schlaich bergermann und partner - sterg...
TRANSCRIPT
![Page 1: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/1.jpg)
schlaich bergermann und partner
sbp sonne gmbh
www.sbp.de
From Moses Mabhida Stadium to Solar Power Generation
in South Africa
Dipl. Ing. (FH) Markus Balz
Managing Director
![Page 2: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/2.jpg)
schlaich bergermann und partner are independent
consulting civil and structural engineers.
We strive to design sophisticated engineering
structures ranging from wide-span lightweight roofs, a
diversity of bridges and slender towers to innovative
solar energy power plants. Our ambitions are
efficiency, beauty and ecology.
For the sake of holistic solutions we seek the
collaboration with architects and engineers from all
fields of expertise who share our goals.
![Page 3: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/3.jpg)
Nelson Mandela Bay Arena Port Elizabeth, South Africa
![Page 4: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/4.jpg)
Soccer City Stadium Johannesburg, South Africa
![Page 5: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/5.jpg)
Greenpoint Stadium Cape Town, South Africa
![Page 6: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/6.jpg)
Moses Mabhida Stadium Durban, South Africa
![Page 7: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/7.jpg)
(My) Conclusions of working in South Africa
• Wide experience in all building technologies
• Experienced contractors that know how to handle large projects (….and international sub
contractors)
• Real team work between parties involved (client, architects, engineers, contractors)
• Make a plan (…but really not too early)
• Contractors listen to good advise
• Building risks involved are considered and accepted
• Fun!
![Page 8: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/8.jpg)
A growing team, sbp sonne gmbh, is working on
making advantage of renewable energies.
The technologies within this field are the Dish-Stirling-
applications for decentralised and small-scale power
plants. Central receiver systems, Parabolic trough and
the solar updraft tower technology is used in large scale
application.
Our highly qualified, motivated and constantly growing
team is willing to contribute in research and
development of any kind of Technologies.
Consulting Engineers for
Renewable Energy
![Page 9: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/9.jpg)
Consultancy for client, owner and contractor
Feasibility studies
Efficiency calculation of power generation
Structural concept, calculation and optimization
Optics evaluation and optimization
Concept and calculation of controls and drives
Planning of prototype and series production
Supervision and quality management
Our Scope of Work
Consulting Engineers for
Renewable Energy
![Page 10: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/10.jpg)
Metrology (Solar Radiation and Wind statistics)
Optics
Structural Engineering
Software Development (FEM – Optics and solar tracking)
Mechanical Engineering (Drives and Thermodynamics)
Electrical Engineering (Control system)
Series Production (Automotive)
Technical Expertise
Consulting Engineers for
Renewable Energy
![Page 11: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/11.jpg)
Global resource of conventional energies and yearly solar radiation
Global fossil fuel reserves
![Page 12: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/12.jpg)
The global supply of natural/renewable resources and economical potential to
exploit it with present technologies – primary energy
![Page 13: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/13.jpg)
Global use of primary energy (EJ/a)
Source: Wissenschaftlicher Beirat der Bundesregierung Globale Umweltveränderungen
Geothermal Energy
Other solar thermal
energy
(warmth)
Solar electricity
(Photovoltaics and solar
thermal power plants)
Wind
Biomass (modern)
Biomass (traditional)
