sample goal methodology2019... · 2019. 8. 28. · the second project, runway 422 blast pads, -...

29
Monroe Regional Airport (MLU) Monroe, Louisiana Fiscal Years 2019 through 2021 Revised DBE GOAL METHODOLOGY Attachment Sponsor: City of Monroe, Louisiana For the period October 1, 2018 to September 30, 2021 DBE Point of Contact: Joycie Stewart, Administrative Clerk Monroe Regional Airport 5400 Operations Road, #201 Monroe, LA 71203 T – (318) 329-2462 F – (318) 329-2599 [email protected] July 25, 2018

Upload: others

Post on 15-Sep-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SAMPLE GOAL METHODOLOGY2019... · 2019. 8. 28. · The second project, Runway 422 Blast Pads, - involves engineering, construction, and pavement marking . The estimated value for

Monroe Regional Airport (MLU)

Monroe, Louisiana

Fiscal Years 2019 through 2021 Revised DBE GOAL METHODOLOGY

Attachment

Sponsor: City of Monroe, Louisiana

For the period October 1, 2018 to September 30, 2021

DBE Point of Contact: Joycie Stewart, Administrative Clerk Monroe Regional Airport 5400 Operations Road, #201 Monroe, LA 71203 T – (318) 329-2462 F – (318) 329-2599 [email protected]

July 25, 2018

Page 2: SAMPLE GOAL METHODOLOGY2019... · 2019. 8. 28. · The second project, Runway 422 Blast Pads, - involves engineering, construction, and pavement marking . The estimated value for

RReevv MMLLUU DDBBEE PPrrooggrraamm 22001199--22002211 GGooaallss PPaaggee 1

Overall Goals and Methodology Monroe Regional Airport (MLU)

Update for FYs 2019 through 2021 OVERALL GOALS (§26.45) Amount of goal: The overall goal for Monroe Regional Airport (MLU or the Airport) for Fiscal Years 2019 through 2021 (October 1, 2018 to September 30, 2021) is 5.15% of the Federal financial assistance that it will expend in DOT-assisted contracts with DBE contractors. Number of Projects to be covered by this contract goal: The Airport expects to fund four (4) DOT-assisted contracts during FYs 2019-2021:

1. 2019 Runway 14-32 - Phase II Construction; 2. 2019 Runway 4-22 Blast Pads; 3. 2020 Taxiway C Realignment - Planning & Design; and 4. 2021 Taxiway C Realignment – Phase I Construction.

The first project, Runway 14-32 - Phase II Construction, involves engineering, trucking, runway construction, and pavement marking. The estimated value for this project is $4,950,000 (Federal portion). The second project, Runway 4-22 Blast Pads, involves engineering, construction, and pavement marking. The estimated value for this project is $450,000 (Federal portion). The third project, Design and Planning of Runway Extension, involves engineering and airport planning. The estimated value for this project is $1,300,000 (Federal portion). The fourth project, Phase I Construction of Taxiway C Realignment, involves engineering, taxiway construction, pavement marking, and local trucking. The estimated value of this project is $6,000,000 (Federal portion). The Airport has set a goal of expending $654,214 with certified DBE firms yielding a participation rate of 5.15%. Market Area: After careful research of the historical bidding practices and responses to requests for professional services, the Airport has determined that its market area is made up of the following Parishes/Counties:

Page 3: SAMPLE GOAL METHODOLOGY2019... · 2019. 8. 28. · The second project, Runway 422 Blast Pads, - involves engineering, construction, and pavement marking . The estimated value for

RReevv MMLLUU DDBBEE PPrrooggrraamm 22001199--22002211 GGooaallss PPaaggee 2

1. East Carroll Parish, Louisiana 2. Franklin Parish, Louisiana 3. Madison Parish, Louisiana 4. Morehouse Parish, Louisiana 5. Ouchita Parish, Louisiana 6. Richland Parish, Louisiana 7. Tensas Parish, Louisiana 8. Union Parish, Louisiana 9. West Carroll Parish, Louisiana

The analysis prepared in determining this included a review of the responses to advertised opportunities for projects awarded by the Airport over the last several years. This period has included the following projects:

• 2017 Runway 14-32 Design (prime located outside the State); • 2016 Phase II Construction of Perimeter Road (prime contractor located in

Ouachita Parish); and • 2014 Phase I Construction of Perimeter Road (prime contractor located in

Ouachita Parish) As can be seen by this analysis, the majority of the respondents were located in the identified Market Area and a substantial amount of contracting dollars has been expended in the same area. Consequently, the Airport has determined that the appropriate Market Area includes the nine parishes described previously. Method: In accordance with the current FAA and DOT guidance, the Airport is utilizing a two-step process in setting its goals for FYs 2019-2021. The first step examines the relative availability of DBE firms in the established Market Area and the second step allows for adjustments to the relative availability based on:

Information from available Disparity Studies; Information gained from research and outreach with:

Organizations servicing or representing DBE’s; Federal, State and Local agencies that procure services; Agencies charged with enforcing Civil Rights Law; and State and Local Agencies responsible for minority/women’s affairs.

Historical accomplishments of the Airport’s DBE program.

