sanea: the eskom war room 22nd july 2015

1
The Eskom War Room 22nd July 2015 SANEA David Lipschitz People Also African Utility Week Ashraf Integrated Energy Solutions stats 5 point plan Focus IPP procurement, Demand side management, Draft IRP, Development of the elecricity price plan Immediate Measures Re-deploy managers, maintenance, Eskom Operational Management, Partial Load Losses Trying to move from 72% to 78% energy availability factor by 2020 Restoration Majuba Duvha But coal might have run out in the area where the recommissioned power station is Get online Medupi 800 MW by Sep 2015 Kusile Improve management of Load Shedding and reduce confusion; and measuring load shedding (kWh) Co-generation STPPP proposal Negotiation Compilation and approval at Eskom Investment and Capital Assurance Committee (ICAS) Gas for Power Gen and Additional Sources of Supply Other IPPs Expedite existing (1000 MW); Coal (2500 MW); 80 possible small scale RE Generation projects (1 to 5 MW); re-commission Ingagane & Vierfontein Govt procurement process for the 80 IPPs: Dec 2015 DSM R9 to R15 per kWh to the economy [R72?] Mines, etc, 10% below 2008 levels Damage to machinery and equipment and labour; investor confidence and social trust not included R11bil per month R5 per kWh for diesel Eskom average cost is R0.67 per kWh excl new build Plus overstaffing, and over paying the staff Other Finance and procurement, skills, regulatory issues, LT issues with ST implications, communications Eskom's liquidity crisis; LT sustainability; LT tariff trajectory Technical skills shortages amongst Eskom's suppliers (expediting Visa applications); technical plant senior managers skills (11 empty positions); additional operating and maintenance staff (141 empty positions) Eskom reorganisation is required (BPP) Gas for Power Generation and Additional Sources of Supply Namibian floating gas storage plant; Moz gas supply pipeline used by SASOL: Imported LNG, OCGT conversion to gas or LNG Floating barges as Saldanha War room on electricity Structure Head is Deputy Minister of Energy & Deputy President EPME, DOE, DPE, DCOG, NT, GCIS, DTI, EDD, Eskom, Contracted Experts DCOG: Dept of Cooperative Governance Not specifically electricity, but starting with electricity Next Phase? KPI's for Eskom's operating divisions Many Depts Coordinate but don't do their work There is also the Financial Task Team address bottlenecks Started on 10 Dec 2014 The meet every Friday And they meet with BUSA every second Friday to deal with issues of cooperation SA supply must grow at 5% to meet the NDP goals Questions Eskom wants tariff increases, but we have had 4x increases already and we have less electricity; skills training; Medupi, Kusile, Ingula: when will they be completed? What about homeowner IPPs? Eskom's view is that its better to have a higher tariff so that we don't have load shedding! Does the 67 cents per kWh include Medupi and Kusile? The answer depends on a cost reflective tariff for Eskom where people won't move off the grid Why is Eskom training people at Medupi? China adds 1 GW of baseload per week; why can't we do this? ISMO

Upload: david-lipschitz

Post on 18-Aug-2015

65 views

Category:

Technology


0 download

TRANSCRIPT

Page 1: SANEA: The Eskom War Room 22nd July 2015

The Eskom War Room22nd July 2015

SANEADavid Lipschitz

People

Also AfricanUtility Week

Ashraf

Integrated EnergySolutions stats

5 point plan

Focus

IPP procurement, Demand sidemanagement, Draft IRP, Development

of the elecricity price plan Immediate Measures

Re-deploy managers, maintenance,Eskom Operational Management,

Partial Load Losses

Trying to move from 72% to 78%energy availability factor by 2020

RestorationMajuba

Duvha

But coal might have run out inthe area where the

recommissioned power stationis

Get online

Medupi

800 MW by Sep 2015

Kusile

Improve management of LoadShedding and reduce confusion;

and measuring load shedding (kWh)

Co-generation STPPP proposalNegotiation

Compilation and approval atEskom Investment and CapitalAssurance Committee (ICAS)

Gas for Power Gen andAdditional Sources of Supply

Other IPPs

Expedite existing (1000 MW); Coal (2500 MW);80 possible small scale RE Generation projects (1 to 5 MW);

re-commission Ingagane & Vierfontein

Govt procurement process forthe 80 IPPs: Dec 2015

DSM

R9 to R15 per kWh to theeconomy [R72?]

Mines, etc, 10%below 2008 levels

Damage to machinery and equipmentand labour; investor confidence and

social trust not included

R11bil per month

R5 per kWh for diesel

Eskom averagecost is R0.67 per kWh

excl new build Plus overstaffing, andover paying the staff

Other

Finance and procurement, skills,regulatory issues, LT issues with ST

implications, communications

Eskom's liquidity crisis; LTsustainability; LT tariff trajectory

Technical skills shortages amongst Eskom'ssuppliers (expediting Visa applications); technical plant senior managers

skills (11 empty positions); additional operating and maintenancestaff (141 empty positions)

Eskomreorganisation isrequired (BPP)

Gas for Power Generation andAdditional Sources of Supply

Namibian floating gas storage plant;Moz gas supply pipeline used by SASOL:

Imported LNG, OCGT conversion to gas or LNG

Floating bargesas Saldanha

War room onelectricity

Structure

Head is DeputyMinister of Energy& Deputy President EPME, DOE, DPE, DCOG, NT, GCIS, DTI, EDD,

Eskom, Contracted Experts

DCOG: Dept ofCooperativeGovernance

Not specificallyelectricity, but starting with electricity

Next Phase?

KPI's for Eskom'soperating divisions

Many Depts

Coordinate butdon't do their work

There is also theFinancial Task Team address bottlenecks

Started on 10 Dec 2014

The meet every Friday

And they meet with BUSA everysecond Friday to deal with

issues of cooperation

SA supplymust grow at 5%

to meet the NDP goals

Questions

Eskom wants tariff increases, but we have had 4xincreases already and we have less electricity;skills training; Medupi, Kusile, Ingula: when will

they be completed?

What abouthomeowner

IPPs?

Eskom's view is that its better tohave a higher tariff so that we don't

have load shedding!

Does the 67 cents per kWhinclude Medupi and Kusile?

The answer depends on a cost reflectivetariff for Eskom where people won't move

off the grid

Why is Eskom trainingpeople at Medupi?

China adds 1 GW of baseload perweek; why can't we do this?

ISMO