Hydraulic energy
Nuclear energy
Gas
Coal
Oil
year
Pri
mary
en
erg
y c
on
su
mp
tio
n (
EJ/a
)
![Page 14: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/14.jpg)
Current Solar Technologies – sorted by size
![Page 15: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/15.jpg)
Current Solar Technologies – schlaich bergermann and partner
![Page 16: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/16.jpg)
Current solar technologies – dispachtable (storable) solar energy generation
![Page 17: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/17.jpg)
0
10
20
30
40
50
60
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Ele
ctr
ic o
utp
ut
(MW
)
Hour of the day
Reference demand 50 MWp
Photovoltaics 50 MW real "nameplate capacity 70MW" 493486 m² Parabolic trough 50 MWel w/o storage 100%, 280284 m²
Parabolic trough 50 MWel 7.5h storage 180%, 510120 m²
Parabolic trough 50 MWel 10h storage 195%, 547000 m²
Solar plants electric output (yearly mean) vs electric demand of South Africa
Illustration of area ratio (m²) between power output of PV and CSP (with and without storage)
![Page 18: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/18.jpg)
Capacity Trends of Renewable Energy Systems
![Page 19: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/19.jpg)
CSP Technology Choice
www.sbp.de
![Page 20: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/20.jpg)
Solar Thermal Electricity Principles
Dish/Stirling /
Dish/PV (CPV)
Point focusing
Parabolic trough /
Linear Fresnel Solar Updraft Tower
(SUT)
Power Tower
(CRS)
Line focusing Non concentrating
Solar thermal power plants
![Page 21: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/21.jpg)
An
da
so
l /S
pa
in
Saud
i Ara
bia
Stu
ttgart
500m North
500m South
500m East/West
Tower Height 180 m
Dish Stirling
Parabolic Trough
Tower
Fresnel
Calif
orn
ia
Upin
gto
n
![Page 22: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/22.jpg)
Solar Updraft Tower
- Non concentrating
www.sbp.de
![Page 23: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/23.jpg)
Tower
Turbine Collector Collector
Solar Updraft Tower Principle
![Page 24: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/24.jpg)
Prototype Manzanares, 1982, Castilla - La Mancha
![Page 25: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/25.jpg)
Solar Updraft Tower (Conceptual Design)
![Page 26: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/26.jpg)
Solar Updraft Tower Conceptual Design
![Page 27: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/27.jpg)
Solar Thermal Boosting
www.sbp.de
![Page 28: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/28.jpg)
HelioFocus solar concentrator – 500m² fresnel dish
![Page 29: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/29.jpg)
Prototype Dish HelioFocus, Israel
![Page 30: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/30.jpg)
Prototype Dish HelioFocus, Israel
![Page 31: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/31.jpg)
HelioFocus test site close to Wuhai/Huinong
![Page 32: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/32.jpg)
29th October 2013 Inauguration of Heliofocus Test Site with 8 x 500 m² Dish units in China
![Page 33: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/33.jpg)
Parabolic Trough Technology
www.sbp.de
![Page 34: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/34.jpg)
EUROTROUGH HELIOTROUGH ULTIMATE TROUGH
?
Large Scale Power Projects
- 50 MWAndasol I, II, III: Aldeire
Spain: 2008, 2009, 2012
- 50 MW Power Plant Moron, Spain: 2011
- 50 MW Power Plant Astexol, Badajoz,
Spain: 2012
- 50 MW Power Plant Extremasol: Badajoz,
Spain: 2012
-125 MW Solar Combined Power Plant
Kuraymat: Egypt, 2010
-50 MW Solar Power Plant, Rajasthan,
Godawari, India; 2013
-25 MW Solar Power Plant, Gujarat,
Cargo Ltd, India, 2013
Coming Projects in:
- Algeria
- Iran
- India
- Morocco
- South Africa
Large Scale Power Projects Large Scale Power Projects
?
