scheduling reports in web intelligence

8
Scheduling Reports in web intelligence (BOXI R2) Manoj Kumar rakesh BO developer [email protected] This documents is basically based on screeshot taken while scheduling the report. The report is stored at directory as pdf. Before scheduling the reports logon to central management console.

Upload: mkrakesh

Post on 02-Dec-2014

27.162 views

Category:

Self Improvement


1 download

DESCRIPTION

This document describes how to schedule a report in Business objects XI R2 Webi.(Based on screen shot Display)

TRANSCRIPT

Page 1: Scheduling Reports In Web Intelligence

Scheduling Reports in web intelligence (BOXI R2)

Manoj Kumar rakesh BO developer [email protected]

This documents is basically based on screeshot taken while scheduling the report.The report is stored at directory as pdf.

Before scheduling the reports logon to central management console.

Page 2: Scheduling Reports In Web Intelligence

Click on central management console.

Click on servers.

Page 3: Scheduling Reports In Web Intelligence

Click on web intelligence job server to configure.

Click on destination tab.

Page 4: Scheduling Reports In Web Intelligence

Check on unmanaged disk and click on enable button on the right.

Click ok to enable the selected item.

Page 5: Scheduling Reports In Web Intelligence

Go back to central management console and re start the web intelligence job server.

Open the report to be schedule.

Click on schedule option in the report.

Page 6: Scheduling Reports In Web Intelligence

Select the format as Adobe Acrobat.Expand the destination option

Uncheck “use the job server Default”

Page 7: Scheduling Reports In Web Intelligence

Give the destination location for the file. Ex.D:\Scheduled.Click on schedule button below right to run the job.