schedule of quantities for hvac works for state bank …€¦ · insulation 80 rmt 3.0 drain piping...

138
a b c d SR. NO. DESCRIPTION OF WORKS QTY UNIT A VRF / VRV SYSTEM (Makes : Mitsubishi Elect. Daikin,Samsung,Toshiba,Mitsubishi Heavy, Hitachi,Blue star, Voltas,Carrier ) 1.0 Supply of Out Door Units suitable for VRF / VRV System Supply, Installation, Testing and Commissioning of Variable refrigerant volume modular type airconditioning system,suitable for cooling by using inverter Driven compressors complete with indoor and outdoor units with individual controller and with fittings etc., as per quantity given below i/c full charging of R410A refrigerant gas Price of outdoor unit shall be inclusive of refrigerant charge for entire system Outdoor units suitable for following capacities: 1.1 46 HP VRF ODU(At Second floor Level) 1 Nos. 2.1 Ceiling mounted Type Indoor Units , unit shall be complete with wireless remote controller 2.1.1 8.0 TR (Open Area) 4 Nos. 2.2 Ceiling concealed Type Indoor Units , unit shall be complete with wireless remote controller 2.2.1 1.0 TR (Credenza) 1 Nos. 2.3 4 way Standard - (3X 3) Cassette Type Indoor Units , unit shall be complete with wireless remote controller 2.3.1 1.5 TR (AGM Room) 1 Nos. 2.3.2 2.5 TR (AGM Room) 1 Nos. 2.3.3 2.5 TR (Pantry & Canteen Room) 1 Nos. 2.3.4 3TR (Conference Room) 2 Nos. SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE B Prices offered for VRF equipments shall be based on CIF-Site basis. The break up pricing Designing, engineering, fabricating and supplying, unloading, shifting, lifting of the following Indoor units comprising of combination of Cassette, Hi-Wall, Ductable Units, (Hi-wall units Electrical power supply – Single / 3-phase near each of the IDUs (Indoor Units) and 3-phase Controls – remote, indoors, inside the occupied area, System should be BMS compatible

Upload: others

Post on 19-Aug-2020

1 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia

a

b

c

d

SR.

NO.DESCRIPTION OF WORKS QTY UNIT

A

VRF / VRV SYSTEM (Makes : Mitsubishi Elect.

Daikin,Samsung,Toshiba,Mitsubishi Heavy, Hitachi,Blue star,

Voltas,Carrier )

1.0 Supply of Out Door Units suitable for VRF / VRV System

Supply, Installation, Testing and Commissioning of Variable

refrigerant volume modular type airconditioning system,suitable for

cooling by using inverter Driven compressors complete with indoor

and outdoor units with individual controller and with fittings etc., as

per quantity given below i/c full charging of R410A refrigerant gas

Price of outdoor unit shall be inclusive of refrigerant charge for entire

system

Outdoor units suitable for following capacities:

1.1 46 HP VRF ODU(At Second floor Level) 1 Nos.

2.1Ceiling mounted Type Indoor Units , unit shall be complete with

wireless remote controller

2.1.1 8.0 TR (Open Area) 4 Nos.

2.2Ceiling concealed Type Indoor Units , unit shall be complete with

wireless remote controller

2.2.1 1.0 TR (Credenza) 1 Nos.

2.34 way Standard - (3X 3) Cassette Type Indoor Units , unit shall be

complete with wireless remote controller

2.3.1 1.5 TR (AGM Room) 1 Nos.

2.3.2 2.5 TR (AGM Room) 1 Nos.

2.3.3 2.5 TR (Pantry & Canteen Room) 1 Nos.

2.3.4 3TR (Conference Room) 2 Nos.

SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK OF

Prices offered for VRF equipments shall be based on CIF-Site basis. The break up pricing

Designing, engineering, fabricating and supplying, unloading, shifting, lifting of the following

Indoor units comprising of combination of Cassette, Hi-Wall, Ductable Units, (Hi-wall units

Electrical power supply – Single / 3-phase near each of the IDUs (Indoor Units) and 3-phase

Controls – remote, indoors, inside the occupied area, System should be BMS compatible

Page 2: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia

2.3.5 2.5 TR (Lounge Room) 2 Nos.

3.0 VRV Ref net Joints

3.1 Multi Kits / Ref Joints 11 Nos.

3.2 Remote controllers(Wired) 4 Nos.

Remote controllers(Wireless) 8 Nos.

4.0 DX AC units for server room

4.1 1 TR hi wall split 3 Star 2 Nos.

5.0Inline centrifugal fans with necessary supports, canvas

connections and other accessory.

Inline cabinate Ex fan

5.1 2200 cfm 40 mm static for toilet CDIF 20 FFA, single phase 1 No.

TOTAL FOR 'A' - VRF / VRV SYSTEM (Including Taxes)

GST Taxes @ 28%

TOTAL FOR 'A' - VRF / VRV SYSTEM (Including Taxes)

Installation and Commissioning of VRF/ VRV system

B VRV / VRF SYSTEM (LOCAL ITEMS)

1.0 Installation of AC units

1.1

Transportation, lifting,shifting, rigging, vibration isolators, supports,

Gas charging , etc complete arrangment for commissioning of Outdoor

units (48 HP) with all required accessories.

