sample heavy oil screening study prepared for epsilon energy ltd. 3-31-2009 gemini solutions inc....
TRANSCRIPT
Sample Heavy Oil Sample Heavy Oil Screening StudyScreening Study
Prepared For Epsilon Energy LTD.Prepared For Epsilon Energy LTD.3-31-20093-31-2009
Gemini Solutions Inc.Gemini Solutions Inc.
James L Buchwalter, P.E./PhD.James L Buchwalter, P.E./PhD.
Goal Of Sample Heavy Oil Goal Of Sample Heavy Oil Screening StudyScreening Study
Build model with crude properties similar Build model with crude properties similar to those found in the heavy Syrian Crudeto those found in the heavy Syrian Crude– Guess properties to allow vertical well rates of Guess properties to allow vertical well rates of
20 BOPD with 11 API crude20 BOPD with 11 API crude Run sensitivities to reservoir temperature Run sensitivities to reservoir temperature
increase from steam flood , horizontal increase from steam flood , horizontal versus vertical wells, and pattern aspect versus vertical wells, and pattern aspect ratio and development sizeratio and development size– These sensitivities can be used to understand These sensitivities can be used to understand
probable flow streams, economics, and rank probable flow streams, economics, and rank multiple prospects in a consistent fashionmultiple prospects in a consistent fashion
Basic Model AssumptionsBasic Model Assumptions
Kr propertiesKr properties 20% water 20% water
saturationsaturation
Well Production Profile, 20 yearsWell Production Profile, 20 years160 acres, no steam, vertical well160 acres, no steam, vertical well
Well Production Profile, 20 yearsWell Production Profile, 20 years160 acres, no steam, vertical well160 acres, no steam, vertical well
Sensitivity – Horizontal WellSensitivity – Horizontal Well160 acres, 3/1 aspect ratio, 3000 feet long160 acres, 3/1 aspect ratio, 3000 feet long
blue [=] horizontal well, green [=] vertical wellblue [=] horizontal well, green [=] vertical wellRecovery increase 4 fold !!Recovery increase 4 fold !!
Sensitivity – Horizontal WellSensitivity – Horizontal Well160 acres, 3/1 aspect ratio, 3000 feet long160 acres, 3/1 aspect ratio, 3000 feet long
Recovery increase 4 fold, 5% recovery factor !!Recovery increase 4 fold, 5% recovery factor !!
Horizontal WellHorizontal WellPressures after 20 yearsPressures after 20 years
160 acres, 3/1 aspect ratio, 3000 feet long 160 acres, 3/1 aspect ratio, 3000 feet long
Heat Oil With SteamHeat Oil With Steam
Original PVT and Original PVT and revised PVT on revised PVT on rightright– Oil viscosity drops Oil viscosity drops
from 71 cp to 13 cp from 71 cp to 13 cp at the bubble pointat the bubble point
6 fold increase in 6 fold increase in rate through rate through viscosity reductionviscosity reduction
Temperature Sensitivity – 160 acresTemperature Sensitivity – 160 acresVertical well [=] blue, vertical well + 180F, greenVertical well [=] blue, vertical well + 180F, green
4 fold increase in recovery!4 fold increase in recovery!
Temperature Sensitivity – 160 acresTemperature Sensitivity – 160 acresHorizontal well [=] blue, horizontal well + 180F, greenHorizontal well [=] blue, horizontal well + 180F, green
10 fold increase in recovery!10 fold increase in recovery!
Horizontal Well Versus Vertical Well Horizontal Well Versus Vertical Well +Steam+Steam
Both scenarios have similar profilesBoth scenarios have similar profilesPerhaps as alternative to steam horizontal well technology Perhaps as alternative to steam horizontal well technology
may be feasible (if vertical permeability sufficient)may be feasible (if vertical permeability sufficient)
Closing CommentsClosing Comments A base model can be built and history matchedA base model can be built and history matched A series of sensitivity models can be created to A series of sensitivity models can be created to
understand the best drilling and completion understand the best drilling and completion strategy for a fieldstrategy for a field
Screening models are adequate for ranking Screening models are adequate for ranking prospects and determining potential recovery prospects and determining potential recovery factors and well drilling/completion strategiesfactors and well drilling/completion strategies
More precise thermal project design requires a More precise thermal project design requires a true thermal simulator and this is recommended true thermal simulator and this is recommended for the final field designfor the final field design– Suggest CMG Stars simulatorSuggest CMG Stars simulator– This work will be an order of magnitude more expensive This work will be an order of magnitude more expensive
than the screening studies and take far longer than the screening studies and take far longer