Page 4: SAMPLE GOAL METHODOLOGY2019... · 2019. 8. 28. · The second project, Runway 422 Blast Pads, - involves engineering, construction, and pavement marking . The estimated value for

RReevv MMLLUU DDBBEE PPrrooggrraamm 22001199--22002211 GGooaallss PPaaggee 3

Relative Availability: The following documents the relative availability for the proposed project and will be used in the overall calculation of relative availability for FY 2019-2021 goals. The following is a summary of the method used to calculate this goal: Step 1: The method used to calculate the relative availability of DBEs for Step 1 in this process is 26.45(c) (1) DBE Directories and Census Bureau Data. The base figure was determined by dividing the total DBE firms in the local market area by the total of all firms (both compiled according to the relevant NAICS/SIC project codes). The following table identifies the components of the project broken down by trade with appropriate NAICS codes. Project 1 – Runway 14-32 - Phase II Construction (2019) This project will extend the runway from 5,000 feet to 6,300 feet to accommodate the anticipated passenger loading requirements and minimize the impacts to the Airport’s operation during required closures of the primary runway. It involves engineering design, runway construction, pavement marking, and local trucking and should provide opportunities for DBE participation as documented in the following table: NAICS code

Work Item

Weighting Factor1

DBEs in Market Area

All Available Firms

Relative Availability

541330 Engineering Services 5% 0 36 0.00% 484110 Gen Freight Trucking, Local 10% 2 22 0.91% 237310 Runway Construction 75% 1 18 4.17% 237310 Pavement Marking (#732) 10% 0 18 0.00% Totals for this Contract 100% 3 94 5.08% 1 Weighting factor is based on % of total project costs in each category. The estimate for the Federally-funded portion of this project is $4,950,000. As identified in the above table, this project involves engineering design, trucking, and runway construction. Therefore, the baseline DBE goal for this contract should be weighted to more accurately reflect the potential DBE participation, as shown below. Base Figure = % Eng x # DBE – Local Market (0) + % Truck x # DBE – Local Market (2) + # All Firms (36) # of All Firms (22) % Rwy Constr x # DBE – Local Market (1) + % Pvmt Mark x # DBE – Local Market (0) # of All Firms (18) # of All Firms (18) Base Figure = 5% x 0/36 + 10% x 2/22 + 75% x 1/18 + 10% x 0/18 This calculation provides a Base Figure of 5.08%.

Page 5: SAMPLE GOAL METHODOLOGY2019... · 2019. 8. 28. · The second project, Runway 422 Blast Pads, - involves engineering, construction, and pavement marking . The estimated value for

RReevv MMLLUU DDBBEE PPrrooggrraamm 22001199--22002211 GGooaallss PPaaggee 4

Project 2 –Runway 4-22 Blast Pads This project involves pavement overlay and remarking of the Blast Pads for Runway 4-22 and should provide opportunities for DBE participation as documented in the following table: NAICS code

Work Item Weighting Factor1

DBEs in Market Area

All Available Firms

Relative Availability

541330 Engineering Services 10% 0 36 0.00% 237310 Runway Construction 80% 1 18 4.44% 237310 Painted Pavement Striping (# 732) 10% 0 18 0.00%

Totals for this Contract 100% 1 72 4.44%

1 Weighting factor is based on % of total project costs in each category. The estimate for the Federally-funded portion of this project is $450,000. As identified in the above table, the relative availability of DBE contractors in the MLU market area includes engineering, trucking, and pavement marking. Therefore, the baseline DBE goal for this contract should be weighted to more accurately reflect the potential DBE participation, as shown below. Base Figure = % Eng Serv x # DBE – Local Market (0) + % Rwy Constr x # DBE – Local Market (1) + # of All Firms (36) # of All Firms (18) + % Striping x # DBE – Local Market (0) # of All Firms (18) Base Figure = 10% x 0/36 + 80% x 1/18 + 10% x 0/18 This calculation provides a Base Figure of 4.44%.

Page 6: SAMPLE GOAL METHODOLOGY2019... · 2019. 8. 28. · The second project, Runway 422 Blast Pads, - involves engineering, construction, and pavement marking . The estimated value for

RReevv MMLLUU DDBBEE PPrrooggrraamm 22001199--22002211 GGooaallss PPaaggee 5

Project 3 – Taxiway C Realignment – Planning & Design This project involves planning and design of the realignment and construction of Taxiway C so that it is a standard parallel taxiway to Runway 4-22. It will include all planning and design for all grading, drainage, paving, lighting, and marking components for the standard taxiway, which at completion will be approximately 7,500' long x 50' wide. This project should provide opportunities for DBE participation as documented in the following table: NAICS code

Work Item Weighting Factor1

DBEs in Market Area

All Available Firms

Relative Availability

541330 Engineering Services 75% 0 36 0.00% 541990 Airport Planning (#C30) 25% 0 0 0.00%

Totals for this Contract 100% 0 36 0.00%

1 Weighting factor is based on % of total project costs in each category. The estimate for the Federally-funded portion of this project is $1,300,000. As identified in the above table, the relative availability of DBE contractors in the MLU market area includes engineering and airport planning. Therefore, the baseline DBE goal for this contract should be weighted to more accurately reflect the potential DBE participation, as shown below. Base Figure = % Eng Serv x # DBE – Local Market (0) + % Plan x # DBE – Local Market (0) # All Firms (36) # of All Firms (0) Base Figure = 75% x 0/36 + 25% x 0/0 This calculation provides a Base Figure of 0.00%.

