SAWPA Workplan April 2011
In early 2011, SAWPA upper management staff developed a Strategic Plan for SAWPA. On April
5, 2011, the SAWPA Board approved a new strategic plan vision, mission, values, and goals. The
vision, mission, and values are defined as follows.
Our Vision
SAWPA’s vision is a sustainable Santa Ana River Watershed that provides clean and reliable
water resources for a vibrant economy and high quality of life for all, while maintaining healthy
ecosystems and open space opportunities.
A successful SAWPA provides value to its member agencies and to the watershed as a whole by
facilitating collaboration across boundaries to address common goals and tackle problems that are
larger than any individual entity.
Our Mission
SAWPA strives to make the Santa Ana River Watershed sustainable through fact-based planning
and informed decision-making, regional and multijurisdictional coordination, and the innovative
development of policies, programs, and projects. Our mission is accomplished through a number
of specific functions:
INTRODUCTION AND BACKGROUND
2
Our Values
Our strategy and day-to-day operations are guided by values strongly held by our member
agencies, management, and staff:
Goals and Strategies
The Strategic Plan was then broken out into the following goals and strategies:
1. Achieve optimal use of local water supplies and reduce reliance on imported water
a. Advance and coordinate regional projects/programs to achieve OWOW goals for
desalination, water reuse, water use efficiency, groundwater recharge/conjunctive use
and stormwater capture and recharge.
b. Develop watershed-wide strategies and plans for desalination, water reuse, water use
efficiency, groundwater recharge/conjunctive use and stormwater capture and recharge.
c. Support and coordinate multi-agency initiatives that enhance the flexibility and
reliability of water supply systems.
2. Improve water quality
a. Administer and support regional approaches to conform to TMDLs and Basin Plan
requirements.
b. Coordinate watershed-wide monitoring program aimed at reducing compliance costs.
c. Develop strategy and market basis for water quality trading.
d. Promote establishing new stormwater quality standards and pathogen indicators to
allocate resources more efficiently.
e. Support Emerging Constituents (ECs) sampling program and explore public outreach
program for ECs and other constituents of public concern.
3
3. Achieve salt balance and ensure continued cost-effective and reliable operation of the
brine line
a. Support salinity management efforts and coordinate watershed-wide salt management
activities.
b. Investigate alternatives for conveying future brine flows and alternative discharge points,
including brine concentration.
c. Address brine line rehabilitation and relocation needs.
d. Market the brine line to maximize flows from industry and other users.
e. Develop solutions to minimize O&M costs of brine line due to solids formation and
scaling.
f. Revise financial strategies and ownership of capacity to eliminate idle capacity.
4. Balance water supply needs with natural habitat protection
a. Develop mechanism to provide mitigation opportunities for ongoing operational
activities and new construction projects in areas occupied by endangered or threatened
species, or in other sensitive areas.
b. Facilitate opportunities for regional management of species and habitat.
c. Support removal of invasive plant species by identifying and prioritizing target species,
and by securing funding for removal and habitat maintenance efforts.
d. Promote solutions to manage waterways to protect all beneficial uses, including
management of sediment and soft-bottom channels.
5. Build public understanding and support for watershed sustainability
a. Coordinate legislative and advocacy efforts on key watershed issues.
b. Develop consistent message in water issues for use by agencies in the watershed.
c. Publish information demonstrating the economic value to the watershed of sustainable
water resources practices and regional collaboration.
d. Establish a repository of information on water quality to assist agencies in analysis and
decision-making.
e. Help foster and brand a unique Santa Ana River Watershed identity.
6. Facilitate incorporation of water resources management in land use planning
a. Highlight to land-use agencies the interrelationship between land use planning and water
resources and provide information to support decision-making.
b. Promote regional approach to stormwater permit compliance that effectively integrates
water supply and integrated regional water management opportunities.
c. Coordinate with land use agencies to resolve issues and avoid disputes associated with
water management activities.
7. Be a resource for compliance with AB32 (greenhouse gas regulations) and reducing its
impact on member agencies
a. Coordinate the development of a climate action plan that addresses GHG mitigation and
adaptation to climate change providing compliance on a regional scale.
b. Identify opportunities for multi-agency cooperation in the development and
implementation of GHG mitigation and adaptation actions.
8. Secure external funding for the watershed to support accomplishing watershed goals
a. Leverage OWOW Plan and future updates to increase the clout of the region in securing
funding.
4
b. Influence state and federal legislation to increase funding for the region.
c. Explore new funding opportunities, such as private sector and foundations.
A framework for an Action Plan was then commenced. SAWPA department heads were asked
to identify lead departments for each strategy, time frames of completion over the next four
years, and estimated labor hours by department to complete each strategy. Labor hours to
operate the functions of SAWPA such as Administrative Services, Finance, and Executive
Management were not delineated, but were included based on support to other departments.
