Page 2: scaffold 2015

• This presentation focuses on standards cited by OSHA in 2014 • Scaffold focus on standards cited at least ten times

Page 3: scaffold 2015

2015 Common OSHA Scaffolds

• Fabricated Frame Scaffold

• Pump Jack Scaffold• Ladder Jack Scaffold• Mobile Scaffold• Suspended scaffolds

• Aerial Lifts• Work Platforms

attached to forklifts

• Mast Scaffolds• Top Plate Scaffold• Cuplok Scaffold• Layher Scaffold

3

Page 4: scaffold 2015

Fabricated Frame

4

Page 5: scaffold 2015

Pump Jack Scaffold

5

Page 6: scaffold 2015

Ladder Jack Scaffold

6

Page 7: scaffold 2015

Mobile Scaffold

7

Page 8: scaffold 2015

Suspended Scaffold

Page 9: scaffold 2015

Aerial Lifts

Page 10: scaffold 2015

Mast Scaffolds

• Follow Manufacturer’s Instruction

Page 11: scaffold 2015

Top Plate Scaffold

11

Page 12: scaffold 2015

Cuplok Scaffold

Page 13: scaffold 2015

Layher Scaffold

Page 14: scaffold 2015

GENERAL REQUIREMENTS

• Capacity• Scaffold Platform Construction• Criteria For Supported Scaffolds• Criteria for Suspended Scaffolds• Access• Use• Fall Protection• Falling Object Protection • Training Requirements

Page 15: scaffold 2015

#1 Most Cited - Scaffold• 1926.451(g)(1) –

Fall Protection on Scaffolding

• Fall protection starts at 10 feet.

• Consider requiring fall protection on scaffolds over 4 feet since it is feasible.

No guardrails on the levels where the workers are working.

Page 16: scaffold 2015

#2 Most Cited - Scaffolds

• 1926.453(b)(2)(v) – Fall Protection in Aerial Lifts

• Users must receive training in the manufacturer’s instruction.

• http://www.ipaf.org/ has training material

• These aerial lifts must be operated on level surfaces.

• Consider requiring fall arrest in scissor lifts since so many fatalities. (see lower photo)

Worker above is not wearing fall arrest

Page 17: scaffold 2015

#3 Most Cited - Scaffolds

• 1926.451(e)(1) - Scaffold Access/Egress

• Many citations involve climbing on the cross bracing.

Worker will be exposed to fall to get to the scaffold.

Page 18: scaffold 2015

#4 Most Cited - Scaffolds

• 1926.451(b)(1) – Scaffold not Fully Planked each working level

Not fully planked, no guardrails, not fully cross braced.

Page 19: scaffold 2015

#5 Most Cited - Scaffolds

• 1926.454(a)• Scaffold Training

Page 20: scaffold 2015

#6 Most Cited - Scaffolds

• 1926.451(g)(1)(vii)• For all scaffolds not

otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, each employee shall be protected by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section.

Page 21: scaffold 2015

#7 Most Cited - Scaffolds

• 1926.451(c)(2)• Supported scaffold

poles, legs, posts, frames, and uprights shall bear on base plates and mud sills or other adequate firm foundation

Page 22: scaffold 2015

#8 Most Cited - Scaffolds

• 1926.451 (g)(1)(i)• Each employee on a

boatswains' chair, catenary scaffold, float scaffold, needle beam scaffold, or ladder jack scaffold shall be protected by a personal fall arrest system

Page 23: scaffold 2015

#9 Most Cited - Scaffolds

• 1926.451(f)(7)• Scaffolds shall be erected,

moved, dismantled, or altered only under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration.

Page 24: scaffold 2015

#10 Most Cited - Scaffolds

• 1926.451(f)(3)• Scaffolds and scaffold

components shall be inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity.

Page 25: scaffold 2015

Capacity

• Each scaffold platform and walkway shall be at least 18 inches

• Ladderjack, pump jack 12 inches

1926.451(b)(2)

Page 26: scaffold 2015

Capacity

• Each end shall extend over the centerline of its support at least 6 inches or cleated

1926.451(b)(4)

Page 27: scaffold 2015

Capacity

• Each end of a platform 10 feet or less in length shall not extend over its support more than 12 inches

1926.451(b)(5)

Page 28: scaffold 2015

Capacity

• Overlap shall occur only over supports, and shall not be less than 12 inches unless the platforms are nailed together or otherwise restrained to prevent movement.