Designed for 4 x 250 MW Blythe,
California: 2014
1. Conceptual Design
2. Prototype:
- PSA/Spain 1998
3. Test loop:
- EuroTrough Loop KJC:
Kramer Junction, USA: 2003
Technology Development
Start of development: 1998 Start of development: 2005 Current development: 2009
1. Conceptual Design
2. Prototype:
- Dortmund/Germany 2006
3. Test loop:
- HelioTrough Loop KJC:
Kramer Junction, USA: 2009
1. Conceptual Design
2. Prototype:
- Cologne/Germany 2011
3. Test loop:
- UT Collector Trough Loop:
Harper Lake, USA: 2012
Commercial Application
![Page 35: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/35.jpg)
EuroTrough Collector:
- Standard technology
- Moderate complexity
- Good optical performance
- Higher demand of manpower
UltimateTrough Collector:
- Optimized manufacturing technology
- Sophisticated complexity
- Very high optical performance
HelioTrough Collector:
- Reduction of numbers of elements
- Sophisticated complexity
- Currently highest optical
performance
- Automized manufacturing processes
Continuing Development – Size and optical quality does matter
![Page 36: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/36.jpg)
Glass tube
Absorber tube
with selective
coating
Tracking
system
Parabolic
concentrator with
reflecting surface
Direct radiation
Principle of a Solar Parabolic Trough Power Plant
![Page 37: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/37.jpg)
Design development - wind tunnel testing
![Page 38: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/38.jpg)
EuroTrough 2 Prototype, Plataforma Solar de Almeria/Spanien 2002
![Page 39: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/39.jpg)
SKAL-ET loop integrated in the SEGS V plant in California
![Page 40: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/40.jpg)
Andasol collector field, Spain
![Page 41: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/41.jpg)
Commercial 50 MW Plants in Spain: Andasol 1, Andasol 2, Andasol 3 (under
construction)
![Page 42: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/42.jpg)
Andasol 1 power block
![Page 43: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/43.jpg)
Andasol 1 molten salt heat storage
![Page 44: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/44.jpg)
Parabolic trough power plant – thermal flow
![Page 45: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/45.jpg)
![Page 46: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/46.jpg)
On-site collector assembly hall
![Page 47: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/47.jpg)
Mirror assembly
![Page 48: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/48.jpg)
Assembly on Site
![Page 49: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/49.jpg)
Parabolic Trough Technology
Ongoing Development
www.sbp.de
![Page 50: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/50.jpg)
Procurement and erection cost breakup
(Estimated current cost ~220 M€ - European cost basis)
Significant savings can be realized with an
economically optimized collector design
Cost efficient solutions for parabolic trough power plants:
An economically optimized collector design is a key to reduce CSP project costs
Cost Structure General
Civil Works
4%
Solar Field
48%
HTF System
9%
Thermal Energy Storage
(TES) 20%
Power Block 10%
BOP
9%
The Solar Field is the most important cost item of a
Parabolic Trough Power Plant
Cost efficient Solar Field has a significant impact on
the economics of the project
Within the Solar Field, the collector structure and
mirrors account for 60 % of the solar field costs
![Page 51: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/51.jpg)
Design and optimization procedures
Structural design geometry
profiles
material
Optical
analysis FEA
Optimization
Technical optimization
![Page 52: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/52.jpg)
Design and optimization procedures
Structural
design geometry
profiles
material
Optical
analysis FEA
Cost
model
Techno-
economic
evaluation
Optimization
Techno-economic optimization
![Page 53: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/53.jpg)
UT – Techno – economical design approach
Analysis of Ultimate Trough – Technology Identification of
potential improvements
Expectations (development aims):
20 - 25 % reduction of solar field investment cost achieved by:
less investment and erection costs for solar field
higher collector performance (higher optical efficiency, lower
auxiliary consumption)
In total:
Levelized Cost of Electricity (LCoE) will decrease by ~12 %
compared to today’s parabolic trough technology.
![Page 54: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/54.jpg)
Ultimate Trough Prototype April 2011 Köln
![Page 55: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/55.jpg)
Optical assessment with deflectometry & photogrammetry – dual
measurement for result validation
Intercept factor - sun rays hitting the receiver under consideration of
the sun shape
• = 99.2% @ 94 mm HCE (for oil as HTF)
• = 97.5% @ 70 mm HCE (for salt as HTF)
Average focal deviation of assembled collector, FDx < 8 mm -
combined deviation caused by mirrors and steel structure
Design: Mirrors are attached stress free to the collector metal structure
Measurement and validation: Optical assessment by 3rd party
Optical performance of UltimateTrough - Test Loop
![Page 56: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/56.jpg)
Ultimate Trough Testloop - California
![Page 57: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/57.jpg)
Ultimate Trough Test Loop - California
![Page 58: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/58.jpg)
• One day per month evaluated and compared to model
• The actual performance is consistently better than the expected performance.
