scheme details 1

Upload: aviraj2006

Post on 03-Apr-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/28/2019 Scheme Details 1

    1/2

    REVISED PARAMETERS FOR ONLINE PROCESSING OF AICTE SCHEMES FROM FINANCIAL YEAR 2012-13

    Schemes

    1 2 3 4 5

    RPS

    Research Promotion

    Scheme

    NCP

    National Coordinated

    Project

    NAFETIC

    National Facilities in

    Engineering & Technology with

    Industrial Collaboration

    MODROBS

    Modernization and

    Removal of Obsolescence

    EDC

    Entrepreneurship

    Development CellParameters

    Eligibility of Institute AICTE approved Institutes

    or AICTE approved

    University Departments

    with relevant PG Programs

    IISc., IITs, IIMs, NITs, AICTE

    approved Institutes & AICTE

    approved University

    Departments with relevant

    PG Programs withAccreditation from NBA.

    AICTE approved Institutes or

    AICTE approved University

    Departments with relevant PG

    Programs with Accreditation

    from NBA.

    AICTE approved Institutes

    or AICTE approved

    University Departments.

    AICTE approved Institutes

    or AICTE approved

    University Departments.

    Requirements i. Full time regularfaculty with research

    experience and

    publications;

    ii. Research facilitiesavailable in the

    Institute;

    iii. Not more than oneproposal from one PIat any given time.

    i.Coordinator must be fulltime regular faculty of

    the Institute.

    ii.Multi-institutionalprojects.

    iii.Association betweenreputed institutes like IIT,

    NIT, IIM, IISc., & AICTE

    approved Institutes andUniversity Departments

    iv.Accreditation from NBA.

    i. Coordinator must be fulltime regular faculty of the

    institute.

    ii. AICTE approved institutesand University Departments

    running PG programmes.

    iii. Having accreditation of theUG/PG programme under

    respective department fromNBA.

    iv. Matching grant from theIndustry.

    i. Institute must be 10years or more old.

    ii.For self-financingInstitutes not more than

    3 proposals per

    institutes per year can

    be submitted.

    iii.For Govt./Govt.-aidedInstitute not more than10 proposals per

    Institute per year can be

    submitted.

    I. Full time regularfaculty as Coordinator

    II. One proposal perinstitute.

    III. Existing AICTEsponsored EDC

    Institutes not eligible

    to apply again.

    Method of

    Assessment

    3 members Expert

    Committee; out of which 2

    members from the

    concerned stream not

    below the rank of Associate

    Professor.

    3 members Expert

    Committee; out of which 2

    members from the

    concerned stream not

    below the rank of Associate

    Professor.

    3 members Expert Committee;

    out of which 2 members from

    the concerned stream not below

    the rank of Associate Professor.

    3 members Expert

    Committee; out of which 2

    members from the

    concerned stream not

    below the rank of Associate

    Professor.

    3 members Expert

    Committee; out of which 2

    members from the

    concerned stream not

    below the rank of Associate

    Professor.

    Duration of Project 3 years 3 years 3 years 1 year 2 years

  • 7/28/2019 Scheme Details 1

    2/2

    # Disbursement of funds for year 2 and 3 shall be based on submission of progress reports to the satisfaction of authority.

    Limit of Funding 25 Lakhs 50 Lakhs 50 Lakhs from AICTE & 50 Lakhs

    from the Industry.

    20 Lakhs 10 Lakhs

    Rs. 4 laks NR

    Rs. 3 laks R Year 1

    Rs. 3 laks R Year 2

    Disbursement

    of

    funds#

    On sanction

    of proposal

    100% of Non-Recurring and

    Recurring of year 1

    100% of Non-Recurring and

    Recurring of year 1

    100% of Non-Recurring and Recurring

    of year 1100% of Non-Recurring and

    Recurring of year 1100% of Non-Recurring and

    Recurring of year 1

    Year 2#

    Recurring of Year 2 Recurring of Year 2Recurring of Year 2 -- Recurring of Year 2

    Year 3#

    Recurring of Year 3 Recurring of Year 3Recurring of Year 3 -- --

    Terms and

    Conditions

    (Documents to be

    submitted)

    i.Annual Submission ofProgress Report.

    ii.Project CompletionReport.

    iii.Payment & Receipt A/c.iv.

    Duly audited UC.

    i.Annual Submission ofProgress Report.

    ii.Project CompletionReport.

    iii.Payment & Receipt A/c.iv.

    Duly audited UC.

    i. Annual Submission ofProgress Report.

    ii. Project Completion Report.iii. Payment & Receipt A/c.iv. Duly audited UC.

    i. Project CompletionReport.

    ii. Payment & Receipt A/c.iii. Duly audited UC.

    i. Annual Submission ofProgress Report.

    ii. Project CompletionReport.

    iii. Payment & Receipt A/c.iv.

    Duly audited UC.

    Expected outcome To create & update general

    research capabilities.

    The research which

    contribute directly to the

    society at large.

    To provide state of arts, R&D

    facilities, sophisticated testing

    and design centre and also

    provide necessary facilities.

    Modernization of existing

    Lab.

    In stimulating and achieving

    excellence in technical

    education & should be self

    sustainable after 2 years of

    establishment.

    Deliverables i.At least one PhD thesissubmitted at the end of

    3 Years.

    ii.Minimum 5 paperspublished out of which

    one at least in National/International Journal.

    iii.Minimum 3 Conferences/ Seminars / Workshop /

    Training Programs

    organized.

    iv.Minimum 3 Consultancyprojects executed

    i. At least one PhD thesissubmitted at the end of

    3 Years.

    ii. Minimum 5 paperspublished out of which

    at least one in National/International Journal.

    iii. Minimum 3 Conferences/ Seminars / Workshop /

    Training Programs

    organized.

    iv. Minimum 3 Consultancyprojects executed

    i. At least one PhD thesissubmitted at the end of 3

    Years.

    ii. Minimum 5 paperspublished out of which one

    at least in National/International Journal.

    iii. Minimum 3 Conferences /Seminars/Workshop/

    Training Programs

    organized.

    iv. Minimum 3 Consultancyprojects executed

    Minimum 3 Conferences

    /Seminars / Workshop /

    Training Programs

    organized / annum