scanned by camscannerwrpc.gov.in/occ/475occ_agenda.pdf6 475th occm agenda 400 kv pgcil s/s raigarh 5...

73
Scanned by CamScanner

Upload: others

Post on 10-Nov-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

  • Scanned by CamScanner

  • AGENDA NOTES FOR 475th MEETING OF OPERATION & COORDINATIONSUB-COMMITTEE OF WRPC

    TO BE HELD ON 10th SEPTEMBER 2015 AT WRPC MUMBAI

    ITEM No. 1: CONFIRMATION OF THE MINUTES

    Minutes of 474th meeting of Operation & Coordination Sub-Committee of WRPC

    held on 13th August 2015 at Mumbai were forwarded vide letter No. WRPC/OPN/OCC-

    Minutes/2015-16/7224 dated 20.08.2015.

    No comment has been received. Sub-Committee may confirm the same.

    ITEM NO.2: REVIEW OF SYSTEM OPERATION DURING THE MONTH OF AUGUST2015.

    2.1 Frequency Particulars

    The average frequency during the month of August, 2015 was 49.98 Hz. The

    maximum instantaneous frequency was 50.25 Hz at 17:06 hrs on 23rd August-15

    while minimum instantaneous frequency was 49.55 Hz at 19:27 hrs on 03rd

    August-15. The frequency profile during August, 2015 was as under:

    01-August-2015 to 31-August-2015 % time

    IEGC band (49.9 < f < 50.05 Hz) 70.00

    < 49.9 Hz 14.97

    > 50.05 Hz 15.03

    The Sub-Committee may like to note.

    2.2 INTER-REGIONAL EXCHANGES

    There was a net inter-regional export of 4479.00 MUs by WR against net export

    schedule of 4255.00 MUs.

    The Sub-Committee may like to discuss.2.3 Voltage Profile

    Voltage profile at some of 765/400 kV sub-stations during the month of August

    2015 furnished by WRLDC is enclosed at Annex-2.3.

    The Sub-Committee may like to discuss.

  • 2

    475th OCCM AGENDA

    2.4 U/F Relay OperationsAs per WRLDC records during August 2015 the system frequency didn’t touch 49.2

    Hz and no UFR operation has been reported by WRLDC.

    The Sub-Committee may like to note.

    2.5 Power Cuts / Load Restrictions

    Details of Power Cuts and Regulatory measures during August 2015 as furnished by

    the state utilities are given in Annex. 2.5.

    The Sub-Committee may note.

    2.6 Details of Generating Units under Forced outages

    Details of generating units under forced outages during August 2015 are given inAnnex-2.6.

    The Sub-Committee may discuss.

    2.7 Details of Generating Units under Planned outages

    The details of generating units under Planned Outages during August 2015 are given inAnnex-2.7

    The Sub-Committee may discuss.

    ITEM NO.3: OPERATIONAL PLANNING

    3.1Proposed Planned maintenance programme of generating units.

    The maintenance programme of generating units for September 2015 & October2015 is given in Annex 3.1.

    The Sub-Committee may discuss and finalize the outage schedule ofgenerating units for the above period.

    3.2 OUTAGE PROGRAMME OF TRANSMISSION LINES/ELEMENTS

    Maintenance programme for transmission lines during the months September2015 & October 2015 is given in Annex 3.2 B.

    The Sub-Committee may discuss and finalize the maintenance programmeproposed above.

  • 3

    475th OCCM AGENDA

    3.3 ANTICIPATED POWER SUPPLY POSITION FOR THE MONTHS –SEPTEMBER 2015 & OCTOBER - 2015

    Details of anticipated restricted & un-restricted demands for the months of September

    2015 & October 2015 are given in Annex 3.3.

    Constituents may furnish the anticipated station wise Availability & Energy for the months

    of September 2015 & October 2015.

    ITEM NO. 4: OPERATIONAL STATISTICS FOR THE MONTH OF AUGUST 2015

    The details of actual generation, demand, drawl of power from grid; exchanges etc.

    are given in the following Annexures:

    Annex 4.1 - Actual Generation and Requirement for August 2015.

    Annex 4.2 - Peak Demand: Schedule Vs Actual for V 2015.

    Annex 4.3 - Integrated Operation of the System and Operation of Inter State Tie lines

    for August 2015.

    Annex 4.7 – Details of level of Major Reservoirs in Western Region for August 2015.

    The Sub-Committee may like to note.

    ITEM NO. 5: SYSTEM DISTURBANCES IN WESTERN REGIONThere was no major grid disturbance in the Western Region during the month.

    However the details of minor incidences during the month received from WRLDC are

    enclosed at Annexure-5.The Sub-Committee may like to note/discuss.

    ITEM NO. 6: Healthiness status of SERs/DRs of equipment in the system.

    Constituents have furnished the status of healthiness of SER/DRs in their systems onthe dates below :

    Sl No. Name ofconstituents

    Date of Receipt

    1 PGCIL,WRTS-I 04.09.20152 PGCIL,WRTS-II 04.09.20153 MPPTCL 13.08.20154 NTPC 03.09.20155 CSPTCL 03.09.20156 GETCO 13.08.20157 MSETCL 13.08.2015

    The sub-Committee may like to note.

  • 4

    475th OCCM AGENDA

    ITEM NO. 7: STATUS OF COMPLETION OF ONGOING SCHEMES FORCOMMISSIONING OF REACTORS, TRANSMISSION LINES ANDGENERATING UNITS IN WR.

    7.1 Status of completion of ongoing Schemes for Commissioning of reactors in2015-16.

    As per the approval of 33rd & 36TH standing committee of WR and subsequentlydiscussion in 28TH WRPC meeting the following reactors have to be installed at thevarious occasions in WR.Accordingly the information regarding the commissioning schedule is as below:

    S.No.

    400 kVSub/stn.

    Size(MVAR)

    Implementingagency

    Expected commissioningdate

    1 Nanded 125 MVAR MSETCL June – 2016

    2 Sholapur 125 MVAR MSETCL June – 2016

    3 Kolhapur 125 MVAR MSETCL June – 2016

    4 Akola 125 MVAR MSETCL June – 2016

    *5 Nagda 125 MVAR MPPTCL December – 2015

    6 Bhopal 80 MVAR MPPTCL August – 2015

    7 ISP 125 MVAR NHDC December 2015

    8 Line reactorat Nagda-ISPline at Nagdaend

    50MVAR MPPTCL March 2016

    11 Satpura 50 MVAR MPPGCL April-2016

    12 Sasan Busreactor

    240 MVAR RELIANCE Commissioned on 23rd May-2015

    *50 MVAR existing bus reactor to be shifted to Nagda-ISP line as line reactor aftercommissioning of 125 MVAr reactor at Nagda.

    Utilities are requested to ensure that reactors are installed and commissionedaccording to the schedule agreed as above. Utilities may give update on thestatus of implementation.

  • 5

    475th OCCM AGENDA

    7.2 Status of completion of 765/400 kV and above on going Transmission Schemesbeing executed/implemented by Transmission Agencies.

    The updated status on various ongoing transmission schemes for the year 2015-16 asper the current information available is as follows: -

    S.No.

    Name of the Line TargetCompletionDate

    Remarks

    POWERGRID1 400 kV Navsari – Kudus D/C Line Sept -15 ROW problem2 765 kV Gwalior - Jaipur line -I

    765 kV Gwalior - Jaipur line -I ICommissioned on 13.08.15Commissioned on 11.08.15

    3 765 kV Dharamjaygarh - JabalpurPooling Station D/C line

    Sept-15

    4 765 kV Wardha –Nizamabad-Hyderabad D/C

    March-16

    5 765 kV Narendra-Kolhapur D/C Dec-156 400 kV Aurangabad - Boisar line D/C

    lineNov -2015

    7 765 kV Aurangabad (PG) - Padghe(PG) D/C

    Sept-2015

    8 800kV Champa – Kurukshetra Bipole Dec- 20159 765 kV Aurangabad- Solapur D/C

    lineOct- 2015

    10 LILO of both circuits of Aurangabad –Pune 400 kV D/c line at Pune765/400 kV GIS

    Oct -15

    11 400 kV Parli-Pune(Sikarapur) LILO atSikarapur

    Commissioned on24.02.2015

    12 765 kV Raipur – Champa765 kV Raigarh - Champa

    Commissioned on 28.05.2015Commissioned on 29.05.2015

    13 765 kV Indore-Vadodara Commissioned on05.06.2015

    14 400 kV Vadodara-Asoj Commissioned on27.06.2015

    15 400 kV Vadodara-Pirana Commissioned on27.06.2015

    16 765kV Dharmjaigad-Rachi-II Sept-201517 400 KV Solapur(NTPC)-Solapur(PG)

    ckt-ICommissioned on10.07.2015

    CHHATTISHGARH1 400 kV Korba west- Marwa

    400 kV Marwa- KhedamaraCommissioned on13.06.2015

    2 400 kV DCDS Raipur(Raita)-Jagdalpur(DCDS)

    Mar- 2016

    3 220 kV DCDS lines Chhuri to Mopka(Bilaspur), (DCDS)

    Nov – 2015

    4 LILO of 220 kV Raigarh-Budipadar at Sep -2015

  • 6

    475th OCCM AGENDA

    400 kV PGCIL S/s Raigarh5 LILO of 220 Korba (E)- Bishrampur

    line at 220 kV Churri S/sCommissioned on01/05/2015.

    GUJARAT1 400 kV D/C Mundra-Zerda line No. 1 Dec -20152 400 kV D/C Mundra-Zerda line No. 2 Dec -20153 400 kV D/C Vadinar-Amreli line Dec -20154 400kV APL-Hadala LILO to Halvad Dec -20155 400 kV D/C Amreli-Kasor line(Part-1) Dec -20156 400 kV Charanka- Veloda Dec -2015MADHYA PRADESH1

    Satpura TPH-Ashta 400KV DCDSLine

    1st ckt commissioned on30th March 2015.2nd ckt – expected by July2015.

    MAHARASHTRA(STU)1 400KV D/C line from Koradi-(II) to

    Wardha S/S(PG) D/CDec – 2015

    2 LILO of 400 kV Chandrapur-Parli atNanded Dec-15

    3 2x1500 MVA 765/400 kV, ICTs atEktuni Dec -15

    4 400 kV Bableshwar-Kudus D/C(Quad) August -16

    5 765 kV Akola(II)-Ektuni -2 (charge at400kV at Tapthithanda)

    Charge at 400kV atTapthithanda on20.05.2015

    6 400kV IEPL-Warora October-2015

    GUJARAT (IPTC route) by WRTransmission (Guj) Pvt. Ltd1 400 kV Rajgarh(PG)-Karamsad

    (GETCO) D/C Dec- 2015

    STERLITE (JTCL)1 765 kV Dhramjaygarh - Jabalpur (JTCL)

    D/C lineSept -2015 Severe ROW Problem

    2 765 kV Jabalpur - Bina (JTCL) S/c Charged on 30th June

    2015.3 400 kV Sujalpur-Kota(IR by RTCL) Dec – 2015STERLITE (BDTCL)1 765 kV Vadodara - Dhule (BDTCL) S/C Charged on 12

    th June2015.

    2 765 kV Bhopal- Jabalpur Charged on 8th June 2015.3 765kV Bhopal - Jabalpur Charged on 8th June 2015.

    The Sub-Committee may discuss and update the status.

  • 7

    475th OCCM AGENDA

    7.3 Commissioning of new Generating units in Western Region and thecapacity expected to be commissioned during the year 2015-16.

    The status regarding Generating units, commissioned /expected to becommissioned during the year 2015-16 according the available information is as below:

    Name of the Power Projects Unit No. Capacity(MW)

    Date of Commissioning/Schedule Date

    GUJARATSIKKA TPS EXT 1 250 Sep-15SIKKA TPS EXT 2 250 Dec-15CHHATTISGARHMarwa 1 500 Dec 2015

    2 500 Dec 2015MAHARASHTRACHANDRAPUR 9 500 Feb- 2016KORADI 9 660 Nov- 2015KORADI 10 660 March -2016PARLI 8 250 Jan- 2016MADHYA PRADESHM/s Jhabua Power, Seoni 1 600 December – 2015Moser Bear (Hindustan power) 2 600 December 2015Essar Power MP Ltd(Mahan) 2 600 Oct -2015CENTRAL SECTOR/IPPVINDYACHAL 13 500 OCT -2015KSK 3 600 March – 2016KSK 4 600 June – 2016SASAN 6 600 COD on 27.03.2015

    ACBIL(Maruti) 1 300Commissioned on17.04.2015

    RKM 1 360 September-2015RKM 2 360 Sept 2015RKM 3 360 Dec 2015

    RKM 4 360 MARCH 2016BALCO 1 300 COD on 11.07.2015

    The WR utilities may intimate the current status on above.

  • 8

    475th OCCM AGENDA

    ITEM NO. 8: MISCELLANEOUS OPERATIONAL ITEMS

    (A) FOLLOW-UP

    ITEM NO. 8.1: QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

    All the constituents are requested to submit the CMP report for the First quarter

    (April 2015 to June 2015) for the year 2015-16.

    The Sub-Committee may like to note and furnish details in respect of above.

    ITEM NO. 8.2: STATUS OF PHYSICAL & CYBER SECURITY IN POWER SECTOR

    Status of physical & cyber security in Power Sector for the First quarter (April 2015 to

    June 2015) have not been received from some of the constituents.

    The Sub-Committee may like to note and furnish details in respect of above.

    ITEM NO. 8.3: READINESS OF SLDC AT GOA, OTHER SLDCs AND WRLDC FORUPGRADATION OF EXISTING SCADA/EMS SYSTEM

    During 29th WRPC meeting it was decided that the status of progress of SLDC’s &

    Back-up SLDC’s of WR constituents /WRLDC would be regularly monitored in monthly

    OCC meeting. The present status of progress of SLDC’s & Back-up SLDC’s of WR

    constituents /WRLDC attached at Annexure – 8.3.All the constituents are requested to give an update in attached format.

