1,800 ft2 addition, renovating existing ft2
Total Option Cost 137,264,184$ 3,335,960$ Potential PLANCON Reimbursement 13,726,418$
$/SQFT
Renovate existing HS & combine w/ MS with common area addition in between
NotesBrief Scope Description Immediate NeedLonger Term
Need
Option 1c:Advantages
Addresses Five Year capital plan at HS & MS
Building capacities support projected enrollments
New 6-8 MS fully supports 21st century learning
Better size for the Sunnyside site than Option 1A
Reduces parking and traffic issues at existing HS/MS
site, increased parking compliance
Reduces field use at HS site, added district fields at
Sunnyside
Makes use of all existing buildings
No need for new stadium
Less phasing moves required in occupied
renovations due to greater swing space than
options 1d and 4a
• Convert PLES to K-1 grade configuration
• Convert AGIS to 2-5 grade configuration
• Build new MS on Sunnyside site,
• Renovate existing HS & MS combine with
New “Core” to make a HS Campus.
Disadvantages Existing HS/MS Building 50-60 years old
Ecological Site limitations at Sunnyside Property
Multiple variances required for construction at Sunnyside site and HS Campus
Parking area at HS impacted during construction
Longer construction process
Occupied renovation of HS
Timeline requirements for site improvements to fulfil contingent land agreement (multiple parcels)
FIG Option 1d.Convert PLES to K-1 grade configuration
Convert AGIS to 2-5 grade configuration
Renovate and add to existing MS (creating a 6-8
MS grade structure)
Renovate and add to existing HS
14
Option 1d:
Renovation Assumptions & Risks
• Will need waivers/variances for added impervious surface, building height
• Existing site will require PA Fish & Boat Commission as well as US Fish & Wildlife Study
• Traffic Study required
• Storm water modifications likely required
• Utilities need to be reviewed for increased capacity
Potential Option Cost Reduction
• Limited renovation of existing MS Section (deferred maintenance needs and light renovation only)
• No reorganization of elementary grade level (use option 4a elementary costs)
Option 1dConvert PLES to K-1 Grade Config. 49,980$ Remove modulars, restore siteConvert AGIS to 2-5 Grade Config. -$ No addition neededRenovate and add to existing MS for 6-8 47,906,362$ 92,436 ft2 addition, renovating existing 117,490 ft2 $228.21Renovate and add to existing HS 75,789,427$ 125,990 ft2 addition, renovating existing 214,104 ft2 $222.85FF&E Allowance 4,373,218$ Furniture allowanceRenovate existing District Office 2,085,960$ 1,800 ft2 addition, renovating existing ft2
Total Option Cost 128,118,987$ 2,085,960$ Potential PLANCON Reimbursement 12,369,579$
$/SQFTNotesBrief Scope Description Immediate NeedLonger Term
Need
Option 1d:• Convert PLES to K-1 grade configuration
• Convert AGIS to 2-5 grade configuration
• Renovate and add to existing MS
• Renovate and add to existing HS
Advantages
Addresses Five Year capital plan at HS & MS
Building capacities support projected enrollments
Makes use of all existing buildings
No need for new stadium at HS
Less cost than options 1A and 1C
Disadvantages Educational intent (21st century) may not be fully
supported
Core space will be problematic at HS/MS
Loss of field behind MS (less fields total)
Less total parking on site and more parking need
Already crowded site would be more crowded
Existing HS/MS Building 50-60 years old to be renovated.