1926.451(b)(7)

Page 29: scaffold 2015

Capacity

• Scaffold components manufactured by different manufacturers shall not be intermixed

1926.451(b)(10)

Page 30: scaffold 2015

Supported Scaffold

• Unstable objects shall not be used to support scaffolds or platform units.

1926.451(c)(2)(ii)

Page 31: scaffold 2015

Supported Scaffold

• Front-end loaders and similar pieces of equipment shall not be used to support scaffold platforms

1926.451(c)(2)(iv)

Page 32: scaffold 2015

Supported Scaffold

• Fork-lifts shall not be used to support scaffold platforms

1926.451(c)(2)(v)

Page 33: scaffold 2015

Supported Scaffold

• Supported scaffold poles, legs, posts, frames, and uprights shall be plumb and braced to prevent swaying and displacement

1926.451(c)(3)

Page 34: scaffold 2015

Suspended Scaffold

• Under 10 citatioons

1926.451(d)

Page 35: scaffold 2015

Access

• Ramps and walkways 6 feet or more above lower levels shall have guardrail

1926.451(e)(5)(i)

Page 36: scaffold 2015

Access

• Integral prefabricated scaffold access frames shall be specifically designed and constructed for use as ladder rungs

• 3/14/2002 Interp “ However, it does not provide a minimum rung length of 8 inches on many others. ”

1926.451(e)(6)(i)

Page 37: scaffold 2015

Use

• Insulated lines safe distance

• 3 feet less than 300 volts

• 10 feet up to 50,000 volts

1926.451(f)(6)

Page 38: scaffold 2015

Use

• Makeshift devices, such as but not limited to boxes and barrels, shall not be used on top of scaffold platform

1926.451(f)(14)

Page 39: scaffold 2015

Use

• Ladders shall not be used on scaffolds to increase the working level height of employee

1926.451(f)(15)

Page 40: scaffold 2015

Use

• Each employee on a boatswains' chair, catenary scaffold, float scaffold, needle beam scaffold, or ladder jack scaffold shall be protected by a personal fall arrest system

1926.451(g)(1)(i)

Page 41: scaffold 2015

Use

• When midrails are used, they shall be installed at a height approximately midway between the top edge of the guardrail system and the platform surface

1926.451(g)(4)(iv)

Page 42: scaffold 2015

Use

• Crossbracing is acceptable in place of a

• Midrail when the crossing point of two braces is between 20 inches and 30 inches

• Toprail when the crossing point of two braces is between 38 inches and 48 inches above the work platform.

1926.451(g)(4)(xv)

Page 43: scaffold 2015

Falling Object Protection

• In addition to wearing hardhats each employee on a scaffold shall be provided with additional protection from falling hand tools, debris, and other small objects

1926.451(h)(1)

12/2/1991 Interp - Employees are susceptible to impact-type head injuries while handling scaffolding material at head level, bending and leaning between scaffolding members and from slips and falls. Therefore, protective helmets are required

Page 44: scaffold 2015

Falling Object Protection

• The area below the scaffold to which objects can fall shall be barricaded, and employees shall not be permitted to enter the hazard area or

• Toeboard installed

1926.451(h)(2)(i)

Page 45: scaffold 2015

Frame Scaffold

• Frames and panels shall be braced by cross, horizontal, or diagonal braces

• What’s wrong here?

1926.451(h)(2)(i)

Page 46: scaffold 2015

Pump Jack Scaffold

• Poles shall be secured to the structure by rigid triangular bracing or equivalent at the bottom, top, and other points as necessary.

1926.452(j)(2)

Page 47: scaffold 2015

Ladderjack Scaffold

• Platforms shall not exceed a height of 20 feet

1926.452(k)(1)

Page 48: scaffold 2015

Mobile Scaffold

• Scaffolds shall be braced by cross, horizontal, or diagonal braces, or combination thereof, to prevent racking or collapse of the scaffold

1926.452(w)(1)

Page 49: scaffold 2015

Mobile Scaffold

• Scaffold casters and wheels shall be locked to prevent movement of the scaffold while the scaffold is used in a stationary manner.

1926.452(w)(2)

Page 50: scaffold 2015

Summary

• Competent person must know manufacturer’s manual

• ANSI A10.8 is the industry standard

• Mast scaffolds are several recent accidents