    ITEM NO. 8.4 CERTIFICATION OF EARLIER COMMISSION OF ELEMENTS:AGM, Power Grid Chhattishgarh informed that various elements, commissioned on or

    after 1st April 2014, as per table –A, have been completed within the CERC Timeline

    by POWERGRID in Chhattisgarh

    Table-A

    S.No.

    Name ofthe Project Name of the Asset

    Zerodate ofProjec

    t

    Timeline ofProject

    issued byCERC

    (IN Months)

    DOCO

    1

    (*)Transmission SystemAssociatedwith IPPs

    Champa Pooling Station –Dharamjaygarh /near KorbaSwitching Station 765kV S/CLine.

    31-05-2011 36

    24-05-2014

  • 9

    475th OCCM AGENDA

    2

    Generation inChhattisgarh(Set-B)

    Champa Pooling Station –Raipur Pooling Station 765kVD/C Line and Bay Extension at765kV Raipur Pooling Stationwith line shunt Reactor forChampa-2 bay.

    40 24-05-2014

    3

    Bay Extension, at 765kVRaipur Pooling Station with lineshunt reactor for 765kVChampa-1 Line Bay - chargedas Bus Reactor

    36 26-05-2014

    4SupplementaryTransmissionScheme ofupcomingIPP ProjectsinChhattisgarh

    765/400kV, 1500MVA, ICT-2 atDharamjaygarh SS along withassociated bays.

    22-03-2012

    36 19-06-2014

    5765/400kV, 1500MVA, ICT-I atDharamjaygarh SS along withassociated bays.

    36 09-07-2014

    (*) Contingency arrangement for transmission lines emanating from 765/400kVChampa SS is approved by CEA / Standing committee.After commissioning of 765kV Durg–Champa-Dharamjaygarh line , a parallel 765kV

    Link was established between Raipur-Ranchi besides 400kV Raipur-Sipat-Ranchi

    which increased the reliability of power transmission from Chhattisgarh and it also

    improves the voltage profile of system . Hence commissioning of above element was

    for overall benefit of the System/Grid Operation of western region.

    As per Chapter-6 , Computation of annual fixed cost of CERC tariff regulation 2014-19

    , there is provision of additional return of 0.5% if projects are completed within timeline

    specified in Annexure-8.4 ( copy attached )

    The Sub Committee may like to discuss and decide about the additional 0.5%.

    ITEM NO. 8.5: Overloading of 315MVA ICTs at various substations of WR-II.

    DGM WRTS-II, PGCIL informed that at Satna, Dehgam, Khandwa, Boisar, Vapi, Bina,

    Kala and Bhachau substations in WR#2, 400/220kV ICTs are getting overloaded due

    to which quite a few times, getting planned / approved outage is very difficult. Further,

    in case of tripping of one ICT, the situation becomes critical as single ICT cannot

    handle the combined load. In view of the same, it is requested to accord approval for

    increasing the MVA capacity of these substations, by way of installation of additional

    ICTs. The loading profile of ICTs of these S/s where loading has been found more

    than 150MW in each ICT for the period of last one year has been sent through mail.

    The Sub Committee may like to discuss the same.

  • 10

    475th OCCM AGENDA

    ITEM NO. 8.6: Installation of Controlled Switching Devices (CSDs) for CBs

    DGM WRTS-II, PGCIL informed that the Controlled Switching Devices (CSD) relay

    are being installed in for protecting Reactors & Transformers from switching surges as

    there have been many instances of equipment failures during switching operations &

    CSD reduces switching surges by controlling the switching moment. Therefore, CSDs

    are being installed for all the reactor CBs and in 765kV ICTs (for CBs of both sides)

    which will in turn improve the performance of equipment. In view of the same outage

    for the CSD commissioning works may be booked under construction category.

    The Sub Committee may like to discuss the same.

    ITEM NO. 8.7: CONTINUOUS HIGH POWER TRANSMISSION THROUGHTARAPUR-BOISAR FEEDERS

    OS, TAPS-3&4 vide letter dated 31.08.2015 informed that high power flow had

    been observed through 400kV Tarapur-Boisar circuit 1&2 due to high power

    requirement at PGCIL Boisar . Due to the high loading of transmission lines,

    approved annual preventive maintenance program had been postponed on many

    occasions . On 21/05/2015 Tarapur-Boisar ckt-2 outage was taken, but after

    opening of Tarapur-Boisar ckt-2 circuit breaker the other circuit was loaded to very

    high level i.e.1170A . After this line was charged immediately & maintenance

    activity could not be completed . Power transmission through 400kV Tarapur-Boisar

    ckt-1&2 and 400kV Tarapur-Padghe ckt-1&2 is mentioned below :

    Outageplan

    Date/TimeOutage status 400kV TarapurBoisar Circuit-1

    400kV TarapurBoisar Circuit-2

    400kV TarapurPadghe Circuit-1

    400kV TarapurPadghe Circuit-2

    21-05-2015@ 07.00Hrs

    Before 400kVTarapur BoisarCkt-2 Outage

    Power : 410MWCurrent :570A

    Power : 405MWCurrent :550A

    Power : 110MWCurrent :155A

    Power : 110MWCurrent :150A

    21-05-2015@ 09.00Hrs

    After 400kVTarapur BoisarCkt-2 Outage

    Power : 830MWCurrent :1170A

    Outage from8.17Hrs

    Power : 120MWCurrent : 168A

    Power : 122MWCurrent : 174A

    Since March 2015 400kV Tarapur-Boisar Circuit-1 & 400kV Tarapur-Boisar Circuit-

    2 load flow is near to 425MW each and 400kV Tarapur-Padghe Circuit-1 & 400kV

    Tarapur-Padghe Circuit-2 load flow is near to 100MW each . Detailed power flow

    from March-2015 to till date of each 400kV line from TAPS-3&4 are mentioned in

    annexure-1. So, it is observed that most of the power flow from TAPS-3&4 is going

  • 11

    475th OCCM AGENDA

    to PGCIL Boisar . Due to this outage of Tarapur-Boisar lines cannot be taken and

    their maintenance is due .

    In view of this it is desired to take corrective action to reduce loading of 400kV

    Tarapur-Boisar lines . This issue has already been informed to WRLDC and your

    kind attention & intervention is required to resolve the issue and ensure trouble free

    operation of TAPS-3&4.

    The Sub-Committee may like to discuss the same.

    ITEM NO. 8.8: REVIEW OF BIGGER SIZED UNIT OUTAGE PLANNING FOR THEPERIOD SEPT’15 TO NOV’15 AND REVIVAL OF ISGS UNITS WHICH AREUNDER PROLONGED FORCED OUTAGE:

    CE, SLDC, Gujarat informed that in ensuing months (during Sept-Dec’15), Gujarat

    State has to meet peak demand of around 15000 MW (ever time high) without wind

    generation support. It is utmost necessary that generation from all sources shall have

    to be made available. Therefore, the planned outages of all bigger sized units for the

    period Sept’15 to Nov’15 shall have to be deferred.

    The generating units which are under planned outage shall be made available as soon

    as possible by expediting their maintenance activities.

    Also, the early restoration of KAPP unit No. 2 (under forced outage since 01.07.15

    due to reactor channel coolant problem) is utmost necessary to meet base load and

    relieve congestions in South Gujarat area.

    The Sub-Committee may like to discuss the same.

    ITEM NO. 8.9: FURNISHING DAILY / MONTHLY DATA BY PGCIL & ISGSSTATIONS:

    CE, SLDC, Gujarat informed that Timely/daily/hourly MWH import / export data

    collection at all interface point is necessary to work out daily hourly demand of the

    State. These data are being used for day to day operational analysis, load forecasting,

    system operation planning and to appraise competent authorities and Government.

  • 12

    475th OCCM AGENDA

    Timely monthly MWH import / export data collection, unit outages data is necessary to

    furnish power system data for whole State to WRPC, CEA and preparation of monthly

    reports and to publish on web-site.

    The format of daily / monthly data collection from CTU substations and NTPC power

    stations (Kawas & Jhanor) is attached at Annexure 8.9.

    Many times, non-reporting of data by PGCIL & NTPC inter face points causing

    delayed reporting. The matter of timely submission of daily data from one nodal point

    to Sub-SLDCs of Gujarat and monthly data to SLDC-Gujarat required to be discussed

    in OCC.

    The Sub-Committee may like to discuss the same.

    ITEM NO. 9 : WRLDC ITEMS

    1. Under Voltage Load Shedding Scheme (UVLS) in WesternRegion

    The need for UVLS for system security was recognized and discussed last several

    OCCM. In 474th OCCM, concerned representative had informed that Low Voltage

    area in Gujarat are Sabarkundla, Vapi, Bhilad, Vertej&Navsari, in Madhya Pradesh

    areNagda& Indore, in Maharashtra areLonikhand, Bableshwar, Padgha, Jejuri. In was

    also informed that Chhattisgarh do not face any low voltage problem.

    Further, It was suggested and agreed that all concerned SLDCs shall study there low

    voltages area and submit a detail scheme for mitigation of these Low voltage pockets.

    In 474th OCCM representatives from SLDC’s were informed that in GujaratSabarkundla, Vapi, Bhilad,Vertej & Navsari, in MP Nagda & Indore, in MaharashtraLonikhand, Bableshwar, Padgha, Jejuri are the LV pocket. Chhattishgarhrepresentative informed that there is no LV pocket in the state.

    Member Secretary suggested that SLDCs shall study there LV pockets and submitdetailed scheme for further consideration in OCC forum.

    The Sub-Committee may like to discuss the same.

  • 13

    475th OCCM AGENDA

    2. Frequent tripping of HVDC Bhadrawati Due to Failure ofAuxiliary Supply

    The issue of auxiliary supply failure from 33 kV feeders was discussed in 453rd OCCand 474th OCCM, 18th WRPC Meeting and 33rd Standing committee meeting.Accordingly one 400/220/33 kV ICT for reliable auxiliary supply was approved atHVDC Bhadrawati and it was commissioned on 19th February 2015. However, it hasbeen informed that auxiliary supply to HVDC from the ICT is not yet started due tonon-availability of supply at 33kV. The reliability of auxiliary supply would enhance ifthe 33 kV supply from 400/220/33kV ICT at Bhadravati is extended to HVDC.In 474th OCCM, SE(O), SLDC Maharashtra informed that the issue pertaining toLocalDiscom(EE MSEDCL, Warora). It will be sorted out within a fortnight time.POWERGRID may appraise the present status.

    3. Constraints in grid operation due to non-availability of telemetryfrom MSETCL / MahaGenco Stations

    Non-availability of telemetry from large number of EHV stations of MSETCL andMahagenco has been flagged by WRLDC and is being deliberated in the OCC forumsince December 2013(21 months). There are nearly 24 stations like 400 kV Warora,Chandrapur(II), Koradi(II), Lonikhand and Taptithanda where the integration ofdatabase is pending, even several months after commissioning of the substations andthere are nearly 48 stations where database integration is completed but data fromthese station is highly intermittent due to continuous failure of communication link.In the absence of telemetry from these stations, severe constraints are beingexperienced by WRLDC control room personnel in real-time supervision and operationof the grid.Further, it was stated by MSETCL in 472th OCC, held at Ahmedabad that all telemetryissues related to Maharashtra shall be sorted out by the month of August-15.MSETCL may appraise the progress.

    4. Mock Black Start Exercise in Western RegionAs mandated by IEGC, the Black start capable units need to conduct mock black startexercises once in every 6 months. Western Region has 29 generating stations withblack start capability. As per the information available with WRLDC only 4 Black Startstations have completed the Mock exercise in the year 2015.

    Sl.No Generating station Date of mock drill exercisecompleted

    1 Kadana, Gujarat 19th Feb 2015

    2 CLPIPL, Gujarat 6th March 2015

    3 HasdeoBango, Chhatisgarh 17th May 2015

    4 Khopoli Hydro, Maharashtra 23rd August 2015

  • 14

    475th OCCM AGENDA

    Madhya Pradesh has planned to complete the mockdrill exercise of all hydro powerstations between September to November,2015 and submitted the schedule asfollows.

    MP is requested to adhere the above schedule to complete all mock exercise in time.Other constituents/regional entities are requested to plan the Mock exercise of theirblack started units and submit their plan for compliance of IEGC regulation 5.8(b).

    Members may like to discuss.

    5. Scheme of two lines in service out of four lines for 765kVWardha-Aurangabad(PG)

    There are four 765kV lines between Wardha and Aurangabad (PG). The Line 1 &

    2and Line 3&4 are on double circuit towers. Out of these four lines, only two lines are

    generally kept in service due to the transmission constrain downstream at

    Aurangabad (PG). Moreover, POWERGRID has requested to keep one of the circuit

    in service in both the tower to avoid theft.

    It was reported that the Line reactor of Line 1 and 3 are switchable in nature at

    Wardhaend and Line reactors of 2 &4 at Wardha end are yet to be commissioned as

    Proposed Date for Black Start Mock drill of Hydro Power stationsin Madhya PradeshSl. No. Name of Power Station Date of Mock Drill1 Birsingpur 29th Sep 2015

    2 Indira Sagar Project 6th Oct 2015

    3 Bargi 12th Oct 2015

    4 Pench 29th Oct 2015

    5 Tons 6th Nov 2015

    6 Rajghat 17th Nov 2015

    7 Madhikheda 18th Nov 2015

    8 Gandhi Sagar 27th Nov 2015

  • 15

    475th OCCM AGENDA

    switchable Line reactors. Further, none of the Wardha Line reactors is switchable in

    nature at Aurangabad (PG).There is one bus reactor also at Wardha end.

    The voltage at Wardha is normally high, even when all the line reactors and Bus

    reactor are in service. So, in order to control high voltage at Wardha and to keep two

    lines in service, the only option left is to keep line 2&4 in service which do not have a

    switchable line reactors and Line 1&3 Lines-reactors are made as Bus reactor to

    control high voltage.

    This creates an operational difficulties and forces operator to keep Line 1 &3 in

    outage condition and changeover of lines as required is not feasible.

    The commissioning of switchable Line Reactor for Line 2&4 at wardha end is essential

    for operation feasibility.