1 no

1.3Ceiling mounted Type Indoor Units , unit shall be complete with

wireless remote controller

1.3.1 8.0 TR (Open Area) 4 Nos.

Page 3: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia

1.44 way Standard - (3X 3) Cassette Type Indoor Units , unit shall be

complete with wireless remote controller

1.4.1 1.0 TR (AGM Room) 1 Nos.

1.4.2 1.6 TR (AGM Room) 1 Nos.

1.4.3 2.5 TR (Pantry & Canteen Room) 1 Nos.

1.4.4 3 TR (Conference Room) 2 Nos.

1.4.5 2.5 TR (Lounge Room) 2 Nos.

1.5 VRV Ref net Joints

1.5.1 Multi Kits / Ref Joints 11 Nos.

1.6 DX AC units for server room

16.1 1 TR hi wall split 2 Nos.

1.7 Timer for operating Split units

1.7.1. Timer for operating Split units 2 Nos.

1.8Inline Ceiling fans with necessary supports, canvas connections

and other accessory.

Inline ceiling suspended Ex fans

1.8.1 2200 cfm 40mm static for toilet CDIF 20 FFA single phase 1 No.

Page 4: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia

1.9

Condensing unit stands , Supply and installation of floor standing

condensing units stand on roof level to install the condensing units 300

mm above roof finish floor. Condensing units stand should be

manufactured out of heavy gauge MS channnel frame work and

painted with one coat of red oxide and two coat of black paint

3 NO

Table type Condensing unit stands for hiwall splits 2 NO

2.0 Refrigerant piping

All refrigerant piping between indoor & outdoor units duly insulated

and covered with Al. foil as per specifications. All expose piping

outside the room shall on GI Perforated cable tray / MS Ladder type &

exposed piping shall be properly supported in GI Perforated cable tray.

Pipe line must be tested for requisite pressure & must be supported.

All refrigerant piping to be insulated with 19 mm thick class "O"

armaflex nitrile rubber with UV protection as per manufacturer

Length of refrigerent line mentioned in the BOQ is inclusive of

liquid and gas line together. ie 1 m of ref pipe inclusive of 1 m of

liquid line + 1 m of gas line including insulation on each line.

2.1 Hard /Soft Pipe with insulation – 19 mm thick 180 RMT

2.1.2Hiwall unit refrigerant piping with 9mmm thick class O tube

insulation80 RMT

3.0 Drain piping

Drain piping in hard PVC with all fittings, supports and clamps upto

50 mm dia. including drilling hole in wall chipping wall etc to conceal

and to route the drain pipe. The piping shall be suitably insulated with

13 mm thk Closed Cell insulation / 60 kg/m3 density stuck with

approved adhesive compound.

3.1 PVC piping 32 mm to 50 mm Dia 110 RMT

4.0 Power & Control cabling:

Supply and installation of AHU starter panel complete with incomer,

star delta starter suitable for 20 HP AHU, Starter shall be complete

with Ammitor, voltmeter, Incoming , outgoing and start/stop and trip

indicating lamps. For on/off/remote and local operation, 3 pole single

throw switch shall be provided in each AHU panel to facilitate

override of the automatic operation.All starters shall be provided with

suitable potential free contract for connections to the Building

Automation System.3 Nos of Single Pole MCB's Shall be provided at

the incoming section of the starter panel for DDC Panel , fire damper

actuator & as a spare.220 / 24 V Transformer

For on/off/remote and local operation, 3 pole single throw switch shall

be provided in each AHU panel to facilitate override of the automatic

operation.

Page 5: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia

4.1 Power cabling as per manufacturers requirement 30 RMT

Electrical contractor shall terminate power in individual switch

socket for each IDU as per requirement. For VRF ODU incoming

power shall be provided at the PDB, from there to each VRF ODU

the cabling shall be carried out by HVAC contractor.

4.2

Power and Control cabling with copper conductor cable with end

termination for Indoor units with Plug Top, Earthing connection, etc.

with FRST PVC conduit ( minimum cable size 2C X 1.5 mm2), OEM

to certify and if cable size certified by OME is higher than the

specified one, same to be considered by the vendor

300 RMT

5 AIR DISTRIBUTION:

5.1 SHEET METAL DUCTING - FACTORY FABRICATED

Rectangular / Circular Ducting in Galvanised Steel

Supply,Fabrication, Installation, Testing & Commissioning of

following gauges of Galvanised Iron ( GI ) Sheet complete with

splitters, supports, dampers, and turning vanes. (Approved Makes:

Jindal, SAIL, TATA, Equivalent) 180 GSM sheet. GI duct fabrication

shall follow SMACNA Standards

a 0.63 mm (24 SWG) GSS ducting 340 Sq.M.

b 0.80 mm (22 SWG) GSS ducting 15 Sq.M.

