schedule for jordanian roads and infrastructure engineers and project managers - ksa
DESCRIPTION
Schedule for RoadsTRANSCRIPT
-
Basic
Salary
PositionsDOB +Nationality
QualificationsNo.
Negotiable
SAUDI CONSULTING SERVICES(SAUD CONSULT)
Project manager , project of sewer networks of Alawaly(mecca, KSA)
2011-20131970 -Jordanian
Bachelordegree of CivilEngineering(1993), JordanUniversity ofScience andTechnology
1
SAUDI CONSULTING SERVICES(SAUD CONSULT)
Site Engineer: supervising of all construction projects as:-Bridges,Tunnels and Construction projects
2006-2011
Ministry of Water andIrrigation (Jordan) /management of water Tafelaprovince
Head of technical affairs and projects department :supervisingof all elements projects as:( Sewer network and trunk lines ,Water network, Trunk lines of water , Water tanks, Pumpstations and operation rooms(
1999-2006
joint venture ( Dar & RorGermany Company) & (SigmaJordanian company)
Site Engineer supervisor: supervising over the projects ofsewer networks of Irbid province
1997-1998
Al-Dar Al- Arabia forEngineering
Supervisor Engineer: Supervising of renew water networks forMafraq province
1996-1997
Taanee& Shdeifat ContractingCompany
Site Engineer execution1993-1996
21,000SR
Al Mobty and Partners Co.,KSA
Project manager: Tabuk Housing infrastructure project2013JordanianBSC. Degree,CivilEngineering,University ofArizona, U.S.A,1990
2
- Al Khodari Sons Co.,Dammam, Saudi Arabia
Project manager : Responsible for anEngineer Procure and Construct (EPC) traffic managementsystem project for the Royal Commission for Jubail to build acentralized traffic management center and install traffic fieldequipment on several intersections and road sections etc...
2011-2013
Traffic Engineering Systems(TES), Amman, Jordan
Managing Directorpreparing the traffic impact studies for the following projects: -Al Jaber Towers,Gardens Hospital, Al Mustahtmer hotel, two highrise towers etc...
2006-2011
Parsons Group, Doha, QatarSenior Transportation EngineerPrepared the traffic design and study elements forthe following projects in Doha, Qatar which included trafficsignal, traffic signingDoha Expressway/Salwa Road project,Al Shamalarea street network project,Zone 54 street network project,AlWaab Street in prepara on for the 2006 winter Olympics
2004-2006
Nokia Telecommunications,Amman, Jordan
Project Manager1999-2000
Consolidated Consultants (CC),Amman, Jordan
Transportation Engineerlight railway system for the Ministry of Transport
1998-1999
Transcore, Phoenix, AZ, USATransportation EngineerResponsible for the Arizona Department ofTransportation
1993-1997
47,50062,000QR
Marwan Kurdi and partenersCO, Amman Jordan.
Part time , senior Estimator and pricing for tenders -2013-till not1959 -Jordanian
-Bsc. In CivilEngineering,Aug. 1983,Tennessee TechUniversity ,USA.
- A-LevelDiploma, June1979,DunstableCollege,London England
3
Alharbi contracting co.,KSA
ProjectsManager for the Northern Area , Roads and bridgeconstruction.
2012-2013
Copri Const. Enter. Est-AbuDhabi UAE
Projects Manager- internal Roads for the Residentialbuildings in Jseewrah Civil works including Red asphaltlayers of 40,000m2 in Yasat Island.Maintenance andimprovement of the road from Um El zumool to Tawi ArbeenClient Al Ain Municipality60 km road -Project handed overahead of time value almost 85 million dhm. Internal Roads atvarious areas in Al Ain city
2009-2012
Haymoor Cousins Co.JordanProject ManagerAl- Mostanada Road CrossingPre-stressed Girder Bridge of (7) spans topping over themain Ring road to Zarqaconnecting tow sectors (Al-Mostanada and Abu Alanda) With all the connection roads ,ramps, electrical works, storm sewers works and trafficsafety works
2008-2009
Haymoor CousinsCo.&M.A.Abu EishehContractingCo.(J.V.) , Jordan
Project Manager, ASSALT RING ROAD-Part 1- 8.1 km dualcarriage- high way project .
2007-2008
-
Waagner Biro Gulf.UAE.Project Manager for Civil Works and any road construction andBridges.