    POWERGRID may appraise

    6. Declaration of ON-BAR DC and OFF-BAR DC by CGS & UMPPstations

    a) As per para 5 of the procedure issued by WRPC Secretariat dt 4th July 2014 inline with the decision of 26th WRPC meeting held on 21st June’2014 at Punethe following was agreed DC Protection: During the RSD, the DC of the RSD stage shall remain at

    the same values as the DC for the block just prior to RSD. DC shall continueto be protected during the ramping period when the unit comes out of RSD.

    b) As decided in the 28th WRPC meeting held on 4th March’2015 at Udaipur,declaration of ON Bar DC and OFF Bar DC by CGS & UMPP stations hadcommenced from 5th March’2015 and the same has been uploaded on WRLDCweb site in the following link.

    http://www.wrldc.com/WebPublish/DC_RSD.aspx

    c) As per the procedure mentioned in Sl.no. (a) above, whenever a unit comes outof RSD, the DC of that particular unit has been protected by graduallyincreasing the DC in ON bar DC and corresponding decrease in OFF Bar DCtill the ON Bar DC of the unit taken out reaches its full DC as submitted byNTPC stations.

    The Sub-Committee may like to note the same.

  • 16

    475th OCCM AGENDA

    ITEM NO. 10: DATE AND VENUE OF NEXT OCC MEETING474th OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure-

    10. As per roster 476th OCC meeting will be hosted by ADANI Power Tiroda on

    13.10.2015 at Adani Power Tiroda in the month of October 2015.

    ******************************

  • Anaulagnak 2.1

    maah Agast 2015

    1. INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

    1.1 MAXIMUM FREQUENCY 50.12 Hz. BETWEEN 1600 Hrs & 1700 Hrs Hrs. ON 02.08.2015AiQaktma AavaRi%t

    1.2 MINIMUM FREQUENCY 49.77 Hz. BETWEEN 1900 Hrs & 2000 Hrs Hrs. ON 13.08.2015nyaUnatma AavaRi%t

    1.3 AVERAGE FREQUENCY 49.98 Hz.AaOsat AavaRi%t

    2. INSTANTANEOUS ta%kailak

    2.1 MAXIMUM FREQUENCY 50.25 Hz. AT 17:06:00 Hrs. ON 23.08.2015AiQaktma AavaRi%t

    2.2 MINIMUM FREQUENCY 49.55 Hz. AT 19:27:00 hrs Hrs. ON 03.08.2015nyaUnatma AavaRi%t

    3. %AGE OF TIME WHEN FREQUENCY WAS AUGUST 2015 JULY 2015 JUNE 2015

    AavaRi%t ka samaya p`itSat maoM

    3.1 BELOW 48.5 Hz. 0.00 0.00 0.00 48.5 hT\ja ko naIcao3.2 BETWEEN 48.5 Hz. AND 48.8 Hz. 0.00 0.00 0.00 48.5 hT\ja AaOr 48.8 hT\ja ko baIca3.3 BETWEEN 48.8 Hz. AND 49.2 Hz. 0.00 0.00 0.00 48.8 hT\ja AaOr 49.2 hT\ja ko baIca3.4 BETWEEN 49.2 Hz. AND 49.5 Hz. 0.00 0.00 0.00

    49.2 hT\ja AaOr 49.5 hT\ja ko baIca3.5 BETWEEN 49.5 Hz. AND 49.7 Hz. 0.31 0.21 0.20 49.5 hT\ja AaOr 49.7 hT\ja ko baIca3.6 BETWEEN 49.7 Hz. AND 49.9 Hz. 14.72 10.43 9.09 49.7 hT\ja AaOr 50.2 hT\ja ko baIca3.7 BETWEEN 49.9 Hz. AND 50.05 Hz. 70.00 70.29 65.01

    49.9 hT\ja AaOr 50.05 hT\ja ko baIca3.8 BETWEEN 50.05 Hz. AND 51.5 Hz. 14.97 19.07 25.70

    50.05 hT\ja AaOr 51.5 hT\ja ko baIca3.9 ABOVE 51.5 Hz. 0.00 0.00 0.00

    51.5 hT\ja ko }pr

    4.1 NO. OF TIMES FREQUENCY 0 0 0 TOUCHED 48.80 Hz. AavaRi%t 48.80 hT\ja kao CUhI

    4.2 NO. OF TIMES FREQUENCY 0 0 0 TOUCHED 48.60 Hz. AavaRi%t 48.60 hT\ja kao CUhI

    4.3 NO. OF TIMES FREQUENCY 0 0 0 TOUCHED 51.00 Hz. AavaRi%t 51.00 hT\ja kao CUhI

    maoM AavaRi%t ko AaMkD,aoM ka ivavarNa

    FREQUENCY PARTICULARS DURING AUGUST 2015

    (AS PER FREQUENCY REPORT OF WRLDC)

    (piScama xao~ Baar p`oYaNa kond` kI AavaRi%t irpaoT- ko AaQaar pr)

  • ANNEXURE-2.3 Voltage Profile during the month of Aug. 2015

    दनांकDate

    अिधकतम युनतम अिधकतम युनतम अिधकतम युनतम अिधकतम युनतम अिधकतम युनतम अिधकतम युनतम अिधकतम युनतम अिधकतम युनतमMax. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv

    1 420 409 417 406 437 416 439 408 421 405 419 408 422 412 417 4032 421 407 417 403 437 412 437 405 421 405 419 408 422 410 417 3993 419 404 414 402 433 413 432 400 420 402 420 406 421 413 416 4014 420 405 416 403 435 414 434 401 419 405 420 408 422 414 414 4035 420 405 416 403 435 414 434 401 419 405 420 408 422 414 414 4036 421 407 418 404 437 414 431 400 418 405 417 408 421 413 412 4027 417 406 413 403 435 414 437 410 416 405 417 408 419 412 412 4008 420 406 416 403 434 414 436 411 417 403 416 406 416 416 411 3979 419 408 418 404 436 415 439 412 415 407 423 412 416 413 410 395

    10 417 405 414 402 435 410 433 406 416 408 421 411 420 413 409 38511 418 404 416 402 437 413 433 401 415 403 415 406 417 410 406 388

    जेतपरुIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

    िव ूतदाब परेखा अग त 2015

    इंदौर इटारसी कराड धुले असोज कासोर भलाई

    11 418 404 416 402 437 413 433 401 415 403 415 406 417 410 406 38812 419 407 417 406 435 412 436 407 415 403 410 410 421 413 408 39013 421 407 420 405 437 415 436 409 420 405 415 407 419 413 408 38514 420 406 419 405 438 414 436 410 418 406 417 408 422 411 408 39515 420 410 421 408 438 420 440 416 419 413 416 412 424 416 408 39616 419 406 417 405 436 414 434 406 420 407 418 407 420 413 408 39817 416 405 415 404 434 410 435 405 418 405 417 407 420 413 408 39318 415 403 416 403 431 408 432 401 416 403 417 407 418 411 408 39619 415 403 416 403 431 408 432 401 416 403 417 407 418 411 408 39620 416 400 416 398 431 404 430 398 416 401 416 405 419 410 409 39421 416 403 416 402 436 409 434 401 416 403 416 406 419 409 407 39422 417 401 417 401 434 411 433 400 416 402 417 406 419 410 410 38823 416 406 415 403 435 410 435 403 416 406 416 408 419 411 408 39124 416 402 413 397 433 410 432 400 416 402 415 406 417 406 408 38925 417 402 413 399 434 411 433 402 416 402 415 408 417 408 405 38226 415 400 412 397 430 408 432 396 415 399 416 403 417 407 409 38427 417 400 413 399 432 407 432 392 417 398 416 402 417 408 406 38128 416 401 411 400 434 410 435 403 417 402 417 406 418 411 404 38429 419 409 417 406 438 411 432 409 420 409 417 411 422 413 405 39130 416 402 414 401 433 410 429 400 420 405 418 406 421 412 405 38231 412 402 410 399 433 413 429 397 416 404 415 406 418 412 401 386

    421 400 421 397 438 404 440 392 421 398 423 402 424 406 417 381

    पि म े य भार ेषण क , मु बई WRLDC, Mumbaiबंधन सूचना णाल MIS

  • दनांकDate

    अिधकतम युनतम अिधकतम युनतम अिधकतम युनतम अिधकतम युनतम अिधकतम युनतम अिधकतम युनतम अिधकतम युनतम अिधकतम युनतमMax. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv

    1 417 405 408 395 423 410 431 416 769 756 785 776 788 764 786 7642 417 405 407 392 423 408 430 413 770 755 787 767 785 759 785 7653 416 405 407 393 421 408 427 409 766 754 784 762 787 761 787 7654 422 405 405 392 423 406 423 419 765 756 781 769 783 759 784 7655 423 407 405 391 423 406 423 419 765 756 785 769 785 760 789 7686 416 403 404 390 421 407 428 415 766 757 784 764 782 757 787 7657 413 407 403 395 420 406 427 411 761 761 779 764 782 764 781 7688 415 404 406 393 423 408 430 416 761 761 779 764 788 761 784 7649 418 405 409 393 421 410 431 417 762 755 787 767 790 762 791 765

    10 414 404 403 390 420 407 428 411 765 755 780 765 781 756 783 75411 417 405 410 397 420 407 427 416 765 761 782 763 794 766 788 765

    ग्वा लयर बनाBina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

    बना ग्वा लयर नागदा खंडवा सपत सव न

    417 405 410 397 420 407 427 416 765 761 782 763 794 766 788 76512 419 407 412 394 422 417 430 415 769 757 793 771 794 767 792 76813 421 406 410 394 425 408 431 417 767 754 791 770 795 765 796 76914 419 406 410 394 422 409 430 414 766 753 788 767 793 764 791 76415 423 409 415 397 423 414 431 421 771 758 796 769 804 768 801 76816 419 407 412 395 424 410 428 415 764 753 780 763 798 766 790 76717 417 404 409 391 421 409 428 412 766 753 788 762 791 756 786 75918 417 407 408 395 421 413 427 410 763 752 784 764 794 771 785 76619 418 402 413 393 420 403 427 410 763 752 783 762 797 760 789 75720 416 404 409 395 421 403 426 407 763 752 783 764 792 766 789 75721 419 408 409 398 420 407 428 408 762 750 784 764 789 768 793 77122 417 406 410 398 420 404 427 410 765 750 786 763 792 770 791 76823 416 406 412 399 419 409 428 412 765 755 789 770 796 771 789 76724 413 402 408 395 419 404 426 407 761 750 782 761 790 763 783 76025 414 401 407 391 419 403 426 408 764 750 786 762 788 754 785 75926 411 401 405 396 418 403 426 407 760 749 774 752 782 758 779 76127 412 401 404 393 420 403 426 407 760 749 774 758 782 760 780 76128 413 404 408 392 420 404 426 411 763 752 779 762 786 757 784 76429 419 409 414 398 422 412 430 416 768 757 787 771 786 757 795 77130 415 405 412 393 420 404 426 410 767 757 787 768 793 760 788 76731 415 405 412 393 416 403 424 409 767 737 787 768 793 760 788 767

    423 401 415 390 425 403 431 407 771 737 796 752 804 754 801 754423 401 415 390 425 403 431 407 771 737 796 752 804 754 801 754

    पि म े य भार ेषण क , मु बई WRLDC, Mumbaiबंधन सूचना णाल MIS

  • No. of Occasions

    Max Load Relief at 49.2 Hz

    No. of Occasions

    Max Load Relief at 49.2 Hz

    No. of Occasions

    Max Load Relief at 49.2 Hz

    No. of Occasions

    Max Load Relief at 49.2 Hz

    1 01-Aug-15 0 0 0 0 0 0 0 02 02-Aug-15 0 0 0 0 0 0 0 03 03-Aug-15 0 0 0 0 0 0 0 04 04-Aug-15 0 0 0 0 0 0 0 05 05-Aug-15 0 0 0 0 0 0 0 06 06-Aug-15 0 0 0 0 0 0 0 07 07-Aug-15 0 0 0 0 0 0 0 08 08-Aug-15 0 0 0 0 0 0 0 09 09-Aug-15 0 0 0 0 0 0 0 0

    10 10-Aug-15 0 0 0 0 0 0 0 011 11-Aug-15 0 0 0 0 0 0 0 012 12-Aug-15 0 0 0 0 0 0 0 013 13-Aug-15 0 0 0 0 0 0 0 014 14-Aug-15 0 0 0 0 0 0 0 015 15-Aug-15 0 0 0 0 0 0 0 016 16-Aug-15 0 0 0 0 0 0 017 17-Aug-15 0 0 NIL NIL NIL 018 18-Aug-15 0 0 0 0 0 0 0 019 19-Aug-15 0 0 0 0 0 0 0 020 20-Aug-15 0 0 0 0 0 0 0 021 21-Aug-15 0 0 0 0 0 0 0 022 22-Aug-15 0 0 0 0 0 0 0 023 23-Aug-15 0 0 0 0 0 0 0 024 24-Aug-15 0 0 0 0 0 0 0 025 25-Aug-15 0 0 0 0 0 0 0 026 26-Aug-15 0 0 0 0 0 0 0 027 27-Aug-15 0 0 0 0 0 0 0 028 28-Aug-15 1 18.26 0 0 0 0 0 029 29-Aug-15 0 0 0 0 0 0 0 030 30-Aug-15 0 0 0 0 0 0 0 031 31-Aug-15 0 0 0 0 0 0 0 0

    1025 91 490 851Recommonded Load relief at 49.2 Hz / 49.0/48.8/48.6 Hz

    Gujarat Maharashtra

    ANNEX -2.4

    DateSl. No Madhya Pradesh( Compiled from the data received from the constituents)

    Chhattisgarh

    Under Frequency Operation in various Constituent System of Western Region during the month AUGUST - 2015