Current staffing also was reflected in the Action Plan with comparison charts to show existing
and projected work load necessary to complete the Strategic Plan. For some departments, the
charts reflect that additional staff would need to be hired to complete all the strategies defined.
The work tasks by lead SAWPA department to accomplish the Goals and Objectives or “Goals
and Strategies” as defined in the Strategic Plan Action Plan are shown in Appendix A.
Resources required in accomplishing the work tasks of the Strategic Plan are discussed next by
each Department.
The resources necessary to accomplish the work tasks by the deadlines defined will be
dependent on a number of factors. Each of the work tasks reflect a combined effort of Planning
staff, IT staff, Legal staff, Administrative Services staff, Finance staff, interns, and the General
Manager. Completion of each new work task prepared by each lead SAWPA department is
based on sufficient support resources from other departments. Insufficient support resources
from other departments may also jeopardize the completion of the tasks by the estimated
completion date defined.
Further, a basic assumption is made that other resources such as adequate and working computer
tools (hardware and software), office supplies, work area space, and tools are available and
functioning properly.
RESOURCES
WORK TASKS
5
Planning Department
Currently, the Planning Department consists of the following staff.
Existing Staff – 3 FTE and 2 interns
1 – Water Resources & Planning Manager
1 – Program Manager
1 – Senior Watershed Planner
2 – Interns (one intern is loaned to the Planning Department from the Finance Department)
Based on the SAWPA FYE 2012 and 2013 Budget completed prior to the SAWPA Strategic
Plan, an additional planning staff member was recommended based on a Strengths, Weaknesses,
Opportunities, Threats (SWOT) analysis conducted by the Planning Department in September
2010 as part of the CA Department of Conservation Watershed Coordinator grant application.
At that time, the SWOT analysis showed that an additional watershed planner position was
needed to assist the department in accomplishing the department goals and objectives
particularly in light of additional work to be undertaken involving the DWR Proposition 84
planning grant and U.S. Bureau of Reclamation Basins Studies Program to both support
OWOW Plan 2.0. The department has been at its historical core level of three full-time
employees for over 25 years. Need exists to expand staffing resources to support the
department goals prior to the addition of the additional work tasks associated with the SAWPA
Strategic Plan.
As a strategy, the Planning Department had proposed under the FYE 2012 SAWPA Budget that
based on a need by the SAWPA Engineering and Operations Department for a part-time
administrator for the new State Proposition 84 IRWM Implementation projects, a new full-time
employee (FTE) could be hired with this person’s hours shared between Proposition 84 grant
administration and the balance of the new staff member labor hours being devoted to Planning
Department goals and objectives accomplishment. It was anticipated that a ½ FTE in FY 2011-
12 and ¾ FTE in FY 2012-13 may be available for planning functions. Additionally, the
Planning Department proposed to continue to rely on two temporary planning interns to support
the department primarily in Roundtable and OWOW Plan update activities envisioned for FYE
2012 and 2013.
2
6
In evaluation of the work load to complete the SAWPA Strategic Plan, an independent
evaluation of work load and staffing resources by SAWPA department was prepared by
Salvador Lopez under contract with SAWPA. His evaluation reflects the following workload
charts by department. Based on early estimates, the Planning Department would need an
additional two to three full-time staff to complete the Strategic Plan.
The Planning and Engineering departments are most affected by the new workload
2
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
Q4
20
11
Q1
20
12
Q2
20
12
Q3
20
12
Q4
20
12
Q1
20
13
Q2
20
13
Q3
20
13
Q4
20
13
Q1
20
14
Q2
20
14
Q3
20
14
Q4
20
14
Q1
20
15
Q2
20
15
Q3
20
15
Q4
20
15
FTE
s
Average workload in FTE Current staff
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
Q4
20
11
Q1
20
12
Q2
20
12
Q3
20
12
Q4
20
12
Q1
20
13
Q2
20
13
Q3
20
13
Q4
20
13
Q1
20
14
Q2
20
14
Q3
20
14
Q4
20
14
Q1
20
15
Q2
20
15
Q3
20
15
Q4
20
15
FTE
s
Average workload Current staff
0.0
0.5
1.0
1.5
2.0
2.5
3.0
Q4
20
11
Q1
20
12
Q2
20
12
Q3
20
12
Q4
20
12
Q1
20
13
Q2
20
13
Q3
20
13
Q4
20
13
Q1
20
14
Q2
20
14
Q3
20
14
Q4
20
14
Q1
20
15
Q2
20
15
Q3
20
15
Q4
20
15
FTE
s
Average workload Current staff
PLANNING ENGINEERING
LEGAL IT
2.9
3.0
3.1
3.2
3.3
3.4
3.5
3.6
3.7
Q4
20
11
Q1
20
12
Q2
20
12
Q3
20
12
Q4
20
12
Q1
20
13
Q2
20
13
Q3
20
13
Q4
20
13
Q1
20
14
Q2
20
14
Q3
20
14
Q4
20
14
Q1
20
15
Q2
20
15
Q3
20
15
Q4
20
15
FTE
s
Average workload Current staff
In review of the workload, one of the Planning Department employees was defined as focusing
on Public Affairs. Later, Mr. Lopez conducted an additional analysis and charts showing the
Planning Department workload redistributed throughout the Strategic Plan time horizon and
separating the Public Affairs position out from the Planning Department and creating a separate
Public Affairs Department.
