Santa Cruz MeetingAugust 12th 2008

Layout options & Schedule Issues

David Lissauer

8/12/2008 1David Lissuaer, Santa Cruz

Meeting.

Page 2: Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting

ID WBS Task Name

1 Linac4 project start

2 2 Linac systems

3 2.1 Source and LEBT construction, test

4 Drawings, material procurement

5 2.2 RFQ construction, test

6 2.4 Accelerating structures construction

7 Klystron prototypying

8 2.6.2 Klystrons construction

9 2.6.1 LLRF construction

10 2.7 Beam Instrumentation construction

11 2.8 Transfer line construction

12 2.9 Magnets construction

13 2.10 Power converters construction

14 5 Building and infrastructure

15 5.1 Building design and construction

16 5.2,3,4 Infrastructure installation

17 3 PS Booster systems

18 3.1 PSB injection elements construction

19 3.2 PSB beam dynamics analysis

20 4 Installation and commissioning

21 4.1 Test stand operation (3 + 10 MeV)

22 4.2 Cavities testing, conditioning

23 Cabling, waveguides installation

24 Accelerator installation

25 Klystrons, modulators installation

26 Hardware tests

27 Front-end commissioning

28 4.5 Linac accelerator commissioning

29 Transfer line commissioning

30 PSB modifications

31 4.6 PSB commissioning with Linac4

32 Start physics run with Linac4

01/01

01/05

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q12007 2008 2009 2010 2011 2012 2013 2014

Milestones

End CE works: December 2010

Installation: 2011

Linac commissioning: 2012

Modifications PSB: shut-down 2012/13 (6 months)

Beam from PSB: 1rst of May 2013

LHCC – 1 July, 2008

8/12/2008 2David Lissauer, Santa Cruz

Meeting.

Page 3: Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting

Construction of LP-SPL and PS2 will not interfere with the regular operation of Linac4 + PSB for physics.

Similarly, beam commissioning of LP-SPL and PS2 will take place without interference with physics.

Milestones Project proposal: June 2011 Project start: January 2012 LP-SPL commissioning: mid-2015 PS2 commissioning: mid-2016 SPS commissioning: May 2017 Beam for physics: July 20173

LHCC – 1 July, 2008

8/12/2008 3David Lissuaer, Santa Cruz

Meeting.

Page 4: Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting

Normal Ramp No phase II

YearPeak Lumi

(x 1034)

Annual Integrated

(fb-1)

Total Integrated

(fb-1)Peak Lumi

(x 1034)

Annual Integrated

(fb-1)

Total Integrated

(fb-1)

2009 0.1 6 6 0.1 6 6

2010 0.2 12 18 0.2 12 18

2011 0.5 30 48 0.5 30 48

2012 1 60 108 1 60 108

2013 1.5 90 198 1.5 90 198

2014 2 120 318 2 120 318

2015 2.5 150 468 2.5 150 468

2016 3 180 648 3 180 648

2017 3 0 648 3 0 648

2018 5 300 948 3 180 828

2019 8 420 1428 3 180 1008

2020 10 540 2028 3 180 1188

2021 10 600 2628 3 180 1368

2022 10 600 3228 3 180 1548

2023 10 600 3828 3 180 1728

2024 10 600 4428 3 180 1908

2025 10 600 5028 3 180 2088

Collimation

Linac4 + IR upgrade phase 1

New injectors

+ IR upgrade phase 2

Radiation damage limit ???

8/12/2008 4David Lissuaer, Santa Cruz

Meeting.

Note: Predicted integrated Luminosity Lower than assumed.

Page 5: Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting

Collimation phase 2

Linac4 + IR upgrade phase 1

New injectors

+ IR upgrade phase 2

Early operatio

n

8/12/2008 5David Lissuaer, Santa Cruz

Meeting.

Page 6: Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting

Collimation phase 2

Linac4 + IR

upgrade phase 1

New injectors

+ IR upgrade phase 2

Early operatio

n

8/12/2008 6David Lissuaer, Santa Cruz

Meeting.

Page 7: Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting

8/12/2008 7David Lissuaer, Santa Cruz

Meeting.

Layout (4+3+2) Fixed Length Barrel

4 Pixel Layers: 1(2) b-layers “easily replaceable” inside a support tube. 3(2) Layers incorporated in the Fixed length Barrel.

