Scheduling and Voltage Scaling for Energy/Reliability Trade-offs in Fault-Tolerant Time-Triggered
Embedded Systems
Kåre Harbo Poulsen,
Paul Pop, Viacheslav Izosimov
August 23, 2007
![Page 2: Scheduling and Voltage Scaling for Energy/Reliability ...paupo/publications/Pop2007ab... · Fault-Tolerant Time-Triggered Embedded Systems Kåre Harbo Poulsen, Paul Pop, Viacheslav](https://reader035.vdocuments.us/reader035/viewer/2022070712/5ecbd831534cef21d6140ff6/html5/thumbnails/2.jpg)
Embedded Systems
![Page 3: Scheduling and Voltage Scaling for Energy/Reliability ...paupo/publications/Pop2007ab... · Fault-Tolerant Time-Triggered Embedded Systems Kåre Harbo Poulsen, Paul Pop, Viacheslav](https://reader035.vdocuments.us/reader035/viewer/2022070712/5ecbd831534cef21d6140ff6/html5/thumbnails/3.jpg)
Design of Embedded Systems
![Page 4: Scheduling and Voltage Scaling for Energy/Reliability ...paupo/publications/Pop2007ab... · Fault-Tolerant Time-Triggered Embedded Systems Kåre Harbo Poulsen, Paul Pop, Viacheslav](https://reader035.vdocuments.us/reader035/viewer/2022070712/5ecbd831534cef21d6140ff6/html5/thumbnails/4.jpg)
Faults
Permanent faults are decreasing Transient faults are increasing
From: Cristian Continescu, Trends and challenges in VLSI circuit reliability, 2003
![Page 5: Scheduling and Voltage Scaling for Energy/Reliability ...paupo/publications/Pop2007ab... · Fault-Tolerant Time-Triggered Embedded Systems Kåre Harbo Poulsen, Paul Pop, Viacheslav](https://reader035.vdocuments.us/reader035/viewer/2022070712/5ecbd831534cef21d6140ff6/html5/thumbnails/5.jpg)
Fault-Tolerance
Tolerate faults gracefully Expressions for reliability for fault-
tolerance
Reexecution
PE2
PE1 P1 P1
Passive Replication
PE2
PE1 P1
P1
Replication
PE2
PE1 P1
P1
![Page 6: Scheduling and Voltage Scaling for Energy/Reliability ...paupo/publications/Pop2007ab... · Fault-Tolerant Time-Triggered Embedded Systems Kåre Harbo Poulsen, Paul Pop, Viacheslav](https://reader035.vdocuments.us/reader035/viewer/2022070712/5ecbd831534cef21d6140ff6/html5/thumbnails/6.jpg)
Embedded Systems Model
Input Application Architecture Reliability goal: 0.999 999 999
PE2
PE1 P1 P2 P4
P3
P5
Bus 1 2
DeadlineR0=0.999 981
P1
P2 P3
P4
P5
PE1 PE2
P1 4 4
P2 4 4
P3 3 3
P4 4 4
P5 4 4
PE1 PE 2
m1
m2
k=1
![Page 7: Scheduling and Voltage Scaling for Energy/Reliability ...paupo/publications/Pop2007ab... · Fault-Tolerant Time-Triggered Embedded Systems Kåre Harbo Poulsen, Paul Pop, Viacheslav](https://reader035.vdocuments.us/reader035/viewer/2022070712/5ecbd831534cef21d6140ff6/html5/thumbnails/7.jpg)
Fault-Tolerant Scheduling
Input Application Architecture Reliability goal: 0.999 999 999
Fault-tolerance for k=1 faults
PE2
PE1 P1 P2 P4
P3
P5
Bus 1 2
Deadline
P1 P2 P4
P3
P5
R0=0.999 999 999 927
P1
P2 P3
P4
P5
PE1 PE2
P1 4 4
P2 4 4
P3 3 3
P4 4 4
P5 4 4
PE1 PE 2
m1
m2
k=1
