samsung total petrochemical c4 lpg tankc2286572.cdn.cloudfiles.rackspacecloud.com/c4writeup.pdfjc...

1
JC Carter teamed with Samsung Total Petrochemical (STP) for the C4 LPG Tank project in Korea. The project consisted of an earthquake-resistant design and included two JC Carter Submerged In-Tank Pumps. JC Carter pumps were selected for their compact size and excellent NPSH characteristic. This allowed STP to utilize an additional 2500 tons of C4. STP required suppliers to provide and deliver resources within a 12 month period and JC Carter successfully executed the project on time. The C4 LPG project was on a fast track beginning in April 2009. JC Carter installed and commissioned the pumps in May 2010, without incident, allowing the C4 facility to start on schedule. As a result, three suppliers (Han-Tech, Daewoo Engineering and JC Carter) were recognized for outstanding performance and contribution to the project. SAMSUNG TOTAL PETROCHEMICAL C4 LPG TANK Bill Osgood, CEO of JC Carter, accepting award from CEO of STP “In recognition of your remarkable contribution to the successful completion of LPT Tank Construction Project with superior technology and experienced management skill as a manufacturer of Submerged Type Cryopump and in honor of outstanding performance, we present this plaque with gratitude to your excellence.” Left to Right: CEO of JC Carter, President of Han-Tech , Senior Vice President of Daewoo Engineering, CEO of STP, Executive Vice President of STP Ribbon Cutting Ceremony

Upload: others

Post on 14-Aug-2021

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SAMSUNG TOTAL PETROCHEMICAL C4 LPG TANKc2286572.cdn.cloudfiles.rackspacecloud.com/C4Writeup.pdfJC Carter teamed with Samsung Total Petrochemical (STP) for the C4 LPG Tank project in

JC Carter teamed with Samsung Total Petrochemical (STP) for the C4 LPG Tank project in Korea. The project consisted of an earthquake-resistant design and included two JC Carter Submerged In-Tank Pumps. JC Carter pumps were selected for their compact size and excellent NPSH characteristic. This allowed STP to utilize an additional 2500 tons of C4. STP required suppliers to provide and deliver resources within a 12 month period and JC Carter successfully executed the project on time. The C4 LPG project was on a fast track beginning in April 2009. JC Carter installed and commissioned the pumps in May 2010, without incident, allowing the C4 facility to start on schedule.

As a result, three suppliers (Han-Tech, Daewoo Engineering and JC Carter) were recognized for outstanding performance and contribution to the project.

SAMSUNG TOTAL PETROCHEMICALC4 LPG TANK

Bill Osgood, CEO of JC Carter, accepting award from CEO of STP

“In recognition of your remarkable contribution to the successful completion of LPT Tank Construction Project with superior technology and experienced management skill as a manufacturer of Submerged Type Cryopump and in honor of outstanding performance, we present this plaque with gratitude to your excellence.”

Left to Right: CEO of JC Carter, President of Han-Tech , Senior Vice President of Daewoo Engineering, CEO of STP, Executive Vice President of STP

Ribbon Cutting Ceremony