2006-2007
aymoor Cousins Co. & M.A.Abu-Eisheh Contracting CO.(J.V), Jordan
Project Manager . ASSALT RING ROAD-Part 1- 8.1 kmdual - carriage - high way project .
2004-2006
HCC , Jordan .Deir alla Zai Amman Water extension project2003N. C.C. , JordanRoads Section Manager2002A.T.C.E. , JordanProject Manager. Upgrade Of Zarqa Road, 20 km Military road
sponsored by the US Corps of Engineers2001-2002
Haymoor Cousins Co., JordanProject Manager. Kemira-Arab Potash Co. Waste Pipeline andEvaporation Ponds Project- 7.00 km of service road andalmost 8km of GRE pipeline of 200 mm diameter.
2001
Marwan Kurdi &Partners Co.,Jordan
Project Manager. Construction of King Hussein Bridge Project2000-2001
Marwan Kurdi & Partners Co.,Jordan
Project Manager. Wala Dam Project . Also theconstruction of a 3km access road from the main road tothe Dam site.
1999-2000
PASCOE-SBC. JordanErection Manager1996-1998A.C.E.Jordan.Sites Manager1995-1996Penta Group for Engineeringand Contracting. Yemen
Area Manager/Project Director1994-1995
Al- Mohandis ContractingCo.Yemen.
Structural Sites Manager.1993-1994
I.C.E. JordanHead of Design & Sales Dept.1991-1993Masar Consulting Engineering,Jordan.
Supervising Engineer. Azraq-Jafr Concrete rigid pavementHigh-Way Project (180km).
1989-1991
Marco ContractingEst.,Qatar.
Site Engineer. Mainly infra-structures for residential areas, earth works ,sewage pipes and other related works.
1989
Al-Mobty Contracting Est.,KSASite Engineer. King Khaled Air-Base extension project. Mainlyearth works and embankments for service road (10 km)
1988
Jordan Armed Forces, Jordan.Civil Engineer1985-1987Al -Swailem Contracting Co. ,KSA
Structural Site Engineer. Tabuk- Dhuba road project section II(90 KM) . The duties included several types of concretebridges
1984
15,000SR
CONCOLIDATEDCONTRACTING COMPANY,ASHGAL (STATE OF QATAR )
PROJECT ENGINEER (ROADS AND infra-structures ). DOKHANHIGHWAY project
2011-2012JordanianB.A in CivilEngineering(1987) fromSalah AldenUniversity inIraq
4
CONCOLIDATEDCONTRACTING COMPANY,MINISTRY OF FINANCE
PROJECT ENGINEER (ROADS AND infra-structures ). PRINCESSNOURA BENT ABDUL-RHMAN UNIVERSTIY FOR GIRLS project
2009-2011
CCC ,MINISTRY OFTRANSPORT &COMMUNICATION
PROJECT ENGINEER (ROADS AND infra-structures ). SOHARPORT INTERCHANGE project
2008-2009
ADVANCED CONSTRUCTIONCOMPANY, KING ABDUL AZIZPORT AUTHORTY
PROJECT MANAGER, INTERSECTION OF KING ABDUL AZIZROAD -KING FAISAL ROAD TANNEL project
2006-2008
(M/S MODERNCONSTRUCTION COMPANY ),M.M.A.A/ DRAINAGEDEPARTMENT- QATAR
PROJECT MANAGER, SURFACE WATER SCHEME ABU HAMOURAREA DRAINAGE AND GROUND WATER C 0566 project, SITEGRADING & ACILLARY WORKS AT DOKHAN GTC228/ED/03project, CONSTRUCTION OF ROAD BLOCK1600/EAST ROADWORKS EIC BC 0540/C1 project, ARAB 'D'DHUKAN ALLIANEE PROJECT R.O.W FOR 36 PIPE LINE,CONSTRUCTION OF ROADS ERC 0393C1 RIW KHIRTYAT LINKROAD,
1997-2005
K.B.A.S, MINISTRY OFMUNCIPAL AFFAIRS ANDAGRICULTURE
PROJECT MANAGER, NEW RAYYAN LINK ROAD1996-1997