![Page 8: Scheduling and Voltage Scaling for Energy/Reliability ...paupo/publications/Pop2007ab... · Fault-Tolerant Time-Triggered Embedded Systems Kåre Harbo Poulsen, Paul Pop, Viacheslav](https://reader035.vdocuments.us/reader035/viewer/2022070712/5ecbd831534cef21d6140ff6/html5/thumbnails/8.jpg)
Fault-Tolerant Scheduling
Fault tolerant scheduler Full transparency
Good debugability Little memory
PE2
PE1 P1 P2 P4
P3
P5
Bus 1 2
Deadline
P1 P2 P4
P3
P5
Only 1 faultFully Transparent Scheduling
P1
P2 P3
P4
P5
PE1 PE2
P1 4 4
P2 4 4
P3 3 3
P4 4 4
P5 4 4
PE1 PE 2
m1
m2
k=1
![Page 9: Scheduling and Voltage Scaling for Energy/Reliability ...paupo/publications/Pop2007ab... · Fault-Tolerant Time-Triggered Embedded Systems Kåre Harbo Poulsen, Paul Pop, Viacheslav](https://reader035.vdocuments.us/reader035/viewer/2022070712/5ecbd831534cef21d6140ff6/html5/thumbnails/9.jpg)
Fault-Tolerant Scheduling
Can be done faster Sacrifice local transparency
PE2
PE1 P1 P2 P4
P3
P5
Bus 1 2
Deadline
P1 P2 P4
P3
P5
Only 1 faultFully Transparent Scheduling
Only 1 fault
P1
P2 P3
P4
P5
PE1 PE2
P1 4 4
P2 4 4
P3 3 3
P4 4 4
P5 4 4
PE1 PE 2
m1
m2
k=1
![Page 10: Scheduling and Voltage Scaling for Energy/Reliability ...paupo/publications/Pop2007ab... · Fault-Tolerant Time-Triggered Embedded Systems Kåre Harbo Poulsen, Paul Pop, Viacheslav](https://reader035.vdocuments.us/reader035/viewer/2022070712/5ecbd831534cef21d6140ff6/html5/thumbnails/10.jpg)
Fault-Tolerant Scheduling
Can be done faster Sacrifice local transparency More complex online scheduler
PE2
PE1 P1 P2 P4
P3
P5
Bus 1 2
Deadline
P1/2
P3
P4/5
Only 1 fault
Slack Sharing Scheduling
P1
P2 P3
P4
P5
PE1 PE2
P1 4 4
P2 4 4
P3 3 3
P4 4 4
P5 4 4
PE1 PE 2
m1
m2
k=1
![Page 11: Scheduling and Voltage Scaling for Energy/Reliability ...paupo/publications/Pop2007ab... · Fault-Tolerant Time-Triggered Embedded Systems Kåre Harbo Poulsen, Paul Pop, Viacheslav](https://reader035.vdocuments.us/reader035/viewer/2022070712/5ecbd831534cef21d6140ff6/html5/thumbnails/11.jpg)
Fault-Tolerant Scheduling
Even faster Sacrifice all transparency Schedule for each fault scenario
PE2
PE1 P1 P2 P4
P3
P5
Bus 1 2
Deadline
P1/2
P3
P4/5
Slack Sharing Scheduling
P1
P2 P3
P4
P5
PE1 PE2
P1 4 4
P2 4 4
P3 3 3
P4 4 4
P5 4 4
PE1 PE 2
m1
m2
k=1
![Page 12: Scheduling and Voltage Scaling for Energy/Reliability ...paupo/publications/Pop2007ab... · Fault-Tolerant Time-Triggered Embedded Systems Kåre Harbo Poulsen, Paul Pop, Viacheslav](https://reader035.vdocuments.us/reader035/viewer/2022070712/5ecbd831534cef21d6140ff6/html5/thumbnails/12.jpg)
Fault-Tolerant Scheduling
Even faster Sacrifice all transparency Schedule for each fault scenario At most k re-executions
PE2
PE1 P1 P1 P4
P3
P5
Bus 1 2
Deadline
P2
P1
P2 P3
P4
P5
PE1 PE2
P1 4 4
P2 4 4
P3 3 3
P4 4 4
P5 4 4
PE1 PE 2
m1
m2
k=1
