Say Goodbye to Paper: Using Autodesk® Revit® Structure in a Digital Shop Model Review ProcessJohann PalaciosCivil Structural Engineering Manager, Pelican Energy ConsultantsTwitter: @johannpalacios @allthingsVDC
Rawle D. SawhVDC Manager, Gilbane Building Company
#AU2013 #johannpalacios #allthingsVDC
This class covers the use of Autodesk Revit Structure software in a workflow designed to share the engineer’s model directly with a fabricator for downstream use. Being able to take models to the next level by using them in a digital review process is a natural step, and this class shows how paper-based shop drawing review can be minimized, if not altogether eliminated. We present a case study describing how a digital shop model approval process was used in lieu of the traditional paper shop drawing process along with the value experienced for the project. This class also touches on best practices and limitations and shows attendees how to create a checklist that enables a project to use models as part of the shop drawing review process.
Class Summary
#AU2013 #johannpalacios #allthingsVDC
At the end of this class, you will be able to:
Describe best practices for sharing models produced in Revit with downstream users
Prepare checklists that are critical to a streamlined shop model approval process.
Identify and describe the limitations of a digital shop model review process and how to address them.
Create a workflow using Autodesk Revit along with third-party communication programs.
Key Learning Objectives
#AU2013 #johannpalacios #allthingsVDC
103 pre-registered attendees coming from all over the world:
Metrics about this class…
#AU2013 #johannpalacios #allthingsVDC
Topics
1) Case Study on Dillard University Professional Sciences School (New Orleans, LA)
2) NY State Case Study
3) BMPs and Current Digital Practices
#AU2013 #johannpalacios #allthingsVDC
Dillard University Professional Schools & Sciences Building
- 3 story, ~130,000 sf, $40 million- Completed in January 2010- Composite steel framing with Nelson Studs- Vulcraft metal decking, roof joists and roof metal
decking- Efficient 31’ x 31’ bay spacing- Typical W12x65 interior columns (Perfect 12”
square)
Case Study: Dillard University PSSB
#AU2013 #johannpalacios #allthingsVDC
GC: Woodward Design+Build Structural Eng.: Woodward Engineering Group Fabricator: Gipson Steel, Inc. Steel Erector: Woodward Steel Group Architect: Sizeler Thompson Brown
Case Study: Dillard University PSSB
#AU2013 #johannpalacios #allthingsVDC
Delivery: Design-Build (Competition) Architect: AutoCAD Architecture MEP: AutoCAD Structural: RISA, Revit Structure 2009 Fabricator: Tekla
Case Study: Dillard University PSSB
#AU2013 #johannpalacios #allthingsVDC
To facilitate virtual shop model review:
To document and track:
Case Study: Dillard University PSSB
#AU2013 #johannpalacios #allthingsVDC
Case Study: Dillard University PSSBRevit Model
(EOR Deliverables)
RISA Model(Analysis)
Tekla Model(Fabricator Deliverable)
#AU2013 #johannpalacios #allthingsVDC
Review – Using GTM, weekly
Tracking – Using MS Onenote
Approvals – Using Tekla models
Case Study: Dillard University PSSB
#AU2013 #johannpalacios #allthingsVDC
- Instant understanding of the issue - Saved 6 weeks off of the schedule- No field changes due to design
review- Increases quality and value of the
process
Case Study: Dillard University PSSB
#AU2013 #johannpalacios #allthingsVDC
- Have a structural game plan that focuses on fabricator’s and steel erector’s practice
- Consider connections!- Involve the fabricator and steel erector
from the beginning of the design (design build model)
- Assign the task of coordination software versions to both the fabricator and the engineer as early as possible
Case Study: Dillard University PSSB
#AU2013 #johannpalacios #allthingsVDC
- Take into account the experience level of the team members
- Develop checklists!- Have a proactive mindset- Encourage managed risk
taking- Address culture if needed
Case Study: Dillard University PSSB
#AU2013 #johannpalacios #allthingsVDC
BIM relies upon collaboration Fast-Track Nowadays there isn’t a project in NYC that
isn’t fast-tracked Impossible to meet schedule constraints
without it Because we can…..to a certain
degree… depending upon where you are.
Why A Digital Shop Model Review Process?
#AU2013 #johannpalacios #allthingsVDC
1)Description of Project2)Team (Stakeholders)3)Software Utilized4)Workflow Process for
Digital Approval5)Lessons Learned
New York State Case Study
#AU2013 #johannpalacios #allthingsVDC
Located in Westchester County Scheduled Completion – May 2015 Approximately 45,000 SF, 6-story addition
including 4 state-of-the-art OR’s and approximately 30 new patient rooms.
Phase II of a 10-Year Master Plan, that once complete, will make this one of the largest Hospitals in Westchester County.
New York State Case Study
#AU2013 #johannpalacios #allthingsVDC
CM: Gilbane Building Company Structural Eng.: Gace Consulting Engineers Fabricator: Cives Steel Company Architect: Perkins Eastman
New York State Case Study
#AU2013 #johannpalacios #allthingsVDC
Delivery: Design-Bid-Build Contract Type: CM-at-Risk Architect: Revit 2013 MEP: Revit 2013 Structural: Revit 2013 Fabricator: Tekla
New York State Case Study
#AU2013 #johannpalacios #allthingsVDC
Case Study: NY State
Beginning of Construction
Shop Drawing Approval Process
Steel Due On Site
Mill Order Due
Cives Model & Shop Drawing Creation
Steel Fabrication (8-10 Weeks Typical in NYC Market)
Procurement, Leveling & Award
100% C&S CD’s Submitted
Beneficial Occupancy
Beginning of Construction
Shop Drawing Approval Process
Steel Due On Site
Mill Order Due
Cives Model & Shop Drawing Creation
Steel Fabrication (8-10 Weeks Typical in NYC Market)
Procurement, Leveling & Award
100% C&S CD’s Submitted
Original Schedule
Revised Schedule
Beneficial Occupancy20 Months of Construction
18 Months of Construction
#AU2013 #johannpalacios #allthingsVDC
Case Study: NY State
Beneficial Occupancy
Beginning of Construction
Shop Drawing Approval Process
Steel Due On Site
Mill Order Due
Cives Model & Shop Drawing Creation
Steel Fabrication (8-10 Weeks Typical in NYC Market)
Procurement, Leveling & Award
100% C&S CD’s Submitted Revised Schedule
#AU2013 #johannpalacios #allthingsVDC
Lessons Learned/Benefits- Adapt to Issues @ Hand- Could not completely eliminate shop drawing
submission b/c DOB requires stamped drawings showing erection plans, connection details achieve the design criteria defined in the basis of design and CD’s. i.e. It’s State Legislation
- Saved 4 weeks of Schedule
New York State Case Study
#AU2013 #johannpalacios #allthingsVDC
Johann Palacios, P.E.Civil Structural Engineering ManagerPelican Energy Consultants, LLC@[email protected]@pelicanenergy.com
Rawle SawhVDC ManagerGilbane Building [email protected]
Contact Us
Please remember to fill out your surveys!Class ID: SE3215
Autodesk is a registered trademark of Autodesk, Inc., and/or its subsidiaries and/or affiliates in the USA and/or other countries. All other brand names, product names, or trademarks belong to their respective holders. Autodesk reserves the right to alter product and services offerings, and specifications and pricing at any time without notice, and is not responsible for typographical or graphical errors that may appear in this document. © 2013 Autodesk, Inc. All rights reserved.