SASHTO 2009. Innovative Intersections. Update on the Continuous Flow Intersection (CFI). Peter Allain, PE, PTOE Louisiana Department of Transportation and Development. CFI Update. Background Theory Safety Capacity Right of way and Access Operation Public Opinion. Background. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: SASHTO 2009

Innovative Intersections

Page 2: SASHTO 2009

Peter Allain, PE, PTOELouisiana Department of

Transportation and Development

Page 3: SASHTO 2009

BackgroundTheorySafetyCapacityRight of way and AccessOperationPublic Opinion

Page 4: SASHTO 2009

Airline Highway at Siegen/S. Sherwood Forrest

Let to contract November 2004 at a cost of $4.4M

Hurricane Katrina August 2005Open to traffic March 2006 Accepted November 2006

Page 5: SASHTO 2009

Actually a Displaced Left-Turn Lane Intersection (DLTLI?)

Left-turning traffic crosses over opposing lanes to the left side of the roadway in advance of the main intersection.

The turn to the cross street can then be made at the same time as the main thru movements.

Partial CFI

Page 6: SASHTO 2009
Page 7: SASHTO 2009
Page 8: SASHTO 2009
Page 9: SASHTO 2009

Traditional Intersection 32 Conflict Points

Partial CFI 30 Conflict Points

Page 10: SASHTO 2009

Right Angle Rear End Head on S Swipe Right Turn Left Turn Non collision TOTAL

2003-04 42 67 0 17 2 15 23 166

2007-08 12 65 2 25 4 11 7 124

-71% -3% N/A 47% 100% -27% -70% -25%

Page 11: SASHTO 2009

846

592

575

432

Free 1638 128

327 1022 285

57

428

361

1599 1634

1766

5845

North

Page 12: SASHTO 2009
Page 13: SASHTO 2009
Page 14: SASHTO 2009
Page 15: SASHTO 2009
Page 16: SASHTO 2009

• Power Failures• Timing• Signing

Page 17: SASHTO 2009
Page 18: SASHTO 2009
Page 19: SASHTO 2009
Page 20: SASHTO 2009
Page 21: SASHTO 2009

Question 5. Please indicate your level of satisfaction with the current traffic conditions of the intersection.

291

10063

2912

0

50

100

150

200

250

300

Level of Satisfaction Level of Satisfaction

59%20%

13%6% 2%

Extremely Satisfied

Somewhat Satisfied

Satisfied

Unsatisfied

Extremely Unsatisfied

92% 92% SatisfiedSatisfied

Page 22: SASHTO 2009

Safety – So far looks good, but not conclusiveNo issues with wrong way at

crossoversCapacity –

Fewer phasesCFI’s do have limits

Right of way and Access – Very wide width Access issues

Page 23: SASHTO 2009

OperationComplexNeeds to be engineered

Public OpinionVery good acceptanceNo problems with misuse

Page 24: SASHTO 2009

For more information:

[email protected]

ABMB.com