7
A new “Public Affairs” Department could be spun off the Planning Department
3
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
Q4
2011
Q1
2012
Q2
2012
Q3
2012
Q4
2012
Q1
2013
Q2
2013
Q3
2013
Q4
2013
Q1
2014
Q2
2014
Q3
2014
Q4
2014
Q1
2015
Q2
2015
Q3
2015
Q4
2015
FTEs
Average workload Current staff
PLANNING
PLANNING
PUBLIC AFFAIRS
0.0
2.0
4.0
6.0
8.0
Q4
2011
Q1
2012
Q2
2012
Q3
2012
Q4
2012
Q1
2013
Q2
2013
Q3
2013
Q4
2013
Q1
2014
Q2
2014
Q3
2014
Q4
2014
Q1
2015
Q2
2015
Q3
2015
Q4
2015
FTEs
Average workload in FTE
Current staff (including 0.5 FTE from interns)
0.0
0.5
1.0
1.5
2.0
2.5
3.0
Q4
2011
Q1
2012
Q2
2012
Q3
2012
Q4
2012
Q1
2013
Q2
2013
Q3
2013
Q4
2013
Q1
2014
Q2
2014
Q3
2014
Q4
2014
Q1
2015
Q2
2015
Q3
2015
Q4
2015
FTEs
Average workload Proposed staff
These charts reflect that even with the addition of a separate staff person dedicated to Public
Affairs, the Planning Department would still need approximately one extra staff person to
complete the Strategic Plan.
Engineering and Operations Department
The resources necessary to accomplish the work tasks by the deadlines defined will be
dependent on a number of factors. Near-term tasks (through 2013) are generally defined and the
level of effort estimated. Some longer-term activities running through 2015, such as project
implementation tasks, are less defined since the project details are not known. Assumptions
have been made about the scope of work/level of effort for these tasks.
In evaluation of the work load to complete the SAWPA Strategic Plan, an independent
evaluation of work load and staffing resources by SAWPA department was prepared by
Salvador Lopez under contract with SAWPA. For the Engineering and Operations Department,
the need for one additional FTE over the next two years to accomplish defined tasks was
identified.
8
Currently, the Engineering and Operations Department contains the following staff.
Existing Staff – 5 FTE and 1 Paid Intern
1 – Executive Manager of Engineering and Operations
1 – Program Manager
1 – Project Manager
1 – Operations Superintendent
1 – Assistant Operations Superintendent
1 – Intern
The additional staff person would allow for the development of an Inland Empire Brine Line
Business Plan including a capacity management plan, further work on alternate disposal
alternatives such as the Salton Sea and management of the State Proposition 84 IRWM
Implementation projects. The Proposition 84 management is funded through FY 2015.
In October 2011, SAWPA department heads were asked to provide a list of work performance
efficiencies that could be implemented to address additional tasks of the Strategic Plan without
additional labor hours. The Engineering and Operations Department has already been
implementing several initiatives (Brine Line permitting and capacity management “red teams”,
marketing, multi-year contracting) and identified the top three new initiatives to further improve
efficiency (contracting for two years with an optional third year, utilizing additional
Administrative Services staff to manage activities, and expand the use of GIS-based tools to
store facility data and track/perform system maintenance. These organizational efficiencies are
expected to free up about 10-15% of the Department’s workload but still well short of the
additional time needed to make-up for another full-time staff member.
9
Information Systems and Technology (IT)
Currently, the IT Department consists of the following staff.
Existing Staff – 3 FTE and 1 Intern
1 – Information Systems and Technology Manager
1 – GIS Project Manager
1 – Systems Analyst
1 – Intern (GIS)
Legal
Legal resources within SAWPA consist of one FTE, the Executive Counsel. Outside counsel
are retained for litigation matters.
Existing Staff – 1 Executive Counsel
The concept of bringing legal services in house in 2010 was intended, among other things, to be
an efficiency measure, in that the Executive Counsel is expected to perform general counsel
services in less time than one FTE, and add other services to the SAWPA team, as well. For
example, the Executive Counsel is currently also serving as project manager for one planning
project, the Stormwater Quality Standards Task Force, is assisting with certain tasks in the
SAWPA
Commission
General Manager
Celeste Cantú
Executive Counsel
Larry McKenney
10
OWOW 2.0 Plan, and is assisting with legislative and policy advocacy and public information
issues.
