sara city phase - 4

22
Builders and Developers Building Tomorrow P H A S E 4

Upload: wesaragroup

Post on 13-Feb-2017

330 views

Category:

Real Estate


0 download

TRANSCRIPT

Page 1: Sara City Phase - 4

Builders and DevelopersBuilding Tomorrow

P H A S E 4

Page 2: Sara City Phase - 4

A glimpse of your wish is just a few slides away

Page 3: Sara City Phase - 4

•Established in 1997, Sara Group has become one of the fastest growing construction companies in Maharashtra.

•Has created some of the most affordable homes with perfectly planned architecture and modern amenities.

•Member of CREDAI, formerly known as PBAP.

•Our drivers are innovation, teamwork and a high degree of technical excellence.

•We bring innovation and progress together.

Builders and DevelopersBuilding Tomorrow

Page 4: Sara City Phase - 4

CHAKAN: A RISING LOCALE

Page 5: Sara City Phase - 4

1. Education institutes include

Poddar International School,

Pius Memorial, Priyadarshini, &

proposed International School

by SARA.

2. Medical assistance is at arms

length with Aditya Birla

Emergency Centre at 1 km,

Surya, Sanjeevani &

Siddhivinayak in 2-3 km

proximity.

3. Banking in Chakan is a

metropolitan experience with

presence of all major giants

including HDFC, ICICI, BOB,

Axis, SBI, IDBI, OBC, PNB, BOM

etc

4. Shiroli Chandus village, located

6 km north of Chakan, has

been identified as a probable

site for the proposed Pune

International Airport.

5. Chakan is now home to

a Special Economic Zone (SEZ)

promoted by the Maharashtra

Industrial Development

Corporation(MIDC).

6. Chakan has evolved into a

major automobile hub and

hosts over 750 large and small

automobile industries. Major

giants includes Mercedes Benz,

Volkswagen Group, Mahindra

& Mahindra and Bajaj Auto.

Page 6: Sara City Phase - 4

P H A S E 4

Page 7: Sara City Phase - 4

AMENITIES

Page 8: Sara City Phase - 4

1. Dada - Dadi Park 2. Children’s Play Area 3. Sand Pit 4. Gazebo 5. Walking Track 6. Rain Water harvesting 7. Tremix or paved internal roads 8. Elegant Entrance Gate 9. CCTV Surveillance

10. 24x7 Security 11. Security Cabin12. Secured Compound Wall13. Fire fighting System 14. Designer lobbies15. DG backup for lift and Common Areas

16. Elevators in each building 17. Mail box 18. PNG (Piped Gas)*19. Sewage Treatment Plant

Page 9: Sara City Phase - 4

SPECIFICATIONS

Page 10: Sara City Phase - 4

1. RCC framed Structure.

2. Walls: 5" thick external AAC Brick work and 4" thick AAC bricks.

3. Plaster: Internal walls with Gypsum finish in all rooms. • Neeru finish in Kitchen & Toilets. Sand

faced double coated external Plaster

4. Doors and Windows: RCC doors frames in all rooms with oil painted flush doors. • Main door wooden frame with

attractive laminates and good quality fittings.

• 3 track powder coated aluminum windows with mosquito net along with oil painted safety grills.

5. Electrical fittings: Concealed electrification with good quality switches. MCB, TV Point in living room.

5. Tiles: 24"X 24" Vitrified tiles in all the rooms. Dado up to 7" height in bathrooms and lintel level in kitchen, • Granite

Kitchen Platform with Stainless Steel Sink.

6. Plumbing: Concealed plumbing with hot and cold mixing unit and one CP fitting in dry Balcony. Separate plumbing line for flush tank (reuse treated water).

7. Paint: Good quality external paint Oil bound distemper paint for internal walls. 8. Provision for Exhaust fan in Kitchen.

Page 11: Sara City Phase - 4

CONFIGURATION

Page 12: Sara City Phase - 4

SALEABLEAREA STATEMENT FOR WING A

FLAT TYPESALEABLE

AREA / FLATSQ.FT (D)

1 BHK SMALL 5951 BHK LARGE 613

1 BHK 586

SALEABLEAREA STATEMENT FOR WING B

FLAT TYPESALEABLE

AREA / FLATSQ.FT (D)

1 BHK SMALL 5951 BHK LARGE 613

2 BHK 779

Page 13: Sara City Phase - 4

1 BHK2 BHK

Page 14: Sara City Phase - 4

THE ROAD TO SATISFACTION

Page 15: Sara City Phase - 4
Page 16: Sara City Phase - 4

KEY PROXIMITIESMercedez Benz: 5 minutes

Volkwagen: 15 minutes

Mahindra & Mahindra: 20 minutes

Marriot Courtyard: 20 minutes

Talawade IT PARK: 30 minutes

Pius Memorial School: 20 minutes

Poddar International School: 15 minutes

Talegaon Railway Station: 30 minutes

Unicare Hospital: 10 minutes

Nigdi Chowk: 30 minutes

Page 17: Sara City Phase - 4

BE AT SARA CITY

Page 18: Sara City Phase - 4

1. Sara City comes with a fulfilling promise of Bigger & Better Lifestyles. A housing project of 1 and 2 bedroom apartments with a valuable rate, Sara City Phase 4 is an enviable opportunity to own your dream home in a dream residential project.

2. With top-of-the-line amenities and facilities, this premier 50-acre mega township in Chakan has been a success story. The only project with a piped gas line, Sara City has been elevating lifestyles in Chakan since the last five years.

3. You are invited to be a part of this celebrated lifestyle.

Page 19: Sara City Phase - 4

WHAT CUSTOMER HAS TO SAY

Page 20: Sara City Phase - 4

We are very impressed with everything Sara

Group offers, right from the location to the cost of the homes. We are

delighted to buy our first home at Sara City.

When our friends and relatives come over to

visit us for the holidays, they have an enjoyable

experience thanks to the abundant and modern amenities on offer. Life

at Sara City is really relaxing.

I was particularly interested in the many

state-of-the-art facilities provided and modern

architecture that is evident in Sara City. I have got everything

here.

Page 21: Sara City Phase - 4

THANK YOU

Page 22: Sara City Phase - 4

Builders and DevelopersBuilding Tomorrow

Contact:Mr. Kiran V. Kirte

(Sr. Sales Executive )Ph.- +91 9665699955

E-Mail Id- [email protected]

Site Office: Chakan-Talegaon Road, Kharabwadi,

Near NAFED Compound, Chakan, Pune - 410 501.

Website: www.sarabuilders.com