Page 7: SAMPLE GOAL METHODOLOGY2019... · 2019. 8. 28. · The second project, Runway 422 Blast Pads, - involves engineering, construction, and pavement marking . The estimated value for

RReevv MMLLUU DDBBEE PPrrooggrraamm 22001199--22002211 GGooaallss PPaaggee 6

Project 4 – Taxiway C Realignment - Phase I Construction This project includes Phases I construction to realign Taxiway C so that it is a standard parallel taxiway to Runway 4-22. It will include engineering, construction, trucking, and pavement marking for the taxiway, which at completion will be approximately 7,500' long x 50' wide. It should provide opportunities for DBE participation as documented in the following table: NAICS code

Work Item Weighting Factor1

DBEs in Market Area

All Available Firms

Relative Availability

541330 Engineering Services 10% 0 36 0.00% 484110 Gen Freight Trucking, Local 10% 2 22 0.91% 237310 Taxiway Construction 70% 1 18 3.89% 237310 Pavement Striping (#732) 10% 0 18 0.00%

Totals for this Contract 100% 3 94 4.80%

1 Weighting factor is based on % of total project costs in each category. The estimated cost for the Federally-funded portion of this project is $6,000,000. As identified in the above table, the relative availability of DBE contractors in the MLU market area includes engineering, taxiway construction, pavement marking, and local trucking. Therefore, the baseline DBE goal for this contract should be weighted to more accurately reflect the potential DBE participation, as shown below. Base Figure = % Eng x # DBE – Local Market (0) + % Constr x # DBE – Local Market (1) + # All Firms (36) # of All Firms (18) % Pvmt Mark x DBE – Local Market (0) % Truck x # DBE – Local Market (2) # All Firms (18) # All Firms (22) Base Figure = 10% x 0/36 + 70% x 1/18 + 10% x 0/18 + 10% x 2/22 This calculation provides a Base Figure of 4.80%. Data Source: DBEs in Local Market Area: State of Louisiana Department of Transportation and

Development DBE directory for Federal Aid Projects in the following parishes: Calcasieu, Parish, Louisiana

All Available Firms: Census Data from American Factfinder website

Page 8: SAMPLE GOAL METHODOLOGY2019... · 2019. 8. 28. · The second project, Runway 422 Blast Pads, - involves engineering, construction, and pavement marking . The estimated value for

RReevv MMLLUU DDBBEE PPrrooggrraamm 22001199--22002211 GGooaallss PPaaggee 7

Weight Factors: Following the procedures to add weight factors based on the individual project estimates, an additional weight factor is applied based on each project’s percentage of the total amount of anticipated award construction dollars.

Project Amount of Estimate

% of Total / Weight Factor

1-Rwy 14-32 Ph II Construction $4,950,000 39.0% 2-Rwy 4-22 Blast Pads $450,000 3.5% 3-Design of Twy C Realignment $1,300,000 10.2% 4-Ph I Construction of Twy C Realign $6,000,000 47.2% Total $12,700,000 100.0% Overall Base Figure: The Overall Base Figure is calculated by multiplying each project's (contract) base figure by its weight factor, and adding them together. Overall Base Figure=(5.08% x 0.39%) + (4.44% x 0.035%) + (0.0% x 0.102%) + (4.80% x 0.472%) = 1.98% + 0.16% + 0.00% + 2.27% = 4.40% Overall Base Figure = 4.40% Step 2: This step is intended to adjust the “base figure” percentage from Step 1 so that it reflects as accurately as possible the DBE participation the recipient would expect in the absence of discrimination. First, the Airport searched out the availability of information from Disparity Studies. This was unable to document the preparation of any disparity studies for the area over the course of the last seven years. To document this fact, the Airport first performed an internet search which yielded two databases of disparity studies – both of which are maintained by the DOT Office of Small and Disadvantaged Business Utilization: Disparity Studies Performed Since 1998 and found at http://osdbuweb.dot.gov/disparity/

Disparity Studies Performed Since 1998 and found at http://osdbuweb.dot.gov/disparity/

Partial List of Disparity Studies conducted for State and Local Agencies and found at http://osdbuweb.dot.gov/business/Dbe/disparit3.xls

Finding no available data at either of these sites, the Airport contacted the following entities in May of 2018 and was unable to document any other documentation of disparity studies performed for the region:

Page 9: SAMPLE GOAL METHODOLOGY2019... · 2019. 8. 28. · The second project, Runway 422 Blast Pads, - involves engineering, construction, and pavement marking . The estimated value for

RReevv MMLLUU DDBBEE PPrrooggrraamm 22001199--22002211 GGooaallss PPaaggee 8

The North Louisiana Economic Partnership located in Monroe, LA The North Delta Regional Planning & Development District, located in

Monroe, LA Historical DBE Accomplishments: Since none of these sources was able to provide the Airport with any available disparity study information and with the lack of any disparity study being performed in the region, the Airport must then look to historical performance and DBE goal accomplishment under previous FAA grants for similar types of construction. The Airport reviewed its historical DBE participation achievement in order to ensure the goal’s reasonableness. By averaging the median historical DBE participation rate with the relative availability calculated in Step 1, an adjusted DBE goal is calculated. The projects anticipated for FYs 2019-2021 include design and construction. A review of the historic overall DBE goals accomplished at the Airport for similar work in recent years revealed that two projects were of the same nature. Therefore, they have been included in the median accomplishment calculation, as summarized below.