Predicting legal staff is difficult, particularly because of uncertainty about the workload that will
be associated with general counsel tasks, as discussed below. A projection of workloads done in
conjunction with the Strategic Plan process showed a peak of nearly two FTEs in 2012,
dropping to just below one FTE by 2014. This trend is associated mainly with the Strategic
Plan tasks and the completion of the Stormwater Quality Standards Task Force. Implementation
planning must identify the efficiencies and the flexibility that will allow this workload to be
evened out over a period of four years while still meeting timelines that are externally driven.
Administrative Services
Currently, the Administrative Services Department consists of the following staff.
Existing Staff – 5 FTE
1 – Administrative Services Manager/Clerk of the Board
2 – Senior Administrative Assistant (Contracts Administration; Engineering and Operations)
1 – Administrative Assistant II (Planning/Legal)
1 – Administrative Assistant I (Receptionist/Information Services)
In the event staffing is increased by two or more in any of the other departments, with the
exception of the Finance Department, an additional Administrative Services support person may
be needed.
11
Finance Department
Currently, the Finance Department consists of the following staff.
Existing Staff – 3 FTE
1 – Chief Financial Officer
2 – Senior Accounting Technicians
1 – Intern
Given the requirements of the Strategic Plans projected work load, the Finance Department has
sufficient resources for completion of the tasks by the estimated completion dates as defined in
the plan.
12
Planning
To address the completion of the new SAWPA Strategic Plan by FYE 2015, a goal was
established to seek to complete the strategic plan as much as possible with the existing staff.
For the Planning Department, an internal evaluation was conducted to determine how much of
the new SAWPA Strategic Plan could be accomplished by completion of the OWOW Plan 2.0
currently budgeted to be completed over the next two years. Each of the Strategic Plan goals and
strategies were compared with tasks defined under the OWOW Plan 2.0 scope. Based on this
comparison, the following facts were determined:
The OWOW Plan is funded in a large part by outside grant funding to SAWPA from a
California Department of Water Resources Proposition 84 Planning grant and to some degree by
federal funding from the U. S. Bureau of Reclamation.
The remaining 65% of the new SAWPA Strategic Plan will need to be accomplished using
available resources and consulting services. Source of funding for the staff or consulting support
is also a major concern. As indicated previously, even with the implementation of proposed
work performance efficiencies, additional staff or consulting services are necessary to make up
for the three additional staff recommended by the SAWPA consultant, Salvador Lopez, to
complete the Strategic Plan. This is considered the primary constraint to effectively
accomplishing the plan by FYE 2015.
Engineering and Operations
To address the completion of the new SAWPA Strategic Plan by FYE 2015, a goal was
established to complete the strategic plan as much as possible using the budgeted staff positions.
Based on the immediate necessity for the grant administrator position, a new part-time or FTE
shared position with the Planning Department is advised which cannot be addressed through
efficiencies of just this department. However, the consultant's recommendation to add another
FTE to support the Engineering and Operations Department may need to be addressed in other
ways. The additional workload can be accomplished by the following three actions:
CONSTRAINTS
13
1. Implement efficiencies;
2. Utilize Administrative Services Department staff to implement/manage simple E&O tasks
(cross-training of staff); and
3. Defer other Inland Empire Brine Line activities that are of a lower priority (shift task
priorities).
Information Systems and Technology (IT)
To address the completion of the new SAWPA Strategic Plan by FYE 2015, a goal was
established to seek to complete the strategic plan as much as possible with the existing staff.
IT currently is staffed by three full-time positions and one intern, along with several IT
consultants manage the technology infrastructure of SAWPA. Many of these technologies will
provide support to the goals laid out in the Strategic Plan. Web presence technology including
social media, Geographical Information Systems (GIS), and advanced communication
capabilities will directly support the Plan.
Several proposed solutions have a direct impact on the IT Department on whether we have the
staff resources to help provide support for the plan. Solutions such as adding a project manager
to the staff would free up our GIS Project Manager, who currently manages the Proposition 84
project, to focus on delivering GIS functionality to the Plan. Other Strategies such as
streamlining efficiencies have a large impact on IT staff time since most of these efficiencies are
based on technology that has yet to be implemented. This was not included in the Strategic Plan
hours and has yet to be prioritized. The prioritization determines when the impact to IT staff
occurs.
In order to cover short-term resource deficiencies, the IT Department would either outsource the
work to consultants or bring in project based interns. Either of these solutions does not
completely eliminate the work load from the IT Department since both the consultant and the
intern must be managed.
Legal
To achieve SAWPA’s goal of achieving efficiency by bringing Legal Counsel in-house, it is
essential that legal services and the other tasks with which counsel is involved be performed as
efficiently as possible. One significant challenge is that the work associated with general
counsel is often reactive to circumstances or to the actions of others and is difficult to manage.
