    Beity Plant ExtensionProject No.: 1607-P1-b

    GAMAForTrading&Contracting 1

    ScenarioofsitesMechanicalWorksFire

    fighting

    network

    installations

    Storagearea(B03)

    1 Thecontractorwillaskedtheownerbeforestartinghisworkswith4daysto

    evacuatetheworkingareabetweentheracksandtheupperlevelofitin

    ordertobeabletowork

    2 Thestorageareawillbedividedintothreepartsinthestoragearea.

    3 Thecontractorwillstartinstallationofscaffoldingineachareafromthe

    groundtoupasshowninthe(fig1.)otherwiseovertheracksifaccepted.

    (Fig1)

    Redarrows:Scaffolding

    Blackarrows:Labors&Materials

  • 7/29/2019 Scenario of Mech. Work Rev-A

    2/18

    Beity Plant ExtensionProject No.: 1607-P1-b

    GAMAForTrading&Contracting 2

    4 Theaccesspassagetotheworkingareaisdescribedbelowasshownin

    (Fig2.) Showingtheentrance&theexitofthematerials&labors.

    (Fig2)

    5 Thelocutionofpowersupplypanelforeclectictoolsisshowing(fig3.)

    WhereonlythedrillingM/C&thecuttingM/Cwellbeused

    (Fig3)

    6Thenumberoflaborswhichwillworkatetchareaitwillbespecifiedindaily

    report&willnotbelessthan45workers/eacharea

  • 7/29/2019 Scenario of Mech. Work Rev-A

    3/18

    Beity Plant ExtensionProject No.: 1607-P1-b

    GAMAForTrading&Contracting 3

    7Paintingofthepipeswiththetwolayersofprimercoatwillbeoutsidethe

    site&thefinishlayerwillbeinsite.

    8Thefabricationofpipesitswillbeinourworkshopyardoutsidetheworking

    areaas

    showing

    (Fig

    4)

    (Fig4)

    9installationoffirefightingpipessupports(usingEquipmentDrillonlyand

    thereis

    no

    hot

    works)

    10Usingfixedscaffoldingabovetheracksortendenciesfloorsandmoving

    scaffoldingatflatfloorandcorridorstoInstallationofsupportsandpipes

    11Transferpipeswithsmalldiameters(Lessthan2.5")byworkersmanually

    fromtheworkshoptotheplaceofinstallationandlargediameters(largerthan

    2.5")transportitbyhandvehicletotheplacesofinstallation.

    12Liftingpipeswithlargediametersfromthegroundtotheinstallationplaces

    byBlancoandliftingpipeswithsmalldiameterstotheplaceofinstallationby

    Handrollerspull

    13

    After

    finishing

    of

    the

    installation

    work

    and

    installation

    of

    pipes

    then

    water

    pressuretestforpipeswillbedone

    14Afterthepressuretests,installationofsprinklers.

  • 7/29/2019 Scenario of Mech. Work Rev-A

    4/18

    Beity Plant ExtensionProject No.: 1607-P1-b

    GAMAForTrading&Contracting 4

    AirConditioninginstallations:

    1 Stepsforinstallationoffans(rooftopfans)1 Identifyingtheplacesofthefansaccordingtotheapproveddrawing

    2 Thecontractorwillstartinstallationofscaffoldingineachareafromthe

    Groundtoupasshowninthe(fig1.)otherwiseovertheracksifaccepted

    (Fig1)

    3 Thelocationofpowersupplypanelforeclectictoolsisshowing(fig2)

    WhereonlythedrillingM/C&thecuttingM/Cwellbeused

  • 7/29/2019 Scenario of Mech. Work Rev-A

    5/18

    Beity Plant ExtensionProject No.: 1607-P1-b

    GAMAForTrading&Contracting 5

    (Fig2)

    4 Theaccesspassagetotheworkingareaisdescribedbelowasshownin

    (Fig3)showingtheentrance&theexitofthematerials

    (Fig3)

    5Makethenecessarystrengtheningintheinternalceilingforthesteel

    structureaccordingtoapproveddrawings.

