Page 1: Sap Manual User Manual

1

Sap Manual - Basic

1. Creating Project

2. WBS Structure

3. Network

4. Activity

5. Cost Planning

6. Reports

Page 2: Sap Manual User Manual

2

Step 1

Page 3: Sap Manual User Manual

3

Step 2

Path : Logistics Project System Project Project Builder

Transcation : CJ20N

CLICK PROJECT BUILDER

Page 4: Sap Manual User Manual

4

Step 3 : Create Project

CLICK Project

Page 5: Sap Manual User Manual

5

Step 4

Project def.: Project Code

Project Description – Name of the Project

Project Profile: With Project Stock (Select from dropdown menu)

PRESS ENTER

FILL FILL

FILL

Page 6: Sap Manual User Manual

6

Step 5

Start date: Project start date as per contract signature (Select from drop down menu)

Finish date: Project finishes date as per contract signature (Select from drop down menu)

FILL

FILL

PRESS ENTER

FILL

Page 7: Sap Manual User Manual

7

Step 6

Long txt: Brief description of the project – Country, Owner, Client, and Scope

FILL

CLICK

Page 8: Sap Manual User Manual

8

Step 7

PROJECT CREATED

DOUBLE

CLICK

Page 9: Sap Manual User Manual

9

Step 8

CLICK

Page 10: Sap Manual User Manual

10

Step 9 : Create WBS

Level: 1 (1st WBS Element should be at level 1)

WBS Element: Same as the Project code (WBS codes and structure to be finalised before uploading the data in

SAP)

Description: Contract

FILL FILL

PRESS ENTER

Page 11: Sap Manual User Manual

11

Step 10

Complete the WBS uploading with correct level, code and description.

Keep saving the data in between to avoid any loss of data due to sudden power failures.

FILL

LEVEL

FILL

FILL

LEVELS

FILL

FILL

Page 12: Sap Manual User Manual

12

Step 11

DOUBLE

CLICK

Page 13: Sap Manual User Manual

13

Step 12

CLICK

VIEW WBS

Page 14: Sap Manual User Manual

14

Step 13

Expand all the WBS elements

CLICK

Page 15: Sap Manual User Manual

15

Step 14

Page 16: Sap Manual User Manual

16

Step 15

PE: Planning Element ( Planning to be done at the lowest level)

Acct: Accounting ( Accounting to be done at the lowest level)

Bill: Billing (Billing to be done at the Contract Level)

CLICK

WHEREVER

REQUIRED

CLICK

Page 17: Sap Manual User Manual

17

Step 17

CLICK

Page 18: Sap Manual User Manual

18

Step 18: Create Network

CLICK

Page 19: Sap Manual User Manual

19

Step 19

Network: Description same as WBS element

Network profile: Activity acct. ass. No plan costs (Select from the dropdown menu)

MRP Controller: 010 (Select from the dropdown menu)

FILL

FILL

FILL

PRESS ENTER

NETWORK CREATED

Page 20: Sap Manual User Manual

20

Step 20

CLICK

Page 21: Sap Manual User Manual

21

Step 22

CLICK

Page 22: Sap Manual User Manual

22

Step 23: Create Activity

CLICK

Page 23: Sap Manual User Manual

23

Step 24

FILL

PRESS ENTER

Page 24: Sap Manual User Manual

24

Step 25

ACTIVITY CREATED

CLICK

Page 25: Sap Manual User Manual

25

Step 27: WBS Release

CLICK

Page 26: Sap Manual User Manual

26

Step 28

CLICK

Page 27: Sap Manual User Manual

27

Step 29

CLICK

WBS RELEASED

Page 28: Sap Manual User Manual

28

Step 30

CLICK

Page 29: Sap Manual User Manual

29

Step 31

CLICK

Page 30: Sap Manual User Manual

30

Step 32

USER STATUS CHANGED :

INIT TO BUDG

CLICK

Page 31: Sap Manual User Manual

31

Step 33: Component Uploading

CLICK

Page 32: Sap Manual User Manual

32

Step 34

FILL FILL

PRESS ENTER

Page 33: Sap Manual User Manual

33

Step 35: Cost Planning

Path: Logistics Project System Financials Planning Costs in WBS

Overall values Change

Transcation Code: CJ40

CLICK

Page 34: Sap Manual User Manual

34

Step 36

CLICK

Page 35: Sap Manual User Manual

35

Step 37

CLICK

CLICK

Page 36: Sap Manual User Manual

36

Step 38

Primary Costs: Direct Costs i.e Raw Material, Semifinished Produts, Subcontracts, Services etc.

Activityinput: Indirect Costs i.e Hourly Rates

CLICK

CLICK

Page 37: Sap Manual User Manual

37

Step 39

CLICK FILL

CLICK

FILL COST CENTRE

FILL HOURS AS PER

THE COST SHEET

FILL ACTIVITY TYPE

PRESS ENTER

Page 38: Sap Manual User Manual

38

Step 40

CLICK

PLANNED VALUE FOR

THE WBS ELEMENT

DISPLAYED

Page 39: Sap Manual User Manual

39

Step 41

PLANNED VALUE FOR

THE WBS ELEMENT

DISPLAYED

PLANNED VALUE FOR

THE WBS ELEMENT

DISPLAYED

CLICK

Page 40: Sap Manual User Manual

40

Step 42

FILL

FILL

CLICK

Page 41: Sap Manual User Manual

41

Step 43

CLICK

Page 42: Sap Manual User Manual

42

Step 44

CLICK

Page 43: Sap Manual User Manual

43

Step 45

Path : Logistics Project system Financials Copy Costs and Revenues Copy Project

Costing (Ind)

Tranx code: CJ9FS

CLICK

Page 44: Sap Manual User Manual

44

Step 46

Template Version: 0

Target Version: 1

FILL

FILL

FILL CLICK

CLICK

CLICK

Page 45: Sap Manual User Manual

45

Step 47

CLICK

Page 46: Sap Manual User Manual

46

Step 48

CLICK

CLICK

Page 47: Sap Manual User Manual

47

Step 49

CLICK

Page 48: Sap Manual User Manual

48

Step 50

CLICK

Page 49: Sap Manual User Manual

49

Step 51

Path : Alstom Add on menu Project Management Reports ZPROJCOSTBOILER – Proj Review

CLICK

Page 50: Sap Manual User Manual

50

Step 52

FILL

CLICK

Page 51: Sap Manual User Manual

51

Step 53

CLICK

Page 52: Sap Manual User Manual

52

Step 54

CLICK

SELECT THE VALUE WHICH

WHICH NEEDS TO BE CHECKED

Page 53: Sap Manual User Manual

53

Step 55

CLICK

Page 54: Sap Manual User Manual

54

Step 56

Page 55: Sap Manual User Manual

55

Step 57

Tranx: PS 91

Page 56: Sap Manual User Manual

56

Step 58

CLICK

Page 57: Sap Manual User Manual

57

Step 59

CLICK

Page 58: Sap Manual User Manual

58

Step 60