CONSOLIDATED CONSULTANTC.C FOR ENGINEERING &ENVIRONMENT -JORDAN,MINISTRY OF PUBLIC WORKSAND HOUSING
PROJECT ENGINEER , GHOR HADITH- POTASSIUM FACTORYHIGHWAY project
1995-1996
AL _SHOUANI GENERALCONTRACTING EST. JORDAN,MINISTRY OF PUBLIC WORKS
PROJECT ENGINEER for ROADWORKS1995
.V OF SAZGITTER CONSULTGHBH AND JORDANIAN
PROJECT ENGINEER , IRBID WATER SUPPLY PROJECT , IRBIDWATER DISTRIBUTION SYSTEM & HOUSE CONNECTIONS
1993-1995
-
CONSULTING ENGINEER,MINISTRY OF WATER ANDIRRIGATION -JORDANARBTHHCH- JERDANEH J.VCONSULTANT JORDAN
PROJECT ENGINEER , RAMTHA- JABER ROAD PROJECT 50/911991-1993
GENERAL EQUIPMENTCOMPANY ' GECOM'
PROJECT ENGINEER , IRBID -AMMAN H.W ROAD 'SECTION 2 '1990-1991
JORDAN ARMYPROJECT ENGINEER , JORDAN ARMY CIVIL WORKS DESIGN &CONSTRUCTION OF ARMY DEFENSE BUILDINGS & ROADS
1987-1989
Negotiable
Planning & Design Section Roads Department - Roads &Transport Authority of Dubai(RTA) UAE.
Senior Pavement Engineer2007-20131962 -Jordanian
-M.Sc. civilengineering(transportation), JUST (JordanUniversity ofScience &Technology) 1995-1997-B.Sc. civilengineering,MosulUniversity Iraq, 1980-1984.
5
Director of Municipal Affairs, Duties &Responsibilities:Planning & designing road way, rehabilitation,
infrastructure, & buildings projects of the above mentionedmunicipalities.
2005-2007
Ministry of Planning &international Co-operation Jordan.
Monitoring & Follow Up Engineer2002-2005
Ministry MunicipalAffairs Jordan.
Duties & Responsibilities:Chairman of the municipalitycommittee.Planning, implementing, and supervising the wholemunicipality work.
2001-2002
Ministry of Municipal Affairs Jordan.
Service Engineer:Supervising roadway projects2000-2001
Ministry of Planning.Main Researcher/Transport Sector: Liaison Ocer / 3rdtransport project implementation with world bank including(Aqaba Raas Al-Naqab highway, Restructuring of Aqabarailway corporation, Design of Aqaba coastal highway,Building & privatization of a light rail system between Amman Zarqa,
1997-2000
Ministry ofMunicipal Affairs Jordan.
Service & Regional Planning Engineer: Chief Engineer / Designsection (highways, infrastructure, & buildings).Supervisorengineer / many highway networks, infrastructure, buildings &rehabilitations projects.
1986-1997
Military ConstructionsCorporation Jordan.
Site Engineer: (6000) sq. meter buildings & the conjugateinfrastructure.
1984-1986
Negotiable
in the center of five cities inJordan / financed by theWorld Bank.
Director of projects and technical development department,and project manager for third tourism project developing theinfrastructure
2011 to date1968 -Jordanian
-B.Sc. in CivilEngineering,AzerbaijanUniversity,/RUSSIAN. 1992with honordegree .
6
Ministry of tourism andantiquities / Management andSupervision
Project Manager of projects implementation unit: follow up allthe projects related to developing the infrastructure andparking, roads and constructions for the tourism sites inJordan.
