sarah olexsak, usdoe office of energy efficiency and renewable energy
Post on 11-Sep-2014
388 views
DESCRIPTION
Workplace Charging panelist at the EV Roadmap 6 conference, July 30th, 2013, Portland, ORTRANSCRIPT
![Page 1: Sarah Olexsak, USDOE Office of Energy Efficiency and Renewable Energy](https://reader033.vdocuments.us/reader033/viewer/2022061106/541242758d7f72c5738b46d8/html5/thumbnails/1.jpg)
Workplace Charging Challenge:part of the EV Everywhere Grand Challenge
Sarah Olexsak, Workplace Charging Challenge Coordinator
Vehicle Technologies Office
Office of Energy Efficiency and Renewable Energy
US Department of Energy
![Page 2: Sarah Olexsak, USDOE Office of Energy Efficiency and Renewable Energy](https://reader033.vdocuments.us/reader033/viewer/2022061106/541242758d7f72c5738b46d8/html5/thumbnails/2.jpg)
• $1.5 billion – next generation batteries• $900 million – components manufacturing & demonstration projects • 17,000+ charging stations & 9,000+ vehicles deployed
American Reinvestment and Recovery Act: largest investment to support vehicle electrification in US history
![Page 3: Sarah Olexsak, USDOE Office of Energy Efficiency and Renewable Energy](https://reader033.vdocuments.us/reader033/viewer/2022061106/541242758d7f72c5738b46d8/html5/thumbnails/3.jpg)
EV Everywhere Grand Challenge: make PEVs as affordable & convenient as gasoline-powered vehicles in the next 10 years
For a copy of the Blueprint, visit
electricvehicles.energy.gov
President Obama, March 7, 2012, Daimler Truck Manufacturing Plant, Mount Holly, North Carolina
![Page 4: Sarah Olexsak, USDOE Office of Energy Efficiency and Renewable Energy](https://reader033.vdocuments.us/reader033/viewer/2022061106/541242758d7f72c5738b46d8/html5/thumbnails/4.jpg)
Workplace charging: a critical part of the PEV deployment strategy
For the big picture+ Fill infrastructure gap+ Grow the PEV market+ Increase visibility of PEVs+ Add electric VMT+ Primary charge point for
multi-unit/urban dwellers
For the employer+ Employee benefit+ Corporate sustainability+ Contribute to LEED certification+ Keeping up with the Googles
![Page 5: Sarah Olexsak, USDOE Office of Energy Efficiency and Renewable Energy](https://reader033.vdocuments.us/reader033/viewer/2022061106/541242758d7f72c5738b46d8/html5/thumbnails/5.jpg)
Partner
DOE
Workplace Charging Challenge
Workplace Charging Challenge: increase the number of US employers offering workplace charging by tenfold in 5 years
Ambassador
![Page 6: Sarah Olexsak, USDOE Office of Energy Efficiency and Renewable Energy](https://reader033.vdocuments.us/reader033/viewer/2022061106/541242758d7f72c5738b46d8/html5/thumbnails/6.jpg)
6
Workplace Charging Challenge Partner Plan
![Page 7: Sarah Olexsak, USDOE Office of Energy Efficiency and Renewable Energy](https://reader033.vdocuments.us/reader033/viewer/2022061106/541242758d7f72c5738b46d8/html5/thumbnails/7.jpg)
Workplace Charging Challenge Partners
![Page 8: Sarah Olexsak, USDOE Office of Energy Efficiency and Renewable Energy](https://reader033.vdocuments.us/reader033/viewer/2022061106/541242758d7f72c5738b46d8/html5/thumbnails/8.jpg)
Promoting workplace charging across the country
![Page 9: Sarah Olexsak, USDOE Office of Energy Efficiency and Renewable Energy](https://reader033.vdocuments.us/reader033/viewer/2022061106/541242758d7f72c5738b46d8/html5/thumbnails/9.jpg)
Workplace Charging Challenge Ambassadors
![Page 10: Sarah Olexsak, USDOE Office of Energy Efficiency and Renewable Energy](https://reader033.vdocuments.us/reader033/viewer/2022061106/541242758d7f72c5738b46d8/html5/thumbnails/10.jpg)
Contact Sarah Olexsak [email protected]
Learn Morewww.electricvehicles.energy.gov
Join the DOE Workplace Charging Challenge!