MLU Historical DBE Accomplishments for DOT-Assisted Contracts Projects

Fiscal Year Goal Accomplishment Type of Work FY 2017 7.73% 4.60% Runway 14-32 Design FY 2016 7.73% 5.90% Phase II Perimeter Road Construction FY 2014 5.72% 6.00% Phase I Perimeter Road Construction 5.90% Median Accomplishments for all Projects

The median percentage of accomplishment for all similar projects over recent years is therefore determined to be 5.90%. When we compare this with the proposed base figure for FY 2019-2021, we determine that our adjusted overall goal is: 5.15%. (Base figure) 4.40% + (Historical median) 5.90% divided by 2 = 5.15% (Adjusted Goal) Breakout of Estimated Race-Neutral and Race-Conscious Participation: The Airport will strive to meet the maximum feasible portion of its overall goal by using race-neutral means of facilitating DBE participation. The Airport uses the following race-neutral means to increase DBE participation: By arranging solicitations, times for the presentations of bids, quantities, specifications, and delivery schedules in ways to facilitate DBE, and other small businesses, participation (e.g. requiring and/or encouraging prime contractors to subcontract portions of work that they might otherwise perform with their own forces). Additionally, the Airport and its engineer provide all potential bidders with information about the State of Louisiana’s Department of Transportation and Development web site for certified DBE contractors found at:

Page 10: SAMPLE GOAL METHODOLOGY2019... · 2019. 8. 28. · The second project, Runway 422 Blast Pads, - involves engineering, construction, and pavement marking . The estimated value for

RReevv MMLLUU DDBBEE PPrrooggrraamm 22001199--22002211 GGooaallss PPaaggee 9

http://www.dotd.state.la.us/cgi-bin/construction.asp Over the history of data tracking, there have been few occasions when the Airport’s annual goals were exceeded. As such, MLU intends to meet the entire goal through race-conscious means. When achievement exceeds the goal, MLU will be in a position to meet the goal through race-neutral means. However, since actual achievement has regularly fallen short of the goal, no race-neutral participation will be assumed. Public Participation: The Airport encourages the participation of DBEs in its Development Program. In an effort to reach the available DBE community, seek out public input into the goal setting process, and to ensure wide distribution of the information contained in this document, the Airport makes copies of its DBE Program and Annual Goals Setting Document available to the local chapter of the Associated General Contractors, local architects and engineers, prospective bidders, and other interested parties. In order to encourage participation by Certified DBE firms, the Airport:

1. Provides prospective bidders with information on the State of Louisiana’s certified list of DBE contractors.

2. Contacts the State of Louisiana to ascertain the availability of DBE contractors in the Market Area and work on ways to encourage participation.

To comply with Code of Federal Regulations Title 49, Part 26, Section 26.45(g)(1)(i), the Airport held a teleconference on July 23, 2018, to:

• Reach out to minority, women's and general contractor groups to discuss opportunities for DBEs;

• Discuss the process to become a certified-DBE; • Address issues that contractors face with the DBE certification process; • Present the proposed DBE Goal for FYs 2019-2021, and • Discuss proposed construction projects that are planned at each airport during

this period.

Page 11: SAMPLE GOAL METHODOLOGY2019... · 2019. 8. 28. · The second project, Runway 422 Blast Pads, - involves engineering, construction, and pavement marking . The estimated value for

RReevv MMLLUU DDBBEE PPrrooggrraamm 22001199--22002211 GGooaallss PPaaggee 10

The following parties were invited to participate:

• North Louisiana Economic Council; • North Delta Regional Planning & Development; • Louisiana Minority Business Council; • Women’s Business Enterprise Council; • Hispanic Chamber of Commerce of Louisiana; • Louisiana Small Business Development Center, Monroe Chapter; • Louisiana Association of General Contractors; • LA DOTD DBE/SBE Program Manager; and • All Certified DBEs in the market area.

Attached are the following appendices regarding the consultation teleconference:

A – Email invitation to the July 23, 2018 teleconference. B – List of the participants invited to attend the teleconference. C – PDF of the online presentation. D – List of attendees. E – Questions/Comments. F – Screenshot of MLU website notice.

Page 12: SAMPLE GOAL METHODOLOGY2019... · 2019. 8. 28. · The second project, Runway 422 Blast Pads, - involves engineering, construction, and pavement marking . The estimated value for

RReevv MMLLUU DDBBEE PPrrooggrraamm 22001199--22002211 GGooaallss PPaaggee 11

Published Notice: The following is the notice of availability of the Airport’s proposed goals and goal setting methodology:

WEBSITE PUBLIC NOTICE

Disadvantaged Business Enterprise (DBE) Goals for Federal Fiscal Years 2019-2021

The Monroe Regional Airport hereby announces its fiscal years 2019-2021 DBE goals for airport construction projects. The proposed goals and goal setting methodology is available for inspection between 7:00 a.m. and 3:30 p.m., Monday through Friday beginning July 26, 2018, through August 25, 2018, in the offices of the Airport Director, 5400 Operations Road, Monroe, LA, 71203. Comments can be sent to either of the following addresses:

Joycie Stewart Federal Aviation Administration Administrative Clerk Civil Rights Staff, AWP-9 5400 Operations Road #201 PO Box 92007 Monroe, LA 71203 Los Angeles, CA 90009-2007

Page 13: SAMPLE GOAL METHODOLOGY2019... · 2019. 8. 28. · The second project, Runway 422 Blast Pads, - involves engineering, construction, and pavement marking . The estimated value for

RReevv MMLLUU DDBBEE PPrrooggrraamm 22001199--22002211 GGooaallss PPaaggee 12

Contract Goals: Historically, MLU has used race-conscious measures in obtaining its overall contract goals on federally assisted contracts. We estimate that, in meeting our overall adjusted goal of 5.15% we will obtain 0% from race-neutral participation and 5.15% from race-conscious measures (e.g. setting contract goals). The estimation of race-neutral participation and race-conscious measures percentages are based on past participation and established goals. The Airport will use contract goals to meet any portion of the overall goal the Airport does not project being able to meet using race-neutral means. Contract goals are established so that, over the period to which the overall goal applies, they will cumulatively result in meeting any portion of the Airport’s overall goal that is not projected to be met through the use of race-neutral means. The Airport will establish contract goals only for those DOT-assisted contracts that have subcontracting possibilities. It is not necessary to establish a contract goal on every contract, and the size of contract goals will be adapted to the circumstances of each contract (e.g., type and location of work, availability of DBEs to perform the particular type of work).

Page 14: SAMPLE GOAL METHODOLOGY2019... · 2019. 8. 28. · The second project, Runway 422 Blast Pads, - involves engineering, construction, and pavement marking . The estimated value for

RReevv MMLLUU DDBBEE PPrrooggrraamm 22001199--22002211 GGooaallss PPaaggee 13

APPENDIX

PUBLIC CONSULTATION DOCUMENTATION

A – Email invitation to the July 23, 2018 teleconference. B – List of the participants invited to attend the teleconference. C – PDF of the online presentation. D – List of attendees. E – Questions/Comments. F – Screenshot of MLU website notice.

Page 15: SAMPLE GOAL METHODOLOGY2019... · 2019. 8. 28. · The second project, Runway 422 Blast Pads, - involves engineering, construction, and pavement marking . The estimated value for

You are invited to attend a teleconference regarding Disadvantaged Business Enterprise (DBE) participation for upcoming construction projects at the Monroe Regional Airport (MLU), in Monroe, Louisiana.

Monday, July 23, 2018, at 2:00 PM (CST) As part of the Federal Aviation Administration’s public consultation requirement for the Disadvantaged Business Enterprise (DBE) goal-setting process*, Kutchins & Groh, LLC is hosting a teleconference to notify currently registered DBE companies within the market area for MLU of potential upcoming construction projects. The purpose of this teleconference is to:

• Reach out to minority, women's and general contractor groups to discuss opportunities for DBEs

• Discuss the process to become a certified-DBE • Identify issues that contractors face with the DBE certification process • Present the proposed DBE Goal for the Monroe Regional Airport for Federal Fiscal

Years 2019-2021 • Review proposed construction projects that are planned at the Airport during this period

To register for this teleconference, please click on the link below entitled "Register.” Once your registration is complete, you will be provided will the teleconference details and the dial-in information. Prior to the start of the teleconference, a PDF version of the presentation that will be presented during the teleconference will be sent to all registered participants via email.

Please feel free to share this with anyone else that you think might be interested in participating in the teleconference. *Code of Federal Regulations Title 49, Part 26, Section 26.45(g)(1)(i)

MLU DBE Teleconference Monday, July 23, 2018 2:00 pm | Central Daylight Time (Chicago, GMT-05:00) | 1 hr

Register

After your request has been approved, you'll receive instructions for joining the meeting.

Need help? Go to http://collaborationhelp.cisco.com.

Lisa Lawson
Typewritten Text
Appendix A
Page 16: SAMPLE GOAL METHODOLOGY2019... · 2019. 8. 28. · The second project, Runway 422 Blast Pads, - involves engineering, construction, and pavement marking . The estimated value for

#Ty

pe:

Com

pany

-Org

aniz

atio

n N

ame:

Cont

act:

Emai

l Add

ress

:Ci

ty:

Type

of W

ork:

1RE

Ben

tzM

elan

ie B

entz

rebe

ntzin

c@be

llsou

th.n

etM

onro

eTr

ucki

ng2

Amy'

s Con

trac

tor S

ervi

ces L

LCAn

nett

e M

artin

anne

tte@

amys

llc.c

omDe

nham

Spr

ings

Truc

king

3Ja

ckso

n &

Fon

teno

t Con

st. C

o., I

nc.