Occupied renovation of HS and MS
Most impactful construction scenario to education (most phased plan with most student moves)
Multiple variances required at existing site
Parking area at HS/MS impacted during construction
No use of Sunnyside property and loss of ‘gifted’ portion of property (resale impact)
Option 4a. (New per Board Retreat)Renovate and expand HS to appropriate size (remove
modular)
Expand MS (7-8) to remove modular classrooms and build
to demographic projection
Expand PLES (K-2) to remove modular classrooms and build
to demographic projection
AGIS (3-6) build to demographic projection
17
Option 4a:
Renovation Assumptions & Risks
• Will need waivers/variances for added impervious surface, building height
• Existing site will require PA Fish & Boat Commission as well as US Fish & Wildlife Study
• Traffic Study required
• Storm water modifications likely required
• Utilities need to be reviewed for increased capacity
• New square footage at MS may trigger full code compliance for existing building (not accounted for)
• New square footage at PLES may trigger full code compliance for existing building (not accounted for)
Potential Option Cost Reduction
• Limited renovation of existing HS Section (deferred maintenance needs, light renovation, ADA)
Option 4aExpand PLES (K-2), remove modulars 4,643,133$ 12,178 ft2 addition, remove modulars, site work $381.28Expand AGIS (3-6) per demographics -$ 1,063 ft2 addition - Not financially feasible $0.00Renovate and expand HS, remove modulars 75,789,427$ 125,990 ft2 addition, renovating existing 214,104 ft2 $222.85
Expand Fred Engle MS (7-8), remove modulars 9,027,998$ 25,634 ft2 addition, site work, no renovation of
existing $0.00FF&E Allowance 3,748,472$ Furniture allowanceRenovate existing District Office 2,085,960$ 1,800 ft2 addition, renovating existing ft2
Total Option Cost 93,209,031$ 2,085,960$ Potential PLANCON Reimbursement 9,320,903$
$/SQFTNotesBrief Scope Description Immediate NeedLonger Term
Need
Option 4a:
Advantages Addresses Five Year capital plan at HS only
Building capacities support projected
enrollments
Makes use of all existing buildings
No need for new stadium at HS
Less cost than all other options
No grade shifting required
Disadvantages Educational intent may not be fully supported (21st
century education)
Does not address 5 year capital plan at MS (defers cost to future date – not accounted for)
Does not reorganize district into a 6-8 grade structure at the MS level
Core space may be problematic at HS/MS
Addition may result in loss of field behind MS
Less total parking on site
Existing HS/MS Buildings 50-60 years old
Occupied renovation of HS & MS
Highly impactful construction scenario at HS/MS
Multiple variances required at existing site
Parking area at HS/MS impacted during construction
No use of Sunnyside property and loss of ‘gifted’ portions of the property (resale impact)
Loss of play area due to addition location at PLES
Board Prioritized District Needs20
High School Renovation and Maintenance 10
Competitive & Comprehensive Educational Programs 8
Competitive, Flexible, Sustainable Infrastructure 8
Fields, Outdoor Space and Outdoor Academic Space 7
Teacher/Staff Retention 7
Monetary Support 5
Cost Controls on Spending 5
True Middle School (6-8) Grade Configuration 5
Elementary Level Student/Teacher Ratio 4
Better space utilization 3
Access to Technology & Technology Based Classes 2
Performing Arts Curriculum 1
21
22
Needs: DescriptionTotal
Points 1a 1c 1d 4aHigh School Renovation and
Maintenance 10
Competitive & Comprehensive
Educational Programs 8No reorg of
grade levels
Competitve, Flexible, Sustainable
Infrastructure 8
Fields, Outdoor Space and Outdoor Academic Space7
Teacher/Staff Retention 7
Monetary Support 5
Cost Controls on Spending 5
True Middle School (6-8) Grade
Configuration 5
Elementary Level
Student/Teacher Ratio 4
Better space utilization 3 MS not used
Access to Technology &
Technology Based Classes 2
Perfroming Arts Curriculum 1
Comparison of School Board Priorities for each Option
Largest District Needs Impact to need
23
Needs: DescriptionTotal
Points 1a 1c 1d 4aOvercrowding of Buildings - Size/Space/Additional
classrooms needed 166
Deferred Maintenance HVAC/MEP upgrades 135 No MS
Parking - traffic flow - safety drop off/pick up 93
Security & Safety of entrances 79 HS Only HS & MS
Internet technology upgrades 73
Need Multi-Use Collaborative Educational Spaces 69