For example, the current pace of SAWPA’s activity in maintenance and repair of the Inland
Empire Brine Line naturally creates numerous legal issues, but then other requirements are
added by extreme weather, line breaks, spills, disputes with bidders or contractors, and litigation
and potential litigation.
When general counsel services are provided by a retained firm, the firm offers efficiencies
(library costs spread over multiple clients; the ability to tap into the experiences of a number of
attorneys) and flexibility (several attorneys can be active during a busy period, and then work
for other clients at other times). SAWPA’s in-house counsel must identify other ways of
achieving similar efficiencies in order to ensure that enough time is available to complete the
tasks identified in the Strategic Plan.
14
Funds have been budgeted for outside counsel for certain legal tasks, particularly litigation.
However, it is not envisioned that significant additional funds will be used to achieve the
Strategic Plan tasks for which legal staff is the lead. SAWPA does have relationships with
consultants and partners that relate to the Strategic Plan tasks for which legal staff is the lead,
and these relationships will need to be used effectively.
Administrative Services
The Administrative Services Department’s additional workload in support of the strategic plan
initiatives/tasks will be highly prioritized and weaved into our ongoing daily activities. Working
with the department heads and project managers, we will implement as many of the streamlining
efficiencies as possible and appropriate.
Finance
The Finance Department’s additional workload in support of the strategic plan initiatives/tasks
will be highly prioritized and weaved into our ongoing daily activities. Working with the
department heads and project managers, we will implement as many of the streamlining
efficiencies as possible and appropriate.
15
To deal with the previously defined constraints, a series of solutions are proposed that will allow
the new SAWPA Strategic Plan to conceivably be accomplished within its defined time period.
Labor
1. Add new FTE employee as originally planned and budgeted. Under the existing FYE
2012 and 2013 SAWPA budgets, a new project manager position is defined to support the
Proposition 84 IRWM Implementation grant administration. This position is essential to
serve as the key staff contact at SAWPA to work with DWR staff in ensuring contract
compliance and appropriate deliverables. Funding for this grant administration is available
under the Round 1 Proposition 84 Implementation grant in the amount of $666,000. It was
anticipated that the grant administration would be applied over the construction term of the
13 projects defined under Proposition 84, Round 1, approximately four to five years. It is
anticipated that if the new job position was filled with a project manager/planner, perhaps this
position could take on the dual role of both grant administration, as well as planning
functions. It is recognized that grant administration for the Proposition 84 Implementation
funding could not be legally applied to non-grant administration functions. However, there
are some SAWPA Strategic Plan strategies that may be considered as important tools that
could potentially enhance the efficiency and streamlining of the grant administrative
functions of the overall Proposition 84 IRWM grant administration. Further, for tasks that are
not related to Proposition 84 IRWM grant administration, sufficient funding under
Proposition 84 Planning grant exists that could be applied to this new position that address
OWOW Plan 2.0 tasks that are also covered in total or in part by the new SAWPA Strategic
Plan. The only downside to this approach is that the Proposition 84 Planning grant funds to
support the planning functions of the position would only be available for the first two years
and not the four to five years of the implementation grant administration. This solution
consequently may not be sustainable.
If the constraint of insufficient funding for the new position beyond the next two years is a
barrier to moving forward with the hiring of the new project manager/planner position, it is
recommended that a part-time grant administrator be hired as soon as possible to serve as the
main DWR contact for the Proposition 84 IRWM Implementation grant administration. This
position would be somewhat similar to the previous Proposition 50 temporary grant
administrator hire with the exception that some project site inspection and verification
experience would be helpful based on our recent experience with administering Proposition
50.
2. Consulting Services. In addition to staff resources, outside consulting support should be
considered as an important supplement to accomplish the new SAWPA Strategic Plan. The
value of using consulting services is that there may be Strategic Plan work tasks that are more
specialized in nature or may be beyond the skill set of the SAWPA staff which can be more
efficiently and effectively accomplished by consultants. An example of this is in the
development of Information Technology tools planned as part of the OWOW Plan 2.0 where
an experienced Flex programming consultant could be brought in to support certain task
functions. In this way, staff resources are better devoted to tasks that they can perform more
efficiently without having to invest valuable labor time on a steep learning curve. This
SOLUTIONS
16
approach will be particularly valuable for specific OWOW planned tasks in developing water
quality outreach tools, watershed assessment/report card, GIS performance tracking tool on
IRWM implementation projects, and website design, many of which are related to goals
defined in the Strategic Plan. Further, consulting support has been budgeted and is expected
in FYE 2012 and 2013 for the detailed feasibility analysis expected for the 5-10 system-wide
project/programs that arise from the Master Craftsmen concept paper.
