sap cbm

45
SAP Preventive Maintenance – The Core and More Len Harms - Vesta

Upload: vvnalla

Post on 19-Jul-2015

45 views

Category:

Software


3 download

TRANSCRIPT

SAP Preventive Maintenance – The Coreand More

Len Harms - Vesta

Agenda

The Core – Preventive Maintenance

The Core – “Light” CBM

“and More”

The Core PM

Preventive Maintenance: Forms

Time-based Performance-based Condition-based

Preventivemaintenance

Temperature

Thickness

Druck

10

2030 40 50

60

70

80

Pressure

2001

Preventive Maintenance: Plan Types

Time-based

Maintenance plan

Single cycle plan Multiple counter planStrategy plan

Performance-based

Service Procurement

Building Blocks

1. When

Cycle or strategy that determines when a PM shouldbe done

2. Where – Equipment or Functional Location

The asset, assets, or location where the work is totake place

3. What – Task List

Define tasks, materials and tools that are required

Tip - Add the Default to the user settings

Maintenance Plans with single Asset

• You can create several maintenance plans.

• Each maintenance plan contains a maintenance item that describes the object to bemaintained.

• The system generates a separate order for each object on a due date.

Maintenance Plan Item with Linear

Maintenance Plans with Asset list

• You create one maintenance plan.

• You assign an object list to themaintenance plan in which all objectto be maintained are listed.

• The system generates an order for allobjects on a due date.

• Supports inspection routes,lubrication routes

For operations in a task list, technicalobjects can be maintained

© SAP 2009 / 11

Enhance- Asset List in Ehp4

Leverage – LAM, OAA, GEO.e with Plan

Linear Assets can berepresented in plans

Use Geo.e to add spatialdata

Operational AccountAssignment provides costof inspection at the exactposition of the work

Report on Inspection plans and results

Inspection results support long term planning

Use results to feedthe long termasset planning

Leverage PPM tosupport the longterm plan

1

23

Create Inspectionplans

Gather results

Create long termplan

4

Analyze results

Maintenance Plans with Strategy

• You create one maintenance plan.

• You assign an object list or a singleasset.

• The system generates an order for allobjects on the due dates with the tasksthat match the strategy.

• Supports a single plan with differenttasks per call date

• Can be performance or time

• The strategy unit must be consistent

Maintenance Plan with Notification

Made possible once multipleNotifications could be addedTo a single order.

Also possible to add task listin a notification as ofERP2005

Move/Skip/Release in graphicsimulation

Change documents in themaintenance plan

Scheduling parameters

Other Items

Preventive maintenance – in mostorganizations today

SAP ERP

Transformer

Work orders arecreated in regular

Intervals

Technician is executing work

Workorder

Agenda

The Core – Preventive Maintenance

The Core – “Light” CBM

“and More”

The Core PM and More

Create a new development project TC:CMOD

ENHANCEMENT IS IMRC0001

Sample Program

Measurement PointSet an upper and/or lower limit

Enter reading and valuation code

Condition based maintenance (using mobility)

SAP ERP

Current

Temperature

Voltage

Transformer

SAP determines whetherWork order should be created

Technician is executing work

Technician feed rounds informationInto SAP to populate

measurement documents

Current

Temperature

Voltage

Transformer

Current

Temperature

Voltage

Transformer

Agenda

The Core – Preventive Maintenance

The Core – “Light” CBM

“and More”

Condition Based Maintenance The Goal

Easily accessible dashboardsallow asset managers and staff tomonitor asset health in real timevia measurement points

Real-time alerts viadashboards give instantupdates on equipment statusand allow rapid reaction

Links to ERP data to triggermaintenance workflow toreduce unplanned downtimeand improve reliability.

Asset health

Continuous improvement

Best practice

Trend analysis identifiesproblem areas forimmediate investigation

V.P.

• Quite a few of equipment delivered today have built insensors

• New sensors (temperature, leakage, etc.) are very affordable

• Collection, analysis and integration into SAP can be setup in afew weeks

Current Situation

SAP ERP

Current

Temperature

Voltage

Transformer

• The historian collect lots of data but provides littleinformation to SAP

• Investments in the historian data has been made that is notleveraged

• EAM groups does not have visibility to condition data in SAPto make/optimize their decisions

Challenges

Integrated condition based maintenance

SAP ERP

Current

Temperature

Voltage

Transformer

DataHistorian

SAP MII

Determine whetheror not to create notification

or work order

Work order is madeavailable to the

Technician

Technician is executing work

OSI PI

APPs

Current

Temperature

Voltage

Transformer

Current

Temperature

Voltage

Transformer

Integration and Intelligence

Integration: A single layer enabling SAP ERPconnectivity into real-time systems to driveequipment-to-enterprise business processinteroperability

Intelligence: Real-time analytics engine thataggregates and delivers unified visualization ofevents, alerts, KPIs and decision support topersonnel thru role-based dashboards

Rule Name (MIITransaction)

Description

DailyRunHourUpdate

This rule updates the run hours per equipment basedon a summarized, binary IsRunning Tag. Parametera arethe tag name and the Measurement Point name

NotificationOnExceedThreshold

This rule creates a notification once a tag value hasexceeded the Threshold value. The Threshold value canbe a tag or static value

… ….