2010-2011
Madaba Infrastructure &Roads reconstruction Project ,financed by the World Bank
Project Manager2008-2010
Ministry of Tourismfollowing all MOTA's projects Roads, maintenance networksand buildings, these projects include Rehabilitation streets,infrastructure, and building development
1994-2008
Al-Switi CompanySite Engineer : Supervising residential road works.1994Ministry of public works andhousing
following the implementation Project Tafellah-Ghor Fifa -Road
1993
22,500SR
JORDAN WATER COMPANY MIYAHUNA LLC
Deputy Project Manager: Project: Consulting Services for WaterSupply of Greater Amman III
Rehabilitation of the tertiary water distribution network&house connections water supply Greater Amman III
2012-20131959 -JordanianA BachelorDegree in CivilEngineer.University ofMiddle EastTechnicalUniversity.Turkey. 1983
7
Group (MMC) MottMacDonald & Company LLC,Oman
Resident Engineer, Water Services2009 -2012
RUQN AL HANDASACONSULTING ENGINEERS,Jordan
Project Manager Engineer: RUQN AL HANDASA CONSULTINGENGINEERS, Jordan: Rehabilitation for Main Sewer Lines inGreat Amman Capital
2007 2009
MWH ARBTECH JARDANEHCONSULTING ENGINEERS,Jordan (worked in YEMEN(
Pipeline Engineer: Gail ba-Wazer City Sewerage System andWaste Water Treatment Plant in Hadramut Region, Yemen
2006 2007
-
HOLY ROCK ENGINEERINGCENTER OFFICE, Jordan
Project Manager2005 2006
CONSULTING ENGINEERINGCENTER AND MOTTMACDONALD, JORDAN(worked in YEMEN)
Site Engineer: Sanaa Sanitation Network2004 2005
LAHMAYER & SIGMAINTERNATIONAL CONSULTINGENGINEERS, Jordan
Site Engineer: Restructuring and Rehabilitation of GreaterAmmans Water Supply System
2001 2004
DAR AL-OMRAN CONSULTING(Shbilat-Badran), Jordan
Site Engineer: Improvement of Infrastructures of Souf Camp,Jarash, Jordan
2000 2001
AL-YAQAZA CONTRACTINGCOMPANY, Jordan
Project Manager: Sewer Housing Connection for Souf Refugees Camp
1999 2000
SALHA CONTRACTING &TRADING COMPANY, Jordan
Site Engineer : Hashimieh and Military Units infrastructureProject
1997 1999
AMRA CONSULTINGCOMPANY, JORDAN
Site Engineer : Zarqa Russifa Sewerage1996 1997
HAMZEH SUWWAN OFFICEFOR CONTRACTING, Jordan
Site Engineer: Execute different bidding projects, construction,water projects, roads, sanitary piping and pavements.
1988 1996
YOUSEF ABU AYASHCONTRACTING &TRADINGCOMPANY Jordan
Site Engineer: Zarqa sewer lines and water pipe lines project1986 1988
TEK-SER CONSTRUCTIONINDUSTRY AND TRADING INC,Turkey
Site Engineer: Zarka Ruseifa Trunk Sewer Contract1984 1986
ISLAMIC ASSOCIATIONCHARITABLE CENTER, Jordan
Site Engineer1983 1984
22,000Moon Contracting Company -Hail, Saudi ArabiaProject Manager.
projects :1- Bridge at intersection of Hail Ring Road with BeirutRoad2- Cloverleaf Bridge at Al jouf Highway3- Bridge at intersection of Hail Ring Road with Hiraj Road
2012-20131976 -Jordanian
JordanUniversity ofScience &Technology ,Bachelor, CivilEngineering /Roads &Materials ,1999
8
General Contracting Company- Sha'ban, Jordan, Amman,Zarqa
Project Manager,Shou'leh intersection Project,The projectconsists of 15m clear width underpass with a total length of220 m below round about to accommodate the new loweredlevel of the existing railway, including retainingwalls,Realignment of multi diameters ductile waterpipes,Construction of storm water networks,Construction oftraffic detours & Roads including all earth works, Asphaltworks, & roads marking.
2009-2012
Advanced ConstructionCompany, Saudi ArabiaConstruction Manager.
project(1) : Bridge at intersection of king Fahad & Koreishroads.project(2) : Bridge at intersection of Makaronah & Hera' roads.
2007-2009
Joint Venture of Marwan AL -Kurdi & Partners Co. and AL -Manhal Est, Jordan, Zarqa,Amman
Site & Technical office Engineer,Amman - Zarqa Highwayproject.