The use of consulting support to supplement staff for the remaining tasks of the Strategic Plan
that are not covered by OWOW also can occur and is encouraged. The biggest challenge is
managing, organizing, and taking advantage of synergies for FYE 2014 and 2015. Funding
sources other than what is provided by the SAWPA member agencies has not been identified.
Staff anticipates taking full advantage of every opportunity to pursue outside grant opportunities
to help support staff and consulting needs. If successful, resources to complete Strategic Plan
by FYE 2012 could occur.
3. Training for Efficiencies. Computer, facilitation skills, understanding member agencies’
planning functions/operations, work performance skills, and business process
improvement.
4. Hiring Additional Student Interns, Unpaid or Paid w/o Benefits. The use of student
interns could help support existing staff with the accomplishment of many of the SAWPA
strategic plan goals and free up higher level planning staff from more routine and basic
planning functions. SAWPA’s past history with student interns has generally been very
positive with internships being extended to high performing students. Currently, SAWPA
uses student interns in most departments under a paid, low wage, non-benefit status. Hiring
unpaid students may produce positive results to extend available resources, however, legal
restrictions apply to the use of unpaid student interns under the Fair Labor Standards Act.
Due to the minimal funding impact, if additional student interns are hired, staff recommends
that they be added under a paid status to avoid potential legal and auditing concerns. At the
same time, SAWPA should be alert to opportunities to use unpaid student interns when a
specific task of the agency aligns with a student’s significant academic project, such as a
graduate thesis. The development of new analytical tools, new applications of emerging
technology (e.g. social networking), or innovative scientific investigations could be primarily
academic activities that might also benefit SAWPA, while SAWPA enhances the educational
experience by serving as a laboratory for new ideas. Securing adequate work spaces for
additional interns may be a concern but may possibly be addressed through “double bunking”
of work stations.
5. Cross-training of Staff. The training of staff among departments could enhance efficiency
and fill in temporary gaps between non-regular workloads and available resources. For
example, if labor shortfall arises in one department, the employee or intern from another
department can be temporarily lent to the other department for use on a temporary basis.
6. Utilizing Member Agencies’ Staffs. Member agencies’ staffs might augment SAWPA
resources by working on specific tasks in the Strategic Plan. This approach is only suitable if
an employee could be temporarily assigned to SAWPA and actually works for SAWPA for a
period of time necessary to achieve the indentified tasks. The concern is that a less structured
approach would create management challenges that would erode the efficiency to be gained.
17
Work Performance
7. Streamlining Efficiencies. In October 2011, SAWPA department heads were asked to
provide a list of work performance efficiencies that could be implemented to address
additional tasks of the Strategic Plan without additional labor hours. The Planning
Department prepared a list of 15 work performance efficiency measures. Other departments
also submitted at least three work performance efficiency measures. This overall list was
prioritized and evaluated by SAWPA department managers and the General Manager and is
shown as Appendix B.
These organizational efficiencies are expected to impact the IT Department and those hours are
not reflected on the workload charts. These organizational efficiencies are expected to free up
only about 10-15% of the Department’s workloads but still well short of the higher percentage
needed to make-up for additional full-time staff as recommended by the Strategic Plan
consultant.
8. Shift or Defer Tasks Priorities. By shifting or deferring some of the lower priority tasks or
tasks that are less defined into later years of the strategic plan horizon, workloads and
funding for projects can be better matched. The priority of the Strategic Plan goals, for this
purpose, has been established by the General Manager (*) as follows:
*
Strategic Plan
Goal Number / Goal
Weighting
Priorities
1 6) Facilitate incorporation of water resources management in land use planning 25%
2 7) Be a resource for compliance with AB32 (greenhouse gas regulations) and
reducing its impact on member agencies
18%
3 3) Achieve salt balance and ensure continued cost-effective and reliable
operation of the brine line
14%
4 9) Build public understanding and support for watershed sustainability 14%
5 8) Secure external funding for the watershed to support accomplishing watershed
goals
14%
6 4) Balance water supply needs with natural habitat protection 7%
7 1) Achieve optimal use of local water supplies and reduce reliance on imported
water
4%
8 2) Improve water quality 4%
18
To fully address the implications of the workplan for the strategic plan to the organization, an
additional study is recommended to evaluate the financial impact of the Strategic Plan workplan
activities. Some of the strategic plan goals and work tasks associated with them have an outside
source of funding while others do not. The overall impact on SAWPA for the next five years
could be significant if some workplan tasks with no funding are prioritized over workplan tasks
with outside funding. A separate study is recommended to evaluate this in the near future.
In summary, every effort will be made to assure that the Strategic Plan priority goals are
addressed with ongoing responsibilities. However, details of future staff resources for FYE 2014
and 2015 have not been defined and with the completion of the OWOW Plan 2.0 by 2013,
existing staff resources will be more readily available to apply to the remaining Strategic Plan
tasks.
Again, one of the primary constraints to this approach is that source of funding to implement
some of these additional tasks has not been clearly defined.