Mechanical Support: Off the tube? Off the Barrel

3 Pixel Discs on the outside.

Internal Discs?

Page 8: Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting

8/12/2008 8David Lissuaer, Santa Cruz

Meeting.

Layout Overview

Barrel Length: 240 Cm (Full length) 12 sensors/side.

Discs: 5 Discs / Side. Need optimization.

Page 9: Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting

8/12/2008 9David Lissuaer, Santa Cruz

Meeting.

Layout Overview (4+3+2) Fixed Length.

Page 10: Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting

8/12/2008 10David Lissuaer, Santa Cruz

Meeting.

Disc Layout is still uncertain. We need to converge on a “baseline” by the time of the Nikhef meeting.

Solution with better coverage but more complicated from an Engineering point of view and more massive. - Need optimization.

Page 11: Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting

Eng. Layout Studies

8/12/2008 11David Lissauer, Santa Cruz

Meeting.

Eng. Studies of the Layout.

Global Support Tube:Pixel? – Very Short strips?

Page 12: Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting

Baseline Assembly Sequence

8/12/2008 12David Lissuaer, Santa Cruz

Meeting.

“Full” Assembly on the surface in “Global Tracker Tube” Barrel SS/LSPixel outer Layers (2 or 3)Pixel Discs + Pixel TubeEC LS/SS + Pixel Tube

Full test on the surface prior to installation

Insertion from the side ~ 6.5 Meter Long~1 meter Diameter

Borated Poly insertion & Services preparation on the CryostatGlobal Tube insertion from the sideServices connections

Page 13: Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting

13

ATLAS UPGRADEASSEMBLY SEQUENCE OF INNER DETECTOR

C.BAULT May 15th 2008

Outer cylinder

Barrel-LS

Pixel

Barrel-SS

Pixel Services

INSERTION END-CAP NOSE + PIXEL DISCS 5-6 INTO OUTER CYLINDER

End_Cap nose

Pixel discs 5-6

Services

Page 14: Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting

14

ATLAS UPGRADEASSEMBLY SEQUENCE OF INNER DETECTOR

C.BAULT May 15th 2008

Outer cylinder

Barrel-LS

Pixel

Barrel-SS

END-CAP NOSE + PIXEL DISCS 5-6 INSTALLATION OF SERVICES

End_Cap nose

Pixel discs 5-6Services

Page 15: Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting

15

ATLAS UPGRADEASSEMBLY SEQUENCE OF INNER DETECTOR

C.BAULT May 15th 2008

Outer cylinder

Barrel-LS

Pixel

Barrel-SS

End_Cap nose

Pixel discs

End_Cap main bloc

with services

INSERTION MAIN BLOC OF END-CAP INTO OUTER CYLINDER

Page 16: Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting

16

Atlas IT envelope layout drawing

160 Pixel Electrical Connectors

Page 17: Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting

ATLAS Timeline.

LHCC will ask experiments for:

LoI Letter of Intent – Mid 2009

TP Technical Proposal - spring 2010

TDR Technical Design report / Subsystem (do not have to be at the same time)

ID – Late 2010 (early 2011)

Calorimeters - Middle of 2011

Muons - Middle / Late 2011 (Depend on upgrade scope)

178/12/2008

David Lissuaer, Santa Cruz Meeting.

Page 18: Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting

8/12/2008 18David Lissuaer, Santa Cruz

Meeting.

Schedule Overview (Preliminary)

Ready for beam December ‘17

Tracker Installation February ‘17

Tracker Ready for installation (Testing) July ‘16

Barrel Installation in the Support Tube January ‘16

EC Installation in the Support Tube April ‘16

Stave installation start June ‘14

Support Structure ready for installation January ‘14Start services installation

EC Stave Production starts June ’13

Barrel Stave Assembly starts January ’13 Readout Electronics and Stave components ready for assembly at

this time.

Page 19: Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting

Conclusions

8/12/2008 19David Lissuaer, Santa Cruz

Meeting.

Little feedback from Simulation to date!!We might not have significant feedback from physics analysis before final decisions will need to be made.

To stay on Schedule need to agree on a baseline (at least for the barrel) by the NIKEHF meeting.

Assembly on the surface has significant advantages. Might be the only solution that will allow installation of the detector in 18 month shut down.

Has serious schedule implications!!!Detector needs to be ready ~12-18 month earlier.