  • ANNEXURE-2.5

    Power Cut/Restrictions in Western Region for the month of August-2015

    k : gaujarat Gujarat

    1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut/ Restriction on Industries a) All industries are allowed to run their units on all days of week & if they want to avail staggered holiday,

    then they will have to staggered on notified day only & cannot avail as per their choice. b) All industries are required to keep their recess timings staggered. 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2. Power supply to Agricultural & Rural Sectors

    a) Only 10 Hrs. Power supply in staggered form in rotation of day & night is given to Ag. Single Phase supply during rest of 14 Hrs by providing LSTC.

    b) Jyotigram Yojana 24 hrs. 3 Anya jaanakarI 3. Any other information: NIL. K : maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid 1 Power Cut/ Restriction on Industries, Load Shedding in the state etc

    ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

    power cut (MW)

    pabandI ka samayaRestriction Timing

    p`it idna kula }jaa- kTaOtITotal Energy Cut

    (MUs /day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HT/LT Industries M (b) Baar inayamana Load Shedding

    SaUnya Nil SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    (c) Anya jaanakarI Other information 1.Weekly Off 2.Staggering of power supply

    SaUnya Nil SaUnya Nil

    SaUnya Nil SaUnya Nil

    SaUnya Nil SaUnya Nil

    SaUnya Nil SaUnya Nil

    2 kRiYa xao~ kao ivaVut AapUit- 2. Power supply to Agricultural Sector: -

    ivavarNa Details sao From idnaaMk Date

    tk To idnaaMk Date

    p`it idna AapUit- GaMTo Supply Hours per day Max. (Hrs) Min. (Hrs) Average (Hrs)

    2.1 Three-Phase Supply(DLF)

    01.08.2015 31.08.2015 23:36 22:43 23:22 2.1 Three-Phase Supply(Irrigation)

    01.08.2015 31.08.2015 09:55 09:24 09:45 2.1 Three-Phase Supply(Mixed)

    01.08.2015 31.08.2015 23:35 22:39 23:15

  • 3 Anya jaanakarI 3. Any other information

    SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

    idnaaMk Date tk To idnaaMk

    Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

    Max. (Hrs)

    Min. (Hrs) Average (Hrs)

    3.1 Commissionary H. Qtrs. 01.08.2015 31.08.2015 23:53 23:35 23:46 3.2 District Head Qtrs. 01.08.2015 31.08.2015 23:55 23:43 23:51 3.3 Tehsil Head Qtrs. 01.08.2015 31.08.2015 23:48 23:21 23:39

    ga : maharaYT/ Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid 1. Power Cut/ Restriction on Industries, Load Shedding in the state etc

    ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

    power cut (MW)

    pabandI ka samayaRestriction Timing

    p`it idna kula }jaa- kTaOtITotal Energy Cut

    (MUs /day From To (a) Power Cuts/Restriction on HT/ LT Industries (b) Load Shedding From 01.08.15 to 31.08.15

    SaUnya Nil

    @ 18-60 MW

    SaUnya Nil

    00.00

    SaUnya Nil 24.00

    SaUnya Nil

    @ 0.7 MUs/day

    (c) Any other information 1.Weekly Off 2. Staggering of power supply Industrial Staggering LS withdrawn from 03/02/2012

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    2 kRiYa xao~ kao ivaVut AapUit- 2. Power supply to Agricultural Sector

    ivavarNa Details sao From idnaaMk Date

    tk To idnaaMk Date

    p`it idna AapUit- GaMTo Supply Hours per day

    Max. (Hrs) Min. (Hrs) Average (Hrs) 2.1 Three-Phase Supply 01.08.2015 31.08.2015 10:00 08:00 09:00

    2.2 Single-Phase Supply 01.08.2015 31.08.2015 18:00 18:00 18:00 3 Anya jaanakarI Any other information: There is no load shedding on industrial feeders in Maharashtra

  • Ga : C%tIsagaZ, Chhattisgarh: 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid 1 Power Cut/ Restriction on Industries, Load Shedding in the state etc

    ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

    pabandI ka samaya Restriction Time

    p`it idna kula }jaa- kTaOtI

    Total Energy Cut (MUs /day)

    sao From tk To

    (A) Scheduled (a) (i) Power Cuts/ Restriction on HT Industries (ii) Power Cuts/Restriction on LT Industries (iii) Power Cuts/Restriction on Rural (iv) Agriculture pump* (v)Urban/ Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

    00.00(Av)

    00.00(Av)

    00.00 (Av) 00.00 (Av) 00.00(Av) 00.00 (Av)

    1.Rural 83.96 MW(Av) For 173.14 Hrs. 2.Town Feeders (C-1to C-6 & X) : 0.00(Av)

    - - -

    00.00 - - -

    - - -

    00.00 - - - -

    - - -

    0.00 - -

    0.469 -

    3. HT Industries 85.54 (Av) For 183.27 Hrs.

    0.385 Total Energy Cut/day 0.854 ( b) Any other information 1.Weekly Off/staggering of power supply

    1day (In a week as per consumer’s option) 50MW(Av.)

    -

    -

    0.039

    2 kRiYa xao~ kao ivaVut AapUit- 2. Power supply to Agricultural Sector

    ivavarNa Details sao From idnaaMk Date

    tk To idnaaMk Date

    p`it idna AapUit- GaMTo Supply Hours per day Max. (Hrs) Min. (Hrs) Average (Hrs)

    2.1 Three-Phase Supply 01.08.2015 to 31.08.2015, 6.00 Hrs (Power cut)

    18.00

    2.2 Single-Phase Supply - - - - - 2.3 Remarks/Note/ - - - - -

    3 Anya jaanakarI / Any other information: SaUnya Nil

  • Annex-2.6

    ( )

    ,Power System Operation Corporation Ltd.(A wholly owned subsidiary company of POWERGRID)

    Western Regional Load Despatch Centre,Mumbai

    2015Details of forced unit outages during the month of Aug. 2015

    अनु

    Sl.No

    Unitसंघटक

    Constituent/IPP

    मतामेगावॉटCap.MW

    सoFrom

    समय

    सoFrom

    समय

    कारणReason

    Time Date Date1. ESSAR-2 GSECL 172 12:12 22-02-2013 STILL OUT STILL OUT SHORTAGE OF GAS

    2. GTPS-2 GSECL 120 20:20 22-10-2014 STILL OUT STILL OUT RSD

    3. GTPS-1 GSECL 120 5:36 22-10-2014 STILL OUT STILL OUT RSD

    4. UKAI-2 GSECL 120 15:02 10-11-2014 STILL OUT STILL OUT RSD

    5. SUGEN-2 GSECL 382 11:46 31-01-2015 STILL OUT STILL OUT RSD

    6. HAZIRA EXT-1 GSECL 351 0:37 25-03-2015 STILL OUT STILL OUT RESTORATION TIMELONG UNCERTAIN7. STPS-1 GSECL 120 09:25 14.05.2015 07:55 11.08.2015 CABLE FAULT

    8. GPEC 1 GSECL 218 23:16 13-07-2015 21:29 06-08-2015 RSD

    9. DGBP 2 GSECL 112 14:36 15-07-2015 06:15 26-08-2015 LOW DEMAND

    10. PIPAVAV 2 GSECL 350 02:50 18-07-2015 STILL OUT STILL OUT GAS PURGE VALVEPROBLEM11. GPEC-2 GSECL 218 15:23 21-07-2015 18:45 06-08-2015 RSD

    12. GTPS- 3 GSECL 219 04:05 22-07-2015 03:30 31.08.2015 RSD

    13. WANAKBORI 5 GSECL 210 10:15 23-07-2015 06:05 31-08-2015 RSD

    14. WANAKBORI 6 GSECL 210 16:03 23-07-2015 11:45 03-09-2015 LESS SCHEDULE

    15. WANAKBORI 4 GSECL 210 06:22 25-07-2015 07:33 09.08.2015 RSD

    16. GPEC 3 GSECL 218 12:34 25-07-2015 19:16 07-08-2015 RSD

    17. UKAI 6 GSECL 500 01:02 26-07-2015 STILL OUT STILL OUT RSD

    18. UKAI 1 GSECL 120 19:30 27-07-2015 STILL OUT STILL OUT RSD

    19. DGBP 1 GSECL 107 12:00 28-07-2015 10:50 08.08.2015 RSD

    20. SLPP 2 GSECL 125 11:28 02-08-2015 00:12 05-08-2015 BTL

    21. OPGS 1 GSECL 150 21:10 02-08-2015 14:15 05-08-2015 DRUM LEVELPROTECTION.22. UTRAN STG II 1 GSECL 375 18:23 08-08-2015 STILL OUT STILL OUT CONTROL PROBLEM

    23. DGBP 1 GSECL 112 20:49 08-08-2015 06:28 11-08-2015 RSD

    24. GPEC 3 GSECL 218 23:43 10-08-2015 06:07 25-08-2015 RSD

    25. GPEC 1 GSECL 218 00:09 11-08-2015 STILL OUT STILL OUT RSD

    26. ALTPS 2 GSECL 125 00:18 11-08-2015 19:09 17-08-2015 PLANNED STATIONSHUTDOWN27. UKAI 5 GSECL 210 12:24 14-08-2015 02:34 20-08-2015 RSD

  • 28. GTPS 4 GSECL 120 19:15 14-08-2015 04:10 27.08.2015 RSD

    29. WANAKBORI 4 GSECL 210 19:48 14-08-2015 08:52 25-08-2015 RSD

    30. DGBP 1 GSECL 107 23:46 14-08-2015 10:43 18-08-2015 RSD

    31. GPEC 2 GSECL 218 23:50 14-08-2015 05:55 19-08-2015 RSD

    32. SLPP 3 GSECL 125 21:43 17-08-2015 STILL OUT STILL OUT TURBINE TRIP

    33. STPS 1 GSECL 120 00:00 19-08-2015 STILL OUT STILL OUT AOH

    34. DGBP 1 GSECL 107 13:54 22-08-2015 06:37 02-09-2015 CW PUMP PROBLEM

    35. WANAKBORI 3 GSECL 210 19:16 24-08-2015 17:38 27-08-2015 BTL

    36. SLPP 4 GSECL 125 22:25 24-08-2015 09:10 28-08-2015 HEAVY WATERLEAKAGE.37. GPEC 3 GSECL 218 09:05 25-08-2015 06:35 28-08-2015 RSD

    38. GPEC 2 GSECL 218 20:15 27-08-2015 05:05 02-09-2015 RSD

    39. CHANDRAPUR-1 MAHAGENCO 210 7:15 28-08-2014 STILL OUT STILL OUT BTL/ ECONOMICSHUTDOWN.

    40. PARLI 6 MAHAGENCO 250 15:07 25-06-2015 STILL OUT STILL OUTFURNACE PRESSUREHIGH/WATERSHORTAGE

    41. BHUSAWAL-2 MAHAGENCO 210 12:43 07-09-2014 STILL OUT STILL OUTFLAMEFAILURE/ECONOMYSHUTDOWN

    42. KORADI-6 MAHAGENCO 210 01:02 20-03-2015 STILL OUT STILL OUT ECONOMICSHUTDOWN

    43. URAN-6 MAHAGENCO 108 16:35 01-04-2015 STILL OUT STILL OUT CLEAN DRAIN TANKLEVEL HIGH

    44. URAN-7 MAHAGENCO 108 00:07 17.04.2015 STILL OUT STILL OUT GAS TURBINEPROBLEM45. PARLI-3 MAHAGENCO 210 12:52 14.06.2015 STILL OUT STILL OUT COAL SHORTAGE

    46. PARLI 4 MAHAGENCO 210 19:47 05-07-2015 STILL OUT STILL OUT WATER SHORTAGE

    47. PARLI 5 MAHAGENCO 510 14:55:00 06-07-2015 STILL OUT STILL OUT WATER SHORTAGE.

    48. PARLI 7 MAHAGENCO 250 12:07:00 08-07-2015 STILL OUT STILL OUT WATER SHORTAGE

    49. CHANDRAPURUNIT-8 MAHAGENCO 500 22:20 09-07-2015 14:00 21-08-2015 Maintenance work

    50. BHUSAWAL 5 MAHAGENCO 500 06:29 29-07-2015 04:35 04-09-2015 BTL

    51. WPCL 4 MAHAGENCO 135 21:57 01-08-2015 15:37 25-08-2015 VIBRATION PROBLEMIN ID FAN.52. KHAPARKHEDA 5 MAHAGENCO 500 04:11 02-08-2015 21:14 06-08-2015 BTL

    53. WPCL 1 MAHAGENCO 135 00:00 09-08-2015 11:06 12-08-2015BACK FILTERDIFFERENTIALPROTECTION

    54. KORADI 5 MAHAGENCO 200 09:01 13-08-2015 08:12 22-08-2015WATER LOGGED ATHT COOLER BOOSTERPUMP.

    55. KORADI 8 MAHAGENCO 200 10:13 13-08-2015 08:37 17-08-2015 COAL MILL PROBLEM

    56. KHAPARKHEDA 1 MAHAGENCO 210 17:18 13-08-2015 15:42 16-08-2015 COAL BUNKERINGPROBLEM

    57. BHUSAWAL 4 MAHAGENCO 500 19:30 13-08-2015 01:53 17-08-2015 WATER WALL TUBELEAKAGE

    58. KHAPARKHEDA 4 MAHAGENCO 210 13:10 16-08-2015 08:43 25-08-2015 TURBINE VIBRATIONHIGH59. KORADI 8 MAHAGENCO 660 09:50 20-08-2015 STILL OUT STILL OUT ESP PROBLEM

