    Feasibility of mix drainage test:

    Take the bucket with the aggregate mixture

    out of the ofen and mix it manuan thoroughlyfor a moment.

    Give the aggregate mixture into the mix pan

    and clamp that in the mixer (REGO Beating

    and mixing machine, Modell: SM 2)

    • Among stirring lower the mixing whisk (6 wires)

    •Dry mixing time of the mineral aggregates is 15

    seconds

    • Admixture of 204g bitumen

    • After mixing time 105 seconds

     After 1 hour the beaker glass should be taken

    out of the oven and evacuated

    Storage of the beaker glass for 1 hour at 170

    degrees centigrade in the oven

     After taking of the mix pan follows a short manualafter mixing time for additional homogenisation

    Weighed portion of approximately 1000g

    asphalt mixture in a 170 degrees centigradetempered and weighed beaker glass (800

    milliliter)

  • 8/16/2019 Schellenberg Test Procedure

    2/2

    2

    Feasibility of mix drainage test:

    • Possible sticking mineral aggregates on the beaker glass have to be removed

    and the beaker glass will be weighed

    • Calculation of the drainage value:

    (glass after evacuationminus weight of the empty beaker glass)multiplied by 100%,

    divided by weighed portion of asphalt)

    • For the calculated drainage values are following rules valid:

    x < 0,2 very good stabilize effect0,2 < x < 0,3 acceptable stabilize effect

    x > 0,3 insufficient stabilize effect