Cafeteria undersized 67
Eliminate portable classrooms 66
Auditorium too small 65
Need More Athletic Fields 63
Need 21st Century learning & STEAM Classes 62
Need Vocational/Trade Education space 53
Need to make 6-8 Middle School 52
Lack of common areas - congregation areas 51
Need to update/improve bathrooms37
Secondary
Only
Secondary
Only
Secondary
OnlyHS Only
Need to improve safety on buses 35
Need More Special Education Spaces 30
Need a long term maintenance plan 30
Hallways are too small 25
Student/teacher ratio too high 24
Comparison of Community Priorities for each Option
Largest District Needs Impact to need
24
Needs: DescriptionTotal
Points 1a 1c 1d 4a
Conference rooms/large meeting spaces (22) 22Secondary
Only
Secondary
Only
Secondary
OnlyHS Only
Complete renovation of the high school (18) 18
Auditorium (16) 16
Eliminate modulars (15) 15
Secure entrance/accessibility (13) 13 HS Only HS & MS
Outdoor learning/leisure opportunities (12) 12 HS Only MS
Build new middle school (12) 12
Teaching spaces – Arts (12) 12Secondary
Only
Secondary
Only
Secondary
OnlyHS Only
Flexible furniture/spaces/electrical (12) 12
Parking (12) 12
Storage (11) 11Secondary
OnlyHS Only
Lab space (11) 11
Larger gyms (11) 11
Eating spaces (11) 11 HS Only
Bus drop/loop (9) 9Secondary
Only
Secondary
Only
Commons at the high school (8) 8
HVAC (7) 7
Custodial/Maintenance issues (7) 7
Copy machines (2) 2
Consumer science (1) 1
Comparison of the Principals and Educational Directors Priorities for each Option
Largest District Needs Impact to need
25
Needs: DescriptionTotal
Points
Total
Weighted
Points 1a 1c 1d 4aClassroom Size/Space 30 132
HVAC/Air Quality Concerns 27 103
Staff Break Area/Collaboration Space/Conference Rooms 33 95
Maintenance Issues 28 93
Cafeteria/Serving 28 87
Hallways/Lockers 28 85
Building Security/Main Entrance 28 84
Washrooms (Adult/Student) 27 84
Student Commons/Break-out Areas 29 79
Technology 27 76
School Size/Location 22 75
Parking/Drop-off/Traffic Flow 23 50
Portable Classroom Issues 12 46
Gym Space/Locker Rooms 14 37
Classroom Suitability 11 34
Storage/Cabinetry 10 34
Natural Daylight 11 33
Main Office/Support Services/Nurse 9 29
Science Classrooms/Labs 7 24
Flexible Seating/Furniture Suitability 8 21
Auditorium 9 17
Special Education Space/Calming/Sensory Space 5 11
Career/Technical Education Space 2 10
Class Size (ratio) 2 9
Music Classrooms/Practice Areas 2 8
Library/Media Center 4 8
Custodial/Maintenance 2 8
Athletic Fields 3 5
Site Suitability/Green Space/Playground Space 1 4
Art Classrooms/Labs 1 2
Swimming Pool 1 2
ADA Accessibility 1 2
Comparison of the HS Teachers Priorities for each Option (HS Impact Only)
Largest District Needs Impact to need
26
Needs: DescriptionTotal
Points
Total
Weighted
Points 1a 1c 1d 4aClassroom Size/Space 21 79
HVAC/Air Quality Concerns 20 74
Natural Daylight 18 47
School Size/Location/Layout 14 47
Parking/Drop-off/Traffic Flow 15 46
Auditorium 14 46
Building Security/Main Entrance 13 42
Hallways/Lockers 16 42
Staff Break Area/Collaboration Space/Conference Rooms 14 35
Washrooms (Adult/Student) 11 33
Technology 9 27
Gym Space/Locker Rooms 9 24
Flexible Seating/Furniture Suitability 8 21
Classroom Suitability 6 19
Portable Classroom Issues 5 18
Science Classrooms/Labs 4 16
Storage/Cabinetry 5 15
Career/Technical Education Space 4 15
Art Classrooms/Labs 4 13
Student Commons/Break-out Areas 7 13
Music Classrooms/Practice Areas 3 10
Athletic Fields 5 10
Maintenance Issues 3 10
Special Education Space/Calming/Sensory Space 3 9
Class Size (ratio) 1 4
Main Office/Support Services/Nurse 2 3
Site Suitability/Green Space/Playground Space 1 3
Library/Media Center 2 3
Cafeteria/Serving 1 2
Comparison of the MS Teachers Priorities for each Option (MS Impact Only)
Largest District Needs Impact to need
27
Needs: DescriptionTotal
Points 1a 1c 1d 4aCafeteria (21) 21
Bathrooms (20) 21
HVAC (19) 19
Handicap Accessibility (19) 19
Not enough space for academic &
extracurricular activities (19) 19
Outdated Auditorium (15) 15
Wider Hallways (15) 15
Commons (15) 15
Custodial issues (15) 15
Roof issues (14) 14
Secure/better entryway (14) 14
Larger classrooms (11) 11
Bleachers in gym (8) 8
No portables (7) 7
Science rooms (7) 7
What are the biggest facility Does the option impact the need?
Comparison of HS Student Priorities for each Option
“Parking Lot” Additions
What additional information
do you need to keep the
process moving?
28
Thank You For Your
Participation!29