• There are still some uncertainties in the measurements which will be evaluated and corrected during the next
weeks of operation.
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00
The
rmal
eff
icie
ncy
Time
UT measured performance, 18.4.2013 ET theoretical performance, 18.4.2013
UT theoretical performance, 18.4.2013
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00
The
rmal
eff
icie
ncy
Time
UT measured performance, 11.3.2013 ET theoretical performance, 11.3.2013
UT theoretical performance, 11.3.2013
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00
The
rmal
eff
icie
ncy
Time
UT measured performance, 13.5.2013 ET theoretical performance, 13.5.2013
UT theoretical performance, 13.5.2013
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00
The
rmal
eff
icie
ncy
Time
UT measured performance, 28.2.2013 ET theoretical performance, 28.2.2013
UT theoretical performance, 28.2.2013
Feb March
April May
Ultimate Trough – Test loop performance
![Page 59: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/59.jpg)
1‘500 m 1‘750 m
1‘0
50
m
1‘3
00
m
Eurotrough, 510‘000 m² Ultimate Trough, 466‘000 m²
Significant cost reduction due to
• Less piping (material, installation, insulation)
• Less heat transfer fluid
ET / UT – Solar field layout for a 50 MW plant with storage
![Page 60: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/60.jpg)
UT L = 6,5m
D = 1,0m
Anchorage
4 x M36 x 840mm &
Block shear connector
100%
38%
60%
ET L = 4,0m
D = 1,0m
Anchorage
4 x M30 x 750mm
100% 163%
Comparison of foundations
![Page 61: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/61.jpg)
Central Receiver Systems
www.sbp.de
![Page 62: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/62.jpg)
Receiver
Heliostat
Receiver
tower heliostat field
Concentrated solar radiation
direct radiation direct radiation
heliostat field
![Page 63: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/63.jpg)
GemaSolar by Torresol 19 MW (17h storage)
![Page 64: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/64.jpg)
Conventional heliostat
![Page 65: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/65.jpg)
SBP / Steinmüller 150 m² metal membrane heliostat – optical quality
![Page 66: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/66.jpg)
SBP 150 m² metall membrane heliostat – variable focal length
![Page 67: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/67.jpg)
SBP Solar field efficiency – blocking and shading optimisation
![Page 68: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/68.jpg)
Comparison of benchmark heliostat and current heliostat development
Foundation 11%
Metal Suport Structure
20%
Reflector Panels
8%
Drive and Controls
45%
Assembly and
Transport on Site 16%
Benchmark Heliostat
Foundation 10%
Metal Suport Structure
30%
Reflector Panels 9%
Drive and Controls 38%
Assembly and Transport on
Site 13%
Current Heliostat Development (Status 6/2013)
Benchmark Solarfield
60 MWel 13h storage
~115 mio. MWh Thermal Power on Receiver annualy
Solarfield Cost = 164 Mio $
LCoE (project related) = 16,7 c$/kwh
Evolution Design
- higher optical efficiency
- reduction of drive costs
- new structural system
Solarfield Cost = 147 Mio $
LCoE (project related) = 14,4 c$/kwh
Cost reduction of solar field = 11%
![Page 69: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/69.jpg)
Technology trends
![Page 70: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/70.jpg)
Installed capacity: 100 MW
Site: North Africa
Linear fuel cost escalation
as in 2000-2010, market prices
PV 2000 h/yr, 30 yr
Wind 2500 h/yr, 20 yr
no storage, no backup
CSP 5500 h/yr, 40 yr
incl. thermal energy storage
and 10% hybrid operation with
natural gas