    60. CHANDRAPURUNIT-8 MAHAGENCO 500 21:35 23-08-2015 STILL OUT STILL OUTCOOLING WATERPUMP TRIPPED

    61. WPCL 1 MAHAGENCO 135 19:18 25-08-2015 STILL OUT STILL OUT ESP

    62. TROMBAY 6 TPC 500 17:08 15-07-2015 STILL OUT STILL OUT ECONOMYSHUTDOWN.

    63.AMRAVATI

    TPP(INDIABULL)-5

    RATTANPOWER INDIA

    LTD270 14:22 03-04-2015 STILL OUT STILL OUT

    TURBINE SHAFTVIBRATIONS

  • 64.AMRAVATI

    TPP(INDIABULL)-4

    RATTANPOWER INDIA

    LTD270 13:06 02-08-2015 09:04 06-08-2015

    AUXILIARY SUPPLYFAILURE

    65. APL MUNDRA 1 ADANIPOWER 330 11:30 27-07-2015 11:48 09-08-2015 RSD

    66. APL MUNDRA 3 ADANIPOWER 330 17:06 27-07-2015 09:09 09-08-2015 RSD

    67. APML TIRODA 2 ADANIPOWER 660 00:30 04-08-2015 04:03 03-09-2015 ID FAN PROBLEM

    68. APL MUNDRA 1 ADANIPOWER 330 01:16 15-08-2015 01:36 18-08-2015WATER LEAKAGESFROM HP HEATER

    69. APML TIRODA 3ADANI

    POWER,TIRODA

    660 05:21 20-08-2015 02:25 23-08-2015MAIN STEAM DRAINLINE LEAKAGE

    70. APL MUNDRA 8 ADANIPOWER 660 12:50 21-08-2015 12:33 25-08-2015CONDENSOR TUBELEAKAGE

    71. APL MUNDRA 5 ADANIPOWER 660 10:58 22-08-2015 06:57 28.08.2015CONDENSER INLETLEAKAGE

    72. UNOSUGEN 1 TORRENTPOWER 382 23:54 31-07-2015 STILL OUT STILL OUT RSD

    73. ESSAR MAHAN-1 ESSARPOWER 660 17:16 17.10.14 STILL OUT STILL OUT LESS SCHEDULE

    74. ESSAR GT-1 ESSARPOWER 172 01:47 12.03.2015 STILL OUT STILL OUT RSD

    75. EPGL 2 ESSARPOWER 600 00:52 26-07-2015 10:34 10.08.2015 RSD

    76. ESSAR IPP 1 ESSARPOWER 170 12:30 11-08-2015 STILL OUT STILL OUT SPARKING ON GT

    77. RGPPL-1B RGPPL 320 23:00 31-03-2014 STILL OUT STILL OUT DRY PRESERVATION

    78. RGPPL-1A RGPPL 320 13:30 8-07-2014 READY READY LESS REQUISITION

    79. RGPPL-2A RGPPL 332 12:00 21-07-2014 STILL OUT STILL OUT CW PUMP PROBLEM

    80. RGPPL-2B RGPPL 332 13:30 1-09-2014 READY READY LESS REQUISITION

    81. RGPPL-3B RGPPL 332 18:09 30.05.2015 STILL OUT STILL OUT NO SCHEDULE

    82. RGPPL-3A RGPPL 332 19:50 01-06-2015 STILLOUTSTILLOUT

    TAKE OUT AFTERTESTING

    83. AMARKANTAK-4 MPGCL 120 11:13 30-04-2014 STILL OUT STILL OUT TURBINE VIBRATION

    84. AMARKANTAK-3 MPGCL 120 0:25 12-01-2015 STILL OUT STILL OUT FIRE CAUGHT INTURBINE FLOOR

    85. JPBINA-1 MPPGCL 250 09:21 14.04.2015 03:16 27-08-2015 RSD

    86. JPBINA-2 MPPGCL 250 12:48 28.04.2015 08:16 01.09.2015 RSD

    87. SGTPS-2 MPPGCL 210 10:47 23.05.2015 07:54 20-08-2015 RSD

    88. SATPURA-III-9 MPPGCL 210 13:30 23.05.2015 STILL OUT STILL OUT FIRE IN GT

    89. SATPURA III 8 MPPGCL 210 00:07 16-06-2015 07:55 22-08-2015 RSD

    90. SINGAJI 1 MPPTCL 600 14:44 20-07-2015 03:36 07-08-2015 TURBINE VIBRATIONHIGH

    91. SATPURA IV 11 MPPTCL 250 01:20 25-07-2015 STILL OUT STILL OUT FIRE IN GT

    92. SATPURA IV 10 MPPTCL 250 02:00 25-07-2015 17:08 27-08-2015 FLAME FAILURE

    93. SINGAJI 2 MPPTCL 600 03:52 02-08-2015 05:29 04-09-2015 BTL

    94. SG TPS 1 MPPTCL 210 14:07 05-08-2015 17:20 19-08-2015 RSD

    95. SG TPS 4 MPPTCL 210 00:280 09-08-2015 23:05 25-08-2015 RSD

    96. SINGAJI 1 MPPTCL 600 00:07 13-08-2015 23:41 27-08-2015 RSD

    97. SATPURA II 7 MPPTCL 210 11:10 15-08-2015 07:40 25.-08-2015 RSD

  • 98. MB POWER 1 MBPOWER 600 11:20 08.07.2015 07:21 22-08-2015 DRUM LEVEL HIGH

    99. KORBA(W) 2 CSPTCL 210 23:30 01-08-2015 04:32 07.08.2015 BOILER INSPECTION

    100. KORBA(W)EXTN-5 CSPTCL 500 10:30 03-08-2015 23:08 11-08-2015 BTL

    101. KORBA(W) 1 CSPTCL 210 22:43 15-08-2015 22:00 19-08-2015 BTL

    102. KORBA(W)CSETCL 4 CSPTCL 210 00:01 18-08-2015 22:00 23-08-2015 STEAM LEAKAGE

    103. CGPL 3 CGPL 830 04:18 05-08-2015 07:04 24-08-2015 BOILER MFT

    104. VANDANA -1 VANDANA 135 15:00 9-01-2015 STILL OUT STILL OUT BTL

    105. DHARIWAL-2 DHARIWAL 300 0:00 22-12-2014 STILL OUT STILL OUT RSD

    106. DHARIWAL-1 DHARIWAL 300 02:27 28.05.2015 STILL OUT STILL OUT HIGH VIBRATIONPROBLEM

    107. LANCO-2 LANCO 300 12:20 21-08-2013 STILL OUT STILL OUT COAL SHORTAGE

    108. JPL STG-I 2 JINDALPOWER 600 17:29 10-07-2015 STILL OUT STILL OUT RSD

    109. JPL STG-II 2 JPL 600 23:58 31-07-2015 STILL OUT STILL OUT LOW SCHEDULE

    110. JP NIGRIE 1 JAYPEE 660 16:56 29-07-2015 21:50 14-08-2015 ELECTIVE SHUT DOWN

    111. DGEN-53 TPGL 400 21:38:00 07-08-2015 STILL OUT STILL OUT LESS SCHEDULE

    112. DGEN-52 TPGL 400 21:45 14-08-2015 06:37 17-08-2015 LESS SCHEDULE

    113. SASAN 4 SASAN 660 05:40 03-08-2015 15:03 08-08-2015BOILER STARTUPSYSTEM LINELEAKAGE

    114. SASAN 3 SASAN 660 17:40:00 09-08-2015 18:30 13-08-2015BOILER START-UPSYSTEM LINELEAKAGE

    115. SASAN 2 SASAN 660 07:32 27-08-2015 05:35 31-08-2015 START UP SYSTEMLEAKAGE

    116. SASAN 3 SASAN 660 14:17 29-08-2015 15:40 03-09-2015 PA FAN BLADE PITCHFAILURE

    117. KSK 1 KSK 600 11:49 21-08-2015 STILL OUT STILL OUT TURBINE SIDEPROBLEM

    118. NSPCL 2 NSPCL 250 01:06 21-08-2015 STILL OUT STILL OUT AOH

    119. ACBIL 1 ACBIL 135 02:36 17-08-2015 06:20 20-08-2015MANUALLY TRIPPEDDUE TO WATERLOGING

    120. KAWAS GT 1A NTPC 106 14:55 01-06-15 11:12 17-08-2015 LESS SCHEDULE

    121. KAWAS GT 1C NTPC 106 17:27 23-06-2015 10:19 17-08-2015 LOW SCHEDULE

    122. KAWAS GT 1B NTPC 106 17:54 23-06-2015 05:52 17-08-2015 LOW SCHEDULE

    123. KAPS 2 NPCL 220 14:09 01-07-2015 STILL OUT STILL OUT FEED WATER SIDEPROBLEM

    124. SIPAT II 5 NTPC 500 23:14 11-07-2015 16:57 14-08-2015 COH

    125. GANDHAR GT 3 NTPC 219 18:45 13-07-2015 18:52 08.08.2015 LESS REQUISITION

    126. GANDHAR GT 2 NTPC 219 20:27 13-07-2015 08:46 11-08-2015 LESS REQUISITION

    127. MOUDA 1 NTPC 500 19:39 20-07-2015 05:24 19-08-2015 RSD

    128. GANDHAR GT 1 NTPC 219 00:37 22-07-2015 05:56 28-08-2015 LESS SCHEDULE

    129. MOUDA 2 NTPC 500 12:18 23-07-2015 08:45 11.08.2015 RSD

    130. VSTPS 5 NTPC 210 10:43 28-07-2015 17:35 10.08.2015 RSD

    131. VSTPS 2 NTPC 210 17:01 28-07-2015 17:45 08.08.2015 RSD

  • 132. KAWAS GT 2A NTPC 106 00:03 01-08-2015 13:02 10-08-2015 RSD

    133. VSTPS 10 NTPC 500 00:05 12-08-2015 STILL OUT STILL OUT AOH, 35 DAYS

    134. GANDHAR GT 3 NTPC 219 15:41 14-08-2015 05:57 03-09-2015 RSD

    135. MOUDA 2 NTPC 500 16:31 14-08-2015 STILL OUT STILL OUT RSD

    136. KAWAS 2B NTPC 164 23:40 14-08-2015 STILL OUT STILL OUT LESS SCHEDULE

    137. VSTPS 4 NTPC 210 11:55 15-08-2015 04:19 25-08-2015 RSD

    138. VSTPS 5 NTPC 210 16:03 15-08-2015 04:37 24-08-2015 RSD

    139. KAWAS 2A NTPC 164 11:21 17-08-2015 STILL OUT STILL OUT LESS SCHEDULE

    140. KAWAS GT 1A NTPC 106 19:58 21-08-2015 04:58 24-08-2015 RSD

    141. GANDHAR GT 2 NTPC 219 19:58 28-08-2015 STILL OUT STILL OUT RSD

    Note: Units out for more than 72 hrs are only included.

  • Annex-2.7

    ( )

    ,Power System Operation Corporation Ltd.(A wholly owned subsidiary company of POWERGRID)

    Western Regional Load Despatch Centre,Mumbai

    2015Details of planned unit outages during the month of Aug. 2015

    अनु

    Sl.No

    Unitसंघटक

    Constituent/IPPमता

    मेगावॉटCap.MW

    सoFrom

    समय

    सoFrom

    समय

    कारणReason

    Time Date Time Date1. GTPS- 5 GSECL 219 00:00 12-07-2015 17:20 01-08-2015 AOH

    2. SLPP 3 GSECL 125 01:23 19-07-2015 20:25 07.08.2015 AOH

    3. WANAKBORI 7 GSECL 210 00:00 05-08-2015 16:55 25-08-2015 AOH

    4. ALTPS 1 GSECL 125 00:32 10-08-2015 23:57 24-08-2015 AOH

    5. SLPP 2 GSECL 125 00:14 16-08-2015 STILL OUT STILL OUT AOH

    6. CGPL 10 CGPL,UMPP 830 01:18 12-07-2015 STILL OUT STILL OUT AOH

    7.

    8. CHANDRAPUR 4 MAHAGENCO 210 23:55 29-08-2015 STILL OUT STILL OUT AOH

    9. KOYNA STG-IV-II MAHAGENCO 250 09:00 20-08-2015 STILL OUT STILL OUT

    REALIGHINING OFT-G ROTOR &ADJUSTING THEBEARINGCLEARANCES.(40DAYS)

    10. VIPL-1 IPP 300 23:58 14-07-2015 23:58 13-08-2015 AOH

    11. LANCO 1 LANCO 300 00:01 25-08-2015 STILL OUT STILL OUT AOH

    12. TAPS – 1 NPCIL 160 22:39 12-10-2014 13:50 03-09-2015 REFUELINGWORKS13. SIPAT II 5 NTPC 500 23:14 11-07-2015 16:57 14.08.2015 AOH

    14. KSTPS 2 NTPC 200 21:05 18-07-2015 16:28 26-08-2015 BTL/AOH

  • (MW) From To1 GUVNL1.1 APL 8 660 14-Sep-15 9-Oct-15 AOH2

    NIL

    3 CSPGCL

    Annexure- 3.1

    MPPGCL

    ReasonS. No. Unit No.

    DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING SEPTEMBER 2015 AND OCTOBER 2015

    Capacity Outage as per Annual Maintenance Plan

    3.1 NIL

    3.2

    44.1 NIL5 Central Sector5.1 KORBA 5 500 30-Sep-15 05-Nov-15 Blr,LPT,GEN ,C&I DDCMIS, ESP5.2 SIPAT 5 600 20-Sep-15 24-Oct-15 AOH5.3 Vindhyachal 4 200 12-Sep-15 21-Oct-15 CAP+GEN+BLR+ESP R&M5.4 CGPL 20 800 25-Sep-15 03-Nov-15 COH5.5 MOUDA 2 500 28-Sep-15 17-Oct-15 AOH

    MSPGCL

  • Annexure  3.2

    SN KV Line From To Bas is Reason System Agency Type

    Date Time Date Time

    1 400 DGEN – TRANSFER BUS 21-Aug-15 09:00 21-Aug-15 18:00 Continuous Attending of Corona Disc of Isolators TEL TEL R

    2400 DGEN – NAVASARI Line 1 23-Aug-15 09:00 23-Aug-15 13:00 Continuous For c loth c leaning of Insulators at 140M Transmission Tower at Narmada River Crossing. TEL TEL R

    3400 DGEN – NAVASARI Line 2 23-Aug-15 14:00 23-Aug-15 18:00 Continuous For c loth c leaning of Insulators at 140M Transmission Tower at Narmada River Crossing TEL TEL R

    4 400 DGEN BUS A 27-Aug-15 09:00 27-Aug-15 18:00 Continuous Attending of Corona Disc of Isolators TEL TEL R

    5 400 DGEN – TRANSFER BUS 27-Aug-15 09:00 27-Aug-15 18:00 Continuous Attending of Corona Disc of Isolators TEL TEL R

    6 400 Vindhyachal-Sasan # 1 line 29-Aug-15 09:00 29-Aug-15 18:00 Daily For Isolator Alignment works at Vindhyachal PS. PGCIL WR-II C

    7 400 Vindhyachal-Sasan # 2 line 30-Aug-15 09:00 30-Aug-15 18:00 Daily For Isolator Alignment works at Vindhyachal PS. PGCIL WR-II C

    8 400 DGEN – NAVASARI Line 2 4-Sep-15 09:00 4-Sep-15 18:00 Continuous Attending of Corona Disc of Isolators TEL TEL R

    9 400 DGEN – TRANSFER BUS 4-Sep-15 09:00 4-Sep-15 18:00 Continuous Attending of Corona Disc of Isolators TEL TEL R

    10

    400 Nagda - Dehgam Ckt.1 5-Sep-15 7:00 10-Sep-15 18:00

    Replacement of defective porcelain disc insulator strings with longrod polymer insulators in

    complete line to avoid undesirable tripping of line PGCIL WR-II C

    11765 Gwalior-Bina# I 5-Sep-15 8:00 12-Oct-05 18:00 Daily Online permit for additional eathing work. A/R to be kept in Non auto mode PGCIL WR-II R

    12 765 Durg-Wardha-2 5-Sep-15 00:00 5-Sep-15 18:00 Daily Line outage required for attending AMP & shutdown works. WRTS-I WRTS-I-CG R

    13

    400 Nagda - Dehgam Ckt.2 11-Sep-15 7:00 16-Sep-15 18:00

    Replacement of defective porcelain disc insulator strings with longrod polymer insulators in

    complete line to avoid undesirable tripping of line PGCIL WR-II C

    14400 DGEN – NAVASARI Line 1 13-Sep-15 09:00 13-Sep-15 13:00 Continuous For c loth c leaning of Insulators at 140M Transmission Tower at Narmada River Crossing. TEL TEL R

    15400 DGEN – NAVASARI Line 2 13-Sep-15 14:00 13-Sep-15 18:00 Continuous For c loth c leaning of Insulators at 140M Transmission Tower at Narmada River Crossing. TEL TEL R

    16400 Tarapur-Boisar # I 15-Sep-15 9:00 15-Sep-15 17:00 Daily Rectification of shut down nature defects, A/R of Tarapur-Boisar # II will be in non-auto mode. PGCIL WR-II R

    17400 Tarapur-Boisar # I I 16-Sep-15 9:00 16-Sep-15 17:00 Daily Rectification of shut down nature defects , A/R of Tarapur-Boisar # I will be in non-auto mode PGCIL WR-II R

    18400 Boisar-Padghe (including LILO) 17-Sep-15 9:00 17-Sep-15 17:00 Daily Rectification of shut down nature defects, A/R of Vapi-Boisar will be in non-auto mode PGCIL WR-II R

    19400 Vapi-Boisar ( including LILO) 18-Sep-15 9:00 18-Sep-15 17:00 Daily Rectification of shut down nature defects, A/R of Boisar-Padghe will be in non-auto mode PGCIL WR-II R

    20 400 400 KV Wardha- Parli # 2 20-Sep-15 09:00 21-Sep-15 18:00 Daily Stringing work of broken earth wire between span 387 to 390 near Wardha WRTS-I WRTS-I R

    21 400 Pune(GIS)-Pune # 1& 2 20-Sep-15 06:00 19-Oct-15 18:00 Daily Online OPGW work. A/R to be kept in Non auto mode WRTML WRTS-I C

    22 400 Solapur-Parli # 1& 2 20-Sep-15 06:00 19-Oct-15 18:00 Daily Online OPGW work. A/R to be kept in Non auto mode WRTML WRTS-I C

    23 765 Seoni-Wardha # 1 20-Sep-15 06:00 19-Oct-15 18:00 Daily Online OPGW work. A/R to be kept in Non auto mode WRTS-I WRTS-I C

    24 400Bhadrawati-Parli-1 &

    Bhadrawati - Dhariwal-Parli 20-Sep-15 06:00 19-Oct-15 18:00 Daily Online OPGW work. A/R to be kept in Non auto mode WRTS-I WRTS-I C

    25 400 Solapur-Kolhapur-1&2 20-Sep-15 06:00 19-Oct-15 18:00 Daily Online OPGW work. A/R to be kept in Non auto mode WRTML WRTS-I C

    26 765Padghe-1 Reactor with Main & Tie bays at

    Aurangabad20-Sep-15 09:00 21-Sep-15 18:00 Daily for connecting strung bus jumper to Line Isolator & Bay AMP works WRTS-I WRTS-I R

    27 400 400KV Talegaon- Kalwa Line 20-Sep-15 08:00 20-Sep-15 18:00 Daily Changing of OPGW Wire, work will be carried out by POWERGRID Telecom MSETCL WRTS-I C

    28 765 765kV Bus-1 at solapur 20-Sep-15 09:00 22-Sep-15 18:00 DailyIsolator Erection of 710 Bay For Solapur- Aurangabad Line-2 & Bus stability test for

    commissioning of Aurangabad ReactorsWRTS-I WRTS-I C

    29 400 Korba Raipur-3 20-Sep-15 08:30 hrs 21-Sep-15 17:30 Continuous For annual maintenance of bay equipments & wave trap replacement NTPC NTPC

    30 400 WTPS - Dehgam (PG) 20-Sep-15 07:00 19-Oct-15 19:00 Daily Online work OPGW laying work GETCO GETCO

    31400 Mundra - Limbdi # 1 20-Sep-15 8:00 19-Oct-15 18:00 Daily

    Online working permit to provide additional earthing Auto recloser to be kept to be kept in non

    auto mode PGCIL WR-II C

    32765 Sasan - Satna Ckt-I 20-Sep-15 6:00 19-Oct-15 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept in non auto mode PGCIL WR-II C

    33765 Gwalior - Agra Ckt-II 20-Sep-15 6:00 19-Oct-15 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept in non auto mode PGCIL WR-II C

    34765 Satna - Gwalior Ckt-I 20-Sep-15 6:00 19-Oct-15 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept in non auto mode PGCIL WR-II C

    35400 Vapi - Kala 20-Sep-15 6:00 19-Oct-15 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept in non auto mode PGCIL WR-II C

    36

    Outage Planning of Transmiss ion elements during the Duration 20.09.2015 to 19.10.2015

  • SN KV Line From To Bas is Reason System Agency Type

    Outage Planning of Transmiss ion elements during the Duration 20.09.2015 to 19.10.2015

    37220 Kawas - Haldarwa 20-Sep-15 6:00 19-Oct-15 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept in non auto mode PGCIL WR-II C

    38220 Gandhar - Haldarwa 20-Sep-15 6:00 19-Oct-15 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept in non auto mode PGCIL WR-II C

    39220 Kawas - Navsari GIS 20-Sep-15 6:00 19-Oct-15 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept in non auto mode PGCIL WR-II C

    40

    220 Kawas - Navsari GIS Ckt. 1&2 20-Sep-15 6:00 26-Sep-15 18:00 Daily

    Shutdown for OPGW installation due to abesnce of Earthwire in Railway Crossing & River

    Crossing. A/R of 220 kv Ichhapore-ESSAR & Ichhapore-Reliance link, 220 kv Sujan – Bhestan

    link, Vav – Navsari link and Navsari - Navsari Link to be kept in non auto mode during work. PGCIL WR-II C

    41220 Vav - Navsari (GETCO) 20-Sep-15 6:00 19-Oct-15 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept in non auto mode C

    42400 400 kV Vindhyachal (PG) - Vindhyachal (NTPC) 20-Sep-15 6:00 19-Oct-15 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept in non auto mode PGCIL WR-II C

    43400 400 kV Vindhyachal 3 - Vindhyachal 4 20-Sep-15 6:00 19-Oct-15 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept in non auto mode NTPC WR-II C

    44 765 Gwalior-Agra#II line 20-Sep-15 8:00 20-Oct-15 18:00 Daily Online OPGW work. A/R to be kept in Non auto mode PGCIL WR-II R

    45765 765kv D/C Durg-Champa Ckt-I & II TL 20-Sep-15 08:00 30-Sep-15 17:00 Daily Non A/R Mode for additional earthing WRTS-I WRTS-I-CG

    46 765 765kv D/C Durg-Kotra Ckt-I & II TL 20-Sep-15 08:00 30-Sep-15 17:00 Daily Non A/R Mode for additional earthing WRTS-I WRTS-I-CG

    47 765 S/C Bilaspur-Seoni-I 20-Sep-15 08:00 19-Oct-15 17:00 Daily Non A/R Mode for additional earthing WRTS-I WRTS-I-CG

    48 765 S/C Bilaspur-Seoni-II 20-Sep-15 08:00 19-Oct-15 17:00 Daily Non A/R Mode for additional earthing WRTS-I WRTS-I-CG

    49 400 Boisar-2 Line Reactor at Aurangabad 21-Sep-15 09:00 21-Sep-15 18:00 Daily for commissioning of 426 Tie bay WRTS_I WRTS_I C

    50 400 Bhadrawati-Chandrapur-1 21-Sep-15 07:00 21-Sep-15 18:00 Daily

    Replacement of Porcelain Insulators with Polymer in Power line/Railway & NH crossings for

    public saftey.Auto reclose shall be kept in Non auto mode for Bhadrawati-Chandrapur-2 line is

    requied.

    WRTS-I WRTS-I C

    51 400 400KV Talegaon -Chakan Line 21-Sep-15 09:30 21-Sep-15 18:00 Daily Placing of Conductor on LA's & NTMC operation check Work at Pune WRTS-I WRTS-I C

    52 400 125 MVAR Bus reactor at Seoni 21-Sep-15 08:00 21-Sep-15 18:00 Daily Bushing tan detla measurement. WRTS-I WRTS-I R

    53 765 Seoni- Wardha-I (Tie bay 720) at Seoni 21-Sep-15 08:00 23-Sep-15 18:00 Conti. AMP works at Seoni WRTS-I WRTS-I R

    54 765 765 KV ICT # 3 at Wardha 21-Sep-15 09:00 22-Sep-15 18:00 Daily 400 KV Side LA replacement work WRTS-I WRTS-I R

    55 400KV Mouda 400kv Bus-1 21-Sep-15 09:00 22-Sep-15 18:00 Continous replacement of isolator gear boxes NTPC NTPC

    56 400kV Bus- Sectionalizer - Bay 442 at Mundra plant 21-Sep-15 09:00 21-Sep-15 18:00 Daily HVI Coating Work & Bay PM Work ATIL ATIL R

    57 220 Main Bus-I 21-Sep-1509:00 Hrs

    1-Oct-15 17:00 Hrs Continous Basis Replacement of 220 KV Main bus-I isolator

    58 400/220/33 315 MVA ICT-I 21-Sep-1509:00 Hrs

    23-Sep-15 17:00 Hrs Continous Basis Replacement of 220 KV Main bus-I isolator

    59 500 Chandrapur-Padghe HVDC Line Pole I 21-Sep-15 08:00 24-Sep-15 18:00 Daily Broken disc insulator replacement work. Hardware tightning, missing hardware replacement w MSETCL MSETCL

    60 400 Chandrapur-PARLI CKT. NO.- III bay 21-Sep-15 07:00 21-Sep-15 19:00 Cont For replacement of R & B-ph CVT's MSETCL MSETCL

    61 500KV 500KV Chandrapur-Padghe HVDC Line Pole I 21-Sep-15 08:00 24-Sep-15 18:00 Daily Broken disc insulator replacement work. Hardware tightning, missing hardware replacement w MSETCL MSETCL

    62 400KV 400KV CHD-PARLI CKT. NO.- III bay 21-Sep-15 07:00 21-Sep-15 19:00 Cont For replacement of R & B-ph CVT's MSETCL MSETCL

    63 400 400KV S/S ASHTA -315 MVA X-MER - II 21-Sep-15 09:00 21-Sep-15 17:00 daily POST MAINTENANCE WORK &TESTING WORK MPPTCL MPPTCL R

    64 400 400KV S/S NAGDA -315 MVA X-MER - I 21-Sep-15 08:00 21-Sep-15 17:00 daily POST MAINTENANCE WORK &TESTING WORK MPPTCL MPPTCL R

    65 400 400 KV S/S BINA - BHOPAL FEEDER BAY - I 21-Sep-15 09:00 21-Sep-15 17:00 daily POST MAINTENANCE & TESTING WORK. MPPTCL MPPTCL R

    66 400 400 KV S/S INDORE - ISP FEEDER BAY - I 21-Sep-15 08:00 21-Sep-15 17:00 daily POST MAINTENANCE & TESTING WORK. MPPTCL MPPTCL R

    67 400 400 KV S/S BHOPAL - BINA FEEDER BAY - I 21-Sep-15 09:00 21-Sep-15 17:00 daily POST MAINTENANCE & TESTING WORK. MPPTCL MPPTCL R

    68 400 400 KV S/S KATNI - BIRSINGPUR FEEDER BAY - II 21-Sep-15 08:00 21-Sep-15 17:00 daily POST MAINTENANCE & TESTING WORK. MPPTCL MPPTCL R

    69 400 400 kv RAJGARH (PGCIL )- NAGDACKT I 21-Sep-15 08:00 21-Sep-15 18:00 daily MAINTENANCE WORK PGCIL/MPPTCL WR - II R

    70

    220 Kawas - Vav Ckt.2 21-Sep-15 8:00 22-Sep-15 18:00 Daily

    Replacement of defective porcelain disc insulator strings with longrod polymer insulators in

    balanced line sections to avoid undesirable tripping of line PGCIL WR-II C

    71 400 Vindhyachal-Jabalpur # 1 21-Sep-15 10:00 21-Sep-15 13:00 Daily Replacement of Line CVT B Phase.at Jabalpur end PGCIL WR-II R

    72 400 Jabalpur#1 Tie Bay at Itars i 21-Sep-15 9:00 21-Sep-15 18:00 Daily For annual maintenace work PGCIL WR-II R

    73

    400 400KV SATNA- BINA#3 21-Sep-15 9:00 25-Sep-15 18:00 Conti.