2007
International ConsultingEngineering Center (CECI),Yemen
Highway Designer & Supervisor,project : Rural Roads in Ibband Taiz Governorates
2005-2007
AL - Ja'far Contracting Co.,Jordan, Aqaba, AmmanSite Engineer.project(1) : Aqaba Coastal Highway
project(2) : Container port Bypass
2000-2005
7 k $Dar Al Handasah Group -Jordan
Senior planning Engineer: Dushanbe grand Mosque inTajikistan project
2013 -till now1973 -Jordanian
BachelorDegree in CivilEngineering,AL-NajahUniversity,Nablus,Pales ne, 1998+ (PMP(
9
Al Mobty Contractors, KSAProject Manager, Coordinator, Planning manager and QS:Infrastructure, Road and railway works, Alwasl Earth Worksetc
2005-2013
Thinet International andLarsen & ToubroInternational(JV),KSA
Senior Planning Engineer and QS Head: Sabic Head QuarterBuilding project ,GroupCHospital projects of 100 Bead eachinDomat, Rafha , and Khafji - Ministry of Health , Schoolprojects ,Electrical Substations - SCECO
2001-2005
-
Freelance, Riyadh, ksaplanning engineer for HRH Prince Waleed Bin Talal Resorts,roads, earth works and building projects in KSA
1999-2001
Dornier System consult(Germania Consultant),Palestine
planning engineer for municipal and road planning inPalestinian
1998-1999
30,000ENGICON EngineerConsultant
Resident Engineer: Construction of Water DistributionNetwork for Rustaq Wilayat in Sultanate of Oman
2013-20141959 -Jordanian
B-Sc. For CivilEngineering,College ofTechnology University ofAden / Yemen.1985
10
ENGICON EngineerConsultant
Contract Specialist: Water Supply of Greater Amman IIIProject \ Rehabilitation of the Tertiary Water DistributionNetwork and House Connections
2011-2013
Construction Experts Company( Conex )Jordan
Site manager: Disi Mudawarra to Amman Conveyance WaterSystem Project.
2010-2011
AL- latifia Trading andContracting Company.KSA
Assistant Project Manager2009-2010
SIGMA ConsultingEngineering.Jordan
Senior CIVIL Engineer in Supervision Department :Consultancy Services for various projects in Jordan (Roads,Water supply networks, sewage network and Building
Construction projects).
2009
Palestine Real StateCompany,Jordan
Project Manager2007-2009
SIGMA ConsultingEngineering,Jordan
Project Manager : Al mushta Qualified Industrial City:Theproject consists of implementation of water supply network,firefighting network, sewage and storm water network,reservoir tank, roads, public buildings and electrical station,main station and two sub station
2006-2007
AL HUSSEINI CONTRACTINGGROUP,Jordan
Project Manager2004-2006
Al mandeb ContractingCompany,KSA
Project Manager: Tabuk City Project:Implementation of Tabukcity drinking water network. Dammam CityProject:Implementation of Dewatering and Storm WaterDrainage System
2000-2004
Housing and UrbanDevelopment Corporation(Government Sector),Jordan
Resident Engineer: Water Supply Projects.Sewage DrainageProjects.Roads Construction Projects.
1991-2000
AL BARAKA GENERALCONTRACTINGCOMPANY,Jordan
Site Engineer: Water Supply and Sewage Drainage Projects1988-1991
AL RJOUB CONTRACTINGCOMPANY, Jordan
Site Engineer: Several road Construction Projects1985-1988
Negotiable
Mubarak Al-HajrafEstablishment (Kuwait)
project manager for riqqa sewer network project2011-till now1963 -Jordanian
BachelorDegree in Civil
EngineeringConstruction, A
LABAMAUNIVERSITY \
USA
11
With (Joint Ventureof LANGDON WILSONINTRNATIONAL.USA, &SIGMA CONSULTINGENGINEERS) AQABA JORDAN
Senior Structure Engineer for Aqaba Military Hospital.Contract,The project is composed of Main Build serving 250 beds ofinpatient,service buildings,Stormwater,sewage,electr,telephone,irrigation, fireworks roadworks
2009-2011
Al Mawared Establishment -Jordan
Project Manager for infrastructure works project,for newcity(Alsharq city),water, sewage, storm lines, power andcommunication lines,Road works
2004 -2009
Al Dani & Qora Co.(Jordan)Project Manager1998 -2004Isa Bazlamit Engineering OfficeJordan
Resident Engineer for Commercial Compounds1997-1998
Maher Al Qaysee Engineeringoffice Jordan
Resident Engineer for Commercial Compounds1996-1997
Abbadi & Annai AssociateEngineers Jordan
Resident Engineer for Commercial Compounds & GovernmentSchools
1991-1993
Mustafa and Majed .Trdg.&Contg.Co (Kuwait)
Site EngIineer, road works (AI Jahra road ), Villas1987-1991
Negotiable
dar Al-amran companyProject manager Jarash Soof, project Infrastructure works (Road storm water , water.works)
2013-till now1961 -Jordanian
B.Sc. degree incivil
engineering/1986 Russhia
12
dar Al-amran companyProject manager: aljezah project Infrastructure works ( Roadstorm water , water.works), Turkmenistan railway project
2012-till now
Tammeer Holding company .(Amman consulting Engineergand planning office )
Head of Infrastructure department at Al Andalucha villageproject
2008-2012
-
Ahmad Yousif AL Tarwnehconstruction Roade Bridgeworks .