![Page 13: Scheduling and Voltage Scaling for Energy/Reliability ...paupo/publications/Pop2007ab... · Fault-Tolerant Time-Triggered Embedded Systems Kåre Harbo Poulsen, Paul Pop, Viacheslav](https://reader035.vdocuments.us/reader035/viewer/2022070712/5ecbd831534cef21d6140ff6/html5/thumbnails/13.jpg)
Fault-Tolerant Scheduling
Even faster Sacrifice all transparency Schedule for each fault scenario At most k re-executions
PE2
PE1 P4P1 P4
P3
P5
Bus 1 2
Deadline
P2
P1
P2 P3
P4
P5
PE1 PE2
P1 4 4
P2 4 4
P3 3 3
P4 4 4
P5 4 4
PE1 PE 2
m1
m2
k=1
![Page 14: Scheduling and Voltage Scaling for Energy/Reliability ...paupo/publications/Pop2007ab... · Fault-Tolerant Time-Triggered Embedded Systems Kåre Harbo Poulsen, Paul Pop, Viacheslav](https://reader035.vdocuments.us/reader035/viewer/2022070712/5ecbd831534cef21d6140ff6/html5/thumbnails/14.jpg)
Fault-Tolerant Scheduling
Even faster Sacrifice all transparency Schedule for each fault scenario At most k re-executions All faults information is shared
PE2
PE1 P1 P4
P3
P5
Bus 1 2
Deadline
P2
Conditional Scheduling
P1
P2 P3
P4
P5
PE1 PE2
P1 4 4
P2 4 4
P3 3 3
P4 4 4
P5 4 4
PE1 PE 2
m1
m2
k=1
![Page 15: Scheduling and Voltage Scaling for Energy/Reliability ...paupo/publications/Pop2007ab... · Fault-Tolerant Time-Triggered Embedded Systems Kåre Harbo Poulsen, Paul Pop, Viacheslav](https://reader035.vdocuments.us/reader035/viewer/2022070712/5ecbd831534cef21d6140ff6/html5/thumbnails/15.jpg)
Fault-Tolerant Schedulings
PE2
PE1 P1 P4
P3
P5
Bus 1 2
P2
Conditional Scheduling
PE2
PE1 P1 P2 P4
P3
P5
Bus 1 2
P1/2
P3
P4/5
Slack Sharing Scheduling
PE2
PE1 P1 P2 P4
P3
P5
Bus 1 2
P1 P2 P4
P3
P5
Fully Transparent Scheduling Deadline
P1
P2 P3
P4
P5
PE1 PE2
P1 4 4
P2 4 4
P3 3 3
P4 4 4
P5 4 4
PE1 PE 2
m1
m2
k=1
![Page 16: Scheduling and Voltage Scaling for Energy/Reliability ...paupo/publications/Pop2007ab... · Fault-Tolerant Time-Triggered Embedded Systems Kåre Harbo Poulsen, Paul Pop, Viacheslav](https://reader035.vdocuments.us/reader035/viewer/2022070712/5ecbd831534cef21d6140ff6/html5/thumbnails/16.jpg)
Energy Management
Goal: minimise energy consumption Dynamic voltage scaling
PE2
PE1 P1
100% Vss
100% E0100% E0
PE2
PE1 P1
66% Vss
44% E0
PE2
PE1 P1
33% Vss
11% E0
![Page 17: Scheduling and Voltage Scaling for Energy/Reliability ...paupo/publications/Pop2007ab... · Fault-Tolerant Time-Triggered Embedded Systems Kåre Harbo Poulsen, Paul Pop, Viacheslav](https://reader035.vdocuments.us/reader035/viewer/2022070712/5ecbd831534cef21d6140ff6/html5/thumbnails/17.jpg)
Energy Management
PE2
PE1 P1 P4
P3
P5
Bus 1 2
P2
Conditional Scheduling
PE2
PE1 P1 P2 P4
P3
P5
Bus 1 2
P1/2
P3
P4/5
Slack Sharing Scheduling
PE2
PE1 P1 P2 P4
P3
P5
Bus 1 2
P1 P2 P4
P3
P5
Fully Transparent Scheduling Deadline
P1
P2 P3
P4
P5
PE1 PE2
P1 4 4
P2 4 4
P3 3 3
P4 4 4
P5 4 4
PE1 PE 2
m1
m2
k=1
![Page 18: Scheduling and Voltage Scaling for Energy/Reliability ...paupo/publications/Pop2007ab... · Fault-Tolerant Time-Triggered Embedded Systems Kåre Harbo Poulsen, Paul Pop, Viacheslav](https://reader035.vdocuments.us/reader035/viewer/2022070712/5ecbd831534cef21d6140ff6/html5/thumbnails/18.jpg)