  • 7/29/2019 Scenario of Mech. Work Rev-A

    6/18

    Beity Plant ExtensionProject No.: 1607-P1-b

    GAMAForTrading&Contracting 6

    6Installtheframewherethefanswillbeinstalledon

    7Makeopeningsinthecorditesheetmetalwhichwillbefrominsidethe

    building

    8Installation&fixingthecurbfromabovethesteelstructure

    9Liftingthefansbycranes&fixingitabovetothecurb

    10Supplying&installationelectriccablesfromthefanstotheelectrical

    board

  • 7/29/2019 Scenario of Mech. Work Rev-A

    7/18

    Beity Plant ExtensionProject No.: 1607-P1-b

    GAMAForTrading&Contracting 7

    Firefightingnetworkinstallations

    Processingarea(B03groundfloor)

    1 Thecontractorwillaskedtheownerbeforestartinghisworkswith4daysto

    evacuatetheworkingareabetweentheracksandtheupperlevelofitinorder

    tobeabletowork

    2 Thecontractorwillstartinstallationofscaffoldingineachareafromthe

    groundtoupasshowninthe(fig1.)

    Fig1

  • 7/29/2019 Scenario of Mech. Work Rev-A

    8/18

    Beity Plant ExtensionProject No.: 1607-P1-b

    GAMAForTrading&Contracting 8

    3 Theaccesspassagetotheworkingareaisdescribedbelowasshownin

    (Fig2.) Showingtheentrance&theexitofthematerials

    (Fig2)

    4 Thelocationofpowersupplypanelforeclectictools(fig3.)

    Fig3

  • 7/29/2019 Scenario of Mech. Work Rev-A

    9/18

    Beity Plant ExtensionProject No.: 1607-P1-b

    GAMAForTrading&Contracting 9

    5Thenumberoflaborswhichwillworkatetchareaitwillbespecifiedindaily

    report&willnotbelessthan45workers/eacharea

    6The

    fabrication

    of

    pipes

    its

    will

    be

    in

    outside

    at

    the

    work

    shop

    area

    (fig

    4.)

    (Fig4)

    7Installation

    of

    fire

    fighting

    pipes

    supports

    (using

    Equipment

    Drill

    only

    and

    there

    isnohotworks)

    8UsingfixedscaffoldinginFlooringleaningandmovingscaffoldingatflatfloor

    andcorridorstoInstallationofsupportsandpipes

    9InstallandfixcantileversupportsinColumnsofsteelstructureformainloops

    andthreadedrodsforbranchespipesbyfixeditinpearlinessthatinupperfloor

    passagethroughthesandwichpanel

    10Transferpipeswithsmalldiameters(Lessthan2.5")byworkersmanuallyfrom

    theworkshoptotheplaceofinstallationandlargediameters(largerthan2.5")

    transportitbyhandvehicletotheplacesofinstallation.

    11Liftingpipeswithlargediametersfromthegroundtotheinstallationplacesby

    BlancoandliftingpipeswithsmalldiameterstotheplaceofinstallationbyHand

    rollerspull

    12Afterfinishingoftheinstallationworkandinstallationofpipesthenwater

    pressuretestforpipeswillbedone

    13Afterthepressuretests,installationofsprinklers.

  • 7/29/2019 Scenario of Mech. Work Rev-A

    10/18

    Beity Plant ExtensionProject No.: 1607-P1-b

    GAMAForTrading&Contracting 10

    Firefightingnetworkinstallations

    Juicepreparationarea(B02)

    1 Thecontractorwillaskedtheownerbeforestartinghisworkswith48hours

    toevacuatetheworkingareabetweentheracksandtheupperlevelofitin

    ordertobeabletowork

    2 Thecontractorwillstartinstallationofscaffoldinginetchareafromthe

    groundtoupasshowninthe(fig1.)Someareaswillbefixedscaffolding(above

    thetanksandM/C)andotherswillbemoving scaffolding

    (fig1)

    3 Theaccesspassagetotheworkingareaisdescribedbelowasshownin

    (Fig2.) Showingtheentrance&theexitofthematerials

  • 7/29/2019 Scenario of Mech. Work Rev-A

    11/18

    Beity Plant ExtensionProject No.: 1607-P1-b

    GAMAForTrading&Contracting 11

    (Fig2)

    4 Thereisnopathforpassageofcablestoworkinthisareaandtherefore

    source

    of

    electricity

    will

    be

    used

    from

    inside

    the

    building,

    knowing

    that

    the

    toolsusedonlythedrillingM/C&thecuttingM/Cwillbeused

    5 Thenumbersoflaborswhichwillworkatetchareaitwillbespecifiedindaily

    Report&willnotbelessthan45workers/eacharea

    6 Paintingofthepipeswiththetwolayersofprimercoatwillbeoutsidethe

    Site&thefinishlayerwillbeonside.