Project Manager: Balaama Interchange ( Bridge ) Project .2007-2008
Ahmad Yousif AL Tarwnehconstruction company
Project Manager ; Public Security Yard,Road , sotorm watr ,sewage . Works
2006-2007
Housing Grant For LimitedIncome Groups
Project Manager Royal :Infrastructure services(roads,watermain,house conctin,sewer..)
2004-2006
( Al Maghareeb-Salt Project ) -Amman( infrastruction project
Project Manager2002-2004
( Marg El Hamam Buildings)-Amman
Project Manager2000-2002
Tabarbor Project.Resident Engineer: Checking shop drawings for roads, watersupply, Sewage, footbath, payment certificates and progressworking programetc
1995-2000
Housing and UrbanDevelopment Corporation
Site engineer: Zaraq New Project ( Taraq Project).infrastruction services(5km roads ,3km water main,
1992-1995
Negotiable
United EnterprisesCompany
project manager: For the following projects:-1) Water Resource Management Programme-Component Water Loss Reduc on Amman IV, DZ19-Lot1-Batch1, Contract 15/20112) Wastewater Trunk Line Sewer Form Sewaleh to the8 Circle Package 4 Contracts 62/20093)Baqa'a Camp Entrance (Bridge & Roads )Contracts 102/2006
2007 tillnow
1958 -Jordanian
B.Sc. CivilEngineering,Mehran Universityof Engineering Technology
1985
13
MORGANTI GROUPINC
(Site & QC Engineer)Waste water treatment plantsprojects,One of them at aqaba and the other as samra wastewater treatment plant .
2004-2007
SIGMA CONSULTINGENGINEERS
Site Engineer Working in Amman Water Project, bidding, pipelaying and quality control for all the type of material which isused in the project also supervising all the concrete mixes andall the types of backfilling materials.
2003-2004
Aegek CompanySite / material Engineer : Working in Wala dam project2000-2003United Enter Prises Company-Al-Fuhais Sanitary sewage Projects (36km) as a Site Engineer .
-Al-Salt water Project as a Project Manager for 2 years.This project 33 km of duc le iron pipes dierent diameters,100 km of polyethylene 2", 15 km of galvanized steel pipeswith dierent diameters and 5500 water meter.-Wadi Shuaib Bridge and Abdel Naser Bridge .-Wadi Mousa Waste Treatment Plant for 2 years as Site andMaterial Engineer responsible for all the concrete, earthworkstests supervising the laying of ductile iron pipes drainage andsewage pipes.
1993-2000
Modern EngineeringLaboratory
During my work with this company I was seconded to:-Al-Karameh Company Al-Hashmiah sewageproject (16km)as material engineer.-Husain Abu-Taoh Company - Zarka water distribution projectphase 2 as a material engineer
1989-1993
Rukun Al-Handasa CompanyWala Water Project Phase 2 responsible for all concrete,earthworks test and concrete mix design
1988-1989
Habeeb Establishment forEngineering Consultants
Al-Wajan sewage project as a material Engineer1987-1988
SojexAs Laboratory technician1986-1987Negotiable
EASTERN ASPHALT ANDCONCRETE MIX COMPANY
PROJECT MANAGER, IMPROVEMENT OF SITRA AREAProject,The scope of work includes storm water lines, sewerlines and MH, dewatering roads, street lighting, road signals,traffic signs,etc...
2011-20121958 -Jordanian
B.SC of CivilEngineering,NWFPEngineeringandTechnology,Peshawar,Pakistan.
14
AL-DARAS CONTRACTINGCOMPANY, JORDAN
PROJECT MANAGER, KADD BY ROADS AND INFRASTRUCTUREAT AL-THULIL Project, Project includes construction ofinfrastructure sewer lines, retaining walls, street lighting,paving and Curb roads etc.