    FOR RE-ORIENTATION OF CVT, LA, WAVE TRAP TO FACILITATE INTERCONNECTION OF

    1200/400KV INTERCONNECTOR AT BINA PGCIL WR-II C

  • SN KV Line From To Bas is Reason System Agency Type

    Outage Planning of Transmiss ion elements during the Duration 20.09.2015 to 19.10.2015

    75400 BINA-2 & 1200KV AT-1 TIE BAY at Bina 21-Sep-15 11:00 21-Sep-15 13:00 Daily Fro NTAMC operation of bay equipment PGCIL WR-II C

    76 400 1200KV AT-1 MAIN BAY at Bina 21-Sep-15 14:30 21-Sep-15 16:30 Daily Fro NTAMC operation of bay equipment PGCIL WR-II C

    77 400 BINA-1 MAIN BAY at Bina 21-Sep-15 16:30 21-Sep-15 18:30 Daily Fro NTAMC operation of bay equipment PGCIL WR-II C

    78400 Gandhar-2 Main Bay- 404 at Dehgam s/s 21-Sep-15 10:00 27-Sep-15 18:00 Conti. For complete overhauling and testing of the BHEL Make PGCIL WR-II R

    79400

    400KV Damoh-Katni#2 (MPPTCL) Tie bay ,402

    bay at Damoh s/s 21-Sep-15 9:00 21-Sep-15 14:00 Daily For annual maintenace work PGCIL WR-II R

    80

    400

    400KV Damoh-Birs inghpur#2 (PGCIL) Tie bay

    ,408 bay at Damoh s/s 21-Sep-15 14:00 21-Sep-15 18:00 Daily For annual maintenace work PGCIL WR-II R

    81765 1500MVA ICT # 2 at Jabalpur Pooling Station 21-Sep-15 9:00 21-Sep-15 18:00 Daily ICT Spare Phase Commissioning with ICT # 2 for Swapping. PGCIL WR-II C

    82 400 Magarwada - Kala Ckt#2 21-Sep-15 10:00 21-Sep-15 16:00 Daily Annual Maintenance of Associated bay at Magarwada GIS PGCIL WR-II R

    83765 Bus # I at Satna 21-Sep-15 9:00 22-Sep-15 18:00 Daily For annual maintenace work & Isolator & E/S Alignment work at Satna. PGCIL WR-II R

    84400 Vapi Kala Ckt I 21-Sep-15 9:00 21-Sep-15 17:00 Daily Rectification of shut down nature defects, A/R of Vapi-Kala # II will be in non-auto mode. PGCIL WR-II R

    85765 Gwalior-Bina#III Line 21-Sep-15 8:00 27-Sep-15 18:00 Daily Online permit for additional eathing work. A/R to be kept in Non auto mode PGCIL WR-II R

    86765 Gwalior- Satna#1 Main Bay (713) at Gwalior 21-Sep-15 10:00 22-Sep-15 18:00 Daily For annual maintenace work. PGCIL WR-II R

    87400 BUS at Indore MPPTCL SS 21-Sep-15 10:00 21-Sep-15 18:00 Daily For replacement of Hortizental fixed contact of Bus I isolator of indore-asoj ckt 1 MPPTCL WR-II C

    88 400 Bilaspur-ACBIL Line at Bilaspur S/S 21-Sep-15 08:00 21-Sep-15 17:00 Daily For AMP work WRTS-I WRTS-I-CG R

    89 765 S/C Bilaspur-Seoni-II 21-Sep-15 08:00 22-Sep-15 17:00 Continuous Fix ing of open Spacer Damper WRTS-I WRTS-I-CG R

    90765

    Jharsuguda(Sundergarh) -

    Korba(Dharamjaygarh) Ckt-I TL 21-Sep-15 08:00 22-Sep-15 18:00 Continuous SAS Works WRTS-I WRTS-I-CG C

    91 765 765kV Bus-I at Kotra PS 21-Sep-15 10:00 22-Sep-15 18:00 Daily AMP 2014-15 WRTS-I WRTS-I-CG R

    92 400 Raipur-Wardha-1&2 21-Sep-15 00:00 30-Sep-15 18:00 Daily A/R non auto mode for Additional Earthing work on lines. WRTS-I WRTS-I-CG

    93 765 Durg-Wardha-2 21-Sep-15 00:00 10-Oct-15 18:00 Daily A/R non auto mode for Additional Earthing work on lines. WRTS-I WRTS-I-CG

    94 765 ICT TIE Bay 802 at Durg Ps 21-Sep-15 09:00 21-Sep-15 13:00 Daily L/o out Relay NTAMC command checking POWERGRID WRTS-I-CG R

    95 765Padghe-2 Reactor with Main & Tie bays at

    Aurangabad22-Sep-15 09:00 23-Sep-15 18:00 Daily for connecting strung bus jumpers to Line Isolator & Bay AMP works WRTS-I WRTS-I R

    96 HVDC HVDC 1 tie bay (402 bay) at Bhadrawati 22-Sep-15 09:00 22-Sep-15 18:00 Daily Yearly Amp works WRTS-I WRTS-I R

    97 400 Bhadrawati-Chandrapur-2 22-Sep-15 07:00 22.9.15 18:00 Daily

    Replacement of Porcelain Insulators with Polymer in Power line/Railway & NH crossings for

    public saftey.Auto reclose shall be kept in Non auto mode for Bhadrawati-Chandrapur-1 line is

    required.

    WRTS-I WRTS-I C

    98 765 Durg PS -Wardha # 1 & 2 22-Sep-15 06:00 22-Sep-15 18:00 Daily For line reactification works WRTS-I WRTS-I C

    99 220 Bus # 2 at Pune (Talegoan) 22-Sep-15 09:30 22-Sep-15 17:00 Daily Fix ing of 202 Line Isolator dropper from Bus and for attending 204 89B Isolator c losing problem. WRTS-I WRTS-I R

    100 765 765/400kV ICT # 1 at Pune ( GIS) 22-Sep-15 09:00 22-Sep-15 17:00 Daily Spare ICT unit integration with ICT # 1 WRTS-I WRTS-I R

    101 220 220KV Osmanabad - Solapur(Bale) 22-Sep-15 08:00 22-Sep-15 18:00 Daily For Crossing of upcoming 765KV Solapur - Aurangnabd line MSETCL WRTS-I C

    102 400kV Sami - Dehgam Line-1 22-Sep-15 09:00 22-Sep-15 18:00 Daily Annual Maintenance of line equipment ATIL ATIL R

    103 400 Vadavi - Kansari - 2 22-Sep-15 08:00 22-Sep-15 18:00 Daily PMM work WRTGPL GETCO

    104 400 Main Bus I at 400 kV Akola 22-Sep-15 09:00 22-Sep-15 18:00 Daily Servic ing of 02 Nos Bus Earth switches by Agency M/s BIMCO Isolators, Hyderabad and other r MSETCL MSETCL

    105 500 HVDC Pole-2 of Chandrapur-Padghe line 22-Sep-15 08:00 23-Sep-15 19:00 Daily Broken Insulator replacement and OPGW wire stringing. MSETCL MSETCL

    106 400kV Main Bus I at 400 kV Akola 22-Sep-15 09:00 22-Sep-15 18:00 Daily Servic ing of 02 Nos Bus Earth switches by Agency M/s BIMCO Isolators, Hyderabad and other r MSETCL MSETCL

    107 500 KV 500 KV HVDC Pole-2 of Chandrapur-Padghe line 22-Sep-15 08:00 23-Sep-15 19:00 Daily Broken Insulator replacement and OPGW wire stringing. MSETCL MSETCL

    108 400 400KV S/S JULWANIYA -315 MVA X-MER - I 22-Sep-15 09:00 23-Sep-15 18:00 daily POST MAINTENANCE WORK &TESTING WORK MPPTCL MPPTCL R

    109 400 400KV S/S ASHTA - 50MVAR BUS REACTOR 22-Sep-15 09:00 22-Sep-15 17:00 daily POST MAINTENANCE WORK &TESTING WORK MPPTCL MPPTCL R

    110 400 400 KV S/S INDORE - ISP FEEDER BAY - II 22-Sep-15 08:00 22-Sep-15 17:00 daily POST MAINTENANCE & TESTING WORK. MPPTCL MPPTCL R

    111 400 400 kv RAJGARH (PGCIL )- NAGDACKT II 22-Sep-15 08:00 22-Sep-15 18:00 daily MAINTENANCE WORK PGCIL/MPPTCL WR - II R

    112 400 400 kv SEONI - BHILAI - CKT 22-Sep-15 09:00 22-Sep-15 18:00 daily MAINTENANCE WORK MPPTCL MPPTCL R

    113 220 220 KV MALANPUR - GWL( PG) CKT - I 22-Sep-15 09:00 22-Sep-15 17:00 daily MAINTENANCE WORK MPPTCL MPPTCL R

    114 220 220 KV DAMOH PG - SAGAR CKT 22-Sep-15 09:00 22-Sep-15 18:00 daily MAINTENANCE WORK MPPTCL MPPTCL R

    115

    400 Jabalpur-Itars i # 4 Line 22-Sep-15 10:00 22-Sep-15 18:00 Daily

    To replace all Itars i # 4 main bay equipment with existing 2000A rating to 3000 A at Jabalpur SS

    under Jabalpur Pooling extension work.. PGCIL WR-II C

  • SN KV Line From To Bas is Reason System Agency Type

    Outage Planning of Transmiss ion elements during the Duration 20.09.2015 to 19.10.2015

    117400 BINA-1 & 400/220KV ICT-1 TIE BAY at Bina 22-Sep-15 9:00 22-Sep-15 11:00 Daily Fro NTAMC operation of bay equipment PGCIL WR-II C

    118 400 400/220KV ICT-1 MAIN BAY 22-Sep-15 11:00 22-Sep-15 13:00 Daily Fro NTAMC operation of bay equipment PGCIL WR-II C

    119 400 SATNA-4 MAIN BAY at Bina 22-Sep-15 14:30 22-Sep-15 16:30 Daily Fro NTAMC operation of bay equipment PGCIL WR-II C

    120400 SATNA-4 & SHUJALPUR-2 TIE BAY at Bina 22-Sep-15 16:30 22-Sep-15 18:30 Daily Fro NTAMC operation of bay equipment PGCIL WR-II C

    121 220 220KV Bus-I at Damoh s/s 22-Sep-15 10:00 22-Sep-15 17:00 Daily For annual maintenace work PGCIL WR-II R

    122

    765

    765kV Dharmjaygarh # 1 Reactor Main & Tie Bay

    at Jabalpur Pooling Station 22-Sep-15 9:00 22-Sep-15 18:00 Conti.

    Jack Bus Jumpering with Line Isolators to enable the commissioning of 765kV JBP -

    Dharmjaygarh # 1 Transmission Line. PGCIL WR-II C

    123400 315MVA ICT 2 at Magarwada 22-Sep-15 9:00 22-Sep-15 17:00 Daily Annual Maintenance of ICT & Associated bay at Magarwada GIS PGCIL WR-II R

    124400 Vapi Kala Ckt 2 22-Sep-15 9:00 22-Sep-15 17:00 Daily Rectification of shut down nature defects, A/R of Vapi-Kala # I will be in non-auto mode. PGCIL WR-II R

    125 400 Indore-Asoj ckt#I 22-Sep-15 10:00 23-Sep-15 18:00 conti For retrofitting of distance relay at Indore MPPTCL SS PGCIL WR-II C

    126 400 Bhilai- Koradi line with LR 22-Sep-15 09:00 22-Sep-15 14:00 Daily For AMP Work WRTS-I WRTS-I-CG R

    127 765 Main Bay 803 of ICT # 1 at Durg PS 22-Sep-15 09:00 22-Sep-15 17:00 Daily For AMP (DCRM) POWERGRID WRTS-I-CG R

    128 765 765/400kv ICT-1 at Aurangabad 23-Sep-15 08:00 24-Sep-15 18:00 DailyCommossioning of OLTC, pending works, FFS works and normalisation of R-ph unit after

    repairs WRTS-I WRTS-I R

    129 400400kV Chandrapur-2 main bay (407 bay) at

    Bhadrawati23-Sep-15 09:00 23-Sep-15 18:00 Daily Yearly Amp works WRTS-I WRTS-I R

    130 400 Bhadrawati-Chandrapur-4 23-Sep-15 07:00 24-Sep-15 18:00 Daily

    Replacement of Porcelain Insulators with Polymer in Power line/Railway & NH crossings for

    public saftey.Auto reclose shall be kept in Non auto mode for Bhadrawati-Chandrapur-3 line is

    requied.