Ande

rson

Jack

son

asj3

@be

llsou

th.n

etM

onro

eCo

nstr

uctio

n4

RK C

onst

ruct

ion,

Inc

Rona

ld C

alho

unrk

06@

yaho

o.co

mM

onro

eCo

nstr

uctio

n5

Robi

nson

Con

stru

ctio

nBr

ian

Robi

nson

bria

nrob

inso

n02@

yaho

o.co

mM

onro

eCo

nstr

uctio

n

6N

orth

Lou

isian

a Ec

onom

ic P

artn

ersh

ipSc

ott M

artin

ezsm

artin

ez@

nlep

.org

Mon

roe

Repr

esen

tativ

e7

Nor

th D

elta

Reg

iona

l Pla

nnin

g &

Dev

elop

men

tDa

vid

Cree

dda

vid@

nort

hdel

ta.o

rgM

onro

eRe

pres

enta

tive

8LA

Min

ority

Bus

ines

s Cou

ncil

Alvi

n W

illia

ms

awill

iam

s@la

mbc

.org

New

Orle

ans

Repr

esen

tativ

e9

Wom

en’s

Bus

ines

s Ent

erpr

ise C

ounc

ilEv

elyn

Kin

gev

elyn

@w

becs

outh

.org

Met

airie

Repr

esen

tativ

e10

Hisp

anic

Cha

mbe

r of C

omm

erce

of L

ouisi

ana

info

@hc

cl.b

izN

ew O

rlean

sRe

pres

enta

tive

11LA

Sm

all B

usin

ess D

evel

opm

ent C

tr-M

onro

elsb

dc.u

lm@

lsbdc

.org

M

onro

eRe

pres

enta

tive

12LA

Ass

ocia

ted

Gene

ral C

ontr

acto

rsSt

eve

Terr

illst

evet

@la

gc.o

rgM

onro

eRe

pres

enta

tive

13LA

DO

TD D

BE/S

BE P

rogr

am M

anag

erRe

my

Grav

esRe

my.

Grav

es@

LA.G

OV

Bato

n Ro

uge,

LA

LA D

OTD

14Ai

rpor

t Dire

ctor

Ron

Phili

psRo

n.Ph

illip

s@ci

.mon

roe.

la.u

sM

onro

eAi

rpor

t15

DBEL

OJo

ycie

Ste

war

tJo

ycie

.Ste

war

t@ci

.Mon

roe.

La.U

SM

onro

eAi

rpor

t

16Ku

tchi

ns &

Gro

h, L

LCBr

adKu

tchi

nsbr

ad@

kutc

hins

-gro

h.co

mM

ansf

ield

, TX

Cons

ulta

nt17

Kutc

hins

& G

roh,

LLC

Greg

Gro

hgr

eg@

kutc

hins

-gro

h.co

mN

ew O

rlean

sCo

nsul

tant

18Ku

tchi

ns &

Gro

h, L

LCLi

sa L

awso

nlis

a@ku

tchi

ns-g

roh.

com

New

Orle

ans

Cons

ulta

nt

K&G

LIST

OF

INVI

TEES

FO

R M

LU T

ELEC

ON

FERE

NCE

ON

MO

NDA

Y 7-

23-1

8 AT

2:0

0 PM

(EST

)

APPE

NDI

X B

CONTRACTORS CONTRACTOR REP'S MLU

Page 17: SAMPLE GOAL METHODOLOGY2019... · 2019. 8. 28. · The second project, Runway 422 Blast Pads, - involves engineering, construction, and pavement marking . The estimated value for

Mo

nro

e R

eg

ion

al

Airp

ort

DB

E T

ele

con

fere

nce

July

23,

20

182:

00

PM

CS

T

Lisa Lawson
Typewritten Text
Appendix C
Page 18: SAMPLE GOAL METHODOLOGY2019... · 2019. 8. 28. · The second project, Runway 422 Blast Pads, - involves engineering, construction, and pavement marking . The estimated value for

Ce

rtif

ied

DB

Es

Ac

ro

ss

Air

po

rt’s

Ma

rk

et A

re

a

Te

leco

nfe

ren

ce P

artic

ipan

ts

Mo

nro

e R

eg

ion

al

Air

po

rt S

ta

ff:

Ro

n P

hill

ips,

Airp

ort

Dire

cto

rJo

ycie

Ste

war

t, D

BE

Lia

iso

n O

ffic

er

Pro

fe

ss

ion

al

& E

co

no

mic

De

ve

lop

me

nt O

rg

an

iza

tio

ns

:

●N

ort

h L

ou

isia

na

Eco

no

mic

Co

un

cil

●N

ort

h D

elt

a R

eg

ion

al P

lan

nin

g &

De

velo

pm

en

t●

Lo

uis

ian

a M

ino

rity

Bu

sin

ess

Co

un

cil

●W

om

en

’s B

usi

ne

ss E

nte

rpris

e C

ou

nci

l●

His

pan

ic C

ham

be

r o

f C

om

me

rce

of

Lo

uis

ian

a●

Lo

uis

ian

a S

mal

l Bu

sin

ess

De

velo

pm

en

t C

en

ter,

M

on

roe

Ch

apte

r●

Lo

uis

ian

a A

sso

ciat

ion

of

Ge

ne

ral L

A C

on

trac

tors

●L

A D

OT

D D

BE

/S

BE

Pro

gra

m M

anag

er

Pre

sen

ted

by

Ku

tch

ins

& G

roh

, LL

C

Co

ns

ult

an

t: K

utc

hin

s &

Gro

h, L

LC

Page 19: SAMPLE GOAL METHODOLOGY2019... · 2019. 8. 28. · The second project, Runway 422 Blast Pads, - involves engineering, construction, and pavement marking . The estimated value for