Appendix A – Work Tasks
Appendix B - Streamlining Efficiencies
Appendix C – SAWPA Organizational Chart
ADDITIONAL STUDY
APPENDICES
SUMMARY
19
20
APPENDIX A – WORK TASKS
21
Planning
1) Hire budgeted Proposition 84 IRWM administrator/planner position as soon as possible to
improve work performance and efficiency for all.
2) Develop in-house training and expertise for conflict management and resolution to decrease high-
priced consultant use. Utilize available grant funding to support consultant contracts for necessary
expertise that cannot be as efficiently done in-house e.g. flex design experts for IT needs,
watershed assessment/report card, system-wide project/program feasibility studies for OWOW
Plan 2.0 etc.
3) Consultant contracts for necessary expertise that cannot be as efficiently done in-house e.g. flex
design experts for IT needs, watershed assessment/report card, system-wide project/program
feasibility studies for OWOW Plan 2.0 etc.
Engineering and Operations
4) For recurring work, extend duration of service contracts to at least 2 years with option for 3rd
year. Reduces staff time to complete RFQ process. Current contracts are 1 to 2 years in duration.
5) Use GIS tools to store Brine Line data, create work orders, schedule recurring work, and track
problem areas. This effort is being coordinated with WMWD new CMMS system.
6) Use one Admin staff as a part-time PM to administer RFQ process in spring 2012 and
administer/manage simple projects for completion.
Information Systems and Technology
7) Use “Dropbox” instead of FTP for file transfer. Dropbox integrates the desktop, I Pad and mobile
(Androids only) when file sharing. The only limit is that each user or client must sign up for an
account. The account is free
8) Use “Touchdown” app on Droid phones to integrate tasks on Outlook and Droids. This app
integrates the Droid and Outlook.
9) Integrate GIS and OnBase documents. This will allow documents to be associated spatially.
10) Be able to check out notebooks and projectors through Outlook. This will allow us to track who
has what.
11) Connect event calendar to meeting rooms. Currently, we have to make sure we make an
appointment in two places so that the events calendar and the meeting room calendars sync.
APPENDIX B – STREAMLINING EFFICIENCIES
22
Legal
12) All outside legal tasks to have an associated budget agreed upon by outside counsel. Look for
opportunities for lump sum task-based payment. One way to ensure efficiency is to control costs,
relative to the ends to be achieved. For all matters for which outside counsel is required,
Executive Counsel will ensure that legal service providers are working under a budget. Executive
Counsel will explore opportunities for beneficial billing methods, such as lump sum task-based
payments, that could save money. Executive Counsel will continuously monitor legal matters
being handled by outside counsel to ensure that the costs SAWPA is incurring make sense
considering dispute. These practices will ensure that sufficient funds are available to allow
outside counsel to address all appropriate matters so that Executive Counsel has time available to
address Strategic Plan tasks.
13) Improve productivity (or reporting of productivity) of State lobbying contract. There are a number
of Strategic Plan tasks that legal staff may be in able to assist with, even while not being the lead,
such as the tasks under Goal 5. Keeping in mind that efficiency can be improved either by
lowering costs or by increasing productivity, Executive Counsel will work with the General
Manager and SAWPA’s legislative advocates to seek ways to improve the effectiveness of
existing lobbying efforts to help achieve Strategic Plan goals.
14) Establish supporting relationships with member agencies’ counsel to shorten research time on
routine issues. In order to create efficiencies similar to a law firm, Executive Counsel will form
strong collaborative relationships with the general counsels of SAWPA’s member agencies. The
member agencies share an interest in SAWPA being efficient, and for almost all general counsel
matters there is no conflict of interest issue in conferring. Member agency counsel would not be
asked to provide legal services, of course, but because of their diverse experience, and the library
of reference materials and work product they possess, could significantly shorten SAWPA’s work
time on normal general counsel activities.
15) Look for opportunities to streamline business processes during review of all agency policies
during the next year. A legal task planned for FY2012 is to conduct a systematic legal review of
existing SAWPA policies. During this review, Executive Counsel will seek opportunities to
streamline SAWPA’s business practices in order to facilitate accomplishment of Strategic Plan
tasks. At the same time, however, the review of existing policies is also a task that could be
reprioritized or spread out over a longer time to even out the legal workload during the next four
years.
Administrative Services
16) Admin support in task force meetings:
Assess the need for admin support (i.e., recording/taking minutes).
Prepare “action” notes (a one-page recap of decisions) vs. meeting notes and possibly save
recording to supplement the notes.
Reduce hard copy paper reproduction at all meetings by loading documents into USB drive
or laptop to be shown via projector at out-of-house meetings. Use projector to show
agenda/meeting handouts etc. in-house as well. Utilize meeting table “signage” at meeting
agenda table with just one copy and the signage, “Previously emailed copies”.
