SBE ASSIGNMENT 2 Electrical services related assignment

Upload: zigma-builders

Post on 08-Jan-2017

18 views

Category:

Engineering


1 download

TRANSCRIPT

Page 1: Sbe assignment 2

SBE ASSIGNMENT 2Electrical services related assignment

Page 2: Sbe assignment 2

FROM WHERE?

• Only LT lines comes to f block along with solar connections.(we are not considering)

• The line comes from generator 1 (dc set 1) near swimming pool.

Page 3: Sbe assignment 2

2 LT PANELS ARE THERE

Page 4: Sbe assignment 2

• ON RIGHT LT PANEL(taking more load)• MCCB 250 AMP/240sqmm cable is

coming • It is divided into 7 • MCCB 100 AMP/70 sqmm• 7 section includes

• Basement• Gf• Ff• Sf• Tf• Ff• Ff(rics)

Page 5: Sbe assignment 2

• ON left LT PANEL(taking more load)• MCCB 250 AMP / 185 sqmm cable

is coming • It is divided into 6 • MCCB 100 AMP/ 70 sqmm• 6section includes

• Basement• Gf• Ff• Sf• Tf• Ff

Page 6: Sbe assignment 2

TO BUS BAR IN EACH FLOOR

Page 7: Sbe assignment 2

THEN TO MCB’S IN DIFFERENT PARTS

• Each class room is connected seperate