Te

leco

nfe

ren

ce P

urp

ose

●R

eac

h o

ut

to m

ino

rity,

wo

me

n's

an

d g

en

era

l co

ntr

acto

r g

rou

ps

to

dis

cuss

op

po

rtu

niti

es

for

DB

Es

●D

iscu

ss t

he

pro

cess

to

be

com

e a

ce

rtifi

ed

-DB

E●

Ad

dre

ss is

sue

s th

at c

on

trac

tors

fac

e w

ith t

he

DB

E c

ert

ifica

tion

pro

cess

●P

rese

nt

the

pro

po

sed

DB

E G

oal

s fo

r th

e M

on

roe

Re

gio

nal

fo

r F

ed

era

l F

isca

l Ye

ars

2019

-20

21●

Dis

cuss

th

e p

rop

ose

d c

on

stru

ctio

n p

roje

cts

that

are

pla

nn

ed

at

the

A

irpo

rt d

urin

g t

his

pe

riod

●D

iscu

ss D

BE

Go

al S

ett

ing

Pro

cess

Pre

sen

ted

by

Ku

tch

ins

& G

roh

, LL

C

Page 20: SAMPLE GOAL METHODOLOGY2019... · 2019. 8. 28. · The second project, Runway 422 Blast Pads, - involves engineering, construction, and pavement marking . The estimated value for

Airp

ort

’s M

arke

t A

rea

Pre

sen

ted

by

Ku

tch

ins

& G

roh

, LL

C

Page 21: SAMPLE GOAL METHODOLOGY2019... · 2019. 8. 28. · The second project, Runway 422 Blast Pads, - involves engineering, construction, and pavement marking . The estimated value for

New

Orl

eans

Reg

iona

l Tr

ansi

t Au

thor

ity

Clic

k he

re f

or W

ebsi

te

Lo

uis

ian

a C

ert

ifyin

g A

ge

nci

es

Dep

artm

ent

of T

rans

port

atio

n an

d D

evel

opm

ent

Clic

k he

re f

or W

ebsi

te

Cons

truc

tion

Let

ting

In

form

atio

n

Clic

k he

re f

or W

ebsi

teP

rese

nte

d b

y K

utc

hin

s &

Gro

h, L

LC

Loui

s Ar

mst

rong

New

Orl

eans

In

tern

atio

nal A

irpo

rt

Clic

k he

re f

or W

ebsi

te

Page 22: SAMPLE GOAL METHODOLOGY2019... · 2019. 8. 28. · The second project, Runway 422 Blast Pads, - involves engineering, construction, and pavement marking . The estimated value for

DB

E C

ert

ific

ati

on

Pro

ce

ss

Pre

se

nte

d b

y K

utc

hin

s &

Gro

h, L

LC

LA

DB

E P

roc

ess In

fo:

Clic

k H

ere

fo

r W

eb

sit

e

Page 23: SAMPLE GOAL METHODOLOGY2019... · 2019. 8. 28. · The second project, Runway 422 Blast Pads, - involves engineering, construction, and pavement marking . The estimated value for

●T

he

ce

rtif

ica

tio

n p

roc

ess t

ak

es a

pp

roxim

ate

ly 5

-6

we

ek

s.

●T

he

re is n

o "

exp

ira

tio

n"

da

te. A

fir

m is c

ert

ifie

d a

s l

on

g a

s t

he

y m

ee

t th

e

elig

ibilit

y r

eq

uir

em

en

ts a

nd

su

bm

it a

No

Ch

an

ge

Aff

ida

vit

an

nu

all

y.

●F

irm

s l

oc

ate

d in

Ne

w O

rle

an

s a

nd

su

rro

un

din

g a

rea

s m

ay

ap

ply

to

an

y o

f th

e

4 c

ert

ify

ing

ag

en

cie

s. If

lo

ca

ted

an

yw

he

re e

lse

in

th

e s

tate

th

ey

mu

st

ap

ply

to

DO

TD

.

●D

BE

fir

ms a

re c

ert

ifie

d in

sp

ec

ific

No

rth

Am

eri

ca

n In

du

str

y C

lassif

ica

tio

n

Co

de

s (

NA

ICS

) a

nd

DO

TD

wo

rk t

yp

es.

●Y

ou

ca

n n

arr

ow

yo

ur

se

arc

h o

f th

e U

CP

DB

E D

ire

cto

ry b

y t

he

se

sp

ec

ific

co

de

s a

t th

is l

ink

: h

ttp

://

ww

w8

.do

td.la

.go

v/

UC

P/

UC

PS

ea

rch

.asp

x.

●T

o a

ssis

t in

se

ttin

g D

BE

go

als

, th

e U

CP

Dir

ec

tory

ma

y b

e "

Exp

ort

ed

to

Exc

el"

.