Condition Based Maintenance - Detail

Tag Name

AB323DS

DS.32.1231

PUMP3223.TP

1. Select Asset2. Select Rule3. Associate Tags and/or fixed values4. Select Frequency5. Submit to database

Threshold Temp: 121

MII DB

Enter inspection data

• Provide maintenance staff witha means to manually inputmeasurement readings

• Easy-to-use Web-basedinterface allows untrained staffto enter inspection results

• Easily delete or modify anerroneous entry

Manual Entry of InspectionData

Asset Health Alerts

• Visual indicators and e-mail notifications alert maintenance staff to the assets in the most critical status

• Data-driven notifications alert users to changes in asset health status so that they can reactappropriately and make informed decisions quickly

• Maintenance staff can trigger a maintenance request if warranted

• Prioritized asset management enables a consolidated alert view

Asset Health History

• Communicate real-time asset health status, monitor and adjust maintenance plan• Clear data layout and status indicators allow you to quickly compare current with target asset output.• Aggregate health status• Gauges visualize the criticality of current asset health• Search by specific asset domain for monitoring• Option:• SAP 3D Visual Enterprise provides a 3D visual image of the asset being monitored

What’s in each solution?

Software

Quickly address the most urgent businessprocesses

Content

SAP-supported best practices, templates,and tools make solution adoption easier

Enablement

Guides and educational material speed end-user adoption

Service

Fixed scope and price provide maximumpredictability and lower risk

SAP RapidDeploymentsolutions

Business challenges There is a solution

SAP Condition-Based Maintenance rapid-deployment solution enables your organization toperform maintenance only when necessary byarming maintenance teams with sophisticatedintelligence and comprehensive asset healthdashboards. The solution also enables manual andautomatic triggering of maintenance workflowleveraging through native integration with the SAPEnterprise Asset Management (SAP EAM) solution.

Get started with condition-basedmaintenance quickly and affordably

Critical asset failures which can have seriousenvironmental and enterprise level consequences asdemonstrated by recent high-profile industrialcatastrophes

Finding a CBM solution that has low entry, low TCO,and leverages existing SAP investments

Traditional time or counter-based maintenancestrategies missing a dynamic component leading tohigher maintenance cost

Other RDS available is Asset Health Visualization

What does SAP deliver? What do you have to do?

Provide IT infrastructure (server)

Install SAP MII, version 12.2, on the developmentand production environments

Install SAP BusinessObjects Dashboards software tomake optional changes to predefined health indexdashboards

Provide asset hierarchy structure from existing SAPECC and SAP EAM applications and information ontag thresholds

Provide access to existing shop floor system withconnector from SAP Plant Connectivity

Provide appropriate contacts in the business and ITdepartments

Conduct end-user training and change management

Conduct performance and integration testing

Perform data migration and cleansing

Transport to production

Key deliverables

Perform installation check

Lead workshop to confirm predefined requirements

Set up MII connectivity with shop floor system viaconnector in SAP Plant Connectivity

Set up the plant database schema for storing shopfloor aggregate data

Configure the asset health index to meet customer-specific dashboard requirements

Activate and test solution

Enable knowledge transfer to key users

Enable support for go-live

System requirements

SOFTWARE• SAP ECC 6.0 EHP4 or above• SAP Manufacturing Integration & Intelligence (SAP MII) on SAP NetWeaver® CE 7.3

version 12.2, SP4 or above• SAP Plant Connectivity 2.2, SP3 or above• SAP BusinessObjects Dashboards 4.0 SP4 or above*• SAP 3D Visual Enterprise application (optional)

DATABASE• SAP HANA® 1.0 SP5 or above (optional) **

* required only for customizing dashboards** SAP HANA® content supporting cross-plant implementation is provided. However, thestandard service offering supports a single plant implementation.

In the system

• Link CBM monitoring system toHistorians to gather real-time data

• perform manual inspection andthen enter results into CBMmonitoring system

• Evaluate data to trigger automatedmaintenance notification via CBMrules and logic

• Perform maintenance jobs withvisual support using SAP 3D VisualEnterprise

• Perform trend analysis by viewinghistorical plant data

Conclusion - Benefits

– Minimize risks and stay incompliance via alerts of imminentcatastrophic asset failures

– Manage investment risk by startingwith a baseline scope and thenscale it gradually

– Reduce maintenance due to fewerreactive repairs of brokenequipment

– Support effort to stay withinregulatory compliance

– Reduce maintenance rework andmean-time-to-repair (MTTR)

– Operate equipment in aneconomically and environmentallysustainable way

– Increased return on assets (ROA)

– Maximized asset utilization

– Improved overall equipment effectiveness (OEE)

– Reduced operational risk in asset management

– Reduced maintenance cost as a percentage of revenue

Summary - Support Asset Life Cycle

Contact:

Len Harms

[email protected]

610-209-6683

THANK YOU FOR PARTICIPATING

Please provide feedback on this session by completing ashort survey via the event mobile application.

SESSION CODE: 8595

For ongoing education on this area of focus,visit www.ASUG.com