SASHTO 2009. Innovative Intersections. Update on the Continuous Flow Intersection (CFI). Peter Allain, PE, PTOE Louisiana Department of Transportation and Development. CFI Update. Background Theory Safety Capacity Right of way and Access Operation Public Opinion. Background. - PowerPoint PPT PresentationTRANSCRIPT
Innovative Intersections
Peter Allain, PE, PTOELouisiana Department of
Transportation and Development
BackgroundTheorySafetyCapacityRight of way and AccessOperationPublic Opinion
Airline Highway at Siegen/S. Sherwood Forrest
Let to contract November 2004 at a cost of $4.4M
Hurricane Katrina August 2005Open to traffic March 2006 Accepted November 2006
Actually a Displaced Left-Turn Lane Intersection (DLTLI?)
Left-turning traffic crosses over opposing lanes to the left side of the roadway in advance of the main intersection.
The turn to the cross street can then be made at the same time as the main thru movements.
Partial CFI
Traditional Intersection 32 Conflict Points
Partial CFI 30 Conflict Points
Right Angle Rear End Head on S Swipe Right Turn Left Turn Non collision TOTAL
2003-04 42 67 0 17 2 15 23 166
2007-08 12 65 2 25 4 11 7 124
-71% -3% N/A 47% 100% -27% -70% -25%
846
592
575
432
Free 1638 128
327 1022 285
57
428
361
1599 1634
1766
5845
North
• Power Failures• Timing• Signing
Question 5. Please indicate your level of satisfaction with the current traffic conditions of the intersection.
291
10063
2912
0
50
100
150
200
250
300
Level of Satisfaction Level of Satisfaction
59%20%
13%6% 2%
Extremely Satisfied
Somewhat Satisfied
Satisfied
Unsatisfied
Extremely Unsatisfied
92% 92% SatisfiedSatisfied
Safety – So far looks good, but not conclusiveNo issues with wrong way at
crossoversCapacity –
Fewer phasesCFI’s do have limits
Right of way and Access – Very wide width Access issues
OperationComplexNeeds to be engineered
Public OpinionVery good acceptanceNo problems with misuse