DB

E C

ert

ific

ati

on

FA

Qs/

Issu

es

Pre

se

nte

d b

y K

utc

hin

s &

Gro

h, L

LC

Page 24: SAMPLE GOAL METHODOLOGY2019... · 2019. 8. 28. · The second project, Runway 422 Blast Pads, - involves engineering, construction, and pavement marking . The estimated value for

ST

EP

1: I

de

ntif

y re

lativ

e a

vaila

bili

ty o

f D

BE

-ce

rtifi

ed

co

ntr

acto

rs, v

en

do

rs &

co

nsu

ltan

ts

ST

EP

2: A

dju

st t

he

go

al b

ase

d o

n p

ast

par

ticip

atio

n o

f D

BE

s an

d a

vaila

ble

st

ud

ies

and

oth

er

info

rmat

ion

DB

E G

oal

Se

ttin

g P

roce

ss

Pre

sen

ted

by

Ku

tch

ins

& G

roh

, LL

C

Page 25: SAMPLE GOAL METHODOLOGY2019... · 2019. 8. 28. · The second project, Runway 422 Blast Pads, - involves engineering, construction, and pavement marking . The estimated value for

DB

E G

oa

l: 5

.15

%

FY

20

19

-2

02

1 D

OT

Assis

ted

Pro

jec

ts:

20

19

Ru

nw

ay

14

-3

2 -

Ph

ase

II C

on

str

uc

tio

n;

20

19

Ru

nw

ay

4-2

2 B

last

Pa

ds;

20

20

Ta

xiw

ay

C R

ea

lig

nm

en

t -

Pla

nn

ing

&; D

esig

n;

20

21 T

axiw

ay

C R

ea

lig

nm

en

t -

Ph

ase

I C

on

str

uc

tio

n

Mo

nro

e R

eg

ion

al

Air

po

rtM

on

roe

, L

ou

isia

na

Pre

se

nte

d b

y K

utc

hin

s &

Gro

h, L

LC

DB

E G

oa

ls: k

utc

hin

s-g

roh

.co

m/

20

18

mlu

db

eg

oa

ls

Fe

de

ral

All

oc

ati

on

: $

12

,70

0,0

00

Exp

ec

ted

DB

E A

pp

ort

ion

me

nt:

$6

54

,214

Page 26: SAMPLE GOAL METHODOLOGY2019... · 2019. 8. 28. · The second project, Runway 422 Blast Pads, - involves engineering, construction, and pavement marking . The estimated value for

Co

nta

cts

Fe

de

ral

Av

iati

on

Ad

min

istr

ati

on

Civ

il R

igh

ts S

taff

, A

WP

-9

PO

Bo

x 9

20

07

Lo

s A

ng

ele

s, C

A 9

00

09

-2

00

7

LA

DO

TD

DB

E/

SB

E P

rog

ram

Ma

na

ge

r

DO

TD

, R

oo

m 3

05

-P

P. O

. B

ox 9

42

45

Ba

ton

Ro

ug

e, L

A 7

08

04

Ac

ad

ian

a R

eg

ion

al

Air

po

rt

Joyc

ieStewart

DB

E L

iais

on

Off

ice

r

54

00

Op

era

tio

ns R

d,

Mo

nro

e, L

A 7

12

03

Pre

se

nte

d b

y K

utc

hin

s &

Gro

h, L

LC

Page 27: SAMPLE GOAL METHODOLOGY2019... · 2019. 8. 28. · The second project, Runway 422 Blast Pads, - involves engineering, construction, and pavement marking . The estimated value for

Co

nc

lusio

n

Qu

esti

on

s?

Ku

tch

ins &

Gro

h, L

LC

40

0 P

oy

dra

s S

t.

Su

ite

13

80

Ne

w O

rle

an

s, L

A 7

013

0

(50

4)

79

9-4

09

0

k-g

@k

utc

hin

s-g

roh

.co

m

Pre

se

nte

d b

y K

utc

hin

s &

Gro

h, L

LC

Page 28: SAMPLE GOAL METHODOLOGY2019... · 2019. 8. 28. · The second project, Runway 422 Blast Pads, - involves engineering, construction, and pavement marking . The estimated value for

#Ty

pe:

Com

pany

-Org

aniz

atio

n N

ame:

Atte

ndee

:Em

ail A

ddre

ss:

City

:Ty

pe o

f Wor

k:

1M

LUM

onro

e Re

gion

al A

irpor

tRo

n Ph

illip

s Ro

n.Ph

illip

s@ci

.mon

roe.

la.u

sM

onro

eAi

rpor

t

2Re

pLA

Sm

all B

usin

ess D

evel

opm

ent C

tr-M

onro

eCh

ristin

a Da

vis

lsbdc

.ulm

@lsb

dc.o

rg

Mon

roe

Repr

esen

tativ

e

3Ku

tchi

ns &

Gro

h, L

LCG

reg

Gro

hgr

eg@

kutc

hins

-gro

h.co

mN

ew O

rlean

sCo

nsul

tant

4Ku

tchi

ns &

Gro

h, L

LCLi

sa L

awso

nlis

a@ku

tchi

ns-g

roh.

com

New

Orle

ans

Cons

ulta

ntK&

G

Appe

ndix

D

LIST

OF

ATTE

NDE

ES F

OR

MLU

TEL

ECO

NFE

REN

CE O

N 7

-23-

18 a

t 2:0

0 pm

Page 29: SAMPLE GOAL METHODOLOGY2019... · 2019. 8. 28. · The second project, Runway 422 Blast Pads, - involves engineering, construction, and pavement marking . The estimated value for

Appendix E

Monroe Regional Airport (MLU) in Monroe, Louisiana

There were no questions during the July 23, 2018

DBE Teleconference regarding the FYs 2019-2021 DBE Goal.