    7 Thefabricationofpipesitswillbeinourwork

    shopyardoutsidetheworkingareaasshowing(Fig

    (Fig3)

    8 installationoffirefighting pipessupports(usingEquipment Drillonlyand

    thereisnohotworks)

    9 Transferpipeswithsmalldiameters(Lessthan2.5")byworkersmanually

    fromtheworkshoptotheplaceofinstallationandlargediameters(larger

    than2.5")transportitbyhandvehicletotheplacesofinstallation.

    10Liftingpipeswithlargediametersfromthegroundtotheinstallationplaces

    byBlancoAndliftingpipeswithsmalldiameterstotheplaceofinstallationby

    Handrollerspull

    11Afterfinishingoftheinstallationworkandinstallationofpipesthenwater

    pressuretestforpipeswillbedone

    12Afterthepressuretests,installationofsprinklers.

  • 7/29/2019 Scenario of Mech. Work Rev-A

    12/18

    Beity Plant ExtensionProject No.: 1607-P1-b

    GAMAForTrading&Contracting 12

    AirConditioninginstallations:

    Airhandlingunit'sinstallation&ductconnection

    1 Identifyingthelocutionoftheunitsaccordingtotheapproveddrawing

    2Theaccesspassagetotheworkingareaisdescribedbelowasshownin

    (Fig1.) Showingtheentrance&theexitofthematerials

    (Fig 1)

    3 Fabricatethebasesthattheunitswillbeinstalledonit

    4Lifting

    the

    unit

    from

    outside

    the

    building

    by

    cranes

    5 Makeopeningsinthesandwichpaneltopassagetheairduct

    Fromtheouttoinside

    6 Assemblytheductinoutsideareaintheworkshopandtransportitbyhand

    Vehicletothefeedpoints

    7 Connectionofpowercablefromtheunittothepowerdistributionpanel

  • 7/29/2019 Scenario of Mech. Work Rev-A

    13/18

    Beity Plant ExtensionProject No.: 1607-P1-b

    GAMAForTrading&Contracting 13

    ceilingwalk ableo for work over theroposed ScenariP

    areas1Thefabricationofpipeswillbeinourworkshopyardoutsidetheworking

    Areaasshowing(Fig1)

    (Fig1)

    2Installationofsupportsforpipeswillbefixedbythreadedrodfromthebeamsandpurlins

    asshowingin(fig.2)

    Fig2)(

  • 7/29/2019 Scenario of Mech. Work Rev-A

    14/18

    Beity Plant ExtensionProject No.: 1607-P1-b

    GAMAForTrading&Contracting 14

    3Transferpipesfromtheworkshoptothearea(1)acrossthepathshowninattached

    drawing.

    Liftingpipesmanuallybylaborsviathestairsandputitinthearea(1)4

  • 7/29/2019 Scenario of Mech. Work Rev-A

    15/18

    Beity Plant ExtensionProject No.: 1607-P1-b

    GAMAForTrading&Contracting 15

    5Transferepipesintothewalkableareabyworkersandputitinhangarsshowninthe

    abovefigure.

    6 Totalnumbersofworkersinthewalkableceilingareawillbe7workersatthesametime.

  • 7/29/2019 Scenario of Mech. Work Rev-A

    16/18

    Beity Plant ExtensionProject No.: 1607-P1-b

    GAMAForTrading&Contracting 16

    cellinglk ablewark over theowScenario forAlternative

    areas

    After calculation of weights (workers & pipes) over the walk

    able ceiling it is found that we need another method of

    installation which is:

    1Thefabricationofpipeswillbeinourworkshopyardoutsidetheworking

    Areaasshowing(Fig1)

    (Fig1)

    2Fabricationcantileversupportsshowingin(fig 2)andfixeditinwallthatis

    Inwalkablesuspendedcelling

  • 7/29/2019 Scenario of Mech. Work Rev-A

    17/18

    Beity Plant ExtensionProject No.: 1607-P1-b

    GAMAForTrading&Contracting 17

    3Transferpipesfromtheworkshoptothearea(1)&area(2)acrossthepathattachedin

    thefollowingfigure.

    4 Makeopeninginthewallbetweenthewalkablesuspendedceilingandthebesideroom

    Area(1)asshowninthefollowingfigure.

    5Afterinstallthesupportsonthewallofthewalkablesuspendedceilingandworkwall

    openinginthesandwichpanelwillbepushthepipesthroughthesupportsasshowing.

  • 7/29/2019 Scenario of Mech. Work Rev-A

    18/18

    Beity Plant ExtensionProject No.: 1607-P1-b

    GAMAForTrading&Contracting 18

    6 Totalnumbersofworkersinthewalkableceilingareawillbe4workersatthesame

    time.