sar/bds service status 2019

15
14 th Meeting of the International Committee on Global Navigation Satellite Systems SAR/BDS Service Status 2019 Bangalore, Dec 2019 Zehua He, BG5CQW China Transport Telecommunications & Information Center

Upload: others

Post on 19-Jan-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SAR/BDS Service Status 2019

14th Meeting of the International Committee on

Global Navigation Satellite Systems

SAR/BDS Service Status 2019

Bangalore, Dec 2019

Zehua He, BG5CQW

China Transport Telecommunications & Information Center

Page 2: SAR/BDS Service Status 2019

SAR/BDS Space Segment

CONTENT

0101

SAR/BDS Ground Segment0102

SAR/BDS Return Link Service0103

2SAR/BDS Service Status 2019

International Cooperation0104

Page 3: SAR/BDS Service Status 2019

3

SAR/BDS Space Segment0101

• 6 MEOSAR in 3 planes

• More details in JC-32-Inf-54.pdf DEVELOPMENT PLAN FOR SAR/BDS

SAR/BDS Service Status 2019

Satellite Plane and slot Launch Date(UTC)

M13, M14 (C32, C33) B1, B3 2018/09/19

M23, M24 (C45, C46) C3, C5 2019/09/22

M21, M22 (C43, C44) A6, A8 2019/11/23

Page 4: SAR/BDS Service Status 2019

4

SAR/BDS Space Segment0101

SAR/BDS Service Status 2019

A B C

1 M15 M13 M6

2 M9 M19 M11

3 M10 M14 M23

4 M7 M20 M17

5 M8 M4 M24

6 M21 M3 M18

7 M16 M1 M5

8 M22 M2 M12

Relative RAAN

Rela

tive M

ean

An

om

aly

Note: Number is satellite common name, not in launch sequence. RLM available for all MEO satellites.

Page 5: SAR/BDS Service Status 2019

5

SAR/BDS Space Segment0101

SAR/BDS Service Status 2019

Coverage Simulation

Page 6: SAR/BDS Service Status 2019

6

SAR/BDS Ground Segment0102

SAR/BDS Service Status 2019

6 L/S Antenna

Plan to commissioning in early 2020.

Beijing MEOLUT

Page 7: SAR/BDS Service Status 2019

7

SAR/BDS Return Link Service0103

SAR/BDS Service Status 2019

MCCRCC

BOCC

Person in distress

LUT

SAR action

FLAM

RLM

RLSP

Crosslink

• 24 MEO + 3 IGSO

• B2b Signal

(1207.14MHz, ACEBOC-QPSK(10))

• Information rate is 500 bps

• Frame length is 1 sec

• Dedicated message type: 8(Type 9 for safety information broadcasting)

• High priority to achieve instant response

RLS system structure

Page 8: SAR/BDS Service Status 2019

8

SAR/BDS Return Link Service0103

SAR/BDS Service Status 2019

Preliminary RLM frame Structure

• Multiple sub-frame in a

single type 8 frame

• 3 types of sub-frame

for 3 types of RLM

• Type 3 RLM is BDS

exclusive.

Service type4bit

BeaconID

60bit

Data messag

e16bit

Type1 RLM

Service type4bit

BeaconID

60bit

Data message64bit

Type2 RLM

Type3 RLMService

type4bit

BeaconID

60bit

Message

Length

6bit

Flexible length

message

80 bit

160 bit

Flexible

Page 9: SAR/BDS Service Status 2019

9

SAR/BDS Return Link Service0103

SAR/BDS Service Status 2019

Space-to-user redundancy

• GNSS antenna may covered by wreckage.

• RLM space-to-user redundancy is needed.

• Strategy needed.

• Spatial strategy - path redundancy

• Temporal strategy – time redundancy

Page 10: SAR/BDS Service Status 2019

10

SAR/BDS Return Link Service0103

SAR/BDS Service Status 2019

Broadcasting strategy - Spatial strategy (SIS)

Beijing

20190302

075806Z

36

02

11

20

3027

22

07

08

15

1

Beijing

20190302

075806Z

36

02

11

20

3027

22

07

08

15

2

Beijing

20190302

075806Z

36

02

11

20

3027

22

07

08

15

3

scheme1(1 satellite, clear sky)

Choose an available satellite with highest elevation on distress location/alert region.

scheme2(2 satellites, small shelter)

Block satellites with ±90 degrees azimuth of last used satellite, choose an available satellitewith highest elevation.

scheme3(3 satellites, medium shelter)

Block satellites with ±90 degrees azimuth of last used satellite and all used satellites,choose an available satellite with highest elevation.

Page 11: SAR/BDS Service Status 2019

11

SAR/BDS Return Link Service0103

SAR/BDS Service Status 2019

Based on SAR scenario

Terminal type scenario SchemeEPIRB-Sea Sea vessel distress #1

ELT-DT-Sea Ditch

PLB-Sea MOB

EPIRB-Land River vessel distress #2

ELT-DT-Land Crash #3

PLB-Land Lost/Earthquake/Avalanche/Flood

Page 12: SAR/BDS Service Status 2019

12

SAR/BDS Return Link Service0103

SAR/BDS Service Status 2019

Broadcasting strategy - Timing strategy

1st

RLMWait for M second

2nd

RLMWait for M second ...

N-1th

RLMWait for M second N

th

• A single message may broadcast for N times• Wait for M second for another frame• Follow GNSS receiver power on time in C/S T.001/T.018.

Page 13: SAR/BDS Service Status 2019

13

SAR/BDS Return Link Service0103

SAR/BDS Service Status 2019

Expected RLS/BDS Performance

• Global capacity: 6000 RLM / hour• Maximum delay: < 2 min• Still Testing

Page 14: SAR/BDS Service Status 2019

14

International Cooperation0104

SAR/BDS Service Status 2019

• Frequency Coordination• Space segment testing and commissioning

• Grounding segment construction and commissioning

• RLS Testing• RLS Demonstration

Page 15: SAR/BDS Service Status 2019

14th Meeting of the International Committee on Global Navigation Satellite Systems

Create a Community of Shared Future

for Mankind.