schedule it09 1 24-09-09. general schedule 9 th, september 09 today
TRANSCRIPT
IT09 1
Schedule
24-09-09
General Schedule 9th, September 09
Today
IT09 3
Overview
24-09-09
IT09 4
Extended transfer line tests..
24-09-09
IT09 524-09-09
Tests with beam
2.5 days with beam Pilot Beam for the most part:
single bunch of 2 - 3 x 109 protons Beam emittance: 1 µm Momentum spread: nominal Nominal tunes, nominal magnetic machine
Total intensity injected: 1 x 1013 protons
IT09 6
Stopping the beam
24-09-09 Stefano Redaelli
IT09 7
Beam etc 2008
24-09-09
Duration Intensity # shots Intensity Commentsh p+ p+
1End TI2, Injection Steering, commission BDI, timing
4 5E+09 100 5.0E+11 TDI in, protecting Alice
2Trajectory acquisition commissioning, trajectory correction, threading
6 5E+09 200 1.0E+12 To IR3 collimators
3 Momentum matching (if required) 1 5E+09 50 2.5E+11
RECYCLE & recover 2
4 Kick response 3 5E+09 300 1.5E+12Data used for , coupling, BPM polarity checks, corrector polarity checks
5 Screens 2 5E+09 50 2.5E+11
6 Dispersion 1 5E+09 200 1.0E+12 Pi bumps, BLMs, BCT
7 Check BLM system 5E+09 100 5.0E+11
8 Higher order polarity checks 3 5E+09 150 7.5E+11
9 Injection region aperture 3 5E+09 300 1.5E+12 TDI in, protecting Alice
10 Aperture - first cut 4 5E+09 300 1.5E+12
11 Aperture - sliding bumps where required 6 5E+09 150 7.5E+11
12 Momentum aperture 2 5E+09 100 5.0E+11
13Effects of magnetic cycle, variations during decay, reproducibility
6 5E+09 100 5.0E+11 Reserve
TOTAL 43 2100 9.0E+12 On to TCPDAYS 2 5.0E+11 On to TDI
IT09 8
Program revisited – one sector – first cut
24-09-09
Final BIS tests, TEDs out etc. Friday p.m.
Injection region 4 ABT & co
Threading 2 To collimators Jorg & co
Momentum matching check 1 Jorg & co
Kick response 4 corrector /BPM checks K. Fuchsberger & co
Dispersion 8 matching from line OP/ABT
Cycle 2 OP
Injection region studies 6 aperture/kicker waveform Bren, Jan & co
Arc Aperture 4 Stefano & co
Higher order polarity 6 Frank Z & co
Momentum aperture 2 trim lines? OP
Cycle 2 OP
Spectrometer 4 Mike & co
Injection protection set-up 4 ABT & co
Loss response at collimators 4
Screens 2 plus shot-to-shot stability VK,
[Multibunch] 2
57 hours
IT09 9
Other
24-09-09
BLMs Parasitic & collimators
Ralph Steinhagen BBQ etc.
R2E
Alice
Quenches ?
IT09 10
Preparation – on the list
24-09-09
[Dry] Run line, injection, and LHC together
OP checks of S23 and/or S78 etc following PGC, cycles etc.
Spectrometer tests
Vacuum valves and interlock tests
Lock Collimators
DSO, EIS etc.
Beam Interlock SystemFinal configurationPIC 2 BIC configurationSMP
Interface to Vacuum, PIC, WIC +…Beam Permit loops in place Activate only required User inputs: 5 BICs (L2, R2, UJ33, SR3 & CCR) are involved Other BICs not implicated in the Beam Permit => User Permits inputs disabled
Beam dump Arm – to BIS, energy tracking
IT09 11
Pre-flight checks
24-09-09
Injection septa, kickers Pulse elements, soft start tests
RF synchro – pre-pulses Extraction/Injection tests
RF re-phasing
Timing System Injection requests
Collimators Controls tests plus Hardware interlocks
Vacuum Interlock tests, valves out
TDI & TCDD IST, Controls tests
BLMs Acquisition, PIC, thresholds
BPMs “BeamThreading” - test
BPM – sum signal Q8.R2, Q8.L3
BTVs Tests, calibration etc.
BCT Test
RADMON Controls tests
RAMSES Check
Optics, aperture & knobs
IT09 12
Pre-flight checks
24-09-09
Logging
Alarms
LSA/Settings etc full pre-cycle, polarity checks, settings checks, FIDEL
YASP
Controls Infrastructure
Magnet model full decay etc
Optics/Aperture
On-line model knobs etc
Sequencer
Software Interlocks Injection permits etc,
PGC & settings on the sector
IT09 13
RP actions after the Sector Test
Delayed access to the LHC due to air activation (~1/2 hour)
The LHC areas affected by the Sectors Test will remain closed until RP has performed a radiation survey in the areas.
The LHC area to be surveyed is ranging from R22 up to the area downstream last beam impact point in Point 3 (direction Point 4).
Point 3 will remain closed with radiation veto. Due to the risk of elevated dose rates the survey in Point 3 will not be done before access to this area is required.
The whole RP survey will last approximately 1 day.
Survey will start downstream Point 3 into direction of Point 4, followed by a survey of the ALICE experimental cavern. Radiation vetos will be lifted as soon as surveys are finished.
24-09-09
Doris Forkel-Wirth, Helmut Vincke
IT09 14
Forecast of area classifications after the test All areas which have seen beam or secondary particles originating from any
beam impact will be classified at least as Supervised Radiation Areas. These areas will range from R22 over ALICE to the area located
downstream Point 3 (direction Point4). Personnel accessing Supervised Radiation Areas have to be equipped with
a personal dosimeter. Areas around the Point 3 collimators will be classified as Controlled
Radiation Areas: Area will not be freely accessible (access doors closed by radiation veto) Personal and operational dosimeter will be required Job and dose planning is required for access
Area around the TDI absorber will most probably remain accessible with personal dosimeter only. The final classification will however depend on the intensity shot on the TDI absorber.
24-09-09
Material leaving classified areas: All material leaving radiation areas needs to be classified and/or controlled by RP
Doris Forkel-Wirth, Helmut Vincke
IT09 15
Support
24-09-09
PO Dave CERN piquet ++
Access Ghislain On-call support TS/ASE
SPS Expert OP coverage OP
RP Helmut Vincke, Doris Forkel-Wirth
HV will be available ( CCC, and full time available by phone. Our technician in charge (or the piquet) will be certainly available via phone full time
MPP Andre, Rob, Nuria On-call support in case of problems. Will particpate.
RF Andy We know where you live
BI Rhodri, Lars, Bernd + on-call support
ATB Beam stopper - check
BT Bren, Etienne, Volker…. On-call support in case of problems. Will particpate.
CRYO On-call support in case of problems
HWC Roberto, Rudiger Will participate.
QPS On-call support in case of problems.
CO Eugenia organising full coverage: LSA, timing, FEs etc.
BIS Bruno Will participate
Vacuum Need on-call support in case of problems.