    WRTS-I WRTS-I C

    131 400409 Main Bay of Aurangabad Line # 1 at Pune

    (Talegoan)23-Sep-15 10:00 23-Sep-15 18:00 Daily AMP works at Pune (Talegoan) WRTS-I WRTS-I R

    132 765 765kV Solapur-Pune Line reactor at Pune ( GIS)23-Sep-15

    09:0023-Sep-15

    17:00 Daily Spare integration with line reactor WRTS-I WRTS-I R

    133 400 400kV Bus-1 at Solapur 23-Sep-15 09:00 24-Sep-15 18:00 Daily For Isolator Erection of 404 Bay & Bus stability test for commissioning of 400KV ICT-3 WRTS-I WRTS-I C

    134 765 Aurangbad # 1 Main 716 Bay at Wardha 23-Sep-15 09:00 23-Sep-15 18:00 Daily AMP work WRTS-I WRTS-I C

    135 220 Bhugaon - Pusad & Wardha Yeotmal D/C Line 23-Sep-15 08:00 23-Sep-15 19:00 DailyPower line crossing work of 765kV D/C Raipur - Wardha Tr. Line-2 ( Crossing span of 765kV

    line is between 127/0-127/1 & 220kV line tower nos. is 35&36) MSETCL MSETCL C

    136 400KV Mouda Wardha line-2 23-Sep-15 09:00 23-Sep-15 18:00 Continous replacement of isolator gear boxes NTPC NTPC

    137 400 Gandhar SWYD, DEHGAM-GPEC TIE CB 23-Sep-15 09:00 24-Sep-1518:00

    ContinousTie CB CT TAN DELTA Test( Remark:Power evacuation will not be effected)

    NTPC &PGCIL NTPC & PGCIL

    138 400kV Sami - Dehgam Line-2 23-Sep-15 09:00 23-0915 18:00 Daily Annual Maintenance of line equipment ATIL ATIL R

    139 400 Chandrapur-Dhariwal Ckt-I 23-Sep-15 10:00 23-Sep-15 18:00 Daily 408 Tie bay B-phase Isolator Cross Arm replacement work MSETCL MSETCL

    140 400 TBC-II bay at 400kv GCR Chandrapur 23-Sep-15 08:00 23-Sep-15 18:00 Cont For servic ing & O/H of B-ph PG-III Isolator. MSETCL MSETCL

    141 400 Chandrapur-Khaperkheda line 23-Sep-15 09:00 23-Sep-15 12:00 Daily Line Signature Test MSETCL MSETCL

    142 400 Chandrapur-Parli Ckt-III line 23-Sep-15 14:00 23-Sep-15 17:00 Daily Line Signature Test MSETCL MSETCL

    143 400 Main Bus II at 400 kV Akola 23-Sep-15 09:00 23-Sep-15 18:00 Daily Servic ing of 02 Nos Bus Earth switches by Agency M/s BIMCO Isolators, Hyderabad. C and Tan MSETCL MSETCL

    144 400kV Main Bus II at 400 kV Akola 23-Sep-15 09:00 23-Sep-15 18:00 Daily Servic ing of 02 Nos Bus Earth switches by Agency M/s BIMCO Isolators, Hyderabad. C and Tan MSETCL MSETCL

    145 400KV 400KV DIL Ckt-I 23-Sep-15 10:00 23-Sep-15 18:00 Daily 408 Tie bay B-phase Isolator Cross Arm replacement work MSETCL MSETCL

    146 400KV 400KV Chandrapur-Khaperkheda line 23-Sep-15 09:00 23-Sep-15 12:00 Daily Line Signature Test MSETCL MSETCL

    147 400KV 400KV Chandrapur-Parli Ckt-III line 23-Sep-15 14:00 23-Sep-15 17:00 Daily Line Signature Test MSETCL MSETCL

    148 400KV 400KV TBC-II bay 23-Sep-15 08:00 23-Sep-15 18:00 Cont For servic ing & O/H of B-ph PG-III Isolator. MSETCL MSETCL

    149 400 400KV S/S ASHTA - 400KV BUS CVT- I 23-Sep-15 09:00 23-Sep-15 17:00 daily POST MAINTENANCE WORK &TESTING WORK MPPTCL MPPTCL R

    150 400 400 KV S/S BINA - BHOPAL FEEDER BAY - II 23-Sep-15 09:00 23-Sep-15 17:00 daily POST MAINTENANCE & TESTING WORK. MPPTCL MPPTCL R

    151 400 400 KV S/S BHOPAL - BINA FEEDER BAY - II 23-Sep-15 09:00 23-Sep-15 17:00 daily POST MAINTENANCE & TESTING WORK. MPPTCL MPPTCL R

    152 220 220 KV MALANPUR - GWL( PG) CKT - II 23-Sep-15 09:00 23-Sep-15 17:00 daily MAINTENANCE WORK MPPTCL MPPTCL R

    153

    220 Kawas - Haldarwa Ckt.1 23-Sep-15 8:00 24-Sep-15 18:00 Daily

    Replacement of defective porcelain disc insulator strings with longrod polymer insulators in

    balanced line sections to avoid undesirable tripping of line PGCIL WR-II C

    154

    400 Jabalpur-Itars i # 4 Line 23-Sep-15 10:00 23-Sep-15 18:00 Daily

    To replace all Itars i # 4 main bay equipment with existing 2000A rating to 3000 A at Jabalpur SS

    under Jabalpur Pooling extension work.. PGCIL WR-II C

    155 400 Jabalpur#2 Tie Bay at Itars i 23-Sep-15 9:00 23-Sep-15 18:00 Daily For annual maintenace work PGCIL WR-II R

    156 400 407 BOISAR MAIN BAY at Vapi 23-Sep-15 9:00 24-Sep-15 17:30 Conti. AMP and Breaker Overhauling works of 407Bay PGCIL WR-II R

  • SN KV Line From To Bas is Reason System Agency Type

    Outage Planning of Transmiss ion elements during the Duration 20.09.2015 to 19.10.2015

    159400

    SATNA-1 & 63MVAR BUS REACTOR TIE BAY at

    Bina 23-Sep-15 14:30 23-Sep-15 16:30 Daily Fro NTAMC operation of bay equipment PGCIL WR-II C

    160400 63MVAR BUS REACTOR BAY at Bina 23-Sep-15 16:30 23-Sep-15 18:30 Daily Fro NTAMC operation of bay equipment PGCIL WR-II C

    161400 Mundra - Jetpur # 1 23-Sep-15 10:00 24-Sep-15 18:00 Daily

    To rectify opened/ missing spacer dampers. Ckt # 2 A/R to be kept in non auto mode during

    shutdown period for Ckt-1 PGCIL WR-II C

    162

    400

    400KV Damoh-Birs inghpur#2 (PGCIL) Main bay

    ,407 bay at Damoh s/s 23-Sep-15 9:00 23-Sep-15 14:00 Daily For annual maintenace work PGCIL WR-II R

    163400

    400KV Damoh-Katni#2 (MPPTCL) Main bay ,401

    bay at Damoh s/s 23-Sep-15 14:00 23-Sep-15 18:00 Daily For annual maintenace work PGCIL WR-II R

    164

    765

    765kV Dharmjaygarh # 2 Reactor Main & Tie Bay

    at Jabalpur Pooling Station 23-Sep-15 9:00 23-Sep-15 18:00 Conti.

    Jack Bus Jumpering with Line Isolators to enable the commissioning of 765kV JBP -

    Dharmjaygarh # 2 Transmission Line. PGCIL WR-II C

    165765 Bus # II at Satna 23-Sep-15 9:00 24-Sep-15 18:00 Daily For annual maintenace work & Isolator & E/S Alignment work at Satna. PGCIL WR-II R

    166400 Magarwada Kala Ckt 1 23-Sep-15 9:00 23-Sep-15 17:00 Daily Rectification of shut down nature defects, A/R of Magarwada-Kala # II will be in non-auto mode. PGCIL WR-II R

    167765

    Gwalior- Satna#1 & Gwl-Bina#2 Tie Bay (714) at

    Gwalior 23-Sep-15 10:00 24-Sep-15 18:00 Daily For annual maintenace work. PGCIL WR-II R

    168 400 ACBIL Tie Bay-414 at Bilaspur S/S 23-Sep-15 08:00 23-Sep-15 17:00 Daily For AMP work WRTS-I WRTS-I-CG R

    169 400 S/C Sipat-Korba 23-Sep-15 08:00 23-Sep-15 17:00 Daily Replacement of Broken Insulator WRTS-I WRTS-I-CG R

    170 765 765kV Bus-II at Kotra PS 23-Sep-15 10:00 24-Sep-15 18:00 Daily AMP 2014-15 WRTS-I WRTS-I-CG R

    171765

    Wardha-1 Main & Tie bays (815 & 814 bays) at

    Durg PS 23-Sep-15 09:00 23-Sep-15 13:00 Daily For NTAMC command (86A&B) checking POWERGRID WRTS-I-CG R

    172765

    Bus reactor Main & Tie bay (812 &811 bays) at

    Durg Ps 23-Sep-15 24-Sep-15 17:30 Daily For NTAMC (86A &B)command checking & AMP & CSD commssioning POWERGRID WRTS-I-CG R

    173 400400kV Chandrapur-1 main bay (406 bay) at

    Bhadrawati24-Sep-15 09:00 24-Sep-15 18:00 Daily Yearly Amp works WRTS-I WRTS-I R

    174 400 BUS # 2 at Pune (Talegoan) 24-Sep-15 09:00 24-Sep-15 18:00 Daily AMP works at Pune (Talegoan) MSTCL WRTS-I R

    175 765 Seoni- Khandwa-II Line reactor at Seoni 24-Sep-15 08:00 24-Sep-15 18:00 Daily AMP works at Seoni WRTS-II WRTS-I R

    176 400 Pune ( GIS)- Pune # 1 24-Sep-15 10:00 24-Sep-15 14:00 Daily Jumper tightening WRTS-I WRTS-I R

    177 400 400KV Girwali - Lonikhand II Ckt I & II 24-Sep-15 08:00 24-Sep-15 18:00 Daily For Crossing of upcoming 765KV Solapur - Aurangnabd line MSETCL WRTS-I C

    178 400 Mauda # 1 Main 434 Bay at Wardha 24-Sep-15 09:00 24-Sep-15 18:00 Daily AMP work WRTS-I WRTS-I R

    179 400KV Mouda 400kv Bus-2 24-Sep-15 09:00 25-Sep-15 18:00 Continous replacement of isolator gear boxes NTPC NTPC

    180 400kVBus Reactor and associate bay eqipments at Sami

    SS24-Sep-15 09:00 24-Sep-15 18:00 Daily Annual Maintenance of Bus Reactor & bay equipment ATIL ATIL R

    181 400kV HVDC Feeder-1 (10C06C) at Mundra HVDC 24-Sep-15 09:00 24-Sep-15 17:00 Daily 10C06C Isolator-Plant Side Connection tightening ATIL ATIL R

    182 400kV405 -Tie bay of ICT LV and Taptithanda Line-1 at

    Akola-II SS24-Sep-15 08:00 24-Sep-15 18:00 Daily Annual Maintenance of bays equipment MEGPTCL MEGPTCL R

    183 400 Chandrapur II - Parli Ckt-II line 24-Sep-15 09:00 24-Sep-15 12:00 Daily Line Signature Test MSETCL MSETCL

    184 500 HVDC Pole-1 of Chandrapur-Padghe line 24-Sep-15 08:00 25-Sep-15 19:00 Daily OPGW jointing and other hardware tightening work. MSETCL MSETCL

    185 400KV 400KV Chandrapur II - Parli Ckt-II line 24-Sep-15 09:00 24-Sep-15 12:00 Daily Line Signature Test MSETCL MSETCL

    186 500 KV 500 KV HVDC Pole-1 of Chandrapur-Padghe line 24-Sep-15 08:00 25-Sep-15 19:00 Daily OPGW jointing and other hardware tightening work. MSETCL MSETCL

    187 400 400KV S/S NAGDA -315 MVA X-MER - II 24-Sep-15 08:00 24-Sep-15 17:00 daily POST MAINTENANCE WORK &TESTING WORK MPPTCL MPPTCL R

    188 400 400KV S/S ASHTA - 400KV BUS CVT- II 24-Sep-15 09:00 24-Sep-15 13:00 daily POST MAINTENANCE WORK &TESTING WORK MPPTCL MPPTCL R

    189 220 220 KV MALANPUR - GWL( PG) CKT - I 24-Sep-15 09:00 24-Sep-15 17:00 daily MAINTENANCE WORK MPPTCL MPPTCL R

    190

    400 Jabalpur-Itars i # 4 Line 24-Sep-15 10:00 24-Sep-15 18:00 Daily

    To replace all Itars i # 4 main bay equipment with existing 2000A rating to 3000 A at Jabalpur SS

    under Jabalpur Pooling extension work.. PGCIL WR-II C

    191 400 Satpura Main Bay at Itars i 24-Sep-15 9:00 24-Sep-15 18:00 Daily For annual maintenace work PGCIL WR-II R

    192 400 SATNA-2 MAIN BAY at Bina 24-Sep-15 9:00 24-Sep-15 11:00 Daily Fro NTAMC operation of bay equipment PGCIL WR-II C

    193400 SATNA-2 AND BPSCL TIE BAY at Bina 24-Sep-15 11:00 24-Sep-15 13:00 Daily Fro NTAMC operation of bay equipment PGCIL WR-II C

    194 400 BPSCL MAIN BAY at Bina 24-Sep-15 14:30 24-Sep-15 16:30 Daily Fro NTAMC operation of bay equipment PGCIL WR-II C

    195 400 BINA-3 MAIN BAY at Bina 24-Sep-15 16:30 24-Sep-15 18:30 Daily Fro NTAMC operation of bay equipment PGCIL WR-II C

    196220

    400KV Damoh-Katni#1 (MPPTCL) Main bay ,404

    bay at Damoh s/s 24-Sep-15 10:00 24-Sep-15 14:00 Daily For annual maintenace work PGCIL WR-II R

    197400 400KV ICT#1 Main Bay,403 Bay at Damoh s/s 24-Sep-15 14:00 24-Sep-15 18:00 Daily For annual maintenace work PGCIL WR-II R

  • SN KV Line From To Bas is Reason System Agency Type

    Outage Planning of Transmiss ion elements during the Duration 20.09.2015 to 19.10.2015

    199400 Magarwada Kala Ckt 2 24-Sep-15 9:00 24-Sep-15 17:00 Daily Rectification of shut down nature defects, A/R of Magarwada-Kala # I will be in non-auto mode. PGCIL WR-II R

    200400 400kv Bus -II of 765/400KV at Indore SS 24-Sep-15 09:00 24-Sep-15 18:00 daily For extension of 400KV Bus #II for Khandawa-Indore bays at Indore SS PGCIL WR-II C

    201 400 Raipur- Wardha # 2 Main Bay 24-Sep-15 09:00 24-Sep-15 17:00 Daily For AMP Work WRTS-I WRTS-I-CG R

    202 400 400kv B/R & Chandrapur-2 tie (409) at Bhadrawati 25-Sep-15 09:00 25-Sep-15 18:00 Daily Yearly Amp works WRTS-I WRTS-I R

    203 400 Kolhapur-Mapusa # 1 & 2 25-Sep-15 06:00 27-Sep-15 18:00 Conti. Stringing of LIL