23
Project Managers could require as part of work/scope that consultants to bring enough copies
to meetings rather than last minute rush to copy for staff to make them. Consultants should
give us 24 hours notice. Better yet, require that they be sent ahead of time electronically.
17) Assess utilizing e-sigs on various accounting processes (i.e., request for work orders, work orders,
request for purchase orders, purchase orders, procurement forms etc.).
Finance
18) Electronic time sheets for a two-week period.
19) Do blanket purchase orders for Staples and others and eliminate a purchase order for each
purchase.
20) Received electronic AP invoices and sent electronic AR invoices.
Additional
21) Use two-year purchase orders/task orders etc. to coincide with budget.
(Karen will need to update Procurement Policy; staff to start in the new year)
22) An Agenda for every meeting to stay focused and on track and send out prior to meeting time.
(Agenda/materials should be included in email appointment reminder when booking)
23) Make the Outlook Events calendar function properly in booking meetings/rooms. (Dean to fix)
24) Re-evaluate what is performed “in-house” versus by contract re brine line.
25) Post documents for member agency use using On-Base re brine line.
26) Red Team Initiative - hauled waste – streamline/coordinate activities of Collection Stations. LWH
permits being issued by SAWPA. Standard permit application forms in use for LWH permits and
Generator Permits. A single LWH permit can be used at any of 4 Collection Stations. Pending:
use of alternate Collection Station during emergency or planned shutdown for M&R – requires
Member Agency changes to Ordinances.
27) Marketing – working to publicize Brine Line to bring new customers. Increased flows reduce cost
per MG. Working to streamline new customer process – Corona Resource Recovery is test case.
28) Video conferencing – technically feasible?
29) On-line reports and data – posting information reducing requests for information.
(Dean/Patti – discuss records retrieval - K/Common)
24
30) Reduce some Task Force meeting notes to action items, work tasks, and decisions if acceptable by
Task Force to relieve admin staff of recording/taking minutes and attending meetings.
(Dean/Patti - discuss minute taking app)
31) Reduce hard copy paper reproduction for task force meetings by loading all documents on a USB
drive or laptop and show by projector at out of house meetings. Use projector to show agenda and
meeting handouts. (Dean/Patti to further discuss)
32) Maximize use of planning interns and low-cost admin staff for more tasks particularly with
OWOW Plan 2.0 task deliverables.
33) Reassess current projects and initiatives relative to strategic plan. Reduce or eliminate efforts on
those that aren’t consistent. For example, does the Trail project provide any real benefit to
SAWPA? At one time, it was a chance for senior management/ elected to interact with others
from the watershed and pitch integrated projects. Still true? (Mark to reassess after workplan)
34) Encourage task force agencies to print their own copies, if desired and bring to meetings.
Encourage task force agencies to receive any task force deliverables in electronic format only to
avoid hard copy processing.
35) Streamline Commission packet agenda prep with an electronic only version. Print version of that
can be given as a public copy. No agenda packets for senior staff and possibly Commission.
Senior staff can print out relevant sections as appropriate and review electronic copies.
36) When producing routine communication items such as agendas, announcements, etc., eliminate
sending back reviews to original author and allow document to be modified as needed as it rises
from project manager, to dept head, to admin reviewer, to general manager. This techniques to
similar to news article review approaches used at newspapers and is described as an “up and out”
approach.
37) Regular SAWPA staff meetings - short and with an agenda- to make sure staff is up to date and
not working cross purposes. And also it’s an opportunity to regularly reinforce the “consultant”
mentality.
38) Add roundtable report component to Dept. Manager’s Meeting that is strictly limited to a 10 min
report per dept of primary interest to other depts.
39) Centralize calendar and posting meeting information in ONE place using ONE format.
40) Create an electronic bulletin board (as part of SAWPA web-page) as a complement to SAWPA
calendar to announce/list each department’s current projects and on-going activities of
significance… to enhance internal communication.
41) Regular SAWPA staff meetings – short and with an agenda - to make sure staff is up-to- date and
not working cross purposes. And, also it’s an opportunity to regularly reinforce the “consultant”
mentality.
25
42) Record all Xeroxing efforts that exceed 100 pages in one Xeroxing session and assign to specific
SAWPA Acct Fund/Projects to assure proper accounting of hard copy costs to specific projects
with the goal to reduce hard copy costs.
Already in the Works!
43) On-line as-built drawings – required by engineers and contractors working in close proximity to
the Brine Line. Has significantly reduced the number of written requests for paper copies of
drawings, especially requests that result in “no-conflict” responses form SAWPA
44) Created web-based posting of customer information for the renewal of permits, costs including a
“cost calculator” and copies of Ordinance No. 5 and all Resolutions.
45) Created web-based “potential customer” page with often requested data.
26
APPENDIX C – SAWPA ORGANIZATIONAL CHART