6.0 ACCESSORIES

6.1 Volume Control Dampers

Supply, installation and adjusting of GSS Volume Control Damper

complete with Manual quadrant control with position indicator to be

provided to enable adjust volume of air as required.in 18 G complete

as per specifications.

4.8 Sq.M.

Al powder coated black opposed blade dampers 10 Sq.M.

6.2 GRILLES

Supply, fabrication, assembling and installation of linear aluminium

powder coated grilles as indicated in the drawings and as per

specifications.

(color to match as per architects requirements)

6.2.1 100/150 mm wide 20 Sq.M.

Page 6: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia

6.3 DIFFUSERS

Supply, fabrication, assembling and installation of Square Diffusers as

indicated in the drawings and as per specifications.

(color to match as per architects requirements)

6.3.1 SA Diffuser with collar damper - 225 x 225 18 Nos

6.3.2 SA Diffuser with collar damper - 300 x 300 3 Nos

6.3.3 RA Diffuser - 250 x 250 21 Nos

6.3.4 RA Diffuser - 300 x 300 RO Nos

6.3.5 RA Diffuser - 225 x 225 RO Nos

6.4 Fresh Air / exhaust louvers

Fresh /exhaust air louvers shall be AL powder coated complete with

bird screen3 Sq.M.

6.5 Double Canvass Connection

Supply, fabrication & installation of double canvass (fire retardant)

flexible connection as per drawings & specifications.4 SETS

6.6 INSULATION

6.6.1 Thermal Insulation of Ducts

Page 7: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia

Supply, fabrication & Installation of thermal insulation on GI ducts

complete with Closed Cell Foam(Nitral Rubber) with minimum

density of 40 Kg/m3 with minimum R Value 4.1/inch & thermal

conductivity -0.035 w/mok confirming to Class 'O' & the inner side

stuck to the outer facia of the GI ducts with recommended /

Proprietory Synthetic adhesive bonding (SR998 or equivalent) &

installed as per manufacturers recommendation. The insulation joints

shall be sealed with 3" wide Black Tape.

9 mm thick Insulation 441 Sq.M.

6.7 Acoustic Lining of Ducts

Supply, fabrication and installation of acoustic lining of supply and

return air ducts as specified and shown on the drawing complete with

50 mm thick 48Kg/m3 density Fiberglass insulation covered with RP

tissue and AL perforated sheets

76 Sq.M.

TOTAL FOR B' Installation Work (Without Taxes)

GST 18%

TOTAL INSTALLATION "B 'With taxes

CANNUAL MAINTANANCE CONTRACT FOR 5YEARS AFTER DEFECT LAIBILITY PERIOD OF ONE YEAR

1 ANNUAL MAINTANANCE CONTRACT FIRST YEAR

1.2 ANNUAL MAINTANANCE CONTRACT SECOND YEAR

1.3 ANNUAL MAINTANANCE CONTRACT THIRD YEAR

1.4 ANNUAL MAINTANANCE CONTRACT FOURTH YEAR

1.5 ANNUAL MAINTANANCE CONTRACT FIFTH YEAR

TOTAL FOR C'AMC WORK(Without Taxes)

GST 18%

TOTAL INSTALLATION "C 'With taxes

Page 8: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia

TOTAL AMOUNT (Rs.)

RATE

(Rs.)

TOTAL

AMOU

NT

(Rs.)

SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK OF

Page 9: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 10: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 11: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 12: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 13: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 14: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia

TOTAL INSTALLATION "B 'With taxes

ANNUAL MAINTANANCE CONTRACT FOR 5YEARS AFTER DEFECT LAIBILITY PERIOD OF ONE YEAR

Page 15: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 16: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 17: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 18: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 19: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 20: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 21: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 22: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 23: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 24: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 25: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 26: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 27: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 28: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 29: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 30: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 31: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 32: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 33: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 34: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 35: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 36: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 37: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 38: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 39: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 40: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 41: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 42: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 43: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 44: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 45: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 46: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 47: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 48: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 49: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 50: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 51: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 52: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 53: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 54: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 55: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 56: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 57: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 58: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 59: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 60: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 61: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 62: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 63: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 64: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 65: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 66: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 67: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 68: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 69: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 70: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 71: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 72: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 73: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 74: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 75: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 76: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 77: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 78: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 79: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 80: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 81: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 82: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 83: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 84: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 85: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 86: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 87: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 88: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 89: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 90: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 91: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 92: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 93: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 94: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 95: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 96: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 97: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 98: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 99: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 100: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 101: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 102: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 103: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 104: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 105: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 106: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 107: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 108: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 109: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 110: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 111: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 112: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 113: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 114: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 115: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 116: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 117: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 118: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 119: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 120: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 121: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 122: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 123: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 124: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 125: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 126: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 127: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 128: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 129: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 130: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 131: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 132: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 133: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 134: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 135: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 136: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 137: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia
Page 138: SCHEDULE OF QUANTITIES FOR HVAC WORKS FOR STATE BANK …€¦ · insulation 80 RMT 3.0 Drain piping Drain piping in hard PVC with all fittings, supports and clamps upto 50 mm dia