LEC = levelized electricity cost Source: German Aerospace Center DLR, 2012
0.00
0.05
0.10
0.15
0.20
0.25
0.30
0.35
0.40
0.45
0.50
2005 2010 2015 2020 2025
Year
Wind
PV
CSP
Coal, Gas
LEC
($
/kW
h)
CSP, PV, Wind, Fuels: cost of generation in MENA
![Page 71: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/71.jpg)
Load: 100 MW, 5500 h/y, 40 yr
Site: North Africa
Linear fuel cost escalation
as in 2000-2010, market prices
PV, Wind incl. pump storage;
10% backup by natural gas
combined cycle
CSP incl. thermal energy
storage and 10% hybrid
operation with natural gas
LEC = levelized electricity cost Source: German Aerospace Center DLR, 2012
0.00
0.05
0.10
0.15
0.20
0.25
0.30
0.35
0.40
0.45
0.50
2005 2010 2015 2020 2025
Year
Wind MENA
PV MENA
CSP MENA
Gas, Coal
LE
C (
$/k
Wh
)
CSP, PV, Wind, Fuels: cost of flexible power in MENA
![Page 72: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/72.jpg)
ET
![Page 73: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/73.jpg)
ET UT
![Page 74: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/74.jpg)
ET UT UT
![Page 75: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/75.jpg)
UT UT
![Page 76: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/76.jpg)
9,9
Hyp
oH
igh
tec
UT UT UT UT ET
![Page 77: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/77.jpg)
9,9
Hyp
oH
igh
tec
![Page 78: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/78.jpg)
CSP in South Africa
![Page 79: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/79.jpg)
Significance to South Africa
High growing
power demand Very fortunate DNI and
vast amount of land
not competing with agriculture
Creating jobs
Develop local knowledge
and high local content Technology export
Technology hub of southern
Africa
Less carbon intensive energy
production
Reduce environmental impact Rising costs of fossil fuels
Represent a greener and
sustainable country
![Page 80: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/80.jpg)
Solar field costs – South African local content
Local content
2012
approx. 60%
Local content
201?
approx. 80%
SCA Foundations; 4.4%
Metal Support Structure (incl. Huckbolts); 24.2%
SF Assembly & Erection; 10.6%
SCE Assembly Line incl. Photogr.; 3.0%
License ( Collector Drawings ); 1.4%
HCE; 17.1%
Mirrors; 13.9%
Drive Units; 1.2%
Sensors & Pylon Cabling; 0.7%
LOC, FSC & Meteo Station; 1.3%
SF Cabling (Supply & Installation); 2.4%
SF Power Supply; 0.3%
Swivel Joints assemblies; 1.7%
Header Piping Material; 4.5%
Header Piping Installation; 2.1%
Inter Loop Piping Material; 3.2%
Inter Loop Piping Installation; 2.8%
Instrumentation; 0.2%
HTF; 4.7%
![Page 81: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/81.jpg)
Conclusions – South Africa
Conclusions for South Africa
- CSP is the answer for many of SAs needs and requirements (Grid
requirements, Flexibilty, local content , unemployment, solar resources etc.)
- SA has recognised the value of CSP (allocation 200MW/year and two
tear feed in tariff ), but it is very conservative facing
technological/financial risks
- SA building contractors do not get in gear – why?
- SA has the manufacturing capabilities the technological institutions to
support growth and significant development within this field
![Page 83: schlaich bergermann und partner - STERG Websitesterg.sun.ac.za/wp-content/uploads/2013/12/Lecture-Markus-Balz1.pdf · schlaich bergermann und partner are independent consulting civil](https://reader033.vdocuments.us/reader033/viewer/2022052709/5a87baaa7f8b9a9f1b8dfa2c/html5/thumbnails/83.jpg)
Schwabstraße 43 70197 Stuttgart
Brunnenstraße 110c 13355 Berlin
555 8th Avenue Suite #2402 New York, NY 10018
1325 Huaihai Road Room 804 Shanghai 200031
Rua Afonso Bras 473 cjs. 113-114 04511-011 Sao Paulo
www.sbp.de