2010-2011
NASS CONTRACTING W.L.L,BAHRAIN
CONSTRUCTION MANAGER,BAHRAIN MAP JUNCTION ProjectThe scope of work includes the construction of signal pointdiamond interchange with and east-west flyover, and theimprovement of Sheikh Isa Bin Salman Highway tying into the
2008-2010
-
Um Al-Hassam Interchange contract limit. The projectobjective is to reduce traffic congestion at Tubil Junction.
DARRAS CONTRACTING CO,AMMAN, JORDAN.
PROJECT MANAGER. AL MUSHATTA INDUSTRIAL CITY,AMMAN PORT Project.The project scope includes constructionof an industrial city complete with infrastructure. 15 KM ofroads, drainage systems, sewage system, water supply system,and telephone lines, streets lighting.
2005-2008
AL TABIB CONTRACTING CO,AQABA, JORDAN.
PROJECT MANAGER:RUM TOURISM IMPROVEMENTPROJECT.The project scope includes construc on of 13 roads,mosque, recreation center, yards, and boundary walls.
2004-2005
GCC CONTRACTING CO, ABUDHABI, UAE.
PROJECT MANAGER: ABU DHABI sewageLINE SYSTEM.Theproject scope includes construction of sewage lines, liftingpump stations, manholes etc.
2003-2004
PAN ARABIAN ENTERPRISE,UAE.
PROJECT MANAGER1999-2003
ABU DHABI MAINTENANCEAND CONSTRUCTION CO, UAE.
PROJECT MANAGER,Water pipeline project connecting thenew pump station on Ajban road with Sweihan and AjbanFarms of 19 KM, 900 mm dia.
1998-1999
TABIB AND DARRAS CO,AQABA, JORDAN
PROJECT MANAGER: AL HAFAYER UTILITY PROJECT AQABA,JORDAN.The project consist of installing storm water lines,sanitary line, water lines, telephone lines, construc on of 3small pump stations, retaining walls, staircases, parapets,roads, pavements, curbstone, tiles, ducts, street lights, etc.
1997-1998
AMRA ENGINEERINGCONSULTING OFFICE, JORDAN.
DESIGN ENGINEER:Amman miscellaneous sanitary project1996-1997
AMRA ENGINEERINGCONSULTING OFFICE,JORDAN.
RESIDENT ENGINEER:AL ZARQA MISCELLANEOUS SANITARYPROJECT.
1994-1996
ALPHA ENGINEERINGCONSULTING OFFICE,JORDAN.
PROJECT MANAGER1993-1994
BUSHRA CONSTRUCTION ANDENGINEERING CO, JORDAN.
PROJECT ENGINEER: SEWERAGE AND STORM WATERPROJECT.
1991-1993
KUWAIT PREFABRICATEDBUILDING CO, KUWAIT.
SITE ENGINEER:AL QURAIN PROJECT, The project consists of25 km sanitary, 18 km storm water, 20 km water, telephonelines, roads, street lights, etc...
1988-1990
TALAL AL GHANIM, KUWAIT.SITE ENGINEER: AL QURAIN HOUSING PROJECT,The projectconsist of 250 Kuwait houses with all u li es and connec onrequired, like sanitary lines, storm water lines, irrigation lines,telephone lines, ducts, street lights, pavements, roads, etc...
1986-1988
M.A. KHURAFI CO, KUWAIT.SITE ENGINEER: AL FAHAHEEL EXPRESS HIGHWAY PROJECT.The project consist of 8 bridges and 4 food bridges, culverts,ducts, infrastructure work, storm water, sanitary lines.
1983-1986
Negotiable
Greater Amman Municipality-Site engineer oversees paving roads( 1994-1995)-Head of Road Maintenance Center- east Amman - (1995-1996)-In charge engineer on road expansion works(1996-1997)-Head of Road Maintenance Center-west Amman- (1997-2003)-Head of Road Maintenance Center -central Amman- (2003-2004)-Head of Preventive Maintenance Section in RoadMaintenance Department (2004-2013)-Manager of Road Maintenance Department till now.
1994- till now1964 -Jordanian
Bachelor in Civilengineering,ZaporizhzhyaUniversity,Russia (1988(
15
Hisham Wadi constructionsExecutive site engineer1993-1994Amra consultation officeSupervising engineer1990-1993Housing projectsSite engineer and constructions executive engineer1988-1990