Energy Management
PE2
PE1 P1 P4
P3
P5
Bus 1 2
P2
Conditional Scheduling
PE2
PE1 P1 P2 P4
P3
P5
Bus 1 2
P1/2
P3
P4/5
Slack Sharing Scheduling
PE2
PE1 P1 P2 P4
P3
P5
Bus 1 2
P1 P2 P4
P3
P5
Fully Transparent Scheduling Deadline
100% E0
P1
P2 P3
P4
P5
PE1 PE2
P1 4 4
P2 4 4
P3 3 3
P4 4 4
P5 4 4
PE1 PE 2
m1
m2
k=1
![Page 19: Scheduling and Voltage Scaling for Energy/Reliability ...paupo/publications/Pop2007ab... · Fault-Tolerant Time-Triggered Embedded Systems Kåre Harbo Poulsen, Paul Pop, Viacheslav](https://reader035.vdocuments.us/reader035/viewer/2022070712/5ecbd831534cef21d6140ff6/html5/thumbnails/19.jpg)
63% E0
Energy Management
PE2
PE1 P1 P4
P3
P5
Bus 1 2
P2
Conditional Scheduling
PE2
PE1 P1 P2P4
P3
P5
Bus 1 2
P3
P4/5
Slack Sharing Scheduling
PE2
PE1 P1 P2 P4
P3
P5
Bus 1 2
P1 P2 P4
P3
P5
Fully Transparent Scheduling Deadline
100% E0
P1
P2 P3
P4
P5
PE1 PE2
P1 4 4
P2 4 4
P3 3 3
P4 4 4
P5 4 4
PE1 PE 2
m1
m2
k=1
![Page 20: Scheduling and Voltage Scaling for Energy/Reliability ...paupo/publications/Pop2007ab... · Fault-Tolerant Time-Triggered Embedded Systems Kåre Harbo Poulsen, Paul Pop, Viacheslav](https://reader035.vdocuments.us/reader035/viewer/2022070712/5ecbd831534cef21d6140ff6/html5/thumbnails/20.jpg)
63% E0
Energy Management
PE2
PE1 P1
P3
P5
Bus 1 2
P2 P4
Conditional Scheduling
PE2
PE1 P1 P2P4
P3
P5
Bus 1 2
P3
P4/5
Slack Sharing Scheduling
PE2
PE1 P1 P2 P4
P3
P5
Bus 1 2
P1 P2 P4
P3
P5
Fully Transparent Scheduling Deadline
100% E0
38% E0
P1
P2 P3
P4
P5
PE1 PE2
P1 4 4
P2 4 4
P3 3 3
P4 4 4
P5 4 4
PE1 PE 2
m1
m2
k=1
![Page 21: Scheduling and Voltage Scaling for Energy/Reliability ...paupo/publications/Pop2007ab... · Fault-Tolerant Time-Triggered Embedded Systems Kåre Harbo Poulsen, Paul Pop, Viacheslav](https://reader035.vdocuments.us/reader035/viewer/2022070712/5ecbd831534cef21d6140ff6/html5/thumbnails/21.jpg)
63% E0
Energy Management
PE2
PE1 P1
P3
P5
Bus 1 2
P2 P4
Conditional Scheduling
PE2
PE1 P1 P2P4
P3
P5
Bus 1 2
P3
P4/5
Slack Sharing Scheduling
PE2
PE1 P1 P2 P4
P3
P5
Bus 1 2
P1 P2 P4
P3
P5
Fully Transparent Scheduling Deadline
100% E0
38% E0
P1
P2 P3
P4
P5
PE1 PE2
P1 4 4
P2 4 4
P3 3 3
P4 4 4
P5 4 4
PE1 PE 2
m1
m2
k=1
![Page 22: Scheduling and Voltage Scaling for Energy/Reliability ...paupo/publications/Pop2007ab... · Fault-Tolerant Time-Triggered Embedded Systems Kåre Harbo Poulsen, Paul Pop, Viacheslav](https://reader035.vdocuments.us/reader035/viewer/2022070712/5ecbd831534cef21d6140ff6/html5/thumbnails/22.jpg)
Reliability and Energy
Lower voltage Critical energy is lowered Probability of faults
increases Circuit operates slower
Lower frequency Longer execution time Probability of faults
increases
![Page 23: Scheduling and Voltage Scaling for Energy/Reliability ...paupo/publications/Pop2007ab... · Fault-Tolerant Time-Triggered Embedded Systems Kåre Harbo Poulsen, Paul Pop, Viacheslav](https://reader035.vdocuments.us/reader035/viewer/2022070712/5ecbd831534cef21d6140ff6/html5/thumbnails/23.jpg)
Reliability and Energy
Exponential model
Dakai Zhu, ReliabilityAware Dynamic Energy Management in Dependable Embedded RealTime Systems, 2006
λ f =λ010d 1− f 1− f
min
Fmin 10 20 30 40 50 60 70 80 90 Fmax
0102030405060708090
100
Failure rate vs. Voltage
Relative voltage
Incr
ease
in fa
ult r
ate
![Page 24: Scheduling and Voltage Scaling for Energy/Reliability ...paupo/publications/Pop2007ab... · Fault-Tolerant Time-Triggered Embedded Systems Kåre Harbo Poulsen, Paul Pop, Viacheslav](https://reader035.vdocuments.us/reader035/viewer/2022070712/5ecbd831534cef21d6140ff6/html5/thumbnails/24.jpg)
63% E0
Energy Management
PE2
PE1 P1
P3
P5
Bus 1 2
P2 P4
Conditional Scheduling
PE2
PE1 P1 P2P4
P3
P5
Bus 1 2
P3
P4/5
Slack Sharing Scheduling
PE2
PE1 P1 P2 P4
P3
P5
Bus 1 2
P1 P2 P4
P3
P5
Fully Transparent Scheduling Deadline
100% E0
38% E0
R=0.999 999 999 93
R=0.999 999 999 25
R=0.999 999 958 208
P1
P2 P3
P4
P5
PE1 PE2
P1 4 4
P2 4 4
P3 3 3
P4 4 4
P5 4 4
PE1 PE 2
m1
m2
k=1
![Page 25: Scheduling and Voltage Scaling for Energy/Reliability ...paupo/publications/Pop2007ab... · Fault-Tolerant Time-Triggered Embedded Systems Kåre Harbo Poulsen, Paul Pop, Viacheslav](https://reader035.vdocuments.us/reader035/viewer/2022070712/5ecbd831534cef21d6140ff6/html5/thumbnails/25.jpg)
Energy/Reliability Trade-off
PE2
PE1
Bus
P5
P1
P2
P3
P6
P4
1 2
Deadline
100% E0
R=0.999 999 987
Reliability goal: 0.999 999 9
k = 1
P1
P2 P3
P4
P5m1
m2
A: G1
N1N2
Voltage levels100%100%
66%66%
33%33%
P6
G2
P1P2P3P4P5
N1 N21070X40X
XX
X40
40
P6 X 50
PE1 PE2
![Page 26: Scheduling and Voltage Scaling for Energy/Reliability ...paupo/publications/Pop2007ab... · Fault-Tolerant Time-Triggered Embedded Systems Kåre Harbo Poulsen, Paul Pop, Viacheslav](https://reader035.vdocuments.us/reader035/viewer/2022070712/5ecbd831534cef21d6140ff6/html5/thumbnails/26.jpg)
Energy/Reliability Trade-off
PE2
PE1
Bus
P5
P2P
1
P3
P6
1 2
P4
Deadline
68% E0
R=0.999 999 878
Reliability goal: 0.999 999 9 Set reliability as hard constraint
k = 1
P1
P2 P3
P4
P5m1
m2
A: G1
N1N2
Voltage levels100%100%
66%66%
33%33%
P6
G2
P1P2P3P4P5
N1 N21070X40X
XX
X40
40
P6 X 50
PE1 PE2
![Page 27: Scheduling and Voltage Scaling for Energy/Reliability ...paupo/publications/Pop2007ab... · Fault-Tolerant Time-Triggered Embedded Systems Kåre Harbo Poulsen, Paul Pop, Viacheslav](https://reader035.vdocuments.us/reader035/viewer/2022070712/5ecbd831534cef21d6140ff6/html5/thumbnails/27.jpg)
Energy/Reliability Trade-off
PE2
PE1
Bus
P1
P2
P6
1
P3
P4
2
P5
Deadline
73% E0
R=0.999 999 920
Reliability goal: 0.999 999 9 Set reliability as hard constraint Trade-off 5% energy Meets reliability goal
k = 1
P1
P2 P3
P4
P5m1
m2
A: G1
N1N2
Voltage levels100%100%
66%66%
33%33%
P6
G2
P1P2P3P4P5
N1 N21070X40X
XX
X40
40
P6 X 50
PE1 PE2
![Page 28: Scheduling and Voltage Scaling for Energy/Reliability ...paupo/publications/Pop2007ab... · Fault-Tolerant Time-Triggered Embedded Systems Kåre Harbo Poulsen, Paul Pop, Viacheslav](https://reader035.vdocuments.us/reader035/viewer/2022070712/5ecbd831534cef21d6140ff6/html5/thumbnails/28.jpg)
Problem Formulation
Input Application Architecture Reliability goal
Decide Fault-Tolerant Scheduling Mapping Fault-Tolerance Policy
While optimising for Energy Under hard reliability goal
![Page 29: Scheduling and Voltage Scaling for Energy/Reliability ...paupo/publications/Pop2007ab... · Fault-Tolerant Time-Triggered Embedded Systems Kåre Harbo Poulsen, Paul Pop, Viacheslav](https://reader035.vdocuments.us/reader035/viewer/2022070712/5ecbd831534cef21d6140ff6/html5/thumbnails/29.jpg)
Implementation
Problem is NP-Complete Normally solved using “best effort” heuristics
Use constraint logic programming Good performance with NP-completeness Optimal solutions are feasible Flexible model ECLiPSe-CLP
![Page 30: Scheduling and Voltage Scaling for Energy/Reliability ...paupo/publications/Pop2007ab... · Fault-Tolerant Time-Triggered Embedded Systems Kåre Harbo Poulsen, Paul Pop, Viacheslav](https://reader035.vdocuments.us/reader035/viewer/2022070712/5ecbd831534cef21d6140ff6/html5/thumbnails/30.jpg)
Comparison of Schedulers
![Page 31: Scheduling and Voltage Scaling for Energy/Reliability ...paupo/publications/Pop2007ab... · Fault-Tolerant Time-Triggered Embedded Systems Kåre Harbo Poulsen, Paul Pop, Viacheslav](https://reader035.vdocuments.us/reader035/viewer/2022070712/5ecbd831534cef21d6140ff6/html5/thumbnails/31.jpg)
Comparison of Schedulers
![Page 32: Scheduling and Voltage Scaling for Energy/Reliability ...paupo/publications/Pop2007ab... · Fault-Tolerant Time-Triggered Embedded Systems Kåre Harbo Poulsen, Paul Pop, Viacheslav](https://reader035.vdocuments.us/reader035/viewer/2022070712/5ecbd831534cef21d6140ff6/html5/thumbnails/32.jpg)
Reliability and Energy Trade-offs
![Page 33: Scheduling and Voltage Scaling for Energy/Reliability ...paupo/publications/Pop2007ab... · Fault-Tolerant Time-Triggered Embedded Systems Kåre Harbo Poulsen, Paul Pop, Viacheslav](https://reader035.vdocuments.us/reader035/viewer/2022070712/5ecbd831534cef21d6140ff6/html5/thumbnails/33.jpg)
Conclusions
Design tool for doing Fault tolerant scheduling Mapping Policy assignment
Optimising for Minimal energy Hard constraints for timing and reliability
Message: Reliability can be met at little energy cost
![Page 34: Scheduling and Voltage Scaling for Energy/Reliability ...paupo/publications/Pop2007ab... · Fault-Tolerant Time-Triggered Embedded Systems Kåre Harbo Poulsen, Paul Pop, Viacheslav](https://reader035.vdocuments.us/reader035/viewer/2022070712/5ecbd831534cef21d6140ff6/html5/